Loading...
HomeMy WebLinkAboutPre-LegislationFile Number: 5386 City of Miami Legislation Resolution Enactment Number: R-19-0083 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com Final Action Date:2/28/2019 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING THE CITY MANAGER TO EXECUTE A MEMORANDUM OF AGREEMENT ("AGREEMENT"), IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION FOR THE CITY OF MIAMI TO COLLABORATE IN THE DEVELOPMENT AND COORDINATION OF THE I-395 HERITAGE TRAIL/SIGNATURE BRIDGE UNDERDECK PROJECT, OFFICE OF CAPITAL IMPROVEMENTS PROJECT NO. 40-13193621, LOCATED ALONG I-395/STATE ROAD 836 BETWEEN NORTHWEST 3RD AVENUE AND BISCAYNE BAY, MIAMI, FLORIDA; FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE ANY AND ALL OTHER NECESSARY DOCUMENTS, ALL IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, FOR THE PURPOSES STATED HEREIN. WHEREAS, the Florida Department of Transportation (TDOT") has jurisdictional ownership of 1-395/State Road 836 (1-395") located between Northwest 3rd Avenue and Biscayne Bay, Miami, Florida ("Limits"); and WHEREAS, FDOT will plan, design, and construct the proposed 1-395 Signature Bridge, the community enhancements below 1-395 ("Underdeck Enhancements"), and highway capacity improvements which are intended to improve mobility and safety in the surrounding area ("Signature Bridge Project"); and WHEREAS, the Underdeck Enhancements of the Signature Bridge Project are intended to reconnect multiple City of Miami ("City") neighborhoods, including but not limited to Overtown, Downtown, Edgewater, and Omni; and WHEREAS, FDOT will grant the City non-exclusive jurisdiction pertaining to the Underdeck Enhancements for the purposes of all zoning, planning, permitting, and operation thereof; and WHEREAS, the City will provide FDOT with the conceptual design of the Underdeck Enhancements to be mutually agreed upon by FDOT and the City, including but not limited to the preferred location and placement of certain improvements and utilities; and WHEREAS, FDOT will be responsible for the construction of the Underdeck Enhancements based on said City -provided design; and WHEREAS, FDOT and the City have determined that it would be in the best interest of the public to enter into the attached Memorandum of Agreement ("Agreement") formally establishing a relationship to perform the development services and establish general design, construction, budgetary, management, maintenance, and schedule parameters that will serve as a guide for the development of the Signature Bridge Project; and WHEREAS, the City acknowledges that no properties affected by the Agreement nor the Underdeck Enhancements will be utilized to offset any loss of park land within the City's municipal boundaries; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. The City Manager is authorized' to execute the Agreement, in a form acceptable to the City Attorney, with FDOT for the collaboration in the development and coordination of the 1-395 Underdeck Enhancements within the Signature Bridge Project Limits. Section 3. The City Manager is further authorized' to execute any and all other necessary documents, all in a form acceptable to the City Attorney, for said purpose. Section 4. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.2 APPROVED AS TO FORM AND CORRECTNESS: i ria i : ndez,4AAttor 2/5/2019 ' The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to, those prescribed by applicable City Charter and City Code provisions. 2 If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10) calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding ("MOU) is entered into on the day of , 2019 ("Effective Date"), by and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida ("DEPARTMENT"), and the CITY OF MIAMI, a municipal corporation of the State of Florida ("CITY") (collectively, the DEPARTMENT and the CITY shall be referred to as the "Parties" and individually as "Party"). The Parties intend to collectively pursue the development of community enhancements, located underneath I-395 ("Underdeck"), consistent with the mission and goals of the DEPARTMENT and CITY. with: The Parties intend to collaborate, to plan and design the Underdeck in a manner consistent (a) the Location Map, attached hereto as Exhibit "A" and incorporated herein by reference; (b) the Aesthetic Volume 2: Proposer's Aesthetic Manual, attached hereto as Exhibit "B" and incorporated herein by reference; (c) the Aesthetic Master Plan, attached hereto as Exhibit "C" and incorporated herein by reference; and, (d) the Programming Study and Recommendations, attached hereto as Exhibit "D" and incorporated herein by reference. The aforementioned Exhibits are referred to herein collectively as the "Exhibits". Accordingly, the Parties desire to cooperate in the pursuit of the Underdeck design in a manner that is mutually beneficial to the other in accordance with the terms hereof. RECITALS A. The DEPARTMENT has jurisdiction over I-395 and is undertaking a proj ect which includes the development of a bridge over Biscayne Boulevard ("Signature Bridge"); the Underdeck; and, highway capacity improvements which are intended to improve safety and mobility, as per the aforementioned Exhibits. B. The Parties intend to create an active environment, consistent with the Exhibits. C. The Parties possess a mutual understanding the Underdeck should be planned and designed in a manner that allows for revenue -generating opportunities, in order to fund operations and maintenance of the Underdeck. Page 1 of 9 1 5386 - Exhibit -SUB THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. D. Accordingly, the Parties wish to explore the joint planning and design of the Underdeck over the course of the next twelve (12) months, wherein the CITY will contribute a plan and design, in a manner consistent with the Exhibits, and the DEPARTMENT will review and comment on said plan and design. E. To that end, the Parties desire to execute this MOU to more specifically outline their expectations as to their respective roles and responsibilities regarding exploring the viability of the development of the Underdeck. Ultimately, the Parties would like to enter into subsequent agreements relating to Underdeck, including but not limited to a Development Agreement; the DEPARTMENT's lease of the Underdeck property to the CITY; and, an Underdeck Operations and Maintenance Agreement. The Parties acknowledge a transaction of this type involves terms and conditions which are unforeseen at this point and have not yet been agreed upon. This MOU is not intended to be a complete or definitive statement of all the terms and conditions of any proposed transaction. Instead, this MOU contemplates and is subject to the negotiation and execution of further agreements. NOW, THEREFORE, the Parties agree as follows: 1. General Framework. This MOU is entered into to memorialize the preliminary terms of the transactions and further agreements discussed herein. As discussed in the recitals and throughout the MOU, the provisions and terms in this MOU are preliminary and shall not be construed to limit the consideration of alternative provisions. This MOU is intended to provide a general framework for the Parties' dealings regarding the Underdeck with the goal of reaching agreement on the final design of the Underdeck and of entering into a lease agreement providing for the CITY's lease, maintenance and operations of the Underdeck The Parties shall negotiate, in a timely manner, such superseding and additional agreements as are necessary to carry out the provisions of this MOU. 2. Term and Phases. The term of this MOU is one (1) year from the Effective Date. The term shall be divided into three (3) phases, described below: • Concept Phase: the Concept Phase shall run from the Effective Date until six months thereafter. By way of example, if the Effective Date were January 31, 2019, the Concept Phase would run from January 31, 2019 — July 31, 2019. Page 2 of 9 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. • Review Phase: the Review Phase shall last approximately thirty (30) days and begin immediately after the last day of the Concept Phase. By way of example, if the Concept Phase were to run from January 31, 2019 — July 31, 2019, the Review Phase shall begin on August 1, 2019 and last until approximately August 31, 2019. Notwithstanding the foregoing, the DEPARTMENT, working with the CITY, shall use best efforts to expedite the Review. Any and all applications or requests for approval from FHWA are not subject to this thirty -day review period. The DEPARTMENT will make every effort to expedite such applications or requests to maintain the project timeline. • Deliverable Phase: the Deliverable Phase shall last five (5) months and begin immediately after the last day of the Review Phase. By way of example, if the Review Phase ends on August 31, 2019, the Deliverable Phase would begin on September 1, 2019 and last until January 31, 2020. The Parties understand time is of the essence and, thus, intend to create an Underdeck plan and design with a level of specificity comparable to the plan and design in Exhibit "B" on or before the 365m day after the Effective Date. 3. Proi ect Development Viabilitv. Consistent with the development and design goals and objectives of the Underdeck, described in the Exhibits attached hereto, the CITY agrees to expend the funds necessary to determine the viability of operating and maintaining the Underdeck. Such expenses may include, but is not limited to costs for the following: • Conceptual design • Development programming • Business plan • Cash flow projections • Legal structure and preliminary lease documents 4. Phased Approach. During the Phases, described in Section 2 above, the CITY shall be responsible to work towards an Underdeck plan and design which is consistent with the Exhibits. Therefore, the roles and responsibilities described below are not exhaustive and may be expanded or reduced by written consent of both Parties. Page 3 of 9 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. • Concept Phase: during the Concept Phase, the CITY shall engage third parties to plan and design the Underdeck in a manner that creates an active mixed-use environment, which may include open spaces; green and natural landscaping; educational, artistic and cultural components; lighting and soundscapes; restaurants and cafes; food event areas and festival spaces; and parking that is consistent with the shared goals of the Parties and the Exhibits. The work product the CITY generates, during this phase, shall be conceptual and submitted to the DEPARTMENT not less than once per month. Thereafter, the DEPARTMENT shall provide comments relative to the CITY's submittals. The DEPARTMENT's comments shall be delivered to the CITY no more than ten (10) business days after the CITY's submittal. As the conceptual plan and design evolves, the CITY shall continue to formulate a business plan for the operation and maintenance of the Underdeck. At the end of the Concept Phase, the CITY shall submit a plan and design with a level of specificity comparable to the plan and design provided in Exhibit "B" for DEPARTMENT review. • Review Phase: during the Review Phase, the DEPARTMENT shall review the CITY's submittal for consistency with the Exhibits, the Department's guidelines, standards, specifications, financials, policies and procedures, and the shared goals set forth above. The DEPARTMENT shall provide comments on the CITY's plan and design. • Deliverable Phase: during the Deliverable Phase, the CITY shall address the DEPARTMENT -provided comments and continue to develop the CITY's plan and design in a manner consistent with the Exhibits and the DEPARTMENT's review comments. The plan and design shall be refined to provide greater detail, including but not limited to utility placement, business plan models, and conceptual budgets. The CITY shall submit the refined plan and design, to the DEPARTMENT, for review and comment on a monthly basis. The CITY shall submit a final plan and design no later than the 365th day after the Effective Date. Both Parties shall take part in said reviews, which shall occur on a timely basis, as described above. • Final Review Phase: the Review Phase shall last approximately thirty (30) days and begin immediately after the last day of the Deliverable Phase. Notwithstanding the foregoing, the DEPARTMENT, working with the CITY, shall use best efforts to expedite the Review. During the Review Phase, the DEPARTMENT shall review the Page 4 of 9 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. CITY's submittal for consistency with the Department's guidelines, standards, specifications, financials, policies and procedures, and the shared goals set forth above. Any and all applications or requests for approval from FHWA are not subject to this thirty -day review period. • DEPARTMENT Approval: Upon completion of the Final Review Phase, the DEPARTMENT will make a final determination whether or not to approve the CITY's proposed plan and design, and any or all of the elements contained therein. The DEPARTMENT's final approval of the Underdeck plan and design with elements proposed by the CITY is contingent upon both Parties' executing a lease agreement providing for the CITY's lease of the properties making up the Underdeck; governing the CITY's operations and maintenance obligations; and providing for the CITY's ability to establish zoning criteria for the Underdeck. 5. Termination of MOU. Termination of MOU. Either Party may terminate this MOU, by written notice thereof to the other. The Party requesting the termination must provide written notice with the rationale for withdrawal and allow fifteen (15) days to address any concerns after providing said notice. If any concerns cannot be addressed by the end of the fifteen -day (15) period, then any previously delivered termination notice becomes effective without further notice. 6. Flow of Economic Benefits. The goal and objective of the CITY is to structure the ownership, funding, and operation of the Underdeck in a way that will provide for the collection of revenue sufficient to allow the payment of expenses necessary to operate and maintain the Underdeck. It is the goal and objective of the Parties that the revenue collected, by the CITY, provide operating subsidies and maintenance reserve contributions which shall be used, entirely, in relation to the Underdeck's operation and maintenance. Remaining annual net cash flow, resulting from the operation of the Underdeck, will be received by the CITY to be used for CITY -wide public transportation -related purposes. 7. Roles and Resnonsibilities. (a) DEPARTMENT: The DEPARTMENT shall be fully responsible for the selection, supervision, and, ultimately, for the contractual engagement of the architect, engineers, contractor, and other professional consultants involved in the final design and construction of the Underdeck The DEPARTMENT will lead its team Page 5 of 9 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ("Development Team") through the planning, design, and construction phases of the Underdeck. The DEPARTMENT understands the CITY shall engage its own professional consultants to prepare and submit a proposed conceptual plan and design, as discussed above and, subsequently, collaborate with the DEPARTMENT as described herein. In determining whether to approve the CITY's proposed conceptual plan and design, the DEPARTMENT shall ensure the final design, as discussed in Section 4 above, of the Underdeck meets the DEPARTMENT's design and construction policies, procedures, standards and guidelines financial, scheduling, engineering, and practical requirements, goals and priorities, which shall be communicated to the CITY throughout the Phased Approach discussed above. The DEPARTMENT shall be responsible for the payment of those Development Team members with whom the DEPARTMENT is in privity of contract. The aforementioned, and any DEPARTMENT responsibilities described herein, shall be subject to all applicable DEPARTMENT procurement requirements and/or the availability of funding at the time of need. (b) CITY: The CITY shall be responsible for the selection, supervision, and the contractual engagement of the professional consultants involved in preparing and delivering the CITY's input on the planning and design of the Underdeck enhancements based upon the Exhibits. The CITY's professional consultants shall be referred to, collectively, as the "City Project Team." The City Project Team shall be responsible for preparing a proposed conceptual site plan; developing a business plan; providing input to the DEPARTMENT on the planning and design of the Underdeck The CITY shall be responsible for the payment of those City Project Team members with whom the CITY is in privity of contract. The aforementioned, and any CITY responsibilities described herein, shall be subject to all applicable CITY procurement ordinance requirements and/or the availability of funding at the time of need. 8. Point -of -Contact. In connection with the matters addressed in this MOU, the Design Project Manager, will serve as designated representative and "point person" for the DEPARTMENT and the Development Team. The Director of the Office of Capital Improvements, will serve as the Page 6 of 9 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. designated representative and "point person" for the CITY and the City Proj ect Team. All official communication about material issues related to the development of the Underdeck must flow through the Design Project Manager and the Director of the Office of Capital Improvements, with each of these designated representatives responsible for the further dissemination of information to other members of their respective teams as they deem appropriate. 9. Notices. All notices under this MOU, including contracts, definitive agreements, etc. shall be in writing and shall be deemed duly given (a) when delivered personally or by prepaid overnight courier, with a record of receipt, (b) the third day after mailing if mailed by certified mail, return receipt requested, or (c) the day of transmission, if sent after regular business hours, provided that, in either event, the completed transmission is electronically verified on the day of transmission or the first day thereafter on which receipt can be verified, to the Parties at the following addresses or telecopy numbers (or to such other address or telecopy number as a Party may have specified by notice given to the other Party pursuant to this provision): To the DEPARTMENT: Florida Department of Transportation District Six Attn: District Maintenance Engineer 1000 NW 111 AVE Room 6205-B Miami, Florida 33172 To the CITY: City Manager City of Miami 444 SW 2 AVE 10th Floor Miami, Florida 33130 With copies to: Director Office of Capital Improvements City of Miami 444 SW 2 AVE 8th Floor Miami, Florida 33130 Page 7 of 9 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. City Attorney Office of the City Attorney City of Miami 444 SW 2 AVE 9th Floor Miami, Florida 33130 10. Entire Memorandum. This MOU constitutes the entire agreement between the Parties, and may be amended or modified only in writing, executed by each Party. 11. Due Authorization. The Parties represent and warrant that the signatories below are duly authorized by the Party each represents to enter into this MOU on behalf of said Party, and by their signatures do bind the Party they represent to the terms of this MOU. 12. Controllin4 Law. This MOU is governed by and will be interpreted and enforced under the laws of the State of Florida. Venue for any actions or suits arising from or related to this MOU shall be in the Circuit Courts of Miami -Dade County, Florida. 13. Severabilitv. If any term or provision of this MOU or the application thereof to any Party shall to any extent be invalid or unenforceable, the remainder of this MOU, or the application of such term or provision to the Party other than that as to which it is invalid or unenforceable, shall not be affected thereby. IN WITNESS WHEREOF, the Parties hereto have executed this Agreement on the day of , 2019. ATTEST: By: Todd B. Hannon CITY OF MIAMI, a municipal corporation of the State of Florida By: Dr. Emilio T. Gonzalez City Clerk City Manager Page 8 of 9 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. APPROVED AS TO INSURANCE REQUIREMENTS: By: Ann -Marie Sharpe, Director Risk Management Department APPROVED AS TO FORM AND CORRECTNESS: By: Victoria Mendez City Attorney FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida By: District Six, Secretary Page 9 of 9 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. EXHIBIT A - LOCATION MAP ZONE 2 NW 14th Street v-0 E Q ZONE 3 N � W V Z Z Z m �i > > 2 lJ > Q QV VQ "O N m N Z Z Z Z Z community SR -836/1-395/1-95 Financial Projects Num ber(s): I-395 Reconstruction 251688-1-52-01(F.A.P. 3951-501-1) 1-95 Pavement Reconstruction 429300-2-52-01 (F,A, P, 0951-685-1) -95 SB to SR -836 W B Connector 423126-2-52-01 MDX 423126-1-52-01 Miami Dade Water & Sewer 251688-1-56-02 MDX Work Program Number: 83611 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. maintainability connecting ARCHER WESTERN � DE MOVA r JOINTVENTURE 0 AL's. Miami's Fountain Signature Bridge - Gateway to the Americas. View from (Perez Art Museum Miami (PAMM), looking West. CONNECTING MIAMI The SR -83611.39511.95 project presents a unique opportunity to transform Miami and benefit the community for years to come. This legacy project includes the iconic Signature Bridge over Biscayne Boulevard, community enhancements below 1.395, and highway capacity improvements that improve mobility and safety. For nearly three years, we have been meeting with key stakeholders including Florida Department of Transportation (FDOT), Miami -Dade Expressway Authority (MDX), the City of Miami, Miami -Dade County, the Overtown Community Redevelopment Agency (OCRA), and the Adrienne Arsht Performing Arts Center (AAPAC) to achieve a better understanding of each party's objectives. The Archer Western-deMoya Joint Venture (AW-dMG) Team has approached this project with the goal of delivering a state of the art infrastructure project that connects Miami. Our lead contractors Archer Western Contractors, LLC (AW) and the deMoya Group, Inc. (BMG) are American, family-owned businesses that are trusted to provide world class construction resources for safe and on-time project delivery. In addition to our engineering leads HDR, Inc., RS&H, Inc., and Metric Engineering, Inc., the AW -BMG Team includes urban designers PlusUrbia, Ronald E. Frazier & Associates (Frazier), Neil Hall, AIA (Hall) and Design2Form (D2F). PlusUrbia has key local knowledge, having recently assisted the AAPAC with their vision for the plaza under the bridge. Frazier, Hall, and D2F are local DBEISBE firms that are strongly committed to rejuvenating the Overtown Community. FDOT, MDX, OCRA, AAPAC, and the community can have confidence of unmatched design and construction expertise in the AW -BMG Team. MAJOR OBJECTIVES We have identified four major objectives that resonate throughout this project: Community, Safety, Mobility, and Maintainability. These goals have served as our guiding principles when developing our comprehensive project approach, ATCs, APTEs, and other enhancements. PROPOSAL ORGANIZATION AND CRITERIA We have provided detailed information about our aesthetic approach throughout this proposal, organizing the proposal in accordance with the Evaluation Criteria, while adhering to the RFP requirements. Athorough Design Intent section details our vision and how it was developed, followed by discussion and renderings of the aesthetic Zones. We included a summary of the evaluation criteria and detailed how our team's design meets and exceeds all of the requirements of this project at the conclusion of this document. The renderings and graphics throughout this proposal, and our attached Aesthetics Master Plan (AMP) roll plots, provide our vision of Miami's future that includes the Heritage Trail and the Fountain Signature Bridge. a 4. - :• A A' View of Heritage Trail from North Miami Avenue looking East -Heritage Trail commemorates Miami's history and connects communities The Heritage Trail is a once-in-a-lifetime legacy urban space that embraces Miami's unique diversity. INSPIRATION The Heritage Trail sits at the heart of Miami, at a signature bridge that symbolizes Miami's location as the Center of the Americas. While the 1-395 bridge's fountain -like arches are symbolic of Miami as the place where people from all backgrounds come together, the Trail is the actual place where that diversity meets to walk, exerdse, play, bike, people watch, be entertained, and enjoy an oasis in the center of the international city. Miami has long been a place of rebirth and renewal — a dty pulsing with the energy of dozens of immigrant communities creating a better life for their families among the sun, sand, and sea of the subtropics. It is fitting that the Trail will serve to heal and reconnect communities long divided. The Fountain Signature Bridge design creates 55 acres of urban space that will re -stitch Overtown, Downtown, Omni, and Edgewater to each other. Once physically divided by infrastructure, these communities will now be united and embraced by a Trail that celebrates their unique culture and heritage. CONNECTIVITY Connectivity is a strong element of the Heritage Trail. There is no main entrance or central attraction. Every segment of the more than mile -long community gathering place is a crucial element of this urban amenity. Historic Overtown will be directly connected to Miami's waterfront via the Trail that serves as a spine linking east to west and west to east. More than 90% of the Trail is designed for people. Our design utilizes a bridge instead of the earth plug in Zone 2, allowing the Trail to be truly continuous from west to east, connecting Overtown to Biscayne Boulevard, DESTINATION The Heritage Trail creates a pedestrian destination at the center of things in the heart of the Americas. Sadly, for decades much of the space under the bridge has been gloomy, isolated and neglected. Our design lets the sun shine in and opens the land up to a seamless parade of passive and active attractions. Grand interactive water features, a shaded urban forest, a multipurpose court, dog play area, people watching promenades and a pedestrian bridge are but a fraction of the jewels that will adorn this greenway of the Americas. 