Loading...
HomeMy WebLinkAboutBack-Up DocumentsCITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO: Emilio T. Gonzalez, Ph.D. DATE: October 15, 2019 FILE: City Manager i l � F ON Annie Perez, CPPD, Director \� SUBJECT: Recommendation for Award of Department of Procurement Riverview Storm Sewer Pump Station, Emergency Generator, CO2 Fire Suppressant System, and Main Switch Disconnect, Project No. M -0127C REFERENCES: Invitation to Bid ("ITB") No. 18- 19-010-R ENCLOSURES: Bid Security List, Contractor's Price Proposal RECOMMENDATION: Based on the findings below, the Department of Procurement ("Procurement") hereby recommends that the referenced Project be awarded to EDFM Corporation ("EDFM"), who has been determined to be the lowest responsive and responsible Bidder for ITB No. 18-19-010-R, Riverview Storm Sewer Pump Station, Emergency Generator, CO2 Fire Suppressant System and Main Switch Disconnect, Project No. M -0127C (the "Project"). BACKGROUND: On May 31, 2019, Procurement issued a solicitation under full and open competition to obtain bids from qualified firms on behalf of the City's Resilience and Public Works (RPW) Department. On July 18, 2019, Procurement received two (2) bids in response to the solicitation (see attached Bid Security List). Pursuant to the solicitation, Bidders were required to have a) a current Certified General Contractor License issued by the State of Florida, or a Miami -Dade County Certificate of Competency as a General Engineering Contractor and b) a minimum of five (5) years' experience under its current business name, in the field of construction and/or repair of municipal, county, state or federal storm water or sewer pump or lift stations, supported by references for three (3) projects completed within the past five (5) years. The submitted reference projects must reflect Bidders' experience in (i) the installation and/or repair of vertical or submersible pumps of at least 10,000-gpm capacity and/or the corresponding mechanical and electrical pump equipment (80 HP motor - minimum); and/or (ii) the installation and/or removal of diesel generators; and/or (iii) the installation of a new CO2 fire suppression system. Submitted referenced projects had to demonstrate that the Bidder (i) served as the Prime Contractor for the referenced project provided; and (ii) self -performed at least twenty-five percent (25%) of the physical labor construction work for the referenced project. The selected Bidder shall be required to self -perform at least twenty-five percent (25%) of the physical labor construction work for the Project. FINDINGS: Procurement staff has completed the review of the bid received from EDFM following the guidelines published in the solicitation and determined that EDFM's bid meets the minimum qualification requirements and is responsive to the ITB. Based on its prior work for the City, Procurement staff has determined that EDFM is a responsible contractor. As reflected on the attached Bid Security List, EDFM is the lowest responsive and responsible Bidder for ITB No.18-19-010-R, and Procurement recommends that the Project be awarded to EDFM. PR19256 Page 2 — Recommendation of Award of Riverview Storm Sewer Pump Station, ITB No. 18-19-010-R Emilio T. Gonzalez, Ph.D., City Manager CONTRACT EXECUTION: Accordingly, Procurement hereby requests authorization to prepare for execution a contract with EDFM. The total Bid amount is $1,412,000.00 for the Scope of Work, plus an Owner's Contingency Allowance in the amount of $141,200.00, for a total contract amount not -to -exceed award value of $1,553,200.00. Your signature below indicates your approval of Procurement's recommendation. r Approved: L ' Date: E i to T.Inzalez, Ph.D., City Manager c: Joseph F. Napoli, Deputy City Manager Nzeribe Ihekwaba, P.E., Ph.D., Assistant City Manager Sandra Bridgeman, Assistant City Manager/Chief Financial Officer Alan M. Dodd, Director, RPW Juvenal Santana, Deputy Director, RPW Christopher R. Bennett, Assistant Director, RPW Fernando V. Ponassi, MA Arch., MA PPA, LEEDOAP, Assistant