1 CULTURE/HERITAGE Miami wouldn't be the growing global destination that it has become without the rich tapestry of ever -evolving cultures that populate its neighborhoods and give it a heartbeat like no place else on earth. African, Latin, Caribbean, and other cultures are celebrated on the Trail. Miami's heritage -- including the Tequesta Native Americans, arrival of Henry Flagler's railway and diaspora of many cultures that create Miami's rich multicultural flavor — will be honored with art, sculpture and design. Each zone has been designed to celebrate its heritage within the context of Miami's legacy. public art. A community garden, farmer's market, amphitheater, fountain square, a multipurpose court and play areas are among the many amenities in the active urban space. THEMES & KEY FEATURES The design team followed a holistic process of research, engagement, design development and refinement, while understanding the different contextual realities a mile -long linear open space is subject to. The design of the Heritage Trail was envisioned at a variety of scales to maintain an overarching identity while respecting the nuances of each zone and providing the experiential and design variety. Design treatments and enhancements were prepared based on a careful evaluation of existing conditions, research into the history of individual communities, institutions and the City of Miami as a whole along the corridor, review of plans and policies, and dialogue with key stakeholders. The resulting understanding of conditions along the corridor and in the CITY CITY l ` CITY CITY CITY CITY Millennium Park was built by Archer Western (Walsh) surrounding neighborhoods provides the foundation upon which the team prepared and refined its designs. The team's plans for improving streetscapes and public spaces along the corridor are guided by the visions and ideas expressed by key stakeholders and by the plans and strategies presented in documents prepared by the City of Miami. Partner agency input was gathered from: the Southeast Overtown-Park West CRA, the OMNI CRA, the Miami Downtown Development Authority (DDA), and the Town Square Community Development Corporation. Direct engagement with community stakeholders helped to confirm and deepen the team's understanding of visions and goals expressed in official planning documents, and provided an important foundation for the design effort. Our design responds to the need for improvements that better connect communities and bridge divides; improve livability, health, and sustainability; and provide safe places for informal and formal gathering. The Trail supports context -sensitive investment along the corridor by focusing attention on the unique qualities of Miami's historic urban neighborhoods. ZONE A ZONE 1 ZONE 2 ZONE 3 � � — +I ��� ' ,tib �'. _ .. ���.. � • ,..:yasi.+�r�. . Aerial Perspective Looking Southeast Sho\Mng Heritage Trail Connecting Overtown \Mth the Omni District 1 qPF t ;z r MIAMI HERITAGE HISTORIC OVERTOWN RAILWAY TEQUESTAS MIAMI TODAY The design overview of each zone is described and illustrated in the following pages. Through the Heritage Trail, we have provided visual consistency between all four zones, while providing features that uniquely define the zones and celebrate Miami's rich heritage. Enhanced landscaping, lighting, and community features are provided throughout, creating an experience like no other. DESIGN ZONE A LEGACY WALL THIS DOCUMENT IS A SUBSTITUTION TO I ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Zone A - Landscape Plan OVERVIEW Aesthetic treatments in Zone A focus on the reestablishment and enhancement of landscape impacted by new structures and related grading. Existing mature landscape material is protected or relocated where possible. New landscape material is planted in patterns and density sufficient to meet FDOT and community objectives for the creation of bold, visually appealing, and distinctive landscapes. We will also use enhanced MSE wall panels with the installation of Legacy Wall inset artwork panels west of NW 3rd Avenue (D.A. Dorsey Blvd) and new landscape plantings along NW 14th Street west of NW 3rd Avenue to soften the effect of the project on schools and institutions south of the interchange such as the Overtown Youth Center. Please refer to the details of Zone Ain the Aesthetic Master Plan (AMP) roll plots, as well as the baseline enhancement table shown on the right. BASELINE REQUIREMENTS & ENHANCEMENTS To meet baseline landscape requirements, a preliminary landscape relocation strategy has been developed with the objective of saving and relocating as many existing trees as possible. Working closely with the District's Landscape Architect, new locations for impacted trees vwll be identified for relocation and trees are replaced in-kind when relocation is not possible. We will maintain and build on bold landscape design objectives and the visual unity of the interchange. Archer Western -de Moya Joint Venture SR -836/1-395/1-95 Steel Finish AM P A-5 Superstructure AM P A-5 Piers AM P A-5 Match existing columns Concrete Finish FED -STD -595, table VIII, shade No. AMP A-5 36622 per 975 Landscape Relocate impacted trees AMPA-2 Mitigate where necessary Additional APTE's without a Baseline Requirement: 16, 61, 64, 78, 99 Total Aggregate Approved APTE's = 5 Please see AMP Roll Plot Sheet A-2 and A-5 for depictions and locations of APTEs, and how baseline requirements are met and significantly exceeded Page 5 OTHER ENHANCEMENTS Aesthetic enhancements above baseline requirements are described below: Enhanced MSE wall panels (APTE 78) are used on the MSE walls west of NW 3rd Avenue to match enhanced treatments on the walls in Zones 2 and 3. The enhanced panels have a relief depth of 3" to maximize visual intrigue and deter graffiti and vandalism Patterns are intended to give more flexibility in placement to achieve organic shapes and shadows. Legacy Wall panels (APTE 99) are located on the MSE walls west of NW 3rd Avenue to mark the western end of the Heritage Trail. The legacy wall panels are attached to the MSE wall and designed in 5'x 5' modules surrounded by MSE panels with custom rustications The design includes culturally significant panels around the edges and a 3" recessed space in the middle for graphic patterns in ceramic tile. White LED lighting is provided to illuminate the vertical surfaces of each of the major abutment walls within the zone. These serve to highlight the verticality of these surfaces and provide additional visual interest. cannect•ng�,� LANDSCAPE ENHANCEMENTS The following enhancements above baseline requirements are incorporated in the project design: • Vertical clearance was increased from 19' in the FDOT Baseline Concept to 63' with our design. High Performance Coating System Additional landscape material, planted to meet bold landscape design objectives, are located within the Interchange in Zone A in space created by the realignment of the roadway. Match existing color Enhanced landscape plantings are established along the north side of NW 14th Street. This area will be dense with native and Florida friendly trees, shrubs and ground covers to create a visual buffer to the Match existing girders adjacent Youth Center. Match existing columns Concrete Finish FED -STD -595, table VIII, shade No. AMP A-5 36622 per 975 Landscape Relocate impacted trees AMPA-2 Mitigate where necessary Additional APTE's without a Baseline Requirement: 16, 61, 64, 78, 99 Total Aggregate Approved APTE's = 5 Please see AMP Roll Plot Sheet A-2 and A-5 for depictions and locations of APTEs, and how baseline requirements are met and significantly exceeded Page 5 OTHER ENHANCEMENTS Aesthetic enhancements above baseline requirements are described below: Enhanced MSE wall panels (APTE 78) are used on the MSE walls west of NW 3rd Avenue to match enhanced treatments on the walls in Zones 2 and 3. The enhanced panels have a relief depth of 3" to maximize visual intrigue and deter graffiti and vandalism Patterns are intended to give more flexibility in placement to achieve organic shapes and shadows. Legacy Wall panels (APTE 99) are located on the MSE walls west of NW 3rd Avenue to mark the western end of the Heritage Trail. The legacy wall panels are attached to the MSE wall and designed in 5'x 5' modules surrounded by MSE panels with custom rustications The design includes culturally significant panels around the edges and a 3" recessed space in the middle for graphic patterns in ceramic tile. White LED lighting is provided to illuminate the vertical surfaces of each of the major abutment walls within the zone. These serve to highlight the verticality of these surfaces and provide additional visual interest. cannect•ng�,� DESIGN ZONE 1 A COMMUNITY ACTIVITY ENHANCEMENTS F,DOT - THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. OVERVIEW Improvements in Zone 1 incorporate West African cultural symbolism to tell the unique story of Overtown's endurance, achievement, historical significance and cultural heritage Our improvements in Overtown are designed to advance community goals for the future. A persistent force in the City's evolution, Overtown was founded in 1896 by African American pioneers and Black workers on Henry Flagler's Florida East Coast Railway. Overtown residents built a proud community with a booming economy and a vibrant social life. To spark renewal, the protect introduces new activities and design influences from West Africa and across the Caribbean and the Americas. Kente Cloth colors and Adinkra symbols from West Africa are used to tell stories of Overtown's endurance and achievement. The Heritage Trail, an interactive fountain, plazas, play spaces, and public art bring community history to life. Throughout, African heritage is expressed in bold colors, sculptural art forms, and graphic symbols and patterning. Please refer to the details of Zone 1 in the AMP roll plots, as well as the baseline enhancement table beginning on page 29. VIEW OF 1-395 EASTBOUND FROM THE INTERSECTION OF NW 14TH STREET & NW 3RD AVENUE LOOKING EAST. Lowvertical clearance results in constrained areas underneath expressway. i D.A. DORSEY URBAN MARKET PLAZA The D.A. Dorsey Urban Market Plaza is a large public space designed for use for food and craft markets, music performances, and a gathering space for community events and activities. The space takes advantage of the openness and daylight access achieved through raising the height of the mainline. FOUNTAIN SQUARE Fountain Square is the centerpiece of the most active stretch of the Heritage Trail in Overtown. This area includes an interactive water feature, a ceremonial area featuring public art and sculpture, and an amphitheater for day and nighttime entertainment. ACTIVITY SPACES Activity areas along the Heritage Trail include a multipurpose court, adult exercise area and small children's play area; the passive recreation area with historic display walls; and the community garden for growing fresh produce. Archer Western -de Moya Joint Venture con[u[tling �...♦ SR -836/1-395/1-95 Page 6,! DESIGN ZONE 1 ": 43 0�111111111111 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. TU IN�DRY Our design goal for Zone 1 was to increase the vertical clearance of the highway, reduce the number of columns and provide illumination revitalizing Overtown. The combination of these goals has led to an extraordinary level of openness that significantly exceeds the FDOT Baseline concept Our lighting design was developed to ensure that we minimize the potential for light pollution to adjacent neighbors. Archer Western -de Moya Joint Venture SR -836/1-395/1-95 r View 1.5 - Heritage Trail with Enhanced Pavement - Night BLACK ARCHIVES IS IN SUPPORT OF THE HERITAGE TRAIL "...The Black Archives History and Research Foundation of South Florida is fully supportive of the Heritage Trail design concepts as presented to us. In fact, the concept fits in well and is compatible to our Folk Life Village Project. Should the AW-dMG team be awarded a design - build contract for this project, we will commit to working with the AW-dMG team..." „t is connecting Page 7 Miami DESIGN ZONE 2 CONNECTING MIAMI West East _ P V -._. A& ALA OVERVIEW The Heritage Trail in Zone 2 becomes the key link that unifies the entire project into a single experience stitching together the Overtown and Omni Districts. The Heritage Trail in Zone 2 honors both Henry Flagler and Julia Tuttle, as the mother of Miami, by convincing Flagler to extend his railroad South and consequently lay the foundation for the incorporation of Miami. The Trail in this Zone plays off these themes, and provides east -west continuity through three transformative improvements that result in a seamless connection between historically divided and segregated communities: 1. Bridging the earth plug to allowfor a direct connection between the east -west sections of the Heritage Trail 2. Crossing the railroad corridor with a pedestrian bridge 3. Moving off-street parking (as shown in the RFP) from the center of the corridor to the perimeter Please refer to the details of Zone 2 in the AMP roll plots, as well as the baseline enhancement table beginning on page 29. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. -_.. NW 13TI1 ' FDOTRAMP _\• BASELINE CONCEPT - RAMP Ac ESS _ _ ■ ■ ■ MAIN LINE FILL \. �- - RAMP raw - - - _ - RAMP I 21 Zone 2 - Urban Design Plan .,UIvIMUNITY ACTIVITY ENHANCEMENTS Archer Western -de Moya Joint Venture SR -836/1-395/1-95 CARIBBEAN HERITAGE PLAZA The eastern block in Zone 2 is designed as a collection of intimate spaces that provide relief from activity along the Trail. The main features are the symbolic Caribbean Islands at either side of the Trail's spine. These spaces, recaptured from the space where parking was proposed, provides 3-dimensional elements that serves as resting slopes and create unique vantage points. Page 8 PEDESTRIAN BRIDGE The pedestrian bridge crossing of the railroad tracks allows for direct, uninterrupted east -west travel for walkers, joggers, and cyclists. The bridge is designed with extended, gradually sloping ramps to allow for open lines of sight. Aesthetic lighting in addition to Trail lighting, promotes safe use and comfort. canna�n Zone 2 Lighting Plan View 2.7 - Heritage Trail Pedestrian Crossing with in Roadway Warning Lights w- View 2.4 -Relocated Parking with Heritage Trail in Background 2.2 2.5 ! ti. 2.4 View 2.5 -Heritage Trail with Aesthetic Lighting Enhancements Ali F�, � 7', IL DESIGN ZONE 3 z � RE 13'1H 7 � 411 H ST ire WOO r � M1� OVERVIEW The origin of the Heritage Trail begins in Zone 3, home to the Signature Bridge Zone 3 design takes into consideration the influence of the Tequesta Indians, and Miami's thriving entertainment district, including theAAPAC, the PAMM and the Frost Science Museum. Zone 3 serves as an integral part of the Trail incorporating the Fountain Bridge's main structural support, as well as the longest column -free space of the whole project. Zone 3 provides broad expanses of uninterrupted plaza to accommodate special events and activities. Paving patterns, bench forms, and design details are inspired by the paving along Biscayne Boulevard created by legendary Brazilian landscape architect Roberto Burle Marx. Translated through different iterations along the Trail, they provide additional design features and continuity. Overlaid circular bands symbolic of the native Tequestas extend as ripples from theAAPAC Thompson Square center outward. Please refer to the details of Zone 3 in the AMP roll plots as well as the baseline enhancement table beginning on page 29 Archer Western -de Moya Joint Venture SR -836/1-395/1-95 1 Page 10 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. FDOT BASELINE CONCEPT COMMUNITY ACTIVITY ENHANCEMENTS TEQUESTA PLAZA & FOUNTAIN The Heritage Trail's ribbon culminates in a circular, interactive water feature that mimics the shape of the Signature Bridge's arcs. The fountain is intended to attract families during the day and is able to be turned off at night. Large concrete globes occupy a casual space that promotes outdoor wandering through historic references and colorful structures. The design of this block allows for future use of the space in coordination with the design of adjacent ground floor development NATIVE LANDSCAPE MULTI-PURPOSE PLAZA The north portion of the eastern block serves as an extended foyer for the AAPAC. This space, designed with planters and canopy trees, will be used as a gathering space as well as a space for valet parking for evening events. The public plaza will triple the capacity for outdoor events while providing a grand approach to the building. PLAZA SPACE The Trail provides a respite from the urban core. This subset of the block will become downtown's conservatory of native species to further support and define the original Tequesta environment. eonnrct�ng —�� Zone 3 Lighting Plan -i View 3.7 - Multipurpose Plaza with Mural in Background - Night :Wlview3.4 . 3.9 77-1 0 do 3.6 _lA, 1 j —, -MultipurposePlaza View3.8- Enhanced Landscaping 3.3 if f I r'A 3.6 �I R J ✓ [ L Aft - .9 - Daytime Viewof f►fit^.9-DaytimeViewof Pedestrian Path East of View 3.9 -Nighttime View of Pedestrian Path East _ Biscayne Boulevard of Biscayne Boulevard �`• s • �• � ," u � i ' .",�—, " � 1 `-�'- %: pit `� r 1•F t � 1 fill,� r ANN 7M o�- s Ad The Signature Bridge's "fountain" design symbolizes both the connection between Miami and the world, and Miami's connection to the water - from the Tequesta Indians to Miami's beaches, cruises, nightlife, culture and commerce- Ground Level Viewfrom NW 13th Street looking Southwest The Fountain concept was inspired by Miami's status as the center of the Americas. Miami's growth as a gateway city has been influenced by various regions of the United States, the Caribbean, as well as Central and South America. In 1930, Pan American Airways established Miami as its worldwide headquarters. Its terminal at what is now City Hall opened up the potential of Miami's waterfront to all of the Americas. The Fountain's design symbolizes these influences similar to an "airline map" depicting the curved travel paths to and from Miami The Fountain pays tribute to Miami's connection to the water that began several thousand years ago with the Tequesta Indians and continues to this day with the tens of millions of visitors that make Miami their destination for the sun, beach, cruises, nightlife, culture and commerce. The bridge is designed using contextual metaphors drawn from the region's tropical and urban environments. The design converts underutilized land beneath it into the focal point of civic life for all of Miami, destined to become the heart of the City for generations to come. The concept of an abstract fountain and its arching forms is symbolic of the area's culture as people from across the Americas come together as one. The connections created both in form and function with this structure will facilitate the full integration of neighbors from all directions, meeting in the central plaza. The physical and psychological barriers dividing the surrounding environment are torn down and replaced with a symbol of unification. The Fountain concept's height and scale create a destination that transitions the high rises to the south with the AAPAC to the north. The AW-dMG Team obtained approval for two signature bridge options: the Fountain cable -supported arch bridge and Unity, a tower -supported cable -stay bridge. When we placed the 450 -ft tall cable stay bridge in our model, it was blocked by high-rise buildings from many views. The slender tower tended to blend in with the high rises. Due to their more two-dimensional appearance, cable -stayed bridges are better suited for water crossings where more expansive views are available. We also analyzed the evaluation criteria for the Signature span and determined that the Fountain design best met those criteria, and Miami's desire for an iconic bridge, much better than the cable -stayed option. i DYNAMIC 3D CABLE ARRANGEMENT Through the use of six arches of varying lengths and heights, the cables produce a true three-dimensional effect that changes in view as drivers move through the structure and as pedestrians migrate through the open spaces. The views dramatically change and are very dynamic from multiple vantage points. Our lighting design emphasizes the cables throughout, with color -changing, programmable LED lights that can produce virtually any desired pattern on the cables. The multiple arches accomplish this intent of the Signature Bridge much more than a tower founded cable -stay, which is one of the reasons our team selected the Fountain. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Archer Western -de Moya Joint Venture connecting SR -836/1-395/1-95 Page 13 Miami VARYING APPEARANCE FROM DRIVER PERSPECTIVE The Fountain Signature Bridge was designed and selected specifically to provide an appearance that varies as drivers move through the structure and also offers different appearances as viewed from different locations. The different lengths and heights of the arches result in a continually changing view, which will provide a pleasing experience These different views are best seen in the Fountain renderings on this page Additionally, our ATC 12C greatly improves the traffic flowon 1-395 WB, so the drivers will be moving at a normal speed through the Fountain instead of being consistently backed up in traffic LU O fy LL LU O fy LL THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. r— Archer Western -de Moya Joint Venture con nr[hg�1'-' SR -836/1-395/1-95 Page 14 -„4=11114MI AESTHETIC TREATMENTS EVALUATION CRITERIA- SIGNATURE SPAN , " - 4-o %-'N' Night time ground level viewfrom NE 13th Street looking Southwest A Viewfrom the Miami River looking— View from the Community Garden East towards Downtown looking East SIGNIFIGAN ENHANCEMENT • Iconic one of a kind ground level roadway and aerial views provide a view of the Fountain's unique architectural design • Varying arch heights, varying lengths, and angles provide dramatically different views from different angles • Bridge width, when viewed as part of the skyline is more than 700 feet wide diagonally. While the view from the roadway parallel to the bridge is only 200 feet Viewlooking Northeast of Repositioned Parking with Heritage Trail in background F* mq—r T e !!� �'�` t! f f l! 4k 11� f f7 I1 laf f4� 1 ! r OM _, 1 TIT NN17 ff ®r— c zrr _..Wil :: ►I Y1� " �.. & L_ 1.l View of Fountain Bridge from the AAPAC looking South _ Viewlooking Northeast of Repositioned Parking with Heritage Trail in background F* TWO SUPERSTRUCTURES, COMBINED TO MAKE VISUALLY UNIFYING STRUCTURE Our design provides for two superstructures, one EB and one WB, that combine into a single structure in visual appearance. The central pedestal of the Fountain and the arches that spring from this structure combine the bridge into a unified sculpture -like structure The pedestal vu ll also be visually appealing below the area used by motorists, decorated with art that represents the Heritage Trail and the history of Miami Our design takes advantage of this separation for Maintenance of Traffic, as the WB direction wll be constructed first, maintaining traffic on existing 1-395 infrastructure We wll then immediately continue with the EB component, allow ng Miami to enjoy the Fountain as quickly as possible. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Archer Western -de Moya Joint Venture connect1114 , --1 SR -836/1-395/1-95 Page 16 - Mi4TV11t FEATURE BRIDGE LIGHTING The lighting design of the arches and cables for the Fountain Bridge provides an unparalleled canvas to display unique and powerful sights at night. The sheer number and volume of the arches, combined with the cable supports, all of which can be uniformly lit and lit in harmony to provide impressive and relevant themes. During the Aesthetics Review Committee presentation, we shared an animation demonstrating howthe lighting can be animated. The LED lights have a long life and color -changing ability. Additionally, because each light can be programmed to display a different color and intensity, there is virtually no lighting theme that cannot be displayed on the Fountain. Just a few examples of the lighting capabilities are shown below. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Archer Western -de Moya Joint Venture connecting�,� SR -836/1-395/1-95 Page 17 miiaml ADHERING TO AND EXCEEDING REQUIREMENTS The AW-dMG Team has gone above and beyond the aesthetic requirements of the Contract Documents through the design and selection of the Fountain. Our bridge is 375' longer than the minimum requirements, and 40% taller. Most importantly, the Fountain has a significant footprint vuth the six arches that can be seen from all angles. The Fountain spans an area of six acres, extending its positive visual impact along the corridor. The RFP required the Signature Bridge to meet minimum length and height requirements. The Fountain exceeds the length requirement by 58% and height requirement by 85 feet, providing iconic status of this bridge that will be enjoyed by Miami and the world for years to come. In order to improve maintainability and quality, the Fountain arches will be precast concrete segments. When completed, our bridge will be the largest concrete segmental arch bridge in the United States, and the second-largest concrete arch. The current longest segmental arch, the Natchez Trace bridge, was designed by team member John Corven more than 25 years ago, and remains virtually maintenance free to this day. The longest concrete arch bridge, at Hoover Dam, was also designed by our lead design firm HDR jointly with TY Lin. _-- �ltil I�dir ITHIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Pr000sed:Elevation '- 330 ft RFP Elet+atlon 5 ft Proposed Length - 1025 ft I L RFP Elevation Requirement - 650 ft z Archer Western -de Moya Joint Venture cnnnr[hn—g -...♦, SR -836/1-395/1-95 Page 18 --= IM 10 M, I THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. VISUAL CONSISTENCY AMONG PIERS All Approach Spans, Main Line, Connector Line, and Ramp piers have the same transverse form. The Signature Bridge transition pier cap does not extend below the bottom of the superstructure elevation. The Signature Bridge transition pier columns do not extend belowthe bottom of the superstructure elevation, and are of the same form as the piers. All Approach Structures have smooth superstructure transitions at ends of all frames except at straddle piers, bridge girders are closed box systems, all spans are constant depth except as allowed in the concept plans, in Zones 1 and 2, there are no horizontal offsets of the fascia web of the exterior box, except at straddle piers, and in Zone 3 smooth transitions are maintained between the Approach Structure superstructure and the superstructure of the Signature Bridge with no horizontal off -sets or vertical steps in web slopes. r r Type 1 Type 2 Type 3 Pier shapes for bridges in Zones 1, 2, and 3 match the requirements of the RFP with two main pier types are used; one for the single box girder configuration (Connector Lines and Ramps) with a base width of 12' and the other used under the twin box girder arrangement of the Main Line is 8' wide at the base. Both pier types use similar, matching pier designs, tailored to match their width. Pier design is characterized by a parabolic arch that occurs on each transverse elevation and are individually monolithic and feature tapering heads that are inclined at the same angles as the web of the box for visual continuity between the two and Main Line and Connector Line piers are designed with deep relief for shadows and visual interest. The pier head vu dths in Zones 1 and 2 match the box girder soffit width Drainage pipes are routed within the concrete bridge elements (e.g. piers, segments, and segmental box wings) and hidden from view. TYPE 1 TYPE 2 MINIMIZES PIER LOCATIONS Our design minimizes pier locations as shown in the table below. We provide E -W connectivity through Zone 2 by removal of the earth plug. Overall Comparison of Spans and Columns RFP Proposed Num • • • . Numberof • MM TYPE 3 Archer Western -de Moya Joint Venture cnnrR[�ng SR -836/1-395/1-95 Page 19 ,�� 1 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. VISUAL CONSISTENCY OF STRUCTURE THROUGHOUT THE TOTAL PROJECT Our design provides visual consistency of structures throughout the aesthetic corridor of 1-395 We have significantly exceeded this requirement by adjusting the span arrangement through approved ATC 4, which provides for the use of consistent depth box girders throughout the project. By eliminating the haunched beams, the bridges not only look sleeker and streamlined, but they provide more vertical clearance and open space, as shown below. We have also extended the segmental bridges an additional span to the west so that the transition is beyond the Heritage Trail, and the Overfown Community. We have designed the span between the Signature Bridge and the segmental bridge to be over a full span that will be cast in place, providing a seamless, smooth transition. Archer Western -de Moya Joint Venture connecting SR-836/1-395/1-95 Page 20 Miami THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ADHERING TO AND EXCEEDING REQUIREMENTS As shown in full detail on the AMP roll plots and renderings, our design significantly exceeds the requirements to provide visual consistency and open space throughout the project. By removing the earth plug and moving the parking to the outer borders of Zone 2, we provide E -W continuity of the entire Heritage Trail. The draft Aesthetics Manual indicated that Zone 2 was not designed for pedestrians, as there were no pedestrian destinations nearby. The AW-dMG design creates numerous pedestrian destinations and by constructing abridge in place of the earth plug, we are providing "one" unified project truly reconnecting communities The design of the piers and superstructure in Zone 1 result in a significant improvement over current conditions With superstructure clearance of up to 63' at NW 3rd Avenue for the center spans, the quality of the space below the superstructure is vastly improved over existing conditions and those represented in the RFP Aesthetics Manual. The additional height and openings will allowfor more vigorous plant growth at the edges of the span, brighter spaces along the trail during daylight hours, and less reflected noise from local traffic Details of wall patterns, concrete finishes, and steel finish are provided in the AMP roll plot. Archer Western -de Moya Joint Venture cannecl�r�g-�' SR -836/1-395/1-95 Page 21 y.""imIllaml VISUAL CONSISTENCY BETWEEN ALL FOUR ZONF'; The Heritage Trail, unique to the AW-dMG Team, is the epitome of visual consistency between all four zones. The Heritage Trail begins with the Legacy Wallin Zone A and continues to celebrate the history and heritage of Miami through Zones land 2, culminating in Zone 3. The Trail's ribbon extends throughout, stitching the community together that has been divided for so many years Similarly, native landscaping as well as wayfinding and educational signs along the Trail will provide a true sense of place and consistency even as the Trail changes along its length to tell the story of Miami. The piers are consistent in shape throughout the Trail, with inset murals that emphasize the heritage celebrated in each Zone. The Trail's mural wall provided in Zone 2 (shown below) adjacent to our proposed shared use bridge crossing will be a focal point and an area of interest that will lure visitors to continue exploring along both sides of the FEC tracks, providing a connected corridor from end to end. Heritage Trail provides consistency between all Zones, as illustrated in the Aesthetics Master Plan roll plots and the renderings below. Zone 1 - Heritage Trail Fountain Square -View from NW 19th Street looking South THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. L7 Archer Western -de Moya Joint Venture ianneclie- SR-836/1-395/1-95 Page 22 v yw MIMI LANDSCAPING Our landscaping design is in accordance with the RFP requirements and significantly exceeds the requirements through approvedAPTEs 14, 34, and 49 as shown in the Aesthetics Master Plan roll plots Approved ATC 12C significantly raises the required clearance over the Trail by as much as 44 feet in Overtown, truly letting the sun shine in and allowing for enhanced landscaping that will provide much needed green space in downtown. • Zone 1: Enhanced Landscape (APTE 14) — Native and naturalized Florida friendly plant material — Irrigation for areas under the structure — Canopy trees, small trees, triple palms, large shrubs, small shrubs, and ground cover Zone 2: Enhanced landscape (APTE 34) — Native and naturalized Florida friendly plant material — Irrigation for areas under the structure — Canopy trees, small trees, triple palms, large shrubs, small shrubs, and ground cover. — 12,615 SF of gravel cover, 32,655 SF of short synthetic turf, and 11,245 SF of long synthetic turf Zone 3: Enhanced low -maintenance landscaping (APTE 49) — Tropical Rockwood Hammock forest — Irrigation for areas under the structure — Canopy tree, small tree, triple palm, large shrub, small shrub, ground cover, and sod. Landscape lighting (APTE 81) provided for all Zones THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Archer Western -de Moya Joint Venture connecting SR -836/1-395/1-95 Page 23 Miami COMPLETE STREETS AND TRAFFIC CALMING We have truly taken the desire for Complete Streets and traffic calming features to heart The Heritage Trail is unmatched in the promotion of enjoyment by pedestrians, bicyclists, and drivers alike. All crosswalks will be high - visibility, some of them raised as approved by the City of Miami, to provide safe places for pedestrians and cyclists to cross the streets that pass through the Trail. The shared use bridge over the railway continues the Trail and provides unique views to users. In Zone 2, we have moved the parking to the outsides of the Trail where it belongs, to maintain continuity of design and separate vehicles from pedestrians. ENHANCEMENTS ACROSS ALL ZONES Traffic calming measures — Raised sidewalks provide safer pedestrian crossings — Slower vehicular travel speeds — Highly visible pedestrian crossings — Continuity along the Trail LED enhanced pedestrian crossings (APTE 102) Bollards (APTE 58) and planters designate crossings and separate pedestrians and vehicles Pavement lighting for Heritage Trail (APTE 2) ZONE 1 Traffic calming measures (APTE 6) along NW 14th Street and adjacent streets "Shared street" enhancements for NW 14th Street and NW 1st Court improve east -west connections and expand the footprint for the Market Square ITHIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ZONE 2 Traffic calming measures (APTE 31) along N Miami Avenue and NE 1st Avenue Parking spaces moved from interior to exterior (APTE 28), provides continuity of Heritage Trail and separates pedestrians from vehicles. Open space increased by 250%, as shown below Shared use bridge crossing the FEC Railroad provides direct east -west access for walkers, joggers, and cyclists. ZONES PEDESTRIAN Traffic calming measures (APTE 41) along NE 2nd Avenue SAFETY FDOT BASELINE • • Focus Area ■ Open Space =1.8 AC WOO PROPOSED Focus Area 0 Open Space = 5 AC �� Archer Western -de Moya Joint Venture connectinki SR -836/1-395/1-95 Page 24 Miami THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ENHANCING COMMUNITY ACTIVITIES The incomparable 55 -acre Heritage Trail enhances community activities like nowhere else in Miami. The Trail provides a destination and gathering place with plazas, an amphitheater, community garden, dog play area, children's play areas, and interactive fountains at each end that reflect the Fountain Signature Bridge The Trail wit serve to revitalize Miami from Biscayne Boulevard to the Midtown Interchange, providing a true reconnection both east to west and north to south. These enhancements were approved as APTEs and can be seen in the Aesthetic Master Plan roll plots. Zone 1 - Multipurpose court (APTE 19), bicycle racks (APTE 62) outdoor training equipment (APTE 71) north of the Trail east of NW 1 st Court Zone 1 - Interactive water feature (APTE 11), and passive recreation area (APTE 70) Zone 1 - Community Garden (APTE 13) south of NW 13th Street Zone 2 - Caribbean Heritage Plaza with enhanced pavement (APTE 27) and Shared Use Bridge Zone 1 - Children's play area (APTE 21), talking/viewing tubes (APTE 73), and musical playground (APTE 74) between NW 1 st Place and NW 1st Court Zone 1 - Amphitheater (APTE 10) between NW 2nd Avenue and NW 1st Place Zone 2 - Sculptures and public art (APTE 33) Zone 3 - Dog Park (APTE 45) and native landscaping (APTE 49) �d Zone 3 - Tequesta Plaza & Fountain (APTE 40) Zone 3 - Multi-purpose Plaza and valet parking area (APTE 37) Zone 3 - Plaza Space with cast stone spheres (APTE 43) Archer Western -de Moya Joint Venture conn&M_94�...♦, SR -836/1-395/1-95 Page 25 1 ADHERING TO AND EXCEEDING REQUIREMENTS The Heritage Trail is the ultimate representation of exceeding the baseline streetscape requirements. This comprehensive approach provides visual consistency between all four Zones, while treating each space as unique, provides enhanced landscaping, promotes complete streets and traffic calming to encourage pedestrian activity and provides outstanding community activities that far exceed the baseline. Unique to our team, the Heritage Trail will provide aesthetic and community enhancements that will be enjoyed for generations while telling the story of Miami's history. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Archer Western -de Moya Joint Venture canned�r�g-~'*� SR -836/1-395/1-95 Page 26 MIdMI ^""'''�L LIGHTING AT CROSS STREETS As shown on the AMP roll plots, we have provided portal lighting at all cross street locations that meet and exceed baseline requirements. Our extensive lighting plan brightens the Heritage Trail and turns night into day, making it safer for all visitors. PORTAL LIGHTING ENHANCEMENTS In -ground pavement lighting along the Heritage Trail (APTE 2) reinforces east -west connections Provides visual continuity Enhances safety and comfort Zone 1: Additional period street lamps (APTE 68) along NW 14th Street to match existing double - headed pedestrian street lamps Zone 3: Replace the existing street lighting with a pole and luminaire (APTE 77) to match those found near the AAPAC. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Archer Western -de Moya Joint Venture connecting SR -836/1-395/1-95 Page 27 Milliplinq ENHANCING DESIGN FEATURES We will provide lighting that enhances the design features of each zone. Throughout the Heritage Trail, we have designed lighting to highlight artwork on piers, landscaping, the interactive fountains, the amphitheater, and artwork throughout. ZONE 1 In -ground pavement lighting along the Heritage Trail (APTE 2) Interactive water feature lighting (APTE 82), with controls tied into the water feature programming Lighting for the amphitheater (APTE 83) Landscape lighting (APTE 81) Lighting for public art (APTE 84). ZONE 2 Decorative catenary, luminaries suspended from taut horizontal cables. Landscape lighting (APTE 81) Lighting for public art (APTE 84) WlkiI:F Color changing LED lighting on the signature bridge base's vertical surfaces (APTE 97) Lighting for the underside of concrete benches (APTE 94) Pole -mounted luminaries illuminate the parking lots (APTE 89) LED Lighting for the interactive water feature (APTE 93) with controls tied into the programming Multi -headed poles to illuminate the plaza (APTE 92) Landscape lighting (APTE 81) Lighting for public art (APTE 84) THIS DOCUMENT IS A SUBSTITUTION TO I ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ADHERING TO AND ENHANCING THE AESTHETIC REQUIREMENTS The AW-dMG design far exceeds the lighting requirements set by the Contract Documents. We have committed over $20M to LED lighting solutions that will turn night into day, making the Heritage Trail enjoyable into the evening hours. With the AAPAC and other arts institutes nearby, lighting is imperative as visitors will attend the many nighttime events and be able to enjoy the Trail before and after those events. Our detailed lighting plan, shown on the AMP roll plots, illustrates how our lighting design significantly exceeds the baseline requirements Archer Western -de Moya Joint Venture ttanne[ting� SR -836/1-395/1-95 Page 28 Miami ALL ZONES EXCEEDING MINIMUM AESTHETIC BASELINE REQUIREMENTS - ALL ZONES The following table demonstrates how our design meets the baseline requirements and also describes our APTEs that exceed the baseline. Each of our 55 approved APTEs are shown in the Aesthetic Master Plan roll plots. The APTEs provide aesthetic and community enhancements that will develop the Heritage Trail as a place to meet, enjoy Miami, and learn of our great City's rich history. 1 Pavement Lighting along Heritage Trail 750 Fixtures 64 Wayfinding Signage 8 Signs 78 MSE Wall Pattern 55,350 SF 80 Murals on Piers 16 Locations 81 Lighting for Planters 60 Round ingrade uplights �� Lighting for Sculptures/Public Art 54 Round ingrade uplights 128 LF LED wall washers �99) Legacy Wall Panels 3,650 SF 5 Locations 1� LED Lighting at Heritage Trail Crossings 8 Locations 8 APTE's Included in all zones kLi 1 i THIS DOCUMENT IS A SUBSTITUTION TO I ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. `. t 11111 4 Archer Western -de Moya Joint Venture connechr�g-~'*� SR -836/1-395/1-95 Page 29 ," ��� EXCEEDING MINIMUM AESTHETIC BASELINE REQUIREMENTS - ZONE 1 Smooth superstructure transitions Approach Span Closed box girders Superstructure Constant depth girders where feasible AMP A-5 Haunched, variable -depth girders allowed No horizontal offsets of fascia web APTE's Included in all zones Approved ATC 4 adjusted span lengths to provide constant depth girders throughout. All haunched, variable -depth girders eliminated. 6 Traffic Calming Measures/Shared S 7 Enhanced Pavement 13 Community Garden Fence 14 Enhanced Landscape* 16 Sculpture and Public Art 68 Period Street Lamps 82 Lighting for Interactive Water Featur 83 Lighting for Amphitheater THIS DOCUMENT IS A SUBSTITUTION TO I ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. 2 Ireets 28,800 18 305,736 12,390 545 96,990 999 73,807 8 8 16 e 8 35 472 * Includes Quantities for Zone A SF Planters SF SF LF SF (Shrubs) Ea (Trees) SF (Ground Cover) Display Frames Sculptures Ea White LED ingrade fountain lights Recessed LED step lights LF (Flexible Linear LED Luminaire) Archer Western -de Moya Joint Venture conne[ting�'*� SR -836/1-395/1-95 Page 30 Milldi1q Two main pier types used Approved ATC 35 modified pier shapes for better maintainability and constructability, Piers Parabolic arch, tapering heads, deep relief included a third, more slender pier of the same AMP A-2, A-5 shape. Same transverse form for all APTE 80 Pattern with 3" relief APTE 78 Retaining Walls No permanent sheet piles or pile -and -panel walls APTE 99 AMP A-2, A-5 Cheek walls at bridge abutments Concrete Finish Federal Color FS37925 Insignia White APTE 7 AMP A-2, A-5 Steel Finish N/A- No Steel bridges in Zone 1 Roadway Lighting Evenly spaced poles APTE 68 AMP A-2, A-5 LED white lights, Fixture suits aesthetics APTE C1O Streetscape Lighting Portal, Secondary Area, Abutment AMP A -2,A-5 Replace -in-kind impactedexistingeriodlighting APTE 2, 68, 81, 82, 83, Urban Design Sidewalks, curb cuts, road modifications AMP A-2, A-5 Fences prohibited APTE 14, 16, *,800 Sidewalks, crosswalks Landscape Stamped, integral color concrete NW 3rd Ave -NW APTE 6, 13, 14,81 99 AMP A-2, A-5 2nd Ave , 730 LF of 10' wide paths, 1,300 LF of 5' wide paths Additional APTE's without a Baseline Requirement: 2, 8, 10, 11, 19, 21, 23, 58, 61, 62, 63, 67, 70, 71, 73,74 Total Aggregate Approved APTE's = 31 Please see AMP Roll Plot Sheet A-2 and A-5 for depictions and locations of APTEs, and how baseline requirements are met and significantly exceeded 6 Traffic Calming Measures/Shared S 7 Enhanced Pavement 13 Community Garden Fence 14 Enhanced Landscape* 16 Sculpture and Public Art 68 Period Street Lamps 82 Lighting for Interactive Water Featur 83 Lighting for Amphitheater THIS DOCUMENT IS A SUBSTITUTION TO I ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. 2 Ireets 28,800 18 305,736 12,390 545 96,990 999 73,807 8 8 16 e 8 35 472 * Includes Quantities for Zone A SF Planters SF SF LF SF (Shrubs) Ea (Trees) SF (Ground Cover) Display Frames Sculptures Ea White LED ingrade fountain lights Recessed LED step lights LF (Flexible Linear LED Luminaire) Archer Western -de Moya Joint Venture conne[ting�'*� SR -836/1-395/1-95 Page 30 Milldi1q EXCEEDING MINIMUM AESTHETIC BASELINE REQUIREMENTS - ZONE 2 APTE's Included in all zones Concrete Finish Smooth superstructure transitions AMP A-3, A-5 Approach Span Closed box girders Approved ATC 4 adjusted span Superstructure Constant depth girders where feasible lengths to provide constant depth AMP A-5 Streetscape Lighting girders throughout. All haunched, AMP A-3, A-5 Haunched, variable -depth girders allowed variable -depth girders eliminated. Sidewalks, curb cuts, road modifications APTE 33, 34 604 800 No horizonal offsets of fascia web Fences prohibited Two main pier types used Approved ATC 35 modified pier Surface parking for 200 spaces connected via APTE 2881 10� Parabolic arch, tapering heads, deep relief shapes for better maintainability and Piers APTE's without a Baseline Requirement: 31, 36, 58, 61, 62, 63, 67 constructability, included a third, more AMP A-3, A-5 Please slender pier of the same shape. Same transverse form for all APTE Cg0) Pattern with 3" relief APTE C8) Retaining Walls No APTE 9 AMP A-3, A-5 permanent sheet piles or pile -and -panel walls Cheek walls at bridge abutments Concrete Finish Federal Color FS37925 Insignia White APTE 27 AMP A-3, A-5 28 Parking Area Relocation/Improvement Steel Finish N/A- No Steel bridges in Zone 1 Roadway Lighting Evenly spaced poles APTE AMP A-3, A-5 LED white lights, Fixture suits aesthetics Streetscape Lighting Portal, Secondary Area, Abutment Lights APTE C2) (�1 AMP A-3, A-5 Illuminate parking lot Urban Design Sidewalks, curb cuts, road modifications APTE 33, 34 604 800 AMP A-3, A-5 Fences prohibited Sidewalks, crosswalks Landscape Surface parking for 200 spaces connected via APTE 2881 10� 12,497 streetscape Additional APTE's without a Baseline Requirement: 31, 36, 58, 61, 62, 63, 67 Ea Total Aggregate Approved APTE's = 19 Please see AMP Roll Plot Sheet A-2 and A-5 for depictions and locations of APTEs, and how baseline requirements are met and significantly exceeded THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. 27 Enhanced Pavement 181,600 SF 28 Parking Area Relocation/Improvement 200 Parking Spaces (included in surface street plans) 33 Sculptures/Public Art 2 Sculptures 77,591 SF (Shrubs) 34 Enhanced Landscape 379 Ea (Trees) 81,725 SF (Ground Cover) 12,497 SF (Gravel) 89 Pole Mounted Luminaires for Parking 17 Ea Archer Western -de Moya Joint Venture connecting SR -836/1-395/1-95 Page 31 Miami EXCEEDING MINIMUM AESTHETIC BASELINE REQUIREMENTS - ZONE 3 APTE's Included in all zones Approved ATC 4 adjusted span lengths to provide constant depth girders throughout. All haunched, variable -depth girders eliminated. Approved ATC 35 modified pier shapes for better maintainability and constructability, included a third, more slender pier of the same shape. APTE (k) Retaining Walls Smooth superstructure transitions Approach Span Closed box girders Superstructure Constant depth girders where feasible AMP A-5 Haunched, variable -depth girders allowed 41 No horizontal offsets of fascia web Federal Color FS37925 Insignia White Two main pier types used AMP A-4, A-5 Parabolic arch, tapering heads, deep relief Piers Steel Finish AMP A-4, A-5 Enhanced Pavement Roadway Lighting Same transverse form for all APTE's Included in all zones Approved ATC 4 adjusted span lengths to provide constant depth girders throughout. All haunched, variable -depth girders eliminated. Approved ATC 35 modified pier shapes for better maintainability and constructability, included a third, more slender pier of the same shape. APTE (k) Retaining Walls Pattern with 3" relief APTE 78 AMP A-4, A-5 No permanent sheet piles or pile -and -panel walls APTE 19i 4,620 Cheek walls at bridge abutments 41 Concrete Finish Federal Color FS37925 Insignia White APTE 42 AMP A-4, A-5 12 Steel Finish N/A- No Steel bridges in Zone 1 Enhanced Pavement Roadway Lighting Evenly spaced poles APTE 77 AMP A-4, A-5 LED white lights, Fixture suits aesthetics APTE 10 Streetscape Lighting Portal, Secondary Area, Abutment Lights APTE 2�1 (_k 89, 92 ` r AMP A-4, A-5 Illuminate parking lot Enhanced Landscape Urban Design Sidewalks, curb cuts, road modifications APTE 41, 49, 648 AMP A-4, A-5 Fences prohibited SF (Gravel) Sidewalks, crosswalks 61,480 Landscape Concrete pathways APTE 37, 5981 �0 105 12 Multi-purpose Parcel 171 77 New Street Lighting Burle Marx streetscape design Fixtures Additional APTE's without a Baseline Requirement: 40, 43, 45, 52, 53, 56, 58, 61, 62, 63, 67, 93, 94, 97 Photo -Luminescent Plaza Coating Total Aggregate Approved APTE's = 30 Please see AMP Roll Plot Sheet A-2 and A-5 for depictions and locations of APTEs, and how baseline requirements are met and significantly exceeded THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. 37 Multipurpose Space 40,000 SF 4,620 SF 41 Traffic Calming Measures 12 Planters 42 Enhanced Pavement 295,637 SF 111,195 SF (Shrubs) 499 Ea (Trees) 49 Enhanced Landscape 11,731 SF (Gravel) 61,480 SF (Ground Cover) 59 Seating in Multi -Purpose Space 12 Planters 77 New Street Lighting 4 Fixtures 105 Photo -Luminescent Plaza Coating 7,760 SF Archer Western -de Moya Joint Venture connecing SR -836/1-395/1-95 Page 32 Miami ALL ZONES THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. IMPROVEMENTS EXCEEDING THE SUB -CRITERIA OF THE AESTHETICS PROPOSAL ALL ZONES & ZONE 1 The Heritage Trail provides significant and meaningful improvements beyond the baseline As shown on the AMP roll plots and the following table, our APTE's come together to create an experience like no other. OurAPTE's provide aesthetic and community enhancements that will develop the Heritage Trail as a place to meet, enjoy Miami, and learn of our great City's rich history. 58 Bollards 211 Ea 61 Trash Bins 34 Ea 61 Wayfinding Signage Included in All Zones 78 Recycling Bins 34 Ea 62 Bicycle Racks (6 slots each) 6 Ea 63 Drinking Fountains 7 Ea 67 Cast Stone Benches 42 Ea ZONE A 16 Sculpture and Public Art Included in Zone 1 61 Trash Cans and Recycling Bins Included in All Zones 64 Wayfinding Signage Included in All Zones 78 MSE Wall Pattern Included in All Zones 99 Legacy Wall Included in All Zones �kel01 ME 8 Parallel Parking 1,191 LF 10 Amphitheater 1 Ea 11 Interactive water feature 1 Ea 19 Multipurpose court 1 Ea Children's play area 1 Equipment 21 Turf 3,220 SF Fence 350 LF Restroom Facilities infrastructure 1 Ea 23 Pump House 100 SF 70 Passive Recreation Area 1 Ea Outdoor Training Equipment 1 Area 71 Turf 5,317 SF 73 TalkingNiewingTubes 2 Tubes 74 Musical Playground 2 Instruments Archer Western -de Moya Joint Venture tonnecEing SR -836/1-395/1-95 Page 33 [iii7f111 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. IMPROVEMENTS EXCEEDING THE SUB -CRITERIA OF THE AESTHETICS PROPOSAL ZONE 2 & ZONE 3 ZONE 2 DESCRIPTION QUANTITY 31 Traffic Calming Measures 20 Planters Restroom Facilities infrastructure 1 Ea 36 pump House 100 SF ZONE 3 40 Interactive Water Feature 1 Ea 43 Cast Stone Spheres 7 Ea Dog Play Area 26,660 SF 45 Fence 1,051 LF Sculptures and Public Art 1 Sculpture 52 Mural 9,000 SF 53 Concrete Benches 6,644 SF 56 Restroom Facilities Infrastructure 1 Ea Pump House 100 SF 92 Lighting for Multi -Purpose Space 16 Poles 93 Lighting for interactive Water Feature 12 Ingrade Fountain White LED Lights 94 Lighting for Concrete Benches 1,661 LF Lighting for Signature Bridge Base Color Change LED ingrade 160 LF 97 Color Change LED wall washer 152 LF Color Change LED flood lights 32 Ea View of Interactive Water Feature from within multi purpose plaza looking North towards theAAPCA Archer Western -de Moya Joint Venture connecting SR -836/1-395/1-95 Page 34 miamil SIGNATURE CORRIDOR THAT EXCEEDS AESTHETIC REQUIREMENTS The Heritage Trail is the epitome of furthering the Department's goal of building a signature corridor with aesthetic features that exceed the Threshold Requirements. Please review our AMP roll plots to experience the future Heritage Trail. Our singular focus of reconnecting communities and "making right the wrongs of the past' is evidenced by the over 390 APTE locations and our focus on safety, community, mobility and maintainability. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Archer Western -de Moya Joint Venture connecting SR -836/1-395/1-95 Page 35 Millipli1q PEDESTRIAN AND BICYCLE SAFETY FEATURES The Trail is made complete with pedestrian and bicycle safety features throughout. With enhanced crosswalks, shared streets, and the shared use pedestrian bridge over the railroad, the Trail will be a haven to Miami's grow- ing walking and cycling enthusiasts. Traffic calming measures (APTE 6 for Zone 1, APTE 31 for Zone 2, APTE 41 for Zone 3) — Raised sidewalks provide safer pedestrian crossings — Slower vehicular travel speeds — Highly visible pedestrian crossings — Continuity along the Heritage Trail LED enhanced pedestrian crossings (APTE 102) Bollards (APTE 58) separate pedestrians and vehicles Pavement lighting for Heritage Trail (APTE 2) "Shared street" enhancements for NW 14th Terrace and NW 1st Court improve east -west connections and expand the footprint for the Market Square (Zone 1) Parking spaces moved from interior to exterior (APTE 28) in Zone 2 provides continuity of Heritage Trail and separates pedestrians from vehicles. Shared use bridge crossing the FEC Railroad provides direct east -west access for walkers, joggers, and cyclists. Significant LED lights throughout to ensure pedestrian and bicycle safety and security THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Archer Western -de Moya Joint Venture connecting�j,�' SR -836/1-395/1-95 "age ' Miami LONG TERM DURABILITY AND MAINTAINABILITY The features of the Heritage Trail have been designed to incorporate longterm durability and maintainability while achieving superior aesthetic and community enhancements. OurAPTE's have been designed to be sustainable and long lasting, from the all concrete Fountain Signature Bridge to LED lights throughout to our 5 year warranty on all landscaping. We have also sought and obtained letters of commitment to maintain these features from local community agencies such as Miami -Dade County, City of Miami, and Florida International University. Letters of support are Included In the APTE package The following tables detail the extraordinary efforts and significant Improvements made to ensure we provide the Department and community with a long term, durable and maintainable project. 