Director, Procurement 9:41ROMM. CITY Or MIAMI OFFICE Or THE CITY CLERK BID SECURITY LIST BID ITEM: Riverview Storin Sewer Pump Station Bill NUMBER: ITB No. 18-19-010-R DATE BID OPENED: July 18, 2019 BIDDER ED)'M Corporation, General Contractors Intereounty Engineering, Inc, Person TIME: 2:00 p.m. BID TOTAL, AMOUNT $1,412,000.00 $1,845,437.00 BID BOND (ER) CASHIER'S CHECK = 5%=- 5% Today's Received (2 bid(s) o behalf- //Pioctue • en C tVDe •t�,,,-tlPREPARED BYputy Cty Cler ScC . ION 4 BIC FORMS Submix ed= July 2, 2019 City of Miami,. Florida Orrice of the- City Clerk City Hall, 15� Floor 3500 Pan American Drive Miami, Florida 33133.5504. The undersigned; as Bidder, hereby declares that the only persons interested in this bid as principal are named- herein and that no person ather than herein mentioned has any interest in this bid or in the Contract to be entered into; that this bid is made without connection vAth any other person, fun, or parties making a bid; and that:I is, in ali respects, made fairly arid- in good faith without collusion or fraud. The Bidder further declares that it has examined the site of the Work and informed itself fully of all conditions. pertaining to .the place where the Work is to bid done; that: it has examined the Contract Documents and all addendathereto furnished before the opening of the bids as acknowledged below, and, that r< has satisfied itself about the Work to be performed; and the it has submitted the required bid Guaranty; and all other required information with the bid; and that this bid is submitted voluntarily and willingly. The Bidder agrees; if this bid is. accepted, to Contract with the City, a poliliical subdivision of the State of Florida, pursuant to the. terms. and conditions of the: Contract Documents and to furnish all necessary materals, equipment, machinery, tools, apparatus, means of trmisportation, and all tabor necessary to construct and.complete within the time limits, the specified Work covered by the Contract Documents for the Project entitled - Bid No: 18-19-010-R Title. RIVEWVIEW STORM SEVVER PUMP STATION - EMERGENCY GENERATOR, CO2 FIRE SUPPRESSANT SYSTEM AND MAIN SWITCH DISCONNECT - M-01270 The Bidder also agrees to fumish .the required. Performance Bond and Payment Bond or alternative form of security, if permitted by the City, -each for not less than the total bid price plus altemems, if .any, and to furnish the required Ceru-:icate(s) of Insurance,. The undersigned further agrees that the Bid Guaranty accompanying the bid shall be forfeited if Bidder fails to execute said Contract and failsto fumish the required Performance Bond and Payment Bond as well as the required-Certincate(s) of Insurance within fifteen (15) calendar days atter being notified of the award of the Contract. In the 0 gent of arithmetical errors, the Bidder agrees that these errors are errors that may be corrected by- the ythe City. in the event of a discrepancy between the price laid inJiigures and the price bid in words, the price in words shall govern. Bidder agrees that any unit price listed in the bid is to be multiplied by. the stated quantity requirements in order to arrive at the. total. Note_ Bidders are bidding -on estirnated quantities for the purpo$a of determining the lowestresponsive and responsible Bidder. Payments will be made based on unit prices of actual quantities installed. Where a discrepancy exists between the unit price and tare extended price the unit price will prevail. Where there is a discrepancy between the numerical and written bid amount, the written bid amount will prevail. RIVERVIEW STOW SEWER E9 rFB Na. 48 -13 -ora-:? PUMP STATION 11tI-J22ZC Form SU must be submitted with Bidder's Bid. The SU Form can be found posted on the webpage with the bid documents. SCOPE OF WORK: The Work consists of furnishing all materials, labor, services, supplies, goods, and equipment necessary for removing the existing diesel generator and disconnection from pump #3; followed by (i) installation of a new diesel generator with connection to pump 4#2; (ii) installation of a new