111... - � ull llrl 'ititill _ 1 �'! APTE 11 - Interactive Water Feature APTE 13- Community Garden MAINTENANCE COMMITMENTS "The Education Effect will set up, manage and maintain the proposed community garden area." - Florida International University a . i THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. All 2 Pavement Lighting High durability LED lights along Heritage Trail 50,000 hour service life Integral color concrete does not require painting 1 7 Enhanced Pavement Abrasion resistant surface Highly durable Cl P Concrete 1 10 Amphitheater Highly durable Low maintenance CIP Concrete surface 1 11 Interactive Water Feature No standing water- no chlorine or cleaning Easy pressure wash maintenance FIU commitment to maintain 1 13 Community Garden Low maintenance concrete path Low maintenance aluminum fence Drought -tolerant, Florida friendly plants 5 year warranty on landscaping Concrete planter curbs, benches, and raised 1 14 Enhanced Landscape planter beds Highly durable, low maintenance Irrigation system included 40 -year service life Durable concrete sculptures and artwork frames 1 16 Sculptures and Public Long lasting ceramic tile art Graffiti -resistant coating on all ceramic tele 1 19 Multi-purpose Courts Low maintenance concrete surface Integral color concrete does not require painting 2 27 Enhanced Pavement Abrasion resistant surface Highly durable Durable concrete sculptures and artwork frames 2 33 Sculptures and Public Long lasting ceramic tile art Graffiti -resistant coating on all ceramic tele Drought -tolerant, Florida friendly plants 5 year warranty on landscaping 2 34 Enhanced Landscape Concrete planter beds - highly durable, low main- tenance Irrigation system included 40 -year service life Archer Western -de Moya Joint Venture connEgi-9g1s�.. SR -836/1-395/1-95 Page 37 ­Z11-millam, I LONG TERM DURA1311 ITY AND MAINTAINABILITY THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. All 63 Drinking Fountains Corrosion resistant coating 6" thickness - more durable than 4" minimum 3 37 Multi-purpose Space Integral color concrete does not require painting 15+ year service life Highly durable Cl P concrete All 67 Cast Stone Benches CIP Concrete surface 3 40 Interactive Water Fea- ture No standing water- no chlorine or cleaning High durability LED lights 1 68 Period Street Lamps Easy pressure wash maintenance Long-lasting aluminum alloy Integral color concrete does not require painting 3 42 Enhanced Pavement Abrasion resistant surface Highly durable Cl P concrete 3 43 Cast Stone Spheres Highly durable Low maintenance 3 45 Dog Play Area Low -maintenance aluminum fence Drought -tolerant, Florida friendly plants 5 year warranty on landscaping Concrete planter beds - highly durable, low main- 3 49 Enhanced Landscape tenance Irrigation system included 40 -year service life Durable concrete sculptures and artwork frames 3 52 Sculptures and Public Long lasting ceramic tile art rt Graffiti -resistant coating on all ceramic the Cl P concrete 3 53 Concrete Benches Highly durable Low maintenance Stainless Steel All 58 Bollards Highly durable Low maintenance Cl P concrete 3 59 Seating in Multi-purpose Highly durable Space Low maintenance All 61 Trash and Recycling Bins Low -maintenance concrete All 62 Bicycle Racks Low -maintenance aluminum THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. All 63 Drinking Fountains Corrosion resistant coating 20+ year service life All 64 Wayfinding Signage Highly durable aluminum 15+ year service life Cl P concrete All 67 Cast Stone Benches Highly durable Low maintenance High durability LED lights 1 68 Period Street Lamps 50,000 hour service life Long-lasting aluminum alloy MAINTENANCE COMMITMENTS "We will program maintenance of "pedestrian platform crossings, planter boxes/jersey barriers located outside of County RMI to separate traffic from pedestrians, approach roadways, visibility crossings, and bicycle lanes." - Miami -Dade County connecting —;,... Miami Archer Western -de Moya Joint Venture SR -836/1-395/1-95 Page 38 THIS DOCUMENT IS A SUBSTITUTION TO I ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. CIP concrete benches 1 70 Passive Recreation Area Highly durable ture Lighting Low maintenance 40+ year service life 1 71 Outdoor Training Equipment 15+ year service life 3 73 Talking/Viewing Tubes Low -maintenance aluminum 3 74 Musical Playground 15+ year service life High durability LED lights 3 77 New Street Lighting 50,000 hour service life Long-lasting aluminum Concrete material All 78 MSE Wall Pattern Highly durable Low maintenance 40+ year service life All 80 Murals on Piers Long lasting ceramic tile art Crossings Graffiti -resistant coating on all ceramic the 3 105 Photo -Luminescent High durability LED lights All 81 Landscape Lighting 50,000 hour service life Long-lasting aluminum alloy High durability LED lights 1 82 Interactive Water 50,000 hour service life Feature Lighting Long-lasting aluminum alloy Durable casing for fountain lights High durability LED lights 1 83 Amphitheater Lighting 50,000 hour service life Long-lasting aluminum alloy High durability LED lights All 84 Sculptures and Public Art Lighting 50,000 hour service life Long-lasting aluminum alloy High durability LED lights 2 89 Pole Mounted Luminaires for Parking 50,000 hour service life Long-lasting aluminum alloy High durability LED lights 3 92 Lighting for Multi-pur- pose Space 50,000 hour service life Long-lasting aluminum alloy THIS DOCUMENT IS A SUBSTITUTION TO I ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. MAINTENANCE COMMITMENTS "We will commit to accepting responsibility for maintenance and operation of the multi -use parking facilities and improvements." - Miami Parking Authority 11 r Archer Western -de Moya Joint Venture connecting_, SR -836/1-395/1-95 Page 39 • , Miami High durability LED lights 3 93 Interactive Water Fea- 50,000 hour service life ture Lighting Long-lasting aluminum alloy Durable casing for fountain lights High durability LED lights 3 94 Lighting for Concrete Benches 50,000 hour service life Long-lasting aluminum alloy High durability LED lights 3 97 Lighting for Signature Bridge Base 50,000 hour service life Long-lasting aluminum alloy Highly durable ceramic tile panels All 99 Legacy Wall Panels Anti -graffiti coating Easy pressure wash maintenance 15+ year service life All 102 Lighting at Heritage Trail High durability LED lights Crossings 20-30 year service life 3 105 Photo -Luminescent Epoxy coating Plaza Coating 10+ year service life MAINTENANCE COMMITMENTS "We will commit to accepting responsibility for maintenance and operation of the multi -use parking facilities and improvements." - Miami Parking Authority 11 r Archer Western -de Moya Joint Venture connecting_, SR -836/1-395/1-95 Page 39 • , Miami Our local team is committed to serving Miami as we have been for decades. This community is our hometown, not just a project to complete and move on. This commitment is reflected in the plethora of aesthetic and community features of the Heritage Trail as well as the Fountain Signature Bridge that demonstrates Miami's status as the center of the Americas. View of Heritage Trail from North Miami Avenue looking East View of Heritage Trail in and Fountain Bridge in background from North Miami Avenue looking Northeast Viewof Fountain Signture Bridgefrom NE 13th Street looking Southwest The Heritage Trail will truly meet Miami's vision to reconnect and revitalize the area that was divided by the 1-395 and 1-95 construction so many years ago. Our primary goal was to ensure that once built this project would serve as a legacy to all those who played a key role in creating Miami's past, present and future. The attention to detailspent in creating this one of a kind iconic facility was to ensure that thousands of yearly visitors would continue to experience the beauty and culture that this project and Miami have to offer. The AW-dMG Team looks forward to working with the x R community, our community, to complete this legacy for all to enjoy for generations. Vie wof Community Garden from NW 1st Court looking East LEGACY WALL REI] I Exhibit C — .'NH� n a MEET W' c Qoic ^1 J Am �f Z NE 1 ZONE 2 ZONE 3 Aid., SE f� RAILWAY HERITAGE LATIN/CARIBBEAN HERITAGE TE UESTAS HERITAGE MIAMI 2050 ZONES A & 1 0 ZONE A ZONE 1 REKfT6WfflpW, LEGACYWALL I PARTNERSHIPAND SUPPORT FROM D WocALGOVERNPAENt COMMUNITY oRoAmnovs R— D!!.6.�,IANa!SA�E,!,8TREE.T.!CAP� 11-1m ........ ... HERITAGE TRAILAESTHETICS PROJECT TECHNICAL ENHANCEMENTS (APTE) ABOVE BASELINE 6 —.N---l..R—TR'— 7 a 10 . !. E m . lills 1! ti A I-,- ✓ 1 111110, OVERTOWN HERITAGE ZONE 2 ® ®• � ®fit m ® ®r ° � G 11 P RAILWAY HERITAGE HERITAGE TRAILAESTHETICS PROJECT TECHNICAL ENHANCEMENTS(APTE) ABOVE BASELINE 27 28 31 �,., .. M.�..w.. 33 �R `E d clc. 77 all P 1 f _ 111,11,17 1-0 m V) z cW C W U z x z W N W z O1 J H Wa Hs xx ZONE 3 MEET ME ATTHE BRIDGE C06 0 9' 0 00 0� o iiJ O o O o Q .R I� o�o�bod,o oO,o co �.s,aoax.aE„aoo �YI�� H m . W: TEQUESTAS HERITAGE T HERITAGE TRAIL AESTHETICS PROJECT TECHNICAL ENHANCEMENTS (APTE) ABOVE BASELINE .E w..EC EE..ucE c.EM Eu R. 92 - �� 11111L— cE ru_� —a `s° 43 49`-• U� v V) z 6� NcxE.E eENcxEs ®® aa,y.wa: .Eo.�N - woo.E.o.EE ®� 61 En Nva w � _ w U z x w M 6, 67 e...:.oNEaENExE: 2 .^ 81 w momz Oe IVB { Hm 92” 93 �. 94 sues* N 97 w.�.Na �s SUPERSTRUCTURE AND PIERS FINISHES LIGHTING SIGNATURE BRIDGE E m APPROACH SPAN SUPERSTRUCTURE & PIERS RETAINING WALLS STREETSCAPE LIGHTING SIGNATURE BRIDGE AND METROMOVER BRIDGE CONCEPTUAL RENDERINGS E ZONES 1, 2, 3 ZONESA, 1, 2, 3 ZONES 1, 2,3 TYPIGAL BRIDGE TYPICAL NARROW PIER SHAPE —s. aExEFliSIAovANYApES1ApoEPu.M1t'llE -•., �...,.. PORTALO6HTING SECONDARY AREA LIGHTING Cyn c. MINIM -w 1 T� Nr ... I T ''` z 7r cc } PIC BRIDGE TYPICAL PER SHAPE ■■ L --'� — --- — ---- \ C � W Lu 1 .. ...,...,.... G TIxGL) �xTED.L,G TxG TYPIGAL BRIDGE TYPICAL WIDE PIERSHAPE p % h W W „N,.., ,. .,. ...„.. .,...,,�........e.. �......_. .,�,.,. \ CONCRETE AND STEEL FINISH ROADWAY LIGHTING TYPICAL ICAL SUPERSTRUCTURE &PIERS TRANSITION SPAN ZONES A, t 2,3 ZONES 1, 2, 3 W �ilf 0 + z I � - _ ZON TERCHANGE ZONEi � I Lu BExEE.s�AoxAx.A E �Aoo e x .� Ao ,.A E AooEOA,L 6� N eti s : .,,.. J SIGNATURE BRIDGE AESTHETIC LIGHTIFG wa THIS DOCUMENT IS A SUBSTITUTION TO I ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. CONSULTANT TEAM In December 2016, FDOT authorized The Urban Group to evaluate the collective properties under the to -be -redeveloped I-395 highway areas for potential uses and develop a strategic planning and feasibility analysis. This ROW Planning Study was developed collaboratively with consultants specializing in planning and urban design, strategic parking solutions, construction and leasing. The Consultant Team members that contributed to this report include the following: THE URBAN GROUP, INC. (Right of Way Consultant) PERKINS+WILL, INC. (Designer and Planner, Main Subconsuitant) STRUCTURED PARKING SOLUTIONS, INC (Parking Subconsuitant) STILES COMPANY (Market Analysis Subconsuitant) More than a decade ago, during the I-395 PD&E Study, one of the major design drivers discovered and described in that effort was that a "reintegration" of the urban grid - both physical and perceived - should be a significant part of the design and implementation of any replacement facility. In the intervening years, understanding that the facility and its environment are intertwined, FDOT has adhered to that idea and this study exploring potential programming underneath the facility is a continuation of that effort. The precise boundary of the study is limited to the FDOT owned parcels underneath and adjacent to the existing (and proposed) I-395 corridor (roughly from NW 3 Avenue to Biscayne Boulevard). However, the impact of the corridor on its adjacent urban environment is well known and the "area of influence" that was studied extended out to a 1/4 mile (+/- 5 minute walk) and 1/2 mile (+/- 10 minute walk). As identified previously, this study expands upon the understanding that the facility runs through three different and unique neighborhoods identified in this report as - Overtown Downtown and Biscayne. Each of three neighborhoods have differing physical, social, economic and environmental issues and the programming scenarios included herein are reflective of these variations The following pages examine and reflect the information generated from the below A Examination of land masses, configurations, surrounding businesses, and communities B. Examination of limitations to redevelopment activities related to I-395 C. Input received from a variety of stakeholders regarding their unique understanding of the area and/or their specialized expertise D. Analysis of local market conditions THIS DOCUMENT IS Abu ea i i i u i iUN TO ORIGINAL, BACKUP ORIGINAL CAN BE SEEN AT NTRODUCTION END OF THIS DOCUMENT. More than a decade ago, during the I-395 PD&E Study, one of the major design drivers discovered and described in that effort was that a "reintegration" of the urban grid - both physical and perceived - should be a significant part of the design and implementation of any replacement facility. In the intervening years, understanding that the facility and its environment are intertwined, FDOT has adhered to that idea and this study exploring potential programming underneath the facility is a continuation of that effort. The precise boundary of the study is limited to the FDOT owned parcels underneath and adjacent to the existing (and proposed) I-395 corridor (roughly from NW 3 Avenue to Biscayne Boulevard). However, the impact of the corridor on its adjacent urban environment is well known and the "area of influence" that was studied extended out to a 1/4 mile (+/- 5 minute walk) and 1/2 mile (+/- 10 minute walk). As identified previously, this study expands upon the understanding that the facility runs through three different and unique neighborhoods identified in this report as - Overtown Downtown and Biscayne. Each of three neighborhoods have differing physical, social, economic and environmental issues and the programming scenarios included herein are reflective of these variations The following pages examine and reflect the information generated from the below A Examination of land masses, configurations, surrounding businesses, and communities B. Examination of limitations to redevelopment activities related to I-395 C. Input received from a variety of stakeholders regarding their unique understanding of the area and/or their specialized expertise D. Analysis of local market conditions TABLE OF CONTENTS A. EXISTING CONDITIONS B. PROGRAM ELEMENTS C. CASE STUDIES D. PROGRAMMING E. COMPREHENSIVE ANALYSIS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. A. EXISTING CONDITIONS Ali 17K �r A. iIL MACARTHUR TH ST CAUSEWAY .,..moi•.: .,. } - 1-395 raw 1A A. EXISTING CONDITIONS 1-395 CURRENT ALIGNMENT w �_ '- mw SCALE: 1" = 400' ST NW 12TH ST w a 0 N z z NW 16TH ST THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. w NW 15TH ST w w a a a f N z z a z NW 9TH ST N F w Z w Z z 0 NW 14TH ST > m z a m NW 13TH ST FEC 1395 NW 11TH ST Lu NW 10TH ST w > Q w Q > Q Q � 3 E W z NW 9TH ST z z L;- _ _ `tom * N 0' 200' 400' 600' 1000' FDOT P E R K I N S+ W I L L 1 7 A. EXISTING CONDITIONS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT STUDY AREA PARCELS I END OF THIS DOCUMENT. NW 16TH ST I •----J J L. -:E, -I NW 13TH ST �- ----1 NW 12TH ST w a z N z z KEY: = STUDY AREA PARCELS w NW 15TH ST w w f 0 Z a N Lu z w z z o NW 14TH ST [D z a u l.. — 1J�C,.esL, r -�• MDC PROPERTY I I I i �•,I•• NW 11TH ST w NW 10TH ST w w > a > a a f 3 s W N z NW 9TH ST z z LJ LJ I �� 0' 200' 400' 600' 1000' $ P E R K I N S+ W I L L URBAN FDOT SCALE: 1" = 400' �� A. EXISTING CONDITIONS/ SITE ANALYSIS SITE CO NTEXT X, NW 13TH ST NW 12TH ST z z OF _J i B IF �LTH*T reG MDCPROPERTY �P W z N w z THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I \11V NW 11TH ST NW 10TH ST Alk m--;- ol 200' 400' 600' 1000, �R 13,,� N SCALE: I" = 400' FDOT P E R K I N S + W I L L LLI NW ISTH ST /D\ x z z NW 14TH ST _J i B IF �LTH*T reG MDCPROPERTY �P W z N w z THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I \11V NW 11TH ST NW 10TH ST Alk m--;- ol 200' 400' 600' 1000, �R 13,,� N SCALE: I" = 400' FDOT P E R K I N S + W I L L A. EXISTING CONDITIONS / SITE ANALYSIS ADJACENT NEIGHBORHOODS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I PERFORMING ARTS NEIGHBORHOOD ass, NW 1-51 w > z (4 3 z KEY: = STUDY AREA PARCELS OVERTOWN NEIGHBORHOOD NW 10TH ST z FEC CORRIDOR > > w LLj 14 Lu > 2; z PERFORMING ARTS NEIGHBORHOOD 3 f N MUSEUM PARK NW 9TH ST LLI cm Aiv ,w L: 0' 200' 400' 600' 1000, 4 101 P E R K I N S + W I L L URBAN FDOT SCALE: 1" = 400' NW 13TH ST r : NW 1-51 w > z (4 3 z KEY: = STUDY AREA PARCELS OVERTOWN NEIGHBORHOOD NW 10TH ST FEC CORRIDOR > > w > MEDIA/ENTERTAINMENT NEIGHBORHOOD PERFORMING ARTS NEIGHBORHOOD 3 f N MUSEUM PARK NW 9TH ST LLI PARK WEST NEIGHBORHOOD Aiv ,w 0' 200' 400' 600' 1000, 4 101 P E R K I N S + W I L L URBAN FDOT SCALE: 1" = 400' A. EXISTING CONDITIONS / SITE ANALYSIS ADJACENT LANDMARKS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. OMNI MALL NW 16TH ST ARSHT CENTER FOR THE PERFORMING ARTS Lu NW ISTH ST Lu Lu z KNIGHT N W III CONCERT HALL Z z Z a NW 14TH ST > w z r� GIBSON PARK NW 13TH ST '--_ MDC PROPERTY NW 12TH ST W > KEY: PEREZ ART MUSEUM I STUDY AREA PARCELS 0 POINTS OF INTEREST z FROST MUSEUM PUBLIC GREENSPACE NW 11TH ST OF SCIENCE MINOR CIRCULATION METRORAIL / METROMOVER La NW 10TH ST MUSEUMPARK METROBUS ROUTE > > Lu > TROLLEY ROUTE TRAIN TRACKSuj N 0000 PEDESTRIAN ROUTES z NW 9TH ST z z I I I \ PED + VEH CONFLICT 01 200' 400' 6001 1000, 4 SCALE: 1" = 4001 FDOT T�. URBAN PERKINS+WILL I11 A. EXISTING CONDITIONS/ SITE ANALYSIS PUBLIC TRANSIT — — — � KEY: • STUDY AREA PARCELS 'ST _ _ — — _ _ — — — PUBLIC GREENSPACE MINOR CIRCULATION -- METRORAIL/ MI. s METROBUS ROUTE ••— TROLLEY ROUTE 11111111 TRAINTRACKS 1 1 1 1 1 1 1 1 1 1 1 I / I 1 / I ;I NW 13TH ST THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. NW 12TH ST ,y Q 0 Z =_ 3 I1 Z 1 - qj BISCAYNE 1 ADRIENNE ARSTCENTER I SCHOOL CARD I� METROMOVER STATION � 10 16 32 A 1 NETROMOVER STATfON �A NW 15TH STM w i T �---•••-% �\ w a a' Q a W , 1 z I j• 1 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. 11, 121 P E R K I N S+ W I L L URBAN FD OT� SCALE: 1" = 400' � .. -------------- NW 16TH ST I I1 1 I' --TROLLEY BISCAYNE 1 ADRIENNE ARSTCENTER I SCHOOL CARD I� METROMOVER STATION � 10 16 32 A 1 NETROMOVER STATfON �A NW 15TH STM w i T �---•••-% �\ w a a' Q a W �� • 1 z Wi Z z, I j• 1 TROLLEYOVERTOWN`, NW 13THT ,-•--•— —�I ..—.._�. .I I ,1 '� I MDC PROPERTY I, _ �`• 1 I •,I •MUSEUM PARK ` M£TROMOV£R STATION AV I ' ELEVENTH �1�Ifv , NW 11TH ST 11 r1, ----------- NW 10TH ST > Q f w ` N NW 9TH ST Z x METQOM R METK WEST ST STATIDNI �\ 0' 20D' 400' 600' 1000' 11, 121 P E R K I N S+ W I L L URBAN FD OT� SCALE: 1" = 400' � .. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP A. EXISTING CONDITIONS/ SITE ANALYSIS END OF THIS DOCUMENT.INALCAN BESEEN AT PEDESTRIAN + VEHICULAR CONNECTIVITY it NW 16TH ST r • • • • • . • INS•IAMf TROLLEY 1 • • • • � ICfSCAYNE 1 • • • AA- • • r -- • � c°91eNM�ARsyr cf�eR 0 age 41 ul Of am GET • • • s • . • NW 14TH ST 010,� • ,• >1 ---df �• f •-_r1AMf TROLLEYO�RTOWN' 1 LLI • �•' �. - - • 1 1 • 1 >I • '-1 1 • uI 1____ - ` 140 • • • L...t �4---- MDC PROPERTYPK I '' 1 �.•�� • oft 090 -0 0 • • • • -•-�... l' � � �,��'"�.IuMOVFR STATION • b • ®_ 1 • KEY: r �. • STUDY AREA PARCELS A • •• •"•"•-•'�•"}' r�`� ��` • S • __ ELEVENTH STRF METROMOVER S-A • • • • • POINTS OF INTEREST ` 090 • • • • • • i .1 • • • • • • PUBLIC GREENSPACE • • • • • • • f� • - NW 11TH ST • • • • • • • • MAJOR CIRCULATION �— �� • = • ■ I 1 • -- METRORAIL / METROMOVER `� •_• • I a I - _ • -- METROBUS ROUTE • • ` • • • • k• • "♦Y • Ma Tr sT • • •v • • • • • • • • • • • • • • • • ••• • • • • • • • --• TROLLEY ROUTE 1 ` •Q ,'� I • •_ 1 •y � I11j1jj� TRAINTRACKS ; ` �•� y1 I N •• PEDESTRIAN ROUTES 1 ` •= vjbJu 111RRw!>;T• • • 1 _ • • METROMOVER STATIONI -M PED+VEN CONFLICT ` • • I , f =• • O' 200' 400' 600' 1000' ' SCALE: 1" = 400' FDOTT im R�;'�, P E R K I N S+ W I L L 113 11 A. EXISTING + PROPOSED IMPROVEMENTS -395 RE -ALIGNMENT EXISTING + PROPOSED 1-395 NW 13TH ST NW 12TH ST w d O z z Z KEY: STUDY AREA PARCELS EXISTING ALIGNMENT PROPOSED ALIGNMENT y a METRORAIL/METROMOVER � H z Z THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ----------- OMNI "7t STATION NW 16TH ST ADRIENNE ARSNT CENTER SCHOOL BOARD METROMOVER STATION METROMOVER STATION Lu NW 15TH ST= — wur Q Q d ° i y Z a w Luw z z { z z z ° NW 14TH ST W" {, z - -- { NW 11TH ST NW 10TH ST NW 9TH ST I L:_j lu a i a Y r� MDC-PPOPERTY MUSEUM PARK / -�' METROMOVERSTATlON EL EVENTH STREET I METROMOVER STATION { { r { W --WEST _' METROMOVER STATIONI- O' 200' 400' 600' 1000' -ri,. 141 PER K I N S +WILL URBAN FDOT� SCALE: 1" = 400' A. EXISTING CONDITIONS / PROPOSED ALIGNMENT ZONING (CITY OF MIAMI) SCALE: r=400 THIS DOCUMENT m^SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN asSEEN ^r U END opr*moocvmswr U ----STATION 7ADR-E A- - FDOT URBAN psnx|ws+w|L L 115 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT A. EXISTING CONDITIONS / PROPOSED ALIGNMENT I END OF THIS DOCUMENT. UNDER CONSTRUCTION + VACANT PARCELS u I ' NW 13TH ST—••, ® U L.. NW 12TH ST w Q Oz --------------------��-- -_\ O KEY: STUDY AREA PARCELS L� ❑ ` VACANT PARCELS � ❑ UNDER CONSTRUCTION SITES ` ��— METRORAIL/METROMOVER 1 -M�ry _ -------- OMNI [r STATION NW 16TH ST ADRIENNE ARSHT CENTER SCHOOL BOARD ""o VEP STATION METROMOVER STATION i Lu NW 1STH 5TH'— — w — + �j� D ' E � 2 D n Z NW 14TH ST Z Z > I J Lull Z ------ m i MDCPROPERTY `•.j �. NW 11TH ST 7 NW 10TH ST NW 9TH ST I I.' � I I •� �'METROMOVER STATION EL EVENTN STREET METROMOVER STATION I Q I N ----------- - m Z PARK WEST Im ETROMOVER STATIONI T I� N I II 4\ 0' 200' 40W 600' 1000' rn� 161 P E R K I N S+ W I L L URBAN FOOT SCALE: 1" = 400' l; -- . A. EXISTING CONDITIONS / PROPOSED ALIGNMENT THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ANTICIPATED MAJOR DEVELOPIVIEi,� i 1-95 "w --- --.. NW 13TH ST I� + 4 ----- OMNI STATION 1 / r 1 NW 16TH ST I ' I ' r ' 1 Ir 1 ADRIENNEARSNTCFNTER r ' SCHOOL EOARO METROMOVERSTATION r ' ME_V-1-101 r w NW 15TH STS^�W > > ` I! Q N Z I W W f Z Z Z NW 14TH ST --------- Lu -- -----•,•� ' r ' �J,VW 13TFj,.$,1,'.._° L.�..__.,=_.�m r•,•�'.�`• I• MDC-PNOPERTY I s-•_• �B° NW 12TH ST > d +� •�'1=_. .. ,._yam,,. I I �j I I ' I EL FVENTH STRFET Z ' I IMIAMIr METROMOVER STATION y INNOVATION T■■ NW LITH ST DISTRICT I I ----- ' KEY: \♦ I I -= -------iv ' y 5 STUDY AREA PARCELS RESORTS WORLD CENTER W NW 10TH ST y MIAMI WORLD CENTER + � I • • f I I MIAMI INNOVATION DISTRICT -I ALL ABOARD FLORIDA , r �j r------I�- _------•�,�-- PARNWEST � NW 9TH ST �- ' METROMOVER FTARON • • I Q I 0' 200' 400' 600' I E 1 iMUS£UM PARR ETROMOYERS ATION N I /\I 1000' Thi° SCALE: I" = 400` FDOTT URBAN p E R K I N S +WILL 117 ll �Y��rTatT A. EXISTING CONDITIONS / PROPOSED ALIGNMENT NEIGHBORHOOD SECTIONS NW 13TH ST PERFORMING ARTS NEIGHBORHOOD MUSEUM PARK PARK WEST NEIGHBORHOOD THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Vii` ____-_______ NW 12TH ST LU 7+ NW 16TH ST SCHOOLSOAAO SCHOOLSOARD ME -M -STATION ISTHT'= ADRIENNE ARSHT CFNTFR D 0ENNE-T-17- MEMOMOVEP STATION Lu > A z z z -------------- - -- NW 14T i ST > KEY: STUDY AREA PARCELS z ------ --------- OVERTOWN NEIGHBORHOOD ll FEC CORRIDOR MEDIA/ENTERTAINMENT NEIGHBORHOOD PERFORMING ARTS NEIGHBORHOOD MUSEUM PARK PARK WEST NEIGHBORHOOD THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. IW 11TH ST 4W 10TH ST F. z NW 9TH ST z Mp C-PNOPERTY ILI -- -T METPOMOVER S7ATIONI ol 200' 400' 600' N 1000, 4 181 P E R K I N S + W I L L URBAN FDGCT� SCALE: 1"=400' Vii` ____-_______ --------------- 7+ NW 16TH ST SCHOOLSOAAO SCHOOLSOARD ME -M -STATION ISTHT'= ADRIENNE ARSHT CFNTFR D 0ENNE-T-17- MEMOMOVEP STATION Lu > NW > > z z Lu z NW 14T i ST > z ------ --------- r ll IW 11TH ST 4W 10TH ST F. z NW 9TH ST z Mp C-PNOPERTY ILI -- -T METPOMOVER S7ATIONI ol 200' 400' 600' N 1000, 4 181 P E R K I N S + W I L L URBAN FDGCT� SCALE: 1"=400' A. HEIGHT + ZONING ANALYSIS / PROPOSED ALIGNMENT BISCAYNE TRANSECT (A—A) MIAMI WORLC CENTER MIXED-USE qb.,Il 1000 MUSEUM RESIDENTIAL I MARQUIS RESIDENTIAL / HOTEL N;' rl z'. Izl db� slw MIAMI I NNOVAf IQN pISTRICT MIXED-USE PERFORMING ARTS CENTER = CIVIC z `-------------------------�', RESIDENTIAL RESIDENTIAL - EAST OF FEC [25FT MIN. HEIGHT CLEARANCE] - SIGNATURE BRIDGE 900 BISCAYNE 10 MUSEUM PARK THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. MELODY 1 76-36 RESIDENTIAL MIAMI-DADE SCHOOL BOARD KEY: :IVIC v N MDC COMMERCIAL RETAIL r PUBLIC SCHOOL GOVERNMENT BLDG. F 4 z z z LOW-DENSITY MULTI -FAMILY I OFFICE INDUSTRIAL INTENSIVE O, 100, 200, 300, SOD' N SCALE: 1" = 400° , COMMERCIAL BUILDING 1400 BISCAYNE T6-80 1 76-36 TODOS TO EDGEWATER� KEY: - HIGH-DENSITY MULTI -FAMILY COMMERCIAL RETAIL TRANSIENT- RESIDENTIAL (HOTEL) PROPOSED HIGH-DENSITY MULTI -FAMILY - TOWNHOUSES MIXED-USE BUSINESS RESIDENTIAL INSTITUTIONAL LOW-DENSITY MULTI -FAMILY I OFFICE INDUSTRIAL INTENSIVE O, 100, 200, 300, SOD' N SCALE: 1" = 400° FDOTT URBAN p E R K I N S +WILL 119 A. HEIGHT + ZONING ANALYSIS / PROPOSED ALIGNMENT DOWNTOWN TRANSECT (B -B) MIAMI INNOVATION DSTRICT MIXED-USE THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. MIAMI INNOVATION PARK PLACE BY DYSTIR CT THE BAY MIXED-USE RESIDENTIAL SQUARE STATION MIXED-USE FUTURE DEVELOPMENT DEVELOPMENT f WE/, F F MfXED-USE 'Z '.2' �.5 j ' r ,Z T z 7 Z Z % zZ -____,___________________ l �. ��%��_,�; / 6�. �"' ,€rr ►rte-. i%`/�/�/�i 46 11 *.Ap ----------------------- MIXED-USE - EAST OF FEC [25FT MIN. HEIGHT CLEARANCE] MIAMI WORLD CENTER - OFF/ON RAMPS AT NE IST AVE T6-60 T6-24 I ,TO DOWNTOWN TO EDGEWATER_ KEY: - HIGH-DENSITY MULTI -FAMILY COMMERCIAL RETAIL TRANSIENT- RESIDENTIAL (HOTEL)/�� PROPOSED HIGH-DENSITY MULTI -FAMILY - TOWNHOUSES MIXED-USE BUSINESS RESIDENTIAL INSTITUTIONAL PROPOSED TOWNHOUSES - LOW-DENSITY MULTI -FAMILY OFFICE INDUSTRIAL INTENSIVE PROPOSED LOW DENSITY MULTI -FAMILY 0' 100' 200' 300' SOO' PROPOSED OFFICE 201 P E R K I N S+ W I L L URBAN F�DOT SCALE: 1" = 400' N THIS DOCUMENT IS A SUBSTITUTION TO A. HEIGHT + ZONING ANALYSIS / PROPOSED ALIGNMENT \ ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT DOWNTOWN EEC TRANSECT — I END OF THIS DOCUMENT. U^ U G� i T6-60 I z z, z 1 I EI -1 1 -.lo.-# t EAST OF FEC [25FT MIN. HEIGHT CLEARANCE] BETWEEN RAMP EMBANKMENTS AND FEC RAIL CORRIDOR D1 TODOS �Jn\:I:iL`I a,-'1�.171e1:1-U1:1: � r-irii� TO WYE ���:�.1►'21aF-\1.41u17.`Er.171q:1-i+1a:N�� KEY: - HIGH-DENSITY MULTI -FAMILY COMMERCIAL RETAIL TRANSIENT- RESIDENTIAL (HOTEL) PROPOSED HIGH-DENSITY MULTI -FAMILY TOWNHOUSES MIXED-USE BUSINESS RESIDENTIAL INSTITUTIONAL��� PROPOSED TOWNHOUSES LOW-DENSITY MULTI -FAMILY OFFICE INDUSTRIAL INTENSIVE PROPOSED OFFICE O' 100' 200' 300' SOO' PROPOSED INDUSTRIAL INTENSIVE PROPOSED MIXED-USE BUSINESS RESIDENTIAL TF. SCALE: 1" = 400' FDOT� URBAN P E R K I N S +WILL 121 A. HEIGHT + ZONING ANALYSIS / PROPOSED ALIGNMENT THIS DOCUMENT IS ARIGINA CAN TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. OVERTOWN FEC TRANSECT (D -D) T6 -24A-0 1: It TO GOVERNMENT CENTER in r N N x x 3 3 3 3 s ------------------------ ---------------------- WEST ----- ----------------------WEST OF FEC CORRIDOR [19FT HEIGHT CLEARANCE] - INDUSTRIAL AREA ADJACENT TO FEC CORRIDOR T6-8-0 1'iu J:a..�u��:a KEY: HIGH-DENSITY MULTI -FAMILY COMMERCIAL RETAIL TRANSIENT- RESIDENTIAL (HOTEL) _ TOWNHOUSES MIXED-USE BUSINESS RESIDENTIAL INSTITUTIONAL LOW-DENSITY MULTI -FAMILY ! OFFICE INDUSTRIAL INTENSIVE The 221 P E R K I N S + W I L L URBAN FDOT� PROPOSED OFFICE N y y. Z z I I T4 -R ' 0' 100' 200' 300' T3 -O TO WYNWOOD,,. .t\ N SOO' T/ SCALE: 1" = 400' A. HEIGHT + ZONING ANALYSIS / PROPOSED ALIGNMENT OVERTOWN TRANSECT (E -E) THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I .I �I 0I 0I of of �I �I fl fl I I ¢ w S I I W 2 2 i x 3 I I 3 z I I z I I ------------------------ I 1 1 ------------------------- WEST OF FEC CORRIDOR [19FT MIN. HEIGHT CLEARANCE] - HISTORIC NEIGHBORHOOD TS -L II TS -L i TS -B -O II D7 1I T44R „I T3-0 TO GOVERNMENT CENTER TO WYNWOODI HISTORIC• • i aJ rsD -•]� KEY: - HIGH-DENSITY MULTI -FAMILY i COMMERCIAL RETAIL TRANSIENT- RESIDENTIAL (HOTEL) TOWNHOUSES a MIXED-USE BUSINESS RESIDENTIAL INSTITUTIONAL - LOW-DENSITY MULTI -FAMILY OFFICE INDUSTRIAL INTENSIVE O' 100' 200' 300' EDO, N SCALE: 1" = 400° FDOTT URBAN pERKINS+WILL 123 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. B. PROGRAM ELEMENTS U.S. + INTERNATIONAL CASE STUDIES COMMERCIAL ENTERTAINMENT D D r 3 a a �w n m • • _ � c On z Oz� c _ c�tn M O D z Mco O ca co D -I r c n c D 0 Z O M z RI 0 to O IM z D 0 7J D O NATURE SPORTS + PLAY D •c o n o cO a v_ 0 w i o n n= 3 n 5`: Q� ar � m 'n 'o n to x 5 o a D m m F o a to m fT 3 In cn O0 O 7 cnm Amway Anen Walk + ORLANDO, FL Bark Park Central + DALLAS. TEXAS D • Burnside Skatepark (n PORTLAND, OREGON m 0400 Chicano Park O Cn +SAN DIEGO, CALIFORNIA —� • Highway 87 Underpass �\ C + SAN JOSE, CALIFORNIA f _ 1LJI • • Holton Street Swing Park FT -1 + WISCONSIN T 1-5 Colonnade Bike Park + SEATLE 1-35 Makeover D + AUSTIN, TX U • • Infra -Space i I-93 +BOSTON • • • ® Jose Marti Park +MIAMI Light Channels ® + SAN ANTONIO, TEXAS • Linky Stone Park - + GREENVILLE, SC • Overpass Skate Park + MINNESOTA Pershing Square +NEW YORK • • • Soma West Skate & Dog I--I—I 1 I I I + SAN FRANCISCO I I Triple Bridge Gateway + NEW YORK • • • Under the + BROOKLYN,, NY NY Underpass Art Walk L St / n + WASHINGTON, DC J Underpass Art Walk M St + WASHINGTON, DC Under the Freeway + WALLACE. ID z A = o3N Wabash Lights O H o +CHICAGO - D O _ � c On z Oz� c _ c�tn M O D z Mco O ca co D -I r c n c D 0 Z O M z RI 0 to O IM z D 17 - COMMERCIAL ENTERTAINMENT • N NATURE z7 D�00 z� D zm F– m z Cn I O SPORTS + PLAY —� FFI o do o -+Fe a b d Z Q�w � z ' ago n D xa� – a CL No ° D T m U O 3 m 3 1 C ° z D In F— n F7 F7 Cn z Albert Heijn + NETHERLANDS — Aspire cn + SYDNEY • • Bajo Puentes Program + MEXICO CITY • Burnley Bouldering Wall + MELBOURNE, AUSTRALIA Folly for a Fly Over + STRATFORD, ENGLAND Garscube Landscape Link F • + GLASGOW. SCOTLAND Matunga Public Park • + MUMBAI. INDIA Metro Station 20 ZNA + SOFIA, BULGARIA Stanica Culture Centre m + ZILINA. SLOVAKIA SEART - Sylvia Park + NEW ZEALAND ! • ! They + TORONTO ! ! • ! ! F Underpass Park + TORONTO / ^ rn Z O = A O U) y O Z O O _ c m 0 0 z 0 A-4 C cV (n M 0 D A f) z U 03 Zy D-4 r =i 0 c D -4 z p ao z M -4 w O M M z D THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. C. CASE STUDIES: C. CASE STUDIES / DOMESTIC (USA) EXTENSIVE PROGRAM USES INFRA -SPACE 1 1-93 LOCATION: Boston, Massachusetts DATE OF INSTALL: Summer 2016 SIZE: 8 acres Installation Cost: $6 million Operation + Maintenance: Unknown Revenue:Lease $785,604 UNDER THE BOE LOCATION: Brooklyn, New York DATE OF INSTALL: Proposal SIZE:. 6 acres Installation Cost: Unknown Operation + Maintenance: Unknown Revenue: Unknown THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. CHICANO PARK LOCATION: San Diego, California DATE OF INSTALL: 1970 SIZE: 7.9 acres Installation Cost: Unknown Operation + Maintenance: Unknown Revenue: Unknown 1 281 P E R K I N S + W I L L URBAN FDOT� C. CASE STUDIES / DOMESTIC (USA) MODERATE PROGRAM USES JOSE MARTI PARK LOCATION: Miami, Florida DATE OF INSTALL: 2005 LENGTH: 1.95 acres Installation Cost: $22 million* Operation + Maintenance: $1.6 million* Revenue: Event Space, Community Center, Exercise Facility $218,872* *VALUES ARE GIVEN BASED OFF THE ENTIRETY OF JOSE MARTI PARK (ALL SEGMENTS ARE NOT BENEATH THE UNDERPASS) SOMA WEST SKATE & DOG PARK LOCATION: San Francisco, California DATE OF INSTALL: 2014 SIZE: 1.6 acres Installation Cost: $3.3 million Skate park: $2.2million / Dog park: $1.06million Operation + Maintenance: Unknown Revenue: Unknown I Na 7 � �' C', L' �,,. `- • �'��.• Ana THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. UNDER THE FREEWAY LOCATION: Wallace, Idaho DATE OF INSTALL: 2004 SIZE: 3.64 acres Installation Cost: $0 Operation + Maintenance: $0 Revenue: Event Space $8,550/ year (Labor Day Weekend) ($95 per booth x 90 booths) P E R K I N S+ W I L L 129 C H U Z ymy1� _ OLL U f = F 2 F C Y N M to O O LL P E R K I N S+ W I L L 129 C. CASE STUDIES / DOMESTIC (USA) MODERATE PROGRAM USES BURNSIDE SKATE PARK LOCATION: Portland, Oregon DATE OF INSTALL: 1990 SIZE: .47 acres Installation Cost: Volunteer based Donations Operation + Maintenance: Volunteer based Donations Revenue: $0 BARK PARK CENTRAL (DEEP ELLUM) LOCATION: Dallas, Texas DATE OF INSTALL: 2003 SIZE: 1.2 acres Installation Cost: Unknown Operation + Maintenance: $20,000 Annually Revenue: $0 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN I END OF THIS DOCUMENT. PERSHING SQUARE LOCATION: Manhattan, New York DATE OF INSTALL: 1939 SIZE: .18 acres Installation Cost: Unknown Operation + Maintenance: Unknown Revenue: Unknown '��dp step' • rgimJi' A!: +: Rim a m N O Ca h�eO LL N U OOLL by 301 P E R K I N S + W I L L URBAN FD F�� EF - fm uH u uL m O eo a C. CASE STUDIES / DOMESTIC (USA) MINIMAE PROGRAM USES HIGHWAY 87 UNDERPASS (SENSING YOU) LOCATION: San Jose, California DATE OF INSTALL: 2015 SIZE: .68 acres Installation Cost: $300,000 Operation + Maintenance: Unknown Revenue: $0 1-35 6TH STREET PARKING LOT (LOT S) LOCATION: Austin, Texas DATE OF INSTALL: 2010 SIZE: 1.37 acres Installation Cost: $2.3 million Operation + Maintenance: Unknown Revenue: Unknown THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. TRIPLE BRIDGE GATEWAY LOCATION: NYC, New York DATE OF INSTALL: 2008 SIZE: .13 acres Installation Cost: 2 million Operation + Maintenance: Unknown Revenue: $0 R1 INu MISSION u o J t• C F W Z = r¢ U L- Y z G ! W < -� W m Q F 7 W Y J m m U j N N 0 h C Y LL C LL m F F N U W U 7 6 Q J m U f y O C TF. FDOTT URBAN PERKINS+WILL 131 C. CASE STUDIES / INTERNATIONAL EXTENSIVE PROGRAM USES THE BENTWAY LOCATION: Toronto, Canada DATE OF INSTALL: Summer 2018 SIZE: -10 acres Installation Cost: Unknown $2-3.1 million/yr. Operation + Maintenance Phase 1: Full build -out: $3.5 - 5 million/yr. $0.9 - $1.7 million/yr. Revenue Phase 1: $0.9 - $1.7 million/yr. Full build -out: THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. UNDERPASS PARK FOLLY FOR A FLY OVER LOCATION: Toronto, Canada LOCATION: Stratford, England DATE OF INSTALL: 2012 DATE OF INSTALL: 2011 SIZE: 2.5 acres SIZE: Unknown Installation Cost: $5.3 million (included construction + art) Installation Cost: $0 (donated or reclaimed materials) Operation + Maintenance: Unknown Operation + Maintenance: Unknown Revenue: Unknown Revenue: Unknown 'z' m r m 2 O Y Y LL LL m ~ W u O Fil I I ifli ffil 1 321 P E R K I N S + W I L L URBAN FD Fin C. CASE STUDIES / INTERNATIONAL MODERATE PROGRAM USES BAJO PUENTES PROGRAM LOCATION: Mexico City, Mexico DATE OF INSTALL: 2013 SIZE: Varies Installation Cost: $0* Operation + Maintenance: $0* Revenue: Food / Beverage, Market, Charging Stations *PROPERTY WAS SOLD BELOW VALUED PRICE IN EXCHANGE THE TENANT IS RESPONSIBLE FOR INSTALLATION, OPERATION AND MAINTENANCE COSTS. MATUNGA FLYOVER PARK LOCATION: Mumbai, India DATE OF INSTALL: 2016 SIZE: -3.96 acres Installation Cost: Unknown Operation + Maintenance: Unknown Revenue: Unknown THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. SEART AT SYLVIA PARK LOCATION: New Zealand DATE OF INSTALL: 2007 SIZE: -1.2 acres Installation Cost: Unknown Operation + Maintenance: Unknown Revenue: $0 IX UY C� ,}2 Y a ¢Y j. W IY C O - q i W C O Y p J Y ` U < F C O_ Y O U I G ` Y O U W I p Q Y LL C 6 ` F C U = O Q LLIx F 00 E N F OO LL m N F 00 E Y d LL LL LL IN Thi, FOOT URBAN P E R K I N S+ W I L L 133 FOCUS CASE STUDIES THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. C. CASE STUDIES / COMMENTS JOSE MARTI PARD MIAMI, FLORIDA PROJECT HIGHLIGHTS: This project is successful because... "This park could be a hidden gem in the Miami Downtown area,Nicely designed, good size, It is located in the Riverfront & you can see the Miami downtown skyline & river view. It has a lot of amenities and great spot for photographers." "The children's playground area is pretty big & well maintained." "...Lot of amenities (swimming pool, playground, community center, basketball, etc) but because it is probably one of the best spot to watch the boats go by the park along the Miami River. This park, de- spite being neglected, has a lot of character." "This is a great little hidden gem! It has a pool, gym, playground, and plenty of grounds to relax in." "Great place to exercise." "I love this park, it can be dirty at times but it has everything you need, a view by a river, grassy areas to hangout or have picnics a little kids park for your children and workout center and a gym not to far for a very reasonable price if I don't say so myself basketball courts for the public and a private pool." PROJECT SHORTCOMINGS: Issues with this project include... "There's not too many trees at this park. It is actually a pretty neglected park." "It is a little bit abandoned, you can even find homeless people sleeping on the benches." "They no longer have WiFi. Sometimes the park is very dirty, the park is very rundown. Many improve- ments needed. Overrun with homeless people who live inside the park and get drunk. Only nice thing is the view, some nice scenic sights. Lots of cool boats ride right past, nice to sit and watch with the family." `SOURCE OF QUOTES: YELP, GOOGLE MAPS +TRIP ADVISOR. QUOTES ARE TAKEN DIRECTLY FROM SOURCE. NO EDITING WAS DONE ON BEHALF OF PERKINS+ WILL. LKETY THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ,. FDOTT .UR13A:, RE=RKINS+WILL 135 C. CASE STUDIES / COMMENTS SOMA WEST SKATE & DOG PAN SAN FRANCISCO, CALIFORNIA PROJECT HIGHLIGHTS: This project is successful because... Likes: Close proximity Fake turf The good: Both areas seem pretty well kept and there's a pretty good amount of room for your dog to run around. The dog owners I've met here all seem pretty nice and seem to clean up after their dog. I really like that it's fake grass so my dog doesn't get dirty (unless he goes and lays in the puddles by the water fountains, which he always manages to do when I look away for a second). Fake grass can often be gross (i.e. poop stains, smell like urine), but this park is well-maintained. Land under the highway is usually dirty and sketchy, but this park has brightened up the space PROJECT SHORTCOMINGS: Issues with this project include... Dislikes: Skateboard and overpass noise Random smokers that like to frequent the park -Lack of poop bags The bad (well, not really that bad): There aren't any poopy bag dispensers, so plan on bringing your own. I thought that was kind of crappy to not have one of these in a dog park. I would think they could install a poop bag dispenser or two. Maybe what I describe in the ugly section below explains why there isn't one. I took my 16 year old nephews here to skate board. They asked to leave within 30 minutes due to the obvious drug use and shady characters going on around them. My nephews are not sheltered Angels, so if they felt unsafe ... well, you get my drift. I glanced at the dog park while I was there. I wouldn't take my dog. Too many unsavory characters and their equally threatening looking dogs hanging around. `SOURCE OF QUOTES: YELP, GOOGLE MAPS +TRIP ADVISOR. QUOTES ARE TAKEN DIRECTLY FROM SOURCE. NO EDITING WAS DONE ON BEHALF OF PERKINS+ WILL. 361 P E R K I N S + W I L L LR13AN FDOT THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. OSI t C. CASE STUDIES/ COMMENTS UNDER THE FREEWAY WALLACE, IDAHO PROJECT HIGHLIGHTS: This project is successful because The UFFM is open from 8-5, Saturday, Sunday and Monday from 8-2, this is a once a year event and only on Labor Day Weekend. Last year, about 7500 shoppers visited the UFFM and downtown Historic Wallace. UFFM provides night safety, portable toilets (and cleaning), garbage cans, no electricity, but some generators are allowed in certain areas. Recently they have added a few spaces on a grassy lawn about 100 -feet from the entrance to the UFFM. which increases number of vendors. PROJECT SHORTCOMINGS: Issues with this project include... This is only an annual event that occurs durning the Labor Day Weekend. The event does not make enough revenue considering the amount of work that goes into the implementation and coordination. They do not have a lot of food vendors at the UFFM. They prefer to send the shoppers to the local restaurants. `SOURCE OF QUOTES: YELP, GOOGLE MAPS +TRIP ADVISOR. QUOTES ARE TAKEN DIRECTLY FROM SOURCE. NO EDITING WAS DONE ON BEHALF OF PERKINS+ WILL. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. li. FDOT E URBANI PERKINS+WILL 137 C. CASE STUDIES/ COMMENTS WON AUSTIN, TEXAS PROJECT HIGHLIGHTS: This project is successful because... "[T]he most dramatic feature will be fourteen enormous lighting tubes that stretch upwards - almost like the horns of a Longhorn - from underneath the interstate out to the property line on the east and west frontage roads. The massive fixtures will contain programmable multi -color LEDs that can put on a light show." "It also is kind of like party lights, or like a suspension bridge, kind of bridging land masses from one side to the other," project architect Phillip Reed said. "We can't rip this down, but let's do something that might help ease the separation, help some kind of psychological flow under and beneath this freeway." "The IH -35 Makeover Project will reconstruct the parking areas under the highway to enhance the safety, comfort, and aesthetics of the area and create an attractive gateway reconnecting downtown to East Austin.The lighting project will be done through the City's Art in Public Places Program and will be programmed LED lights in arches over the parking lots. A computer-generated illumination will create a show as well as create safe lighting." "An inviting art structure/lighting installation designed to join the East and West sides of 35 more closely." "Anything that illuminates, cleans up and makes more hospitable that parking area under the highway is a good idea in my book." "I like it, when you go down there at night the parking lot is really bright (therefore safer!) and slightly purple. It makes it look pretty modern and inviting, far better than it was before." Rates: Mon -Sat: 5am-7pm free Max Height: 8 ft. 2 in. Mon -Thu: 7pm-3am $7 Total # of Parking Stalls: 182 Fri -Sat: 7pm-3am $8 Sun: Free `SOURCE OF QUOTES: YELP, GOOGLE MAPS +TRIP ADVISOR. QUOTES ARE TAKEN DIRECTLY FROM SOURCE. NO EDITING WAS DONE ON BEHALF OF PERKINS+ WILL. 381 P E R K I N S + W I L L LRG3AN FDOT THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. srn - C. CASE STUDIES/ COMMENTS PERSHING SQUARE NEW YORK, NEW YORK PROJECT HIGHLIGHTS: This project is successful because... "Pershing Square's location makes it a popular stopover for many commuters on their way. You can dine in or grab a quick lunch to go." "This is at a great location. prices are a little high but make sense given the service, food quality, and location. It's a typical diner experience." "Fear not tired traveler, the Pershing Square Cafe is not only convenient but delicious." "The location and decor are great and the brunch/breakfast food is excellent." "Great food and beautiful space." "Great location if you're transiting and want to get out the station. Nicely decorated and good staff." "Much nicer inside than expected." PROJECT SHORTCOMINGS: Issues with this project include... "Food was average, nothing special. Really convenient location but in my opinion really overpriced Would not go back." "This place has become a terrible tourist trap." I dislike most of the restaurants in the immediate vicinity of Grand Central because they generally have mediocre food and can get away with it because there is so much foot traffic from tourists and a lunch crowd that values speed over quality. "SOURCE OF QUOTES: YELP, GOOGLE MAPS ITR IP ADVISOR. QUOTES ARE TAKEN DIRECTLY FROM SOURCE. NO EDITING WAS DONE ON BEHALF OF PERKINS+ WILL. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. —r -r- 7- P FDOT iRBAN P E R K I N S + W I L L 139 C. CASE STUDIES/ SCALE COMPARATIVE SIZE Z TOTAL PROJECT AREA= 10.7 ACRES AREA UNDER STRUCTURE= 2.3 ACRES STATE ROUTE 75 `CHICANO PARK' SAN DIEGO, CALIFORNIA TOTAL PROJECT AREA= 5.9 ACRES AREA UNDER STRUCTURE= 4 ACRES EASTERN AVENUE, ADELAIDE, RICHMOND STREET `THE UNDERPASS' TORONTO, CANADA MEL-] Eli r IN TOTAL PROJECT AREA= 32.5 ACRES AREA UNDER STRUCTURE= 25.8 ACRES h. 401 P E R K I N S + W I L L URBAN FDOT� THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. TOTAL PROJECT AREA= 1.3 ACRES U.S ROUTE 101 CENTRAL FWY SOMA WEST SKATE & DOG PARK SAN FRANCISCO, CALIFORNIA 1-395 MIAMI, FLORIDA SCALE: 1" = 400' 0' 200' 400' 600' 1000' C. CASE STUDIES/ SCALE COMPARATIVE SIZE 46 TOTAL PROJECT AREA= 3.6 ACRES i 1-95 JOSE MARTI MIAMI, FLORIDA F TOTAL PROJECT AREA= 7.4 ACRES -� 1-90 UNDER THE FREEWAY WALLACE, IDAHO �L. � • 1 I ', I, � of L� a WIT'AVl N TOTAL PROJECT AREA= 32.5 ACRES AREA UNDER STRUCTURE= 25.8 ACRES O' 200' 400' 600' 1000' SCALE: 1" = 400' �•J THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. TOTAL PROJECT AREA= .6 ACRES E BURNSIDE ST BURNSIDE SKATEPARK PORTLAND, OREGON 1-395 MIAMI, FLORIDA TF. FDOTT URBAN PERKINS+WILL 141 D. PROGRAMMING i THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. 10 % 1% � D. PROGRAMMING- SPORTS +PLAY 1will � T yr w ■ THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. D. PROGRAMMING / PREREQUISITE PLAY ACTIVITIES PLAYGROUNDS JOGGING TRAILS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I WORKOUT STATIONS F -T/l &I REFERENCE: BLANCHE PARK, COCONUT GROVE TYPICAL 400m TRACK 15,600 SF 14,400 SF 130' -------------- 836-1-95 >NW -14TH ST it z -.J L] Z z L L II I 441 PER KINS+WILL URBAN FD 7T REFERENCE: PEACOCK PARK, COCONUT GROVE 6,000 SF ------ 30' 200' w ii IQ W 0 z N U 0 > NW 13TH ST z MDC PROPERTY MACARTHUR CAUSEWAY Ol 200' 400' 600' 1000, SCALE: 1" = 400' D. PROGRAMMING / POSSIBLE INCOME SOURCE SPORT ACTIVITIES SKATE PARK BIKE POLO BIKE TRACKS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I REFERENCE: BURNSIDE SKATEPARK REFERENCE: JOSE MARTI PARK BIKE POLO COURT REFERENCE: BROOKLYN BIKE PARK 12,000 SF 16,800 SF 54,000 SF I soI - - - - - - - 11 70' , 240' 225' ISO, L 240' 836-1-95 NW 14TH ST Z 11 0— NW13THST Z_ L`••` '' i- 1z, III [I �, I MDC PROPERTY 0' 200' 400' 600' 1000, FDOT MACARTHUR CAUSEWAY TF. URBAN PERKINS+WILL 145 D. PROGRAMMING / INCOME SOURCE SPORT ACTIVITIES SOCCER 66 BASKETBALL THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I TECHNICAL CLIMBING WALLS TYPICAL PITCH TYPICAL COURT REFERENCE: X-TREME ROCK CLIMBING CENTER MIAMI 64,350 SF 8,050 SF 42,000 SF Ili 11.5' ISO, 115, 280' 330' 836-1-95 > NW 14TH ST z 11 u -,j NW 13TH ST MDC C PROPERTY z: 461 PER KINS+WILL 0 URBAN tQ pp"ft�n' _ 7T • MACARTHUR CAUSEWAY 0' 200' 400' 600' 1000, SCALE: 111 = 4001 D. PROGRAMMING- NATURE mac THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. D. PROGRAMMING / PREREQUISITE OPEN SPACES LAWN SPACE LANDSCAPING THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. REFERENCE: SOUNDSCAPE PARK LAWN, MIAMI BEACH REFERENCE: MUSEUM PLAZA, DOWNTOWN MIAMI 36,000 SF ---- ; 1150' I-- I 280' 836-1-95 i 481 36,400 SF I 160' I I 190' -• _ > NW 14TH ST W I Z 4 O- NW 13TH ST MDC PROPERTY P Iz �1 FD&� REFERENCE: 1111 LINCOLN RD, MIAMI BEACH 28,050 SF -------'185' 330' MACARTHUR CAUSEWAY 0' 200' 400' 600' 1000' SCALE: 1" = 400' D. PROGRAMMING / POSSIBLE INCOME SOURCE COMMUNITY ACTIVITIES COMMUNITY GARDEN SPACE * YOGA AND EXERCISE CLASSES * REFERENCE: 6,000 SF '----'130' 200' 836-1-95 r� 0, 200' 400' 600' SCALE: I" = 400' REFERENCE: 625 SF " 125' 25' THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. PUBLIC LECTURES AND COURSES REFERENCE: 1,200 SF ' '130' vo I > NW 14TH ST CIS z z MACARTHUR w CAUSEWAY NW 13TH ST Ll�w2j MDC PROPERTY 1000, F1 PROGRAM ELEMENT IS NOT REPRESE NTED IN CASE STUDIES FDOT URBAN PERKINS+WILL 149 D. PROGRAMMING / INCOME SOURCE PET AMENITIES DOG PARK DOG DAY CARE * DOG GROOMER THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I REFERENCE: MARGARET PACE PARK, EDGEWATER 26,250 SF 150, 175' REFERENCE: 5,000 SF 100, REFERENCE: 1,250 SF �j 50' 25' > NW 14TH ST Z m 0- NW 13TH ST z z MDCPROPERTY tz: PROGRAM ELEMENT IS NOT R�PRESENT�E I NCA STUD Tht 501 P E R K I N S + W I L L URBAN FD A MACARTHUR CAUSEWAY 0' 200' 400' 600' 1000, SCALE: 111 = 4001 D. PROGRAMMING- ENTERTAINMENT ._iAV �1II.ii :::::::::: ::..:::::.... THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. D. PROGRAMMING / PREREQUISITE (ART IN PUBLIC PLACES) PUBLIC DISPLAYS LIGHTING SCULPTURE GRAPHICS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. REFERENCE: LIGHT CHANNELS, SAN ANTONIO REFERENCE: FREMONT TROLL, SEATTLE 25,500 SF 500 SF --- T 2I25' 1111 no' 20' I I 150' 521 836-1-95 REFERENCE: FISH MURAL, 1-95 DELAWARE :140' 1 � > NW 14TH ST Q 0! Z 0- NW MDCPROPERTY I , � ;z: FD&� MACARTHUR CAUSEWAY i 0' 200' 400' 600' 1000' SCALE: 1" = 400' D. PROGRAMMING / POSSIBLE INCOME SOURCE ATTRACTIONS ZIP LINING * MURALS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. AMUSEMENT RIDES REFERENCE: ZIP LINES - DALLAS, TX 600' 836-1-95 4 W � 0, M Q Z r\ z NW-}2TH-ST I I I 0' 200' 400' 600' 1000' SCALE: 1" = 400' REFERENCE: WYNWOOD WALL, WYNWOOD REFERENCE: CAROUSEL 1,256 SF Q 40' diameter 0 J m W 2: Q MACARTHUR u 1O CAUSEWAY PROGRAM ELEMENT IS NOT REPRESENTED IN CASE STUDIES FDOTT URBAN P E R K I N S + W I L L 153 42,000 SF -----,' I � I140' I 300' > NW 14TH ST I I Iwl, I I III II 1_ II I —•-� 3 EI — - - -' � 'a 0 NW 13THST-Z L.. I _ •— �'.- 1wl MDCPROPERTY ` I •z. C J REFERENCE: CAROUSEL 1,256 SF Q 40' diameter 0 J m W 2: Q MACARTHUR u 1O CAUSEWAY PROGRAM ELEMENT IS NOT REPRESENTED IN CASE STUDIES FDOTT URBAN P E R K I N S + W I L L 153 D. PROGRAMMING / INCOME SOURCE COMMUNITY EVENTS FOOD TRUCK RALLY * FARMERS MARKET WF�T; mp THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I FESTIVALS * REFERENCE: WYNWOOD ART WALK RALLY 18,900 SF I , 210' 836-1-95 L; PROGRAM ELEMENT IS NOT R�PRESEN­TE N )CA�STJUD Tht 541 PER KINS+WILL URBAN FDOT REFERENCE: BRICKELL CITY CENTRE MARKET 37,800 SF ---------- I I --------- 1160' 630' > NW 14TH ST -.J NW 13TH ST MDCPROPERTY REFERENCE: GROVETOBER FEST, PEACOCK PARK 112,000 SF 2.0' 400' lz - - -- - -- - -- L MACARTHUR CAUSEWAY 0' 200' 400' 600' 1000, SCALE: 111 = 4001 D. PROGRAMMING / INCOME SOURCE SEASONAL COMMUNITY EVENTS AUTUMN PUMPKIN PATCH * WINTER ICE SKATE RINK * THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I SUMMER SPLASH PARTY * 26,000 SF 8,000 SF 12,000 SF 130' 1-1I100' 11I IL 100, 11 ---11 111 100, — �, so, 120' 200' 836-1-95 < 14TH ST r� /1 4-� 0, 200' 400' 600' SCALE: I" = 400' 1000, I z MACARTHUR CAUSEWAY < NW 13TH ST MDC PROPERTY — -7 1z. L PROGRAM ELEMENT IS NOT REPRESE D IN CASE STUDIES FD 0T7 P E R K I N S + W I L L 155 D. PROGRAMMING / INCOME SOURCE + FLEXIBILITY TEMPORARY KIOSKS FOOD * BEVERAGE* THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. CONVENIENCE ITEMS * TYPICAL SHIPPING CONTAINER SIZES 160 SF 320 SF - 8 8' 20' 40' TYPICAL SHIPPING CONTAINER SIZES 160 SF 320 SF 8' 8' 20' 40' TYPICAL SHIPPING CONTAINER SIZES 160 SF 320 SF 8, _.8, 20' 40' 836-1-95 r ��•' > �NW 14TH ST l- W J Z 1 j Z Y IC Q �> w - N 3�_ ✓ `'--.- i�- .__ . Z- �..� Q _ NW 13TH ST I- �..^awl MDC PROPERTY I ` Ll L...r..�.. ` ` -J .__. —. — 1 * PROGRAM ELEMENT IS NOT R�PRESENTE NCA STUD �••- - -"� ` Tht 561 PERKINS+WILL URBAN FQOT7� MACARTHUR CAUSEWAY 0' 200' 400' 600' 1000' SCALE: 1" = 400' D. PROGRAMMING / INCOME SOURCE + FLEXIBILITY TEMPORARY KIOSKS GALLERY SPACE * RETAIL SPACE * EXHIBIT SPACE * THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I TYPICAL SHIPPING CONTAINER SIZES 160 SF 320 SF .. 8' �. 8' 20' 40' TYPICAL SHIPPING CONTAINER SIZES 160 SF 320 SF �. a' _' 8' 20' 40' TYPICAL SHIPPING CONTAINER SIZES 160 SF 320 SF 81 _.8, 20' 40' 836-1-95 NW 14TH ST z CARTHUR 0 MA F7w U m �2 CAUSEWAY r� N- _ `_;0 NW 13TH ST w lz— IVIDC PROPERTY Ll 0, 200' 400' 600' 1000, 1 PROGRAM ELEMENT IS NOT REPRESENTED IN CASE STUDIES SCALE: 11" = 400' FDOT URBAN P E R K I N S + W I L L 1 57 D. PROGRAMMING / INCOME SOURCE + FLEXIBILITY TEMPORARY KIOSKS BIKE SHARE STATIONS * TYPICAL SHIPPING CONTAINER SIZES 160 SF 320 SF .. 8' _. 8' 20, 40' 836-1-95 SPORT EQUIPMENT STORAGE it 44 V THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I EQUIPMENT REPAIR AND SERVICE * TYPICAL SHIPPING CONTAINER SIZES 160 SF 320 SF ,. a' _- 8' 20' 40' TYPICAL SHIPPING CONTAINER SIZES 160 SF 320 SF 81 _.8, 20' 40' fJ > NW 14TH ST lw IS ILI z OC'-- Z J 1 L._—.- 1�� - ._— . 