CO2 fire suppression system; and (iii) installation of an electrical main switch disconnect at the Riverview Pump Station. The Riverview Pump Station is located at 1301 NW 6 Street, Miami, Florida 33125. The Bidder shall self -perform at least twenty five percent (25%) of the physical labor construction work for the Project. The selected Bidder or one of their approved sub -contractors shall provide a crane to lift the heavy generator and equipment. Additive Item 1 is for price comparison only. The City of Miami, in its sole and absolute discretion, shall decide whether to proceed with the work involving Additive Item 1. The full Scope of Work is detailed in the attached Exhibit 1 AT PAGE #103. ITB ihla,: 13-19-010-R - RIVERVIEVII STORM SEtVER PUMP STAT50M - EMERGENCY GEMERATOR, CO2 FIRE Si-PPRESSAIa3T SYSTEM AND MAIN SY11ITCH DISCONNECT. M- n -11 77r. TOTAL. iE-,ASE B'D CONS` F.U4:::' N COST y (Ei.��'.ludinci Additive Item 1`-/Cu 7c,u"7 # _'N TO %,.n... E.+'n...SE C 7-,,';5T:€a., CT1!0.X! C10378 4 -C ,) �R-� AL 01AFc,,i( L 1-0`1 0 sIJ U 4J 0 - (Total Bid Construction Cost (Excluding Additive Item 1) " 0TH: ' ISAD C0NS111-P, r:.IC € I0� v0S T F0I ?c.DDITIV, I T E IIi 1: � G� .3L A i 7 .;; F ;TA,L SI D E~,.E0,a3'eUCTlOi C0S6 FGR?4DZD011T'e E _.1EM1 :: (Total Bid Construction Cost for Additive Itam 1) RIVEi2VIEW STORM SEWER. 70 1 TB No. 18-19-010-R, PUMP STAT1 ION - M -0127C ITB No. 18-19-010-R - RIVERVIEW STORM SEWER PUMP STATION EMERGENCY GENERATOR, CO2 FIRE SUPPRESSANT SYSTEM AND MAIN SWITCH DISCONNECT, M -0127C EXHIBIT 1: REVISE® Price Sheet - Bid Tabulation ITEM # DESCRIPTION Original Quantity UNIT UNIT PRICE TOTAL ITEM COST Furnish all labor, material and equipment for the complete removal of the existing diesel generator, 1 including the generator pad and all pipes, mechanical and electrical fixtures and appurtenances, as described 1 LS L, _j J 0.00 U J in the approved plans and General Conditions. Furnish all labor, material and equipment to install a new concrete generator pad, 30'-2" x 9'-O' x V-6" and 2 provide 10 -mil polyethylene vapor barrier with 1 LS U J r f 0100 minimum 6" wide Z-locl( type lapping Visqueen (or `l approved equal) per Sheet C-4 #6, as described in the approved plans and General Conditions. Furnish all labor, material and equipment for the 3 proposed Electrical Work, as described in the approved 2 LS G c c S0,00 plans and General Conditions. Furnish all labor, material and equipment for the 4 proposed Mechanical Work, as described in the 1 L5 J approved plans and General Conditions. V CJ Furnish all labor, material and equipment in order to install an HVAC system, Including the equipment as specified by the manufacturer's number, which shall 5 include all accessories and controls, as listed in the 1 LS $0.00 catalog as "standard with the equipment" Accessories shall be furnished as specified per HVAC General Notes In Sheet M-1, and as described In the approved^' U 466",-1 plans and General Conditions V (J Furnish all labor, material and equipment for the 6 installation of an Electrical Riser and Grounding Rod 1 LS n $0.00 per approved Sheet EE -2, and as described in the Ui� approved plan and General Conditions. VVV C_7 Furnish all labor, material and equipment necessary for 7 the installation of a CO2 Fire Suppression System, as described in the approved plans and General 1 LS gggppp 00 Conditions. Furnish and install a new generator, including full 8 diesel tank, to handle the capacity to power a 35,000 1 LS corn Fairbanks Niihuis vertical pump. TOTAL BASE BID LEGEND: EA - each I LS -lump sum I SF - square feet I CY -cubic yard I SY - square yard I PCY - per CONSTRUCTION SO -00 contract year COST (Excluding o Additive Item 1) Furnish all labor, material and equipment necessary for 1) removing a 35,000 gpm pump (Pump #3), and 2) Additive purchasing and installing a vertical 35,000 gpm 1 LS $0.00 Item 1 Fairbanks -Morse 36" axial flow, 580 rpm, 2 -stage pumps, for a 400 HP, as described In the approved General Conditions. plans and TOTAL BID CONSTRUCTION $0.00 COST FOR ADDITIVE ITEM 1