0--_. Q_ NW 13TH ST IF z z MDC PROPERTY z PROGRAM ELEMENT IS NOT R�PRESENT�EN �CA�ST U )D Tht 581 P E R K I N S + W I L L URBAN FD MACARTHUR CAUSEWAY / Iii / , 0' 200' 400' 600' 1000, SCALE: 111 = 4001 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. D. PROGRAMMING- COMMERCIAL D. PROGRAMMING / INCOME SOURCE PARKING SURFACE PARKING STRUCTURED PARKING * THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. AUTOMATED ROBOTIC PARKING * REFERENCE: ARSHT CENTER PARKING LOT 120,000 SF (- 380 SPACES) ---------- I I 300' ---------- 400' 836-1-95 * PR 601 27,500 SF 80 SPACES P/F) 125' 220' NW 14TH ST ULI N )CA�S T JUD E F7 TT L.. 27,000 SF 160 SPACES P/F) 125' 220' O z V - NW 13TH ST- Z- - -- - -----m ---- MDCPROPERTY i, Z; MACARTHUR CAUSEWAY 0' 200' 400' 600' 1000, SCALE: 111 = 4001 [). PROGRAMMING / INCOME SOURCE NFRASTRUCTURE BUS DEPOT~ EVENT PARKING PARK AND RIDE THIS DOCUMENT m^SUBSTITUTION ro U oms/w^L. BACKUP ORIGINAL CAN asSEEN ^r U END opTHIS DOCUMENT. nsrsnswcs: FORMER DOWNTOWN MIAMI GREYHOUND STATION 191,250 SF 25,000 SF (- 80 SPACES) �"�°r"°�°�w _ _ 11 z | | 11 |200'L-� ] ^»» NW 14TH ST MDCPROPERTY ______ 425' _______ 450 836-1-95 SCALE: r=4on m^c^nTHun CAUSEWAY ~~~�pnqan^msLsmswr/awornsp oIN CASE STUDIES DOT psnx/ws+w/LL 161 D. PROGRAMMING / INCOME SOURCE NFRASTRUCTURE SERVICE TRANSIT REP -AIR CENTER CITY EQUIPMENT STORAGE FACILITIES THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. RECREATIONAL STORAGE FACILITY * 13,800 SF L -----JT -------- 160' 230' 836-1-95 r 3,600 SF 9,000 SF 60' ISO, ll'� NW 14TH ST --� >1 0z MDC PROPERTY PROGRAM ELEMENT IS NOT RPRESEN`TE �N �CA STUDIThc E 621 P E R K I N S + W I L L URBAN tID wp"Wm' ,O7T MACARTHUR CAUSEWAY 0' 200' 400' 600' 1000, SCALE: 111 = 4001 D. PROGRAMMING / INCOME SOURCE CIVIC INFRASTRUCTURE POLICE STATION * POST OFFICE * THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I FIRE STATION REFERENCE: MIAMI POLICE DEPARTMENT REFERENCE: FLAGLER US POST OFFICE REFERENCE: MIAMI FIRE STATION #1 27,000 SF 40,000 SF 16,100 SF 150, 1 115, 200' 140' ISO, 200' 836-1-95 > NW 14TH ST 11 Z z O MACARTHUR II W.•w wU NW CAUSEWAY MDC PROPERTY 0' 200' 400' 600' 1000, PROGRAM ELEMENT IS NOT REPRESE D IN CASE STUDIES TI, !D 07 SCALE: 1"=400' tT P E R K I N S + W I L L 1 63 D. PROGRAMMING / INCOME SOURCE RESIDENT SERVICES MOVING SERVICES I 1'q Pd7l!4. 836-1-95 I w I L� II a THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. PERSONAL STORAGE FACILITY * CAR STORAGE FACILITY * M1 ' i -._ ri 57,600 SF I I I I 240' I I 240' i I Q NW 14TH ST 1 r a ii r a I = N ro > I r �; w NW 13TH ST- Z Z L.. i _ MDC PROPERTY i L 1 i- NW 12TH ST * PROGRAM ELEMENT IS NOT REPRESENTED IN CASE STUDIES L------ 641 P E R K I N S + W I L L URBF�r7 45,000 SF I I I I I300' I I I 150' p m w Z Q MACARTHUR u '^ CAUSEWAY 0' 200' 400' 600' 1000' SCALE: 1" = 400' PROGRAMMINGD. STORAGE,. E ;, AND LIGHT INDUSTRIAL WAREHOUSE FACILITY * THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. HOSPITALITY SERVICES * 80,000 SF I � 400' 836-1-95 a C M r�Z N 0' 200' 400' 600' 1000' SCALE: 1" = 400' 22,500 SF 40,000 SF 11 11 --- II150' I I 200' ,50' ----'' 200' jl 1 I > NW 14TH ST W E ¢ w • 1 ,Z 4 O Z � Y L..-_! �.. NW13TH ST- �-.• I - - .:� 1wl MDC PROPERTY j lZ I �••- - `"� * PROGRAM ELEMENT IS NOT RE Thi, / FDOT iJ" NthREAN � 4 MACARTHUR CAUSEWAY IN CASE STUDIES P E R K I N S+ W I L L 165 D. PROGRAMMING / INCOME SOURCE LEASABLE STUDIO SPACE ART STUDIO * MUSIC STUDIO * DANCE STUDIO * THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. 625 SF * PR 661 836-1-95 r 'blil-l- 2,500 SF -go, so, 71 5,625 SF �II75' I 1l > NW 14TH ST z NW 13TH ST Z_ -111 MDC PROPERTY ,Z: FNC A�ST U )D E F7 TT MACARTHUR CAUSEWAY 0' 200' 400' 600' 1000, SCALE: 111 = 4001 D. PROGRAMMING / INCOME SOURCE VENUE SPACE LIVE MUSIC DINING NIGHT CLUB * THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I 11,500 SF 7,000 SF 11,200 SF '---'170' IL 1 _;I115' J 1I I 151 11 1 1111 100, 1 1 - - —160' lool 70' 836-1-95 > NW 14TH ST > Z aMACARTHUR U W. NW 13TH ST - CAUSEWAY 7T MDC PROPERTY 0, 200' 400' 600' 1000, PROGRAM ELEMENT IS NOT REIPRESE D IN CASE STUDIES TI, !DO7SCALE: 1"=400' tT P E R K I N S + W I L L 1 67 D. PROGRAMMING / INCOME SOURCE VEHICLE SERVICES GASOLINE STATION * AUTO SERVICE STATION * THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. I CAR WASH SERVICE * 10,000 SF I - J I100, L - lo 836-1-95 NW 12TH ST 4,000 SF 11,11 100' w NW 14TH ST CAUSEWAY 0, 200' 400' 600' 1000, SCALE: 111 = 4001 ..jw z 0 > NW 13TH ST MDC PROPERTY Z: PROGRAM ELEMENT IS NOT REPRESENTED IN CASE STUDIES I " 681 P E R K I N S + W I L L URBA FQ97T- 28,000 SF 350' MACARTHUR CAUSEWAY 0, 200' 400' 600' 1000, SCALE: 111 = 4001 [). PROGRAMMING / INCOME SOURCE EVERYDAY RETAIL SERVICES CONVENIENCE STORE~ DRUG STORE~ THIS DOCUMENT m^SUBSTITUTION ro U ORIGINAL. BACKUP oms/NAL CAN asSEEN ^r U U END opr*moocvmswr U GROCERY STORE NW 14TH ST IlIW 13TH ST- IVIDC PROPERTY zi Li \ ' | �'---� � ''J�--''-----' � zvv ^vv oov �oo |\ || | \ U � �'--'-----'= ^pnqan�ms�smswraworn� ~- SCALE: r=4uu m^c^nmvx CAUSEWAY !E�o/wCASE STUDIES psnx|ws+w|L L 169 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. D. PROGRAMMING- HEIGHT ANALYSIS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT D. PROGRAMMING / POTENTIAL LEASABLE ENVELOPE- 19' MIN. HEIGHT CLEARANCE END OF THIS DOCUMENT. HEIGHT ANALYSIS (WEST OF FEC Lll\� Tv VARIES .10*- VARIES � I 4 VARIES VARIES 1W-0 VARILS o� SCALE: 1" = 20' TF. FDOTT URBAN PERKINS +WILL 171 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT D. PROGRAMMING / POTENTIAL LEASABLE ENVELOPE- 25' MIN. HEIGHT CLEARANCE I END OF THIS DOCUMENT. HEIGHT ANALYSIS (EAST OE EEC 1-11\11- VARIE5 SCALE: 1" = 20' h. 721 P E R K I N S + W I L L URBAN FD F�� 0 0 in N N VARIES VARIES 1 D' -o", o` THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. D. PROGRAMMING- EXPLORED SYMBIOTIC CONNECTIONS D. PROGRAM MATRIX CURRENT RESIDENTS USERS + DRIVERS PRE -REQUISITE by 741 P E R K I N S + W I L L URBAN FD F�� INCOME SOURCE CAR SERVICES INFRASTRUCTURE — EVENTS - SOCCER BASKETBALL ROCK CLIMBING FOOD BEVERAGE CONVENIENCE STORE GALLERY SPACE RETAIL SPACE EXHIBIT SPACE BIKE SHARE SPORTSTORAGE SPORT REPAIR LIVE MUSIC DIMING NIGHT CLUB THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. DOG PARK DOG DAY CARE DOG GROOMER MOVING SERVICES PERSONAL STORAGE FACILITY WAREHOUSE FACILITY RESTAURANT STORAGE FACILITY HOSPITALITY SERVICES CAR STORAGE FACILITY GASOLINE STATION AUTO SERVICE STATION CAR WASH SERVICE CONVENIENCE STORE DRUGSTORE GROCERYSTORE SKATEPARK OFFICE SPACE BIKE ACTIVITIES POTENTIAL DEVELOPMENT WORKOUT STATIONS BIKE TRACK LAWN SPACE—�aa.u.u. �u�c • •. sn acJ.- �f�i�44 COMMUNITY EVENTS PUBLIC SEATING YOGA & EXERCISE CLASSES TOURISM 4 PUBLIC LECTURES & COURSES GALLERY SPACE SCULGTUR� MURALS G9APH16 by 741 P E R K I N S + W I L L URBAN FD F�� INCOME SOURCE CAR SERVICES INFRASTRUCTURE — EVENTS - SOCCER BASKETBALL ROCK CLIMBING FOOD BEVERAGE CONVENIENCE STORE GALLERY SPACE RETAIL SPACE EXHIBIT SPACE BIKE SHARE SPORTSTORAGE SPORT REPAIR LIVE MUSIC DIMING NIGHT CLUB THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. DOG PARK DOG DAY CARE DOG GROOMER MOVING SERVICES PERSONAL STORAGE FACILITY WAREHOUSE FACILITY RESTAURANT STORAGE FACILITY HOSPITALITY SERVICES CAR STORAGE FACILITY GASOLINE STATION AUTO SERVICE STATION CAR WASH SERVICE CONVENIENCE STORE DRUGSTORE GROCERYSTORE D. PROGRAM MATRIX CURRENT OFFICE THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. USERS + DRIVERS PRE -REQUISITE INCOME SOURCE SOCCER RESIDENTS CURRENT .. SKATEPARK SPORTS BASKETBALL ROCKCLIMBING JOGGING TRAILS BIKE ACTIVITIES PI .AVIJc lIie5 POTENTIAL DEVELOPMENT WORKOUT STATIONS BIKE TRACK FOOD RESIDENTS FUTURE LAWN SPACE COMMUNITY GARDEN SPACE BEVERAGE CONVENIENCE STORE COMMUNITY EVENTS PUBLIC SEATING YOGA & EXERCISE CLASSES FLEXIBLE KIOSKS GALLERY SPACE RETAIL SPACE TOURISM LANDSCAPING PUBLIC LECTURES & COURSES EXHIBIT SPACE BIKE SHARE _IGHTING GALLERY SPACE SPORT STORAGE SPORT REPAIR SCULPTURE MURALS GRAPHICS AMUSEMENT RIDES SUPPORT SERVICES STUDIO SPACE CAR SERVICES LIVE MUSIC NIGHT VENUES DINING NIGHT CLUB GENERAL RETAIL CAR STORAGE FACILITY GASOLINE STATION AUTO SERVICE STATION CAR WASH SERVICE BUS DEPOT EVENT PARKING PARK & RIDE TRANSIT REPAIR CENTER INFRASTRUCTURE - CITY EQUIPMENT STORAGE RECREATIONAL STORAGE POLICE STATION POST OFFICE FIRE STATION EVENTS TF. FDOTT URBAN P E R K I N S + W I L L I75 D. PROGRAM MATRIX FUTURE RESIDENTS AND USERS USERS + DRIVERS PRE -REQUISITE INCOME SOURCE 1 761 P E R K I N S + W I L L URBAN FD F�� THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. CONVENIENCE STORE DRUGSTORE GROCERY STORE SOCCER ��a..•.a.+�-_ti .:,:.=..+`�4-LAYGROUNDS SKATEPARK SPORTS BASKETBALL ROCK CLIMBING JOGGING TRAILS PET AMENITIES POTENTIAL DEVELOPMENT WORKOUT STATIONS FOOD LAWN SPACE COMMUNITY GARDEN SPACE BEVERAGE CONVENIENCE STORE COMMUMTY EVENTS PUBLIC SEATING YOGA & EXERCISE CLASSES GALLERY SPACE RETAIL SPACE T' �i F I'_M LANDSCAPING PUBLIC LECTURES & COURSES EXHIBIT SPACE BIKE SHARE LIGHTING 'IMMM GALLERY SPA.CE- SPORTSTORAGE SCULPTURE MURALS SPORT REPAIR AMUSEMENT RIDES SUPPORT SERVICES STUDIO SPACE CAR SERVICES NIGHT VENUES INFRASTRUCTURE EVENTS 1 761 P E R K I N S + W I L L URBAN FD F�� THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. CONVENIENCE STORE DRUGSTORE GROCERY STORE D. PROGRAM MATRIX TOURISM USERS + DRIVERS c: ESI-OENTS tURREh]T OFFICE SPACE POTENTIAL DEVELOPMENT RESIDENTS FUTURE COMMUNITY EVENTS PRE -REQUISITE -LAYGROUNUS JOGGING TRAPLS WORKOUT STATIONS SKATEPARK BIKE ACTIVITIES BIKE TRACK COMMUNITY GARDEN SPACE YOGA & EXERCISE CLASSES GRAPHICS AMUSEMENT RIDES INCOME SOURCE SUPPORT SERVICE, STUDIO SPACE CAR SERVICES THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. FOOD BEVERAGE CONVENIENCE STORE GALLERY SPACE RETAIL SPACE EXHIBIT SPACE BIKE SHARE SPORTSTORAGE SPORT REPAIR LIVE MUSIC DINING NIGHT CLUB CONVENIENCE STORE DRUGSTORE GROCERY STORE BUS DEPOT EVENT PARKING PARK & RIDE TRANSIT REPAIR CENTER CITY EQUIPMENT STORAGE RECREATIONAL STORAGE POLICE STATION POST OFFICE FIRE STATION FOOD TRUCK RALLY FARMER'S MARKET FESTIVALS TF. FDOTT URBAN PERKINS +WILL 177 lT_ r_,nnr D. PROGRAM MATRIX COMMUNITY USERS + DRIVERS RESIDENTS CURRENT OFFICE SPACE POTENTIAL DEVELOPMENT RESIDENTS FUTURE TOURISM PRE -REQUISITE INCOME SOURCE -LAYGROUNDS SKATEPARK JOGGING TRAILS BIKE ACTIVITIES WORKOUT STATIONS BIKE TRACK LAWN SPACE PUBLIC SEATING YOGA &EXERCISE CLASSES FLEXIBLE KIOSKS PUBLIC LECTURES & COURSES GRAPHICS AMUSEMENT RIDES SUPPORT SERVICES STUDIO SPACE CnR `,E I;WIIF= THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. FOOD BEVERAGE CONVENIENCE STORE GALLERY SPACE RETAIL SPACE EXHIBIT SPACE BIKE SHARE SPORTSTORAGE SPORT REPAIR LIVE MUSIC DINING NIGHT CLUB GENERAL RETAIL BUS DEPOT EVENT PARKING PARK & RIDE TRANSIT REPAIR CENTER INFRASTRUCTURE CITY EQUIPMENT STORAGE RECREATIONAL STORAGE POLICE STATION POST OFFICE FIRE STATION EVENTS 78I FIRKINS+WILL URBAN FD F�� MOVING SERVICES PERSONAL STORAGE FACILITY WAREHOUSE FACILITY RESTAURANT STORAGE FACILITY HOSPITALITY SERVICES FOOD TRUCK RALLY FARMER'S MARKET FESTIVALS D. PROGRAM MATRIX URBAN CONNECTIONS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. USERS + DRIVERS PRE -REQUISITE INCOME SOURCE I: ESIDEW'- CURRLN . ILAVGROUNUtS SKATEPARK SPORTS OFFICE SPACE JOGGING TRAILS BIKE ACTIVITIES PET AMENII IES Vs•ua.uui •ua�a iaa..�a.•r�� WORKOUT STATIONS BIKE TRACK RESIUENTS FU ruF,. COMMUNITY GARDEN SPACE COMMUNITY EVENT YOGA & EXERCISE CLASSES FLEXIBLE KIOSKS TOURISM - PUBLIC LECTURES & COURSES GALLERY SPACE SCULPTURE MURALS MOVING SERVICES PERSONAL STORAGE FACILITY GRAPHICS AMUSEMENT RIDES WAREHOUSE FACILITY RESTAURANT STORAGE FACILITY HOSPITALITY SERVICES ART STUDIO • • MUSIC STUDIO DANCE STUDIO CAR STORAGE FACILITY GASOLINE STATION AUTO SERVICE STATION CAR WASH SERVICE LIVE MUSIC DINING NIGHT CLUB CONVENIENCE STORE _ ins�.rs.rr.a•�..�u.:sti' DRUGSTORE GROCERYSTORE BUS DEPOT EVENT PARKING PARK & RIDE TRANSIT REPAIR CENTER CITY EQUIPMENT STORAGE RECREATIONAL STORAGE POLICE STATION POST OFFICE FIRE STATION fI 11 Thi FDOTT URBAN PERKINS +WILL I79 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. E. COMPREHENSIVE ANALYSIS a W ON P w z m O z P:a 7 U � J 0)a w z w w o a ° 2 yam w Y O zUp J /J W � Oa0 N 0= U J H oz aLL pyo NFp =iz O , O w O z O U W O O O z W ry O cn O cnH <O z \Q Q z W z W oW U QW r r o� LL x ♦ N - ` ; ` J � 3 Ln z 1' ir LLI CL 00 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT ECOMPREHENSIVE ANALYSIS END OF THIS DOCUMENT. AERIAL OF ANTICIPATED SITE CONDITIONS k`-�. TFi FDOT URBAN P E R K I N S + W I L L 183 E. COMPREHENSIVE ANALYSIS SITE DISTRICTS OVERLAY THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. D NT PJ �- B S CAY y � h 841 PERKINS+WILL URBAN F�DOT E. COMPREHENSIVE ANALYSIS ^ n LYSIS THIS DOCUMENT IS ARIGINA CAN S I" I r R L C I V J V /-i I V /-1 i ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. SITE MAJOR CORRIDORS �?vt _ SCALE: 1" = 400' Z -NLN 9TH ST a z O 0 w BISCAYN E �F ----N -- • I \ u u i 0' 200' 400' 600' FDOTT �R�(�, PERKINS+WILL 185 �l E. COMPREHENSIVE ANALYSIS / OUTREACH STAKEHOLDER MEETING NOTES ��ES RpW Pig f li�gSpdvMeeti[ evyi6h Omni CRANotes[March 1 & 27.20171 A endees FI kiert Gonzalez, Asst Director Adam Old, Sr Planner Courtney Omega, Community Liason Users • In the very near future there will be new residents who will require additional and new services • The Omni area is easily accessible from Brickell via MetroMover(Omni area draws visitors from all MetroMover stops) Physical Conditions • "Miami Ave" serves as the "Main Street" between downtown Miami and Wynwood (with Omni right in the middle) • I-395 ramps propose a "traffic" problem at NElst Street Potential Uses • Retail "incubation spaces" (a step up from "Miami Flea") - allows entrepreneurs an opportu nity to test an idea without too much commitment o Potentially house them in shipping containers restaurants, hair care, etc • "Cool" retailers on/alongl4th Street • Maker's spaces (i e "Made in Overtown") oGreat Visibility o Requires a "critical mass"of spaces (20-50 spaces) to be effective Parking • Omni CRA working with MPA to propose a"district parking program" o reduce parking requirements for private development parcels o provide district -wide parking at "centralized" locations • What is FDOT going to require for parking under 1-395? Existing Retailers/Uses • Help existing retailers modernize "in place" • Work with existing residents/retailers to save them from "displacement Issues • There is a need for parking Opportunities • "Activate the site" • "Pre-activation"with park uses • Mus1c/entertainment • Business - kiosk and/or retai I(supporting MWC, etc) Connectivity • Downtown to Overtown • Museum [Art in public places] Cycle infrastructure • Magic City Bike collective may be interested in relocating here 861 P E R K I N S + W I L L URBAN FD 1.395 ROW Plannina Studv Meetina with Miami Parkina Authority Notes [M arch 2. 20171 Attendees Art Nonega, Executive Director Users • Miami -Dade School Board exploring expansion of"1-prep"(up tol,000 students) o Provide open space for student use? • FDOT/Miam-Dade land swap o Proposed 6 -story parking structure to serve adjacent Arsht Center • Reduce height (too much impact on Signature Bridge)and supplement with surface parking (easier to adapt when parking demand lowers) • ContactOmmCRA regardinga potential "Omni Overlay District" o One goal is to maintain/expand workforce housing Potential Uses • Bus"staging area" for Museum buses while they wait? • Outdoor fitness • Musc venue (to complement other venues/events - ie ULTRA) • Pop-up retail Soccer Padel Yoga Physical Conditions • Improve Biscayne Boulevard crossings (already a lot of existing pedestrian traffic) Parking • Future parking demand is changing o Expected to lower (by how much and when still unknown) o All new MPA parking facilities are being designed to be "repurposeable" to accommodate other/future uses o MPA is not comfortable with robotic parking at this time o Due to low clea rances, explore partially submerged parking with"park" on top THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. [• r5 RpW Plapnin0 $Qv Merytig5]Yuith �ir, pAde CounNNo[es (March 9, 20171 AA endees JerrykSe ,AssstantUirec or, F2E� NK, PER Nathan Kogon, Assistant Director, PER Carlos Cruz-Casas, Assistant Director, PW TD Potential Uses • Linear Park Access o Bike/ped[include bikesharing program locations, bike corrals + spaces for cargo bikes ] o Transit [bus/trolley stop, facilities ] o provide pickup /drop off locations for car/ride sharing services • Soundstage forconcerts? o Attenuate roadway noise by using speakers similar to Sound Space and Millenmum park • Activate a rea for events • Provide and (be sure to enclose) play spaces for children • Zip line(like the SlotZilla Zip Line on Freemont Street 'n Las Vegas) • Mural District (definition of"mural" in City of Miami - advertising) o Expand to include area and increase number (currently 45 are allowed) o Potential new digital market -billboards? o Digital kiosks 4 currently allowable on bus kiosks Physical Conditions • Provide/Integrate protected bike lanes o North Miami Avenue & HE D Ave (one-way pair?) o connecting Midtown to Downtown o Impacted by proposed 1-395 on -ramps? • Improve pedestrian accessfromllth Street MetroMoverto site • "Hide" the highway (integrate intotheurban fabric) or"accentuate"it(le signaturebridge) • Mask/screen theundersideof the highwayfromview below E. COMPREHENSIVE ANALYSIS / OUTREACH STAKEHOLDER MEETING NOTES 395 ROW Planningp Study Meetingwith Arsht Center Notes [March 9. 20171 ttendees Ken Ha rus, Vice -P residentof Operations Darrell Alzurh x Aric Kurzman, Esq, x Users • "Town Square Neighborhood" envisions the area as "a place for assembly" o "pre/post show" spaces (generally6pm - midnight) • Restaurants, food and beverage options o "hangouts pace during non-event days" (le South bank Centre Food Market m London) • New "high rise" living lacks children play area (provide safe, fenced areas) Physical Conditions • Improve connection to Museum Park o Provide safe Biscayne Boulevard crossings o Connect to Museum Park via NEI] St (along the west side of Biscayne Blvd) • Explore MOT (maintenance of traffic) options for times when Biscayne Blvd is closed for events (both vehicular and pedestrian traffic) Parking • Parking [short-term/ medium-term needs] o Expecting a vastly reduced parking need in 5-10 years o Parking area is used <10%of the time (90% empty) o Create flexible parking areas that can be used for other uses • Provide ride sharing drop-off areas in the place of parking spaces Potential Uses • No storage,warehouses, service stations, transit hubs near Biscayne Boulevard • Flexible/ programmable spaces o Pop up spaces o Incubatorspaces o Amplified music? o Theater? • Event space opportunities (like "Three Points" in Kansas City) • "Interactive"more than "Passive" uses o Similar to"Crown Fountain" in Chicago (children, tourists, etc) • Provide "kid friendly" places • "small, local" food & beverage options • "art supply store" • "container" size programmable theater spaces "padel" • "farmer's market" 1-395 ROW Plannina Studv Meetinppwith Cit��((of Miami Notes [March 13. 20171 Attendees Luciana Gonzalez, Assistant Director, Planning &Zoning David Snow, Interim Chief of Urban Design, Planning and Zoning Juvenal Santana, Director, Public Works and Transportation Kevin Kirwin, Director, Parks and Recreation Users • Consider checking in with the City's Asset Management Department Potential Uses • No Skate park (high use- low impact) • Yoga (Bayfront Park is very successful') • soccer, padel, flexible fields (soccer sized) • pop up beer gardens, festival space • Provide new and interesting attractions o Watersh des, o Skating rinks (ice in winter?) o Movie Theater? • Gtyequipment storage -[maintenance yard, parking, services, etc] • Gty employment center • "Improve what we have today" oNew, innovative retail options oopen space opportunities o flexible office uses • Affordable housing housing opportunities • Office space? Industrial? Pop up? • Ma ker spaces. permanent + temporary • Flexible open space \ parking areas [dual uses] Parking • If parking is allowed - keep its design standards high' THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. [-395 ROW Planning Studv Meeting with Miami DDA Notes [March 13. 20171 Attendees Neil chafers, Manager, Planning, Urban Design & Transportation Fabian De La Espriella, Urban Design+ Transportation Character • Create"waterfront night life" [something different than a"Brickell rooftop bar"] • Provide"cool space" options within walking distance to downtown[MWC, etc] • Balance between "rental revenue" and residents (keep "elements" open to residents - not lust lease out to leagues, for events, etc ) • Keep proposed uses/character more "edgy" than "polished" (Brickell is polished) Potential Uses • Provided a bus transferstation west ofthe FEC corridor(parkand ride?) • Dog parks, green space, safe children space, flexible plaza space [arts, festivals, etc ] • Homeless shelter?/housing?/ Micro units? [low income] • Micro theater (perhaps in shipping containers?) • Art Incubators (perhaps in shipping containers?) o Allows for temporary and "pop up" uses • Artist housing (near Arsht center) • Artist offices (near Arsht center) • Food hall/ Food vendors/ Farmer's Market • "Water" transportation [introduce a watercanal w/boat access under highway?] • Exercise"boot camp" opportunity • Golf/ driving rang, [similar to"top golf'] • Dedicated sports area • Water Sports/Play "Flow Rider" system o Splash pads, waterpa rk elements, ch i ldren play (create a relationship to Museum Park visitors)"Interactive" Elements' Physical Conditions • Provide adequate and easy access to sites [additional trolleys, water taxis, etc] Parking • Parking requirements should be reduced Tr. FDOTT URBAN PERKINS +WILL 187 E. COMPREHENSIVE ANALYSIS / OUTREACH STAKEHOLDER MEETING NOTES V95 ROW Plannine Studv Meetiry�with Downtown NET FMarch23. 20171 Attendees William Plasencia, Downtown NET Administrator Issues • Traffic&transportation -"free and quick access" o Biscayne Boulevard to Brickell to Arshtto Overtown, etc oBus +Trolley • Homelessness Transportation Cycling o More cyclists than current infrastructure can support • Wynwood to Downtown •Downtown to Jackson o Additional protected lanes would be appropriate (one-way pairs?) o Safe bicycle storage [potential money generator] o Bicyclerepa it/maintenance services • nogas stations in area • no air pump stations • Pedestrian traffic o Lowatthistime o Anticipated to grow precipitously with new residential development projects Uses • Omni CRAto purchase and repurpose bank building • Tomorrowl and to temporarily become beer garden • Housingrequired oWorkforce/Affordable housing [West of FEC] o Moderate/ Market Rate housing [East of FEC] • Temporal/ more bohemian elements o mghthfe[simi larto Mexican zocalos] o "Flash" kitchens Users • Edgewater/ Biscayne Boulevard residents • Arsht Center visitors • New/ Anticipated residents • Workforce/ families 881 PERKINS+WILL URBAN FD 1.395 ROW Planning Study M eetinp with Oventown NE%March 27. 20171 Attendees Brain ss Howard, Overtown NET Administrator Current 1.395 Related Issues • Il legal ro du ping • Homelessness issues • Lack of maintenance o cleaning on a more regular schedule Requests for "now" improvements • Lighting -bright white light (not amber) • Raise the fence line [from 6' to 8,I • Some"security" service as a deterrent • Pest control [rats] o Illegal public feeding contributes to animal activity Opportunities • Ensure that the new facility is well lit&kept clean' • Green spaces okay o Active uses p e outdoor basketball courts [in support of Gibson park indoor courts] o Not passive but active' o Skate park possible but not community priority • Potential co -location and interaction with Police sub-station/Police Athletic League • Expand and improve upon Overtown food works [13th St] o Potential relocation to new site • Incorporate Overtown History o Historic Overtown memorial walk o Cultural/ tourist attraction o "Experience Overtown" campaign • Priority is Jobs' Retail' Eyes on the street' o Incubators oAccelerators oLow barrier to entry for local entrepreneurs o Low cost to start/ low losses if unsuccessful THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. [-395 ROW Plannine Study M eatine with Overtown CRA [ADril 14.20171 Attendees Clarence Woodgill Opportunities • Give community stakeholder control of uses if meet needs of the community • Connect development along 3rd Ave from North to South • Bring"Market Concept" o Farmer's market o Arts &Craft oKIOskS[Ten-Pora Yy+Fixed] • Music festivals • Small stage for music/ amphitheater • All uses/spaces to be flexible enough to "double" as spill over parking • "Games" painted into plaza • Creati ng a "gathering space/place"for residents • Tell a story of "Overtown" within the design ofarea in overtown p e information panels, heritage/culture] THIS DOCUMENT IS A SUBSTITUTION TOE. COMPREHENSIVE O PRE ELSIVE1L ANALYSIS J ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT SCENARIOS INTRODUCTION I I END OF THIS DOCUMENT. Based on the precedent examples, research of existing and anticipated future conditions and input from stakeholders, we have developed the following three potential strategic development scenarios. The intent of the study is to explore and identify potential uses for the FDOT owned properties underneath the future 1-395 facility to better understand FDOT's land use options prior to the selection of a design/build project team and a final facility design Many potential uses were explored and for the purposes of this report, sorted into the following use categories: High Commercial [restaurant, retail, live music, gallery, etc.] Low Commercial [gyms, studio space, incubator retail, etc.] Structured Parking [to serve civic spaces, city event parking] Surface Parking [can be closed for events or repurposed] Recreation/ Event Space [play field, festivals, ice skating rink, etc] Mixed Open Space [public greenspace, stormwater treatment, etc.] Facilities/ Warehouse [warehouse, storage facilities, prep kitchen, studios, etc.] Municipal Use [city equipment storage, transit repair, etc] Each scenario explores the selection and location of a mix of uses in and along the corridor where potential uses would be appropriate per our understanding of the neighboring context, market conditions and stakeholder input. Also, based on our research regarding current and anticipated future conditions for the properties that would impact/be impacted by the new 1-395 facility (generally within a half -mile - or 10 minute walk) we have identified three distinct neighborhoods that we have designated for the purposed of this report (from East to West): Biscayne (generally centered on Biscayne Boulevard and NE 2 Avenue) is more regional in nature with the highest volume of people travelling along Biscayne Boulevard and the civic nature the Performing Arts Center, Museums and the proposed signature bridge. Downtown (generally centered on N. Miami Avenue) is more metropolitan in nature and is a major north -south thoroughfare through the City of Miami. As the urban center for thriving neighborhood communities from Brickell to Midtown Miami, there is great potential for development of services for the growing population. Overtown (generally centered on NW 14 Street and NW 3 Avenue) is more local in nature and is in the heart of the historic, predominantly African American Overtown neighborhood. The existing and potential development is considerably lower than the adjacent Biscayne and Downtown neighborhoods. Thi FDOTT USAN PERKINS +WILL 189 THIS DOCUMENT IS A SUBSTITUTION TO E. COMPREHENSIVE ANALYSIS / SCENARIO'A' ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT MIXED PROGRAM END OF THIS DOCUMENT. Overtown - Local retail, Incubator Downtown - Fitness and sports facilites, Biscayne - Public plaza and park space, restaurants, Studio Space/Warehouse Dog Park and Playground, Pet care and Restaurant and Cafes, Parking Facilities convinience store NW 15TH ST OVERTOWN — i-T------•--------� Z A— I I NW14THST DOWNTOWN 3 4 nr---T-------------------�� Li �_. BISCAYNE - i � O --- - �� > — - f i"7 MDC PROPERTY _ g z�- LT_ Z 004� a7i... �� �� HIGH COMMERCIAL [RESTAURANT, RETAIL, LIVE MUSIC, GALLERY] I I { ` LOW COMMERCIAL [GYMS, STUDIO SPACE, INCUBATOR RETAIL] � STRUCTURED PARKING [P.A.C., CITY EVENT PARKING] SURFACE PARKING [CAN BE CLOSED FOR EVENTS OR REPURPOSED11-1------ - ice/ — — — — — — — --------�/ GREENSPACE & PUBLIC SPACE [PLAY FIELD, FESTIVALS, ICE SKATING RINK] 4 N SPORTS & RECREATION [PUBLIC GREENSPACE, STORMWATER TREATMENT] FACILITIES & WAREHOUSE [WAREHOUSE, STORAGE FACILITIES] ul Z u MUNICIPAL USE [CITY EQUIPMENT STORAGE, TRANSIT REPAIR] NW 10TH ST O' 150' 300' 450' 750' 901 P E R K I N S + W I L L URBAN FD OT� ----4 . THIS DOCUMENT IS A SUBSTITUTION TO L. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT BISCAYNE BLVD / Civic Cultural Space END OF THIS DOCUMENT. PARKABLE PLAZA SPACE \ WEEKEND PUBLIC ART PARK SIDE RESTAURANTS/BEER GARDEN \�---) PUBLIC ECOLOGICAL GREEN SPACE, STORMWATER TREATMENT N wo r� t — `� 71 . CONTAINER POP-UP MARKET [FOOD + ENTERTAINMENT] URBAN lT- P E R K I N S+ W I L L 191 E. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE BISCAYNE BLVD. / Civic Cultura MULTI -USE OPEN GREEN SPACE THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Spa CC -----) SIGNATURE BRIDGE PARK SIDE RESTAURANTS FEATURE ELEMENT POP-UP DINING T I Ell - 7 -1 r7l E------•— �� ��- �_�� .. — ���&rye --- - . BISCAYNE BOULEVARE _f- I -rt . 921 PERKINS+WILL URBAN FD THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT E. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE END OF THIS DOCUMENT. NE 2ND AVE / Vibrant Art + Food Street j '�— NF 13TH ST ,.-...... PARKABLE PARK SEASONAL EVENT SPACE FOOD TRUCK RALLY 11TH ST t 19LIV7- SURFACE OR STRUCTURED PUBLIC PARKING, EVENT PARKING z w z SIDEWALK CAFE/ RESTAURANTS ART INCUBATOR SPACES TF. FDOTT URBAN P E R K I N S + W I L L 193 E. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE NE 1ST AVENUE / Active City PARK AND RIDE, SURFACE PARKING OR STRUCTURED PUBLIC PARKING E-- �♦ I LEASH LESS DOG PARK m i I � _'♦..t may--- -.R Q ---- ;J ` ----------- j L - - J NE 13TH ST sus• MDC�jy"Tlb**lo: e to W — - -- I– w Z ■ � �:. -ter ■ _ FITNESS FACILITY The SPORTS RETAIL 941 P E R K I N S + W I L L URBAN FD ENCLOSED CHILD PLAYGROUND OR OUTDOOR WORKOUT STATIONS I' `-- ♦ \` -) SPORT COURTS THIS DOCUMENT IS A SUBSTITUTION TO I ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. E. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE NE 1ST AVENUE / Active City *77 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. --) SPORTS + PLAY TF. FDOTT URBAN PERKINS +WILL 195 THIS DOCUMENT IS A SUBSTITUTION TO E. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT N. MIAMI ANeighborhood Needs END OF THIS DOCUMENT. CITY STORAGE YARD INS q_ Ptop ram *.. i�... * 07 , V. PUBLIC ECOLOGICAL GREENSPACE, STORMWATER TREATMENT LEASHLESS DOG PARK rf.,. MMUNITY PARK, COMMUNITY GARDEN, YOGA LAWN 961 P E R K I N S+ W I L L URBAN RBN FDO PARTNERSHIP WITH INNOVATION DISTRICT?) SURFACE OR STRUCTURED PUBLIC PARKING, EVENT PARKING 9�-;--N4k PET DAYCARE, PET GROOMING, CONVENIENCE STORE NE 13TH ST.�� lam ---------J awe *.. i�... * 07 , V. PUBLIC ECOLOGICAL GREENSPACE, STORMWATER TREATMENT LEASHLESS DOG PARK rf.,. MMUNITY PARK, COMMUNITY GARDEN, YOGA LAWN 961 P E R K I N S+ W I L L URBAN RBN FDO PARTNERSHIP WITH INNOVATION DISTRICT?) SURFACE OR STRUCTURED PUBLIC PARKING, EVENT PARKING 9�-;--N4k PET DAYCARE, PET GROOMING, CONVENIENCE STORE THIS DOCUMENT IS A SUBSTITUTION TO E. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT N. MIAMI ANeighborhood Needs END OF THIS DOCUMENT. PUBLIC ECOLOGICAL E_____� GREENSPACE, STORMWATER TREATMENT NEIGHBORHOOD RETAIL -i COMMUNITY GARDEN/ YOGA N MIAMI AVENUE TF. FDOTT URBAN PERKINS +WILL 197 E. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE NW 1ST AVE / Essential services NEIGHBORHOOD RETAIL/ INCUBATOR SPACES aa / Z ZIS / I / I SURFACE PARKING (VALET, EVENTS) / v -1 981 P E R K I N S + W I L L URBAN WAREHOUSE/ STORAGE FACILITY F�J -- — --> i i i i ,a' I 12TH ST In 4t `. ee • • w � --. L*e��e�eew --------------------> THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. b �i6•lcl .�� WAREHOUSE/ STORAGE FACILITY CITY STORAGE YARD E. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE NW 3RD AVE / Neighborhood Core -1 COMMUNITY MARKET SPACE FESTIVAL SPACE J NW � 14-H ST'- \\---7 MAXI MAR NET � U t 331 z j NEIGHBORHOOD RETAIL - - - r NW 13TH ST I 1 W ART/MUSIC/DANCE STUDIO SPACE G. Q F_ 3 z THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. SERVICE AND WAREHOUSE FACILITY OPEN GREEN SPACE TF. FDOTT URBAN PERKINS+WILL 199 E. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE NW 2ND AVE / Neighborhood Retain COMMERCIAL FACILITIES T I I I I I 1 COMMUNITY MARKET SPACE, FESTIVAL SPACE NEIGHBORHOOD RETAIL THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. -rt . 1001 P E R K I N S + W I L L URBAN FD E. COMPREHENSIVE ANALYSIS / PROGRAM ELEMENTS BY AVENUE NW 3RD AVE / Neighborhood Core COMMUNITY MARKET SPACE, E FESTIVAL SPACE GIBSON PARK E WOO NEIGHBORHOOD RETAIL COMMUNITY BUSINESS NW 3RD AVE CIVIC USE CONTAI THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Thi• FDOT� URBAN PERKINS+WILL 1101 E. COMPREHENSIVE ANALYSIS / SCENARIO `A' MIXED PROGRAM Overtown - Local retail, Incubator restaurants, Studio Space/Warehouse I� OVERTOWN moi— ------•-- F1 r i w LLF > p ¢, Le-------------- _J m Z Z11 I HIGH COMMERCIAL [RESTAURANT, RETAIL, LIVE MUSIC, GALLERY] LOW COMMERCIAL [GYMS, STUDIO SPACE, INCUBATOR RETAIL] \ _ STRUCTURED PARKING [P.A.C., CITY EVENT PARKING] \ IIIIIIIII SURFACE PARKING [CAN BE CLOSED FOR EVENTS OR REPURPOSED]\ -- GREENSPACE & PUBLIC SPACE [PLAY FIELD, FESTIVALS, ICE SKATING RINK] SPORTS & RECREATION [PUBLIC GREENSPACE, STORMWATER TREATMENT] j[ FACILITIES & WAREHOUSE [WAREHOUSE, STORAGE FACILITIES] MUNICIPAL USE [CITY EQUIPMENT STORAGE, TRANSIT REPAIR] 1021 PERKINS+WILL URBAN FDOT� Downtown - Fitness and sports facilites, Dog Park and Playground, Pet care and convinience store NW 15TH ST L Z NW 14TH ST ' ----- DOWNTOWN -- II NW 10TH ST Son THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Biscayne - Public plaza and park space, Restaurant and Cafes, Parking Facilities m LI BISCAYNE LU > — — — — — — — — — — — \ -- --- r MDC PROPERTY ' I � u e. J L � � O --� w--i--------------- > ¢ N /\III Z i O' 150' 300' 450' 750' E. COMPREHENSIVE ANALYSIS / SCENARIO `B' PARKING FOCUS Overtown - Local retail, Incubator restaurants, and Parking ,.� OVERTOWN --- /i— ------ ----1� Downtown - Parking Structure for PAC and City events, Mechanized Parking, Passive greenspace Q F NW 15TH ST Q f ..••L.. i---�--.---- II I— — l:,l 1- - • -� �,� F � L - - r �! GREENSPACE & PUBLIC SPACE [PLAY FIELD, FESTIVALS, ICE SKATING RINK) SPORTS & RECREATION [PUBLIC GREENSPACE, STORMWATER TREATMENT] FACILITIES & WAREHOUSE [WAREHOUSE, STORAGE FACILITIES] MUNICIPAL USE [ CITY EQUIPMENT STORAGE, TRANSIT REPAIR) THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Biscayne - Public plaza and park space, Restaurant and Cafes, Parking Facilities at Z1,m L L C4 3'I� Z � z, NW 14TH ST I � I HIGH COMMERCIAL (RESTAURANT. RETAIL, LIVE MUSIC, I GALLERYI LOW COMMERCIAL [GYMS, STUDIO SPACE, INCUBATOR RETAIL] STRUCTURED PARKING [P.A.C., CITY EVENT PARKING) \ VNTOWN SURFACE PARKING [CAN BE CLOSED FOR EVENTS OR REPURPOSED) - GREENSPACE & PUBLIC SPACE [PLAY FIELD, FESTIVALS, ICE SKATING RINK) SPORTS & RECREATION [PUBLIC GREENSPACE, STORMWATER TREATMENT] FACILITIES & WAREHOUSE [WAREHOUSE, STORAGE FACILITIES] MUNICIPAL USE [ CITY EQUIPMENT STORAGE, TRANSIT REPAIR) THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Biscayne - Public plaza and park space, Restaurant and Cafes, Parking Facilities I I + -c I 4 I -- W —. Z O' 150' 300' 450' FDOTT URBAN N I 750' PERKINS+WILL 1103 • NW 14TH ST - • _ w_ • •' • • • • • • • • • • • • VNTOWN _ t • W \ —— ---BISCAYNE--- ��\ a ��� • - -U Lu° I� I I + -c I 4 I -- W —. Z O' 150' 300' 450' FDOTT URBAN N I 750' PERKINS+WILL 1103 E. COMPREHENSIVE ANALYSIS / SCENARIO `C' GREENSPACE FOCUS Overtown - Local retail, Incubator restaurants, Parking, Greenspace, Sport courts and fields Downtown - Sport courts and fields, Dog Park and Playground, Pet care and convinience store THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Biscayne - Public plaza and park space, Restaurant and Cafes, Parking Facilities 4 i NW 15TH ST Q — NW 14TH ST - ?� ° - • • • • Lam_ OWNTOWN • • • • • • I• • • • • • • • • i • • P J I� _ - J J--- ----------- --\ LI .� F- - - �� BISCAYNE _I I - ----------------- I / \ �•�W -� „ � - - - �_�' —_ srss" — err r_ > s oujoujil �i' L� �,� �. (9DC PROPERTY - -�i: , ro 7Z I Z Zioo � let=oo X15. - !� - r7tr �rs�l IlrrTi "'s %'� 1✓ I i I HIGH COMMERCIAL [RESTAURANT, RETAIL, LIVE MUSIC, GALLERYI I I + t I LOW COMMERCIAL [GYMS, STUDIO SPACE, INCUBATOR RETAIL] �' • • + • • • • `1 / a �n • • • * / -- _ STRUCTURED PARKING [P.A.C., CITY EVENT PARKING) — � SURFACE PARKING [CAN 8E CLOSED FOR EVENTS OR REPURPOSED] '-_._---- —------�--/ i GREENSPACF & PUBLIC SPACE [PLAY FIELD, FESTIVALS, ICE SKATING RINK) Q N SPORTS &RECREATION [PUBLIC GREENSPACF, STORM WATER TREATMENT]In/\ C FACILITIES & WAREHOUSE [WAREHOUSE, STORAGE FACILITIES] w MUNICIPAL USE [CITY EQUIPMENT STORAGE, TRANSIT REPAIR] NW 10TH ST Z O' 150' 300' 450' 750' 1041 P E R K I N S + W I L L URBAN FD E. COMPREHENSIVE ANALYSIS / SCENARIO `A' MIXED PROGRAM WITH METRICS THIS DOCUMENT IS A SUBSTITUTION TO I ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. DOWNTO iN - — — — — — — — — — — — BISCAYNE -------------------- ► \—---------------------- SCENARIO A- MIXED PROGRAM ANTICIPATED ANNUAL REVENUE SYMBOL ZONING (GSF) (LSF (& .85) REVENUE LOW REVENUE HIGH COST OF CONSTRUCTION TOTAL LOW TOTAL HIGH — HIGH COMMERCIAL 50,350 42,798 30 50 $200 SF $1,283,925 $2,139,875 LOW COMMERCIAL 40,802 34,682 15 25 $150 SF $520,226 $867,043 — STRUCTURED PARKING 53,523 *300 1500 2100 $19,000 (PER SPACE) $450,000 $630,000 SURFACE PARKING 141,144 *280 1090 1450 $6,500 (PER SPACE) $305,200 $406,000 RECREATION/ EVENT SPACE 245,233 208,448 $0 $400,000 MIXED OPEN SPACE 452,123 384,305 $0 $0 FACILITIES/ WAREHOUSE 56,789 48,271 8 14 $70 SF $386,165 $675,789 I+IUNICIPAL USE 73,855 62,777 0 8 BASED ON GROUND LEASE $0 $502,214 *spaces TOTAL $2,945,516 $5,620,921 Projected revenue based on survey of current market conditions in Downtown Miami. More detailed analysis would be required to verify these estimates. N 0' 150' 300' 450' 750' 4 TF. FDOTT URBAN PERKINS +WILL 1105 E. COMPREHENSIVE ANALYSIS / SCENARIO `B' PARKING FOCUS WITH METRICS THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. SCENARIO B- PARKING FOCUS TOTAL LOW TOTAL HIGH $445,052 $741,753 SYMBOL ZONING (GSF) (LSF (o, .85) REVENUE LOW REVENUE HIGH COST OF CONSTRUCTION - HIGH COMMERCIAL 17,453 14,835 30 50 $200 SF LOW COMMERCIAL 27,796 23,627 15 25 $150 SF - STRUCTURED PARKING 199,826 *1475 1425 1900 $19,000 (PER SPACE) SURFACE PARKING 145,141 *290 650 870 $6,500 (PER SPACE) RECREATION/ EVENT SPACE 186,902 158,867 MIXED OPEN SPACE 437,481 371,859 - FACILITIES/ WAREHOUSE 5,028 4,274 8 14 $70 SF MUNICIPAL USE 73,855 62,777 0 8 BASED ON GROUND LEASE *spaces TOTAL Projected revenue based on survey of current market conditions in Downtown Miami. More detailed analysis would be required to verify these estimates. 1061 P E R K I N S + W I L L URBAN FD --------------------- ANTICIPATED ANN'JAL REVENUE TOTAL LOW TOTAL HIGH $445,052 $741,753 $354,399 $590,665 $2,101,875 $2,802,500 $188,500 $252,300 $0 $400,000 $0 $0 $34,190 $59,833 $0 $502,214 $3,124,016 $5,349,265 N O' 150' 300' 450' 750' THIS DOCUMENT IS A SUBSTITUTION TO E. COMPREHENSIVE ANALYSIS / SCENARIO'C' ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT GREENSPACE E WITH IVIETRI C END OF THIS DOCUMENT. — -�OVERTOWN — — — — — a f I DOW4�----------- — — — — — — — �•• h NTO �' — BISCAYNE tt• - - !� A _ I i� i�� I �' 1 �••� _ ��� MDC PROPERTY �� s•�ssY- •• Sts• IJ ,, ------------------�---� L+s�'!i'sss•i� I• s • e \ / SCENARIO C- GREENSPACE FOCUS ZONING (GSF) (LSF (&.85) REVENUE LOW REVENUE HIGH COST OF CONSTRUCTION HIGH COMMERCIAL 12,354 10,501 30 50 $200 SF LOW COMMERCIAL 28,294 24,050 15 25 $150 SF STRUCTURED PARKING 53,523 *300 1500 2100 $19,000 (PER SPACE) SURFACE PARKING R 143,935 *285 1090 1450 $6,500 (PER SPACE) RECREATION/ EVENT SPACE 247,097 210,032 MIXED OPEN SPACE 591,049 502,392 FACILITIES/ WAREHOUSE 5,028 4,274 8 14 $70 SF MUNICIPAL USE 53,381 45,374 0 8 BASED ON GROUND LEASE *spaces TOTAL Projected revenue based on survey of current market conditions in Downtown Miami. More detailed analysis would be required to verify these estimates. ANTICIPATED ANNUAL REVENUE TOTAL LOW TOTAL HIGH $315,027 $525,045 $360,749 $601,248 $450,000 $630,000 $310,650 $413,250 $0 $400,000 $0 $0 $34,190 $59,833 $O $362,991 $1,470,616 $2,992,367 N 0' 150' 300' 450' 750' �\ TF. FDOTT URBAN PERKINS+WILL 1107 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT E. COMPREHENSIVE ANALYSIS END OF THIS DOCUMENT. SCENARIO COMPARISON WITH METRICc MIXED PROGRAM SCENARIOA-MIXED PROGRAM ANTICIPATED ANNUAL REVENUE SYMBOL ZONING TOTAL LOW TOTAL HIGH 1H IGH COMMERCIAL $1,283,925 $2,139,8]51 LOW COMMERCIAL $520,226$867,0431 $2,802,500 STRUCTURED PARKING $450,000 $630,0001 SURF CE PARKING $305,200 $406,0001 RECREATION/ EVENT SPACE $0 $400,0001 $0 MIXED OPEN SPACE $0 $OI $59,833 FACILITIES/ WAREHOUSE $386,165 $675,7891 $502,214 MUNICIPAL USE $0 $502,2141 1 $2,945,516 $5,620,9211 Projected revenue based on survey of current market conditions in Downtown Miami More detailed analysis would be required to verify these estimates, 1081 P E R K I N S + W I L L URBAN FD PARKING FOCUSED KING F 1NG CIPATED EVENUE AN TIOTASOS,52UAL RTOTAL HIg41,753 HIGHCOME TOTAL LOWEDyIANN $315,02] TOTAL H GH LOW COMMERCIAL $354,399 $590,665 STRUCTURED PARKING OMUNICIPALUSE $2,101,875 $2,802,500 SURFACE PARKING $188,500 $252,300 RECREATION/EVENT SPACE $0 $400,00MIXED OPEN SPACE $0 $0 FACILITIES/WAREHOUSE $34,190 $59,833 MUNICIPAL USE $0 $502,214 $3,124,016 $5,349,265 Projected revenue based on survey of current market conditions in Downtown Miami More detailed analysis would be required to verify these estimates GREENSPACE FOCUSED S S(jEN C- GREENSP/�C ANTICIPATAL REVENUE BI;IQ ONGS `/M (1L IGH COMMERCIAL TOTAL LOWEDyIANN $315,02] TOTAL H GH LOW COMMERCIAL $360,749 $601,248 STRUCTURED PARKING $450,000 $630,000 SURFACE PARKING $310,650 $413,250 7$525,045 RECREATION/ EVENT SPACE $0 $400,000 MIXED OPEN SPACE $0 $0 0ACILITIES/WAREHOUSE $34,190 $59,833 MUNICIPAL USE $0$362,991 $1,470,618 $2,992,367 Projected revenue based on survey of current market conditions in Downtown Miami More detailed analysis would be required to verifythese estimates THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. PERKINS +WILL SUBSTITUTED I MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding ("MOU) is entered into on the da of , 2019 ("Effective Date"), by and between the STATE OF FL IDA DEPARTMENT OF TRANSPORTATION, an agency of the State o Florida ("DEPARTMENT"), and the CITY OF MIAMI, a municipal corporation of the S to of Florida ("CITY") (collectively, the DEPARTMENT and the CITY shall be referred to as e "Parties" and individually as "Party"). The Parties intend to collectively pursue the develo ent of community enhancements, located underneath I-395 ("Underdeck"), consistent with e mission and goals of the DEPARTMENT and CITY. The Parties intend to collaborate, to plan and design the Un rdeck in a manner consistent with: (a) the Location Map, attached hereto as Exhibit "A" a incorporated herein by reference; (b) the Aesthetic Volume 2: Proposer's Aesthetic M ual, attached hereto as Exhibit "B" and incorporated herein by reference; (c) the Aesthetic Master Plan, attached here as Exhibit "C" and incorporated herein by reference; and, (d) the Programming Study and Rec mendations, attached hereto as Exhibit "D" and incorporated herein by reference The aforementioned Exhibits and/ referred to herein collectively as the "Exhibits". Accordingly, the Parties d ire to cooperate in the pursuit of the Underdeck design in a manner that is mutually benefic' 1 to the other in accordance with the terms hereof. RECITALS A. Therment TMENT has jurisdiction over I-395 and is undertaking a project which includes the devel of a bridge over Biscayne Boulevard ("Signature Bridge"); the Un/deckamndighway capacity improvements which are intended to improve safety and moaforementioned Exhibits. Parties intendto create an active environment, consistent with the Exhibits. Parties possess a mutual understanding the Underdeck should be planned and deser that allows for revenue -generating opportunities, in order to fund operations maintenance of the Underdeck. Page 1 of 9 I SUBSTITUTED I D. Accordingly, the Parties wish to explore the joint planning and design of the Underdeck over the course of the next twelve (12) months, wherein the CITY will contribute plan and design, in a manner consistent with the Exhibits, and the DEPARTMENT will re ew and comment on said plan and design. E. To that end, the Parties desire to execute this MOU to more specific y outline their expectations as to their respective roles and responsibilities regarding explori the viability of the development of the Underdeck. Ultimately, the Parties would like to ent into subsequent agreements relating to Underdeck, including but not limited to a Develop ent Agreement; the DEPARTMENT's lease of the Underdeck property to the CITY; and, a nderdeck Operations and Maintenance Agreement. The Parties acknowledge a transactio f this type involves terms and conditions which are unforeseen at this point and have not ye een agreed upon. This MOU is not intended to be a complete or definitive statement of al the terms and conditions of any proposed transaction. Instead, this MOU contemplates d is subject to the negotiation and execution of further agreements. NOW, i rthx-tFORE, the Parties agree as 1. General Framework. This MOU is entered into to memo 'alize the preliminary terms of the transactions and further agreements discussed herein. A iscussed in the recitals and throughout the MOU, the provisions and terms in this MOU re preliminary and shall not be construed to limit the consideration of alternative provis. ns. This MOU is intended to provide a general framework for the Parties' dealings regardin e Underdeck with the goal of reaching agreement on the final design of the Underdeck a of entering into a lease agreement providing for the CITY's lease, maintenance and operati s of the Underdeck. u,,. eve this A40U does not eammit either- Pai4 , The Parties shall negotiate, in a timely manner, such superseding and additional ag ements as are necessary to carry out the provisions of this MOU. 2. Term d Phases. Th erm of this MOU is one (1) year from the Effective Date. The term shall be divided into thr (3) phases, described below: • Concept Phase: the Concept Phase shall run from the Effective Date until six months thereafter. By way of example, if the Effective Date were January 31, 2019, the Concept Phase would run from January 31, 2019 — July 31, 2019. Page 2 of 9 I SUBSTITUTED I • Review Phase: the Review Phase shall last approximately thirty (30) days and begin immediately after the last day of the Concept Phase. /aef example f the Concept Phase were to run from January 31 2019 —Jul, the iew Phase shall begin on August 1 2019 and last until approximust 2019. Notwithstanding the foregoing, the DEPARTMENT, workiITY, shalluse best efforts to expedite the Review. Any and all applr requests forapproval from FHWA are not subject to this thirty-dayperiod. TheDEPARTMENT will make every effort to expedite such apor requests to maintain the project timeline. • Deliverable Phase: the Deliverable Phase s/las (5) months and begin immediately after the last day of the Reviewway of example, if the Review Phase ends on August 31, 2019, the Phase would begin on September 1, 2019 and last until January 3 The Parties understand time is of the essence an , thus, intend to create an Underdeck plan and design with a level of specificity comparable to e plan and design in Exhibit "B" on or before the 365m day after the Effective Date. 3. Project Develent Viability. Consistent with the developme and design goals and objectives of the Underdeck, described in the Exhibits attached eto, the CITY agrees to expend the funds necessary to determine the viability of operatin and maintaining the Underdeck. Such expenses may include, but is not limited to costs for tl/following: • Conceptual • Develop ent programming • Busi ss plan • C flow projections • Aegal structure and preliminary lease documents 4. R4Aed ADDroach. Durin e Phases, described in Section 2 above, the CITY shall be responsible to work towards an nderdeck plan and design which is consistent with the Exhibits. Therefore, the roles and sponsibilities described below are not exhaustive and may be expanded or reduced by written consent of both Parties. Page 3 of 9 I SUBSTITUTED I • Concept Phase: during the Concept Phase, the CITY shall engage third parties to plana and design the Underdeck in a manner that creates an active mixed-use environmeylE, which may include open spaces; green and natural landscaping; educational, istic and cultural components; lighting and soundscapes; restaurants and cafes; f d event areas and festival spaces; and parking that is consistent with the shared oals of the Parties and the Exhibits. The work product the CITY generates, during is phase, shall be conceptual and submitted to the DEPARTMENT not less tha once per month. Thereafter, the DEPARTMENT shall provide comments 1,/ tive to the CITY's submittals. The DEPARTMENT's comments shall be deliv ed to the CITY no more than ten (10) business days after the C/review. ittal. As the conceptual plan and design evolves the CITY shall continuee usiness plan for the operation and maintenance of the Underdeck. At e Concept Phase, the CITY shall submit a plan and design with a level ofomparable to the plan and design provided in Exhibit "B" for DEPARTM.Review Phase: during the Review PhaseTMENT shall review the CITY's submittal for consistency /theibits, the Department's guidelines, standards, specifications, financials, pocedures, and the shared goals set forth above. The DEPARTMENT shallments on the CTTY's plan and design. Deliverable Phase: durierable Phase, the CITY shall address the DEPARTMENT-provi d comments and continue to develop the CITY's plan and design in a manner onsistent with the Exhibits and the DEPARTMENT's review comm/Then and design shall be refined to provide greater detail, including but not limty placement business plan models and conceptual budgets. The CITY the refined plan and design, to the DEPARTMENT, for review and commthly basis. The CITY shall submit a final plan and design no later 365th day after the Effective Date. Both Parties shall take part in said reviews, shall occur on a timely basis, as described above. Final Review Phase: the Review Phase shall last approximately thirty (30) days and begin immediately after the last day of the Deliverable Phase. Notwithstanding the foregoing, the DEPARTMENT, working with the CITY, shall use best efforts to expedite the Review. During the Review Phase, the DEPARTMENT shall review the Page 4 of 9 I SUBSTITUTED CITY's submittal for consistency with the Department's guidelines, standards, specifications, financials, policies and procedures, and the shared goals set forth /thi Any and all applications or requests for approval from FHWA are not subject thirty -day review period. • DEPARTMENT Approval: Upon completion of the Final Review hase, the DEPARTMENT will make a final determination whether or not to app ve the CITY's proposed plan and design, and any or all of the elements cont ned therein. The DEPARTMENT's final approval of the Underdeck plan and esign with elements proposed by the CITY is contingent upon both Parties' ex ting a lease agreement providing for the CITY's lease of the properties making the Underdeck; governing the CITY's operations and maintenance obligations- and providing for the CITY's ability to establish zoning criteria for the Underde . 5. Termination of MOU. Termination of MOU. Either Party may terminate this MOU, by written notice ereof to the other. The Party requesting the termination must provide written notice with the ratio e for withdrawal and allow fifteen (15) days to address any concerns after providing said notice. If y concerns cannot be addressed by the end of the fifteen -day (15) period, then any previously deli v ed termination notice becomes effective without further notice. 6. Flow of ECQnomic Benefits. The goal and objective of th/CITY is to structure the ownership, funding, and operation of the Underdeck in a way that 11 provide for the collection of revenue sufficient to allow the payment of expenses necessar to operate and maintain the Underdeck. It is the goal and objective of the Parties that the reve e collected by the CITY provide operating subsidies and maintenance reserve contributions ich shall be used, entirely, in relation to the Underdeck's operation and maintenance. Rem ' ing annual net cash flow, resulting from the operation of the Underdeck, will be received by t CITY to be used for CITY -wide public transportation -related purposes. 7. Roles nd Responsibilities, a) DEPARTMENT: The DEPARTMENT shall be fully responsible for the selection, supervision, and, ultimately, for the contractual engagement of the architect, engineers, contractor, and other professional consultants involved in the final design and construction of the Underdeck The DEPARTMENT will lead its team Page 5 of 9 SUBSTITUTED I ("Development Team") through the planning, design, and construction phases of the Underdeck. The DEPARTMENT understands the CITY shall engage its own professional consultants to prepare and submit a proposed conceptual plan d design, as discussed above and, subsequently, collaborate with the DEPART NT as described herein. In determining whether to approve the CITY's roposed conceptual plan and design, the DEPARTMENT shall ensure the fi design, as discussed in Section 4 above, of the Underdeck meets the DEPAR ENT's design and construction policies, procedures, standards and 'delines financial, scheduling, engineering, and practical requirements, goal and priorities, which shall be communicated to the CITY throughout the P sed Approach discussed above. The DEPARTMENT shall be responsib for the payment of those Development Team members with whom the PARTMENT is in privity of contract. The aforementioned, and any DEP TMENT responsibilities described herein, shall be subject to all applicable DTMENT procurement requirements and/or the availability of funding at th ime of need. (b) CITY: The CITY shall be respo able for the selection, supervision, and the contractual engagement of the ofessional consultants involved in preparing and delivering the CITY's in on the planning and design of the Underdeck enhancements based upo the Exhibits. The CITY's professional consultants shall be referred to, collec ' ely, as the "City Project Team." The City Project Team shall be responsib for preparing a proposed conceptual site plan; developing a business plan; oviding input to the DEPARTMENT on the planning and design of the Und deck. The CITY shall be responsible for the payment of those City Project earn members with whom the CITY is in privity of contract. The afor entioned, and any CITY responsibilities described herein, shall be subject to a applicable CITY procurement ordinance requirements and/or the availability of funding at the time of need. 8. P ' nt-of-Contact. /qn connection with the matters addressed in this MOU, the Design Project Manager, will as designated representative and "point person" for the DEPARTMENT and the opment Team. The Director of the Office of Capital Improvements, will serve as the Page 6 of 9 SUBSTITUTED I designated representative and "point person" for the CITY and the City Proj ect Team. All official communication about material issues related to the development of the Underdeck must fl through the Design Project Manager and the Director of the Office of Capital Improvement ith each of these designated representatives responsible for the further dissemination of in ation to other members of their respective teams as they deem appropriate. 9. Notice*. All notices under this MOU, including contracts, definitive agreeme s, etc. shall be in writing and shall be deemed duly given (a) when delivered personally or y prepaid overnight courier, with a record of receipt, (b) the third day after mailing if maile y certified mail, return receipt requested, or (c) the day of transmission, if sent after regular siness hours, provided that, in either event, the completed transmission is electronically verifi d on the day of transmission or the first day thereafter on which receipt can be verified, to th arties at the following addresses or telecopy numbers (or to such other address or telecopy umber as a Party may have specified by notice given to the other Party pursuant to this provi on): To the DEPARTMENT: Florida Department of Transportation District Six Attn: District Maintenance Engine 1000 NW 111 AVE Room 6205-B Miami, Florida 33172 To the CITY: City Manager City of Miami 444 SW 2 AVE 10th Floor Miami, Flo � a 33130 With copies to: Vice of Capital Improvements ity of Miami 444 SW 2 AVE 8th Floor Miami, Florida 33130 Page 7 of 9 SUBSTITUTED City Attorney Office of the City Attorney City of Miami 444 SW 2 AVE 9th Floor Miami, Florida 33130 10. Entire Memorandum. This MOU constitutes the entire agreement between the Parties, and m be amended or modified only in writing, executed by each Party. 11. Due Authorization. The Parties represent and warrant that the signatories below e duly authorized by the Party each represents to enter into this MOU on behalf of said Pa y, and by their signatures do bind the Party they represent to the terms of this MOU. 12. Controlling Law. This MOU is governed by and will be interpreted nd enforced under the laws of the State of Florida. Venue for any actions or suits arising f m or related to this MOU shall be in the Circuit Courts of Miami -Dads Countvy , Florida. 13. $everabililv_. If any term or provision/to r the application thereof to any Party shall to any extent be invalid or unenforceaber of this MOU, or the application of such term or provision to the Party other than it is invalid or unenforceable, shall not be affected thereby. IN WITNESS W1 E OF, the Parties hereto have executed this Agreement on the day of 2019. ATTEST: CITY OF MIAMI, a municipal corporation of the State of Florida By: By: Todd . Hannon Dr. Emilio T. Gonzalez Ci Clerk City Manager Page 8 of 9 SUBSTITUTED REQUIREMENTS: Ann -Marie Sharpe, Director Risk Management Department FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida File Number: 5692 City of Miami Legislation Resolution Enactment Number: R-19-0204 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com Final Action Date:5/23/2019 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING AN INCREASE TO THE PROFESSIONAL SERVICES AGREEMENTS WITH A.D.A. ENGINEERING, INC., AMBRO, INC., A&P CONSULTING TRANSPORTATION ENGINEERS, CORP., CHEN MOORE AND ASSOCIATES, INC., COASTAL SYSTEMS INTERNATIONAL, INC., EAC CONSULTING, INC., HBC ENGINEERING COMPANY, H.W. LOCHNER, INC., KIMLEY-HORN AND ASSOCIATES, INC., MILIAN, SWAIN & ASSOCIATES, INC., STEARNS, CONRAD AND SCHMIDT, CONSULTING ENGINEERS, INC., SRS ENGINEERING, INC., TETRA TECH, INC., TRACE CONSULTANTS, INC., WANTMAN GROUP, INC., AND WSP USA, INC., FOR THE PROVISION OF CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS, FOR ADDITIONAL WORK IN AN AMOUNT NOT -TO -EXCEED $500,000.00 FOR EACH FIRM, THEREBY INCREASING THE TOTAL COMPENSATION LIMIT FROM $500,000.00 TO AN AMOUNT NOT -TO -EXCEED $1,000,000.00 EACH; ALLOCATING FUNDS FROM THE APPROPRIATE CAPITAL IMPROVEMENT PROJECTS AND DEPARTMENTAL BUDGETS, SUBJECT TO BUDGETARY APPROVAL AT THE TIME OF THE NEED; AUTHORIZING THE CITY MANAGER TO EXECUTE AN AMENDMENT TO EACH AGREEMENT WITH A.D.A. ENGINEERING, INC., AMBRO, INC., A&P CONSULTING TRANSPORTATION ENGINEERS, CORP., CHEN MOORE AND ASSOCIATES, INC., COASTAL SYSTEMS INTERNATIONAL, INC., EAC CONSULTING, INC., HBC ENGINEERING COMPANY, H.W. LOCHNER, INC., KIMLEY-HORN AND ASSOCIATES, INC., MILIAN, SWAIN & ASSOCIATES, INC., STEARNS, CONRAD AND SCHMIDT, CONSULTING ENGINEERS, INC., SRS ENGINEERING, INC., TETRA TECH, INC., TRACE CONSULTANTS, INC., WANTMAN GROUP, INC., AND WSP USA, INC., IN SUBSTANTIALLY THE ATTACHED FORM; FURTHER AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE ALL OTHER DOCUMENTS, INCLUDING ANY AMENDMENTS AND EXTENSIONS, SUBJECT TO ALLOCATIONS, APPROPRIATIONS, AND BUDGETARY APPROVAL HAVING BEEN PREVIOUSLY MADE, AND IN COMPLIANCE WITH APPLICABLE PROVISIONS OF THE CODE OF THE CITY OF MIAMI, FLORIDA, AS AMENDED, ("CITY CODE"), INCLUDING THE CITY OF MIAMI'S PROCUREMENT ORDINANCE, ANTI -DEFICIENCY ACT, AND FINANCIAL INTEGRITY PRINCIPLES, ALL AS SET FORTH IN CHAPTER 18 OF THE CITY CODE, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, AND IN COMPLIANCE WITH APPLICABLE REGULATIONS, AS MAY BE NECESSARY FOR SAID PURPOSE. WHEREAS, pursuant to the Section 18-87 of the Code of the City of Miami, Florida, as amended ("City Code") and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed Professional Services Agreements ("Agreement") with A.D.A. Engineering, Inc., AMBRO, Inc., A&P Consulting Transportation Engineers, Corp., Chen Moore and Associates, Inc., Coastal Systems International, Inc., EAC Consulting, Inc., HBC Engineering Company, H.W. Lochner, Inc., Kimley-Horn and Associates, Inc., Milian, Swain & Associates, Inc., R.J. Behar & Company, Inc., RS&H, Inc., Stearns, Conrad and Schmidt, Consulting Engineers, Inc., SRS Engineering, Inc., Stantec Consulting Services, Inc., Tetra Tech, Inc., Trace Consultants, Inc., T.Y. Lin International, Wantman Group, Inc., and WSP USA, Inc., for the provision of Civil Engineering Services for Miscellaneous Projects, in an amount not -to -exceed $500,000.00 for each firm, respectively; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the Compensation Limit under the Agreement to accommodate outstanding and foreseeable future assignments; and WHEREAS, the proposed Amendment No. 1, in substantially the attached form, proposes to increase the Compensation Limit for sixteen (16) Consultants of the twenty (20) currently under contract, based on evaluations conducted by the City's Office of Capital Improvements (OCI) on the City's most recent capital projects, by an amount not -to -exceed $500,000.00, thereby increasing the total Compensation Limit from $500,000.00 to an amount not -to -exceed $1,000,000.00 each, and any increase in the Compensation Limit above $500,000.00 requires City Commission approval pursuant to Section 18-87 of the City Code; and WHEREAS, OCI has a continuing need for professional civil engineering services for miscellaneous projects; and WHEREAS, pursuant to Section 287.055, Florida Statutes, known as the "Consultants Competitive Negotiation Act," provides, in the pertinent portion, that continuing contracts for architects and engineers are limited to projects where the estimated construction cost for each individual project does not exceed $2,000,000.00, among other limitations; and WHEREAS, funds are to be allocated from the appropriate capital improvements projects and departmental budgets. NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble of this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. An increase to the Agreements with A.D.A. Engineering, Inc., AMBRO, Inc., A&P Consulting Transportation Engineers, Corp., Chen Moore and Associates, Inc., Coastal Systems International, Inc., EAC Consulting, Inc., HBC Engineering Company, H.W. Lochner, Inc., Kimley-Horn and Associates, Inc., Milian, Swain & Associates, Inc., Stearns, Conrad and Schmidt, Consulting Engineers, Inc., SRS Engineering, Inc., Tetra Tech, Inc., Trace Consultants, Inc., Wantman Group, Inc., and WSP USA, Inc., for the provision of Civil Engineering Services for Miscellaneous Projects, in an amount not -to -exceed $500,000.00 for each firm, thereby increasing the total Compensation Limit from $500,000.00 to a total amount not -to -exceed $1,000,000.00 each, is authorized.' ' The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to, those prescribed by applicable City Charter and City Code provisions. Section 3. The City Manager is authorized' to execute Amendment No.1, in substantially the attached form, to the Agreements with A.D.A. Engineering, Inc., AMBRO, Inc., A&P Consulting Transportation Engineers, Corp., Chen Moore and Associates, Inc., Coastal Systems International, Inc., EAC Consulting, Inc., HBC Engineering Company, H.W. Lochner, Inc., Kimley-Horn and Associates, Inc., Milian, Swain & Associates, Inc., Stearns, Conrad and Schmidt, Consulting Engineers, Inc., SRS Engineering, Inc., Tetra Tech, Inc., Trace Consultants, Inc., Wantman Group, Inc., and WSP USA, Inc., for said purposes. Section 4. Funds are to be allocated from the appropriate capital improvement projects and departmental budgets. Section 5. The City Manager is further authorized' to negotiate and execute all other documents, including any amendments and extensions, subject to allocations, appropriations, and budgetary approval having been previously made, and in compliance with applicable provisions of the City Code, including the City of Miami's Procurement Ordinance, Anti - Deficiency Act, and Financial Integrity Principles, all as set forth in Chapter 18 of the City Code, in a form acceptable to the City Attorney, and in compliance with applicable regulations, as may be necessary for said purpose. Section 6. This Resolution shall become effective immediately upon its adoption and signature by the Mayor.2 APPROVED AS TO FORM AND CORRECTNESS: i ria i nde�z�4ttor 4/1112019 i na i 'ndeU�z)yttoriey 519t2019 2 If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10) calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH MILIAN, SWAIN & ASSOCIATES, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated September 4, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and Milian, Swain & Associates, Inc. ("Consultant"), a Florida Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: Signatur -- P., C' Print Name, Title ATTEST: 1 Consultant Se etar' Y (Affirm Consul ant Seal, if available) APPROVED AS TO INSURANCE REQUIREMENTS: Ann -Marie Sharpe, Director Risk Management Department ATTEST: MILIAN, SWAIN & ASSOCIATES, INC., a Florida Corporation Signature Print Name, Title of Authorized Officer or Manager (Corporate Seal) APPROVED AS TO LEGAL FORM AND CORRECTNESS: Victoria Mendez, City Attorney CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH EAC CONSULTING, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 22, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and EAC Consulting, Inc. ("Consultant"), a Florida Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services') for the Office of Capital Improvements ("OCI") is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: Signatur� ,�'/arJ�..iE �2i� � DG,Cic� r/1•9,v�� Print Name, Title ATTEST: Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE REQUIREMENTS: Ann -Marie Sharpe, Director Risk Management Department NAVE -11=36 EAC CONSULTING, INC., a Florida Corporation zvl/V // Signature % 0✓1ei4Du;E7_ CWva tI ��i2e�'iDt i Print Name, Title of Authorized Officer or Manager (Corporate Seal) APPROVED AS TO LEGAL FORM AND CORRECTNESS: Victoria Mendez, City Attorney CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH TETRA TECH, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 29, 2018 (the "Agreement") between. the City of Miami,.a municipal corporation of the State of Florida ("City"), and Tetra Tech, Inc. ("Consultant'), a Foreign Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") . is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: Signature v Brian N. Carter, Sr. VP Corporate r'nntrnl l ar Print Name, Title ATTEST: Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE REQUIREMENTS: Ann -Marie Sharpe, Director Risk Management Department ATTEST: TETRA TECH, INC., a Foreign Corporation 4nature !! Richard A. Lemmon,:Sr. Vice President Print Name, Title of Authorized Officer or Manager T E H (Corporate Seal) FEB APPROVED AS TO LEGAL FORM AND CORRECTNESS: Victoria Mendez, City Attorney CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager WkIrAF61261laldilI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH H.W. LOCHNER, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 22, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and H.W. Lochner, Inc. ("Consultant'), a Foreign Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI°) is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: Signature Print Name, Title ATTEST: Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE REQUIREMENTS: Ann -Marie Sharpe, Director Risk Management Department ATTEST: H.W. LOCHNER, INC., a Foreign Corporation Signature' Print Name, Title of Authorized Officer or Manager (Corporate Seal) APPROVED AS TO LEGAL FORM AND CORRECTNESS: Victoria Mendez, City Attorney CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH WSP USA. INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 10, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and WSP USA, Inc. ("Consultant"), a Foreign Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 15-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: WSP USA, INC., a Foreign Corporation !� Mgitally signed by Rmald SI ON: ,.=Ronald M Colas. PE Sl. c=l'S, �=WSP USA INC, III/ e C 201902.2716211bale: 201402.2' I6 21 <8 -05-CO' Soaatbre` Signature Elia Nunez, PE Ronald M. -Colas, PE, SI. Assistant Vice President Vice President I Sr. Area Manaqer Print Name, Title Print Name, Title of Authorized Officer or Manager ATTEST: (Corporate Seal) 7 Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE APPROVED AS TO LEGAL FORM AND REQUIREMENTS: CORRECTNESS: Ann -Marie Sharpe, Director Victoria Mendez, City Attorney Risk Management Department ATTEST: CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH STEARNS, CONRAD AND SCHMIDT, CONSULTING ENGINEERS, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated February 8, 2019 (the "Agreement") between the City of. Miami, a municipal corporation of the State of Florida ("City'), and Stearns, Conrad and Schmidt, Consulting Engineers, Inc. ("Consultant'), a Foreign Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 12019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses, All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: l SignaturV 0 -u --N u n i A P i N c DA , STAT Print Name, Title C)S n \ r' ATTEST: Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE REQUIREMENTS: Ann -Marie Sharpe, Director Risk Management Department �NlMIA STEARNS, CONRAD AND SCHMIDT, CONSULTING ENGINEERS, INC., a Foreign Corporation Signature Print Name, Title of Authorized Officer or Manager (Corporate Seal) APPROVED AS TO LEGAL FORM AND CORRECTNESS: Victoria Mendez, City Attorney CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH WANTMAN GROUP, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 29, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and-Wantman Group, Inc:-("Consultant"),--a--Florida-Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 12019. RECITALS WHEREAS, pursuant to the City of Miami ("City') Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: Signature WANTMAN GROUP, INC., a Florida Corporation ,r Signature Kate Fontaine VP Administration, Corporate Secretary Mario Echaqarrua Executive Vice President / COO Print Name, Title Print Name, Title of Authorized Officer or Manager ATTEST: Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE REQUIREMENTS: Ann -Marie Sharpe, Director Risk Management Department ATTEST: APPROVED AS TO LEGAL FORM AND CORRECTNESS: Victoria Mendez, City Attorney CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH HBC ENGINEERING COMPANY FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 16, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and HBC Engineering Company -("Consultant"); a -Florida --Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: NBC ENGINEERING COMPANY, a Florida Corporation Signature Signature Print Name, Title Print Name, Title of Authorized Officer or Manager ATTEST: (Corporate Seal) Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE APPROVED AS TO LEGAL FORM AND REQUIREMENTS: CORRECTNESS: Ann -Marie Sharpe, Director Victoria Mendez, City Attorney Risk Management Department ATTEST: CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH CHEN MOORE AND ASSOCIATES, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 29, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and Chen Moore -and Associates,—Inc. ("Consultant°), a—Florida Corporation, for the provision_ of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: r i' Signature Print Name, Title ATTEST: Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE REQUIREMENTS: Ann -Marie Sharpe, Director Risk Management Department ATTEST: CHEN MOORE AND ASSOCIATES, INC., a Florida ComVration if Peter Mc ore, President & CEO i Print Name, Title of Authorized Officer or Manager (Corporate Seal) APPROVED AS TO LEGAL FORM AND CORRECTNESS: Victoria Mendez, City Attorney CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH TRACE CONSULTANTS, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 22, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and TRACE Consultants, Inc. ("Consultant'), a Florida Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 12019, RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: Signataie , Print Name, Title ' ATTEST: Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE REQUIREMENTS: Ann -Marie Sharpe, Director Risk Management Department ATTEST: TRACE CONSULTANTS, INC., a Florida Corporation Signature RAP111 J-AluC—L 9-1, r4i5jtA�'tvi- Print Name, Title of Authorized Officer or Manager (Corporate Seal) APPROVED AS TO LEGAL FORM AND CORRECTNESS: Victoria Mendez, City Attorney CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH AMBRO, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated September 7, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and Ambro, Inc. ("Consultant"), a Florida Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 12019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: AMBRO, INC., a Florida Corporation r Signature Srgnat e '_"'45 fQ'" PKe_bg_6�/- Fiee']5; D6AIt Print Name, Title Print Name, Title of Authorized Officer or Manager ATTEST: (Corporate Seal) Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE APPROVED AS TO LEGAL FORM AND REQUIREMENTS: CORRECTNESS: Ann -Marie Sharpe, Director Victoria Mendez, City Attorney Risk Management Department ATTEST: CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City, Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH A.D.A. ENGINEERING, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 16, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida_ ("City"), and A.D.A. Engineering, Inc. ("Consultant'), a Florida Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 12019. RECITALS WHEREAS, pursuant to the City of Miami ("City') Procurement Code Section 18-87 and Request for Qualifications (°RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: Signature V 1Vel e' CD. A-CludI'd CM4-axU Print Name, Title i ATTEST: Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE REQUIREMENTS: Ann -Marie Sharpe, Director Risk Management Department ATTEST: A.D.A. ENGINEERING, INC., a Florida Corporation Signature Alberto D. Argudin, PE, CGC, LEER AP, President Print Name, Title of Authorized Officer or Manager (Corporate Seal) APPROVED AS TO LEGAL FORM AND CORRECTNESS: Victoria Mendez, City Attorney CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH A&P CONSULTING TRANSPORTATION ENGINEERS, CORP. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 16, 2018 (the "Agreement") between -the City of Miami; -a municipal corporation of -the State of Florida ("City"), and A&P Consulting Transportation Engineers, Corp. ("Consultant"), a Florida Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: A&P CONSULTING TRANSPORTATION ENGINEERS, CORP., a F - rida j Corpora Signature Signature Arnelio Alfonso, P.E. - Principal Antonio G. Acosta, P.E. - President Print Name, Title Print Name, Title of Authorized Officer or Manager AT ST:(Corporate Seal) 1 Carlos M. Gil®raP.E* Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE APPROVED AS TO LEGAL FORM AND REQUIREMENTS: CORRECTNESS: Ann -Marie Sharpe, Director Victoria Mendez, City Attorney Risk Management Department ATTEST: CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH COASTAL SYSTEMS INTERNATIONAL, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 16, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and Coastal Systems International, Inc. ("Consultant'), a Florida Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000), The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: COASTAL SYSTEMS INTERNATIONAL, INC., a Florida Corporation Signature Signature Print Name, Title Print Name, Title of Authorized Officer or Manager ATTEST: (Corporate Seal) Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE APPROVED AS TO LEGAL FORM AND REQUIREMENTS: CORRECTNESS: Ann -Marie Sharpe, Director Victoria Mendez, City Attorney Risk Management Department ATTEST: CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH KIMLEY-HORN AND ASSOCIATES. INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 16, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and Kimley-Horn and Associates, Inc. ("Consultant"), a Foreign Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: KIMLEY-HORN AND ASSOCIATES, INC., a Foreign Corporation Signature Signature Print Name, Title Print Name, Title of Authorized Officer or Manager ATTEST: (Corporate Seal) Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE APPROVED AS TO LEGAL FORM AND REQUIREMENTS: CORRECTNESS: Ann -Marie Sharpe, Director Victoria Mendez, City Attorney Risk Management Department ATTEST: CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T, Gonzalez, Ph.D., City Manager CITY OF MIAMI OFFICE OF CAPITAL IMPROVEMENTS AMENDMENT No. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH SRS ENGINEERING, INC. FOR CIVIL ENGINEERING SERVICES FOR MISCELLANEOUS PROJECTS This Amendment No. 1 to the Professional Services Agreement dated August 16, 2018 (the "Agreement") between the City of Miami, a municipal corporation of the State of Florida ("City"), and SRS Engineering, Inc. ("Consultant"), a Florida Corporation, for the provision of Civil Engineering Services for Miscellaneous Projects ("Services") for the Office of Capital Improvements ("OCI") is entered into this day of 2019. RECITALS WHEREAS, pursuant to the City of Miami ("City") Procurement Code Section 18-87 and Request for Qualifications ("RFQ") No. 16-17-063, the City Manager executed an Agreement with Consultant for an amount not -to -exceed $500,000; and WHEREAS, the current Compensation Limit is not sufficient to address the costs associated with the outstanding and foreseeable future design and construction administration assignments; and WHEREAS, it is in the best interest of the City to increase the capacity under the Agreement to accommodate outstanding and foreseeable future assignments, and executing Amendment No. 1 to the Agreement increases the capacity by $500,000, thereby increasing the award value from $500,000 to an amount not -to -exceed $1,000,000; and WHEREAS, the City Commission has adopted Resolution No. to approve the corresponding increase in the Compensation Limits; and NOW THEREFORE, in consideration of the foregoing, the parties hereby amend the Agreement as follows: Section 2.05-1 Compensation Limits is hereby increased by Five Hundred Thousand Dollars ($500,000), thereby increasing the total award value from Five Hundred Thousand Dollars ($500,000), to an amount not -to -exceed One Million Dollars ($1,000,000). The One Million Dollars ($1,000,000) is a Guaranteed Maximum Price inclusive, without limitation, of fees, costs, and reimbursable expenses. All other terms and conditions of the Agreement are in operative force and effect and remain unchanged. IN WITNESS WHEREOF, the parties have executed this Amendment as of the day and year first above written. WITNESS/ATTEST: SRS ENGINEERING, INC., a Florida Corporation Signature Signature Print Name, Title Print Name, Title of Authorized Officer or Manager ATTEST: (Corporate Seal) Consultant Secretary (Affirm Consultant Seal, if available) APPROVED AS TO INSURANCE APPROVED AS TO LEGAL FORM AND REQUIREMENTS: CORRECTNESS: Ann -Marie Sharpe, Director Victoria Mendez, City Attorney Risk Management Department ATTEST: CITY OF MIAMI, a municipal corporation of the State of Florida Todd B. Hannon, City Clerk Emilio T. Gonzalez, Ph.D., City Manager