HomeMy WebLinkAboutSubmittal - Richard Alayon - Traffic Study for Blue Lagoon• • Submitted into the public recSE�r on City Clerk INTERSECTION TRAFFIC STUDY NW 7t1' Street/Blue Lagoon Drive Final Prepared For: BLUE LAGOON CONDOMINIUM ASSOCIATION Prepared By: R.J. Behar & Company, Ine. July 5, 2018 44sc�-S�+�I 2����I AI�y�=raAC- 5W4 ;xp)ik)euy00, TRAFFIC STUDY Table of Contents • EXECUTIVESUMMARY.......................................................................................................................... 5 1. INTRODUCTION................................................................................................................................ 6 2. OBJECTIVE......................................................................................................................................... 6 3. PURPOSE.............................................................................................................................................6 Table 6: With Proposed Project - Access NW 7`h ST.(AM).................................................................... 4. METHODOLOGY............................................................................................................................... 6 5. EXISTING CONDITIONSS................................................................................................................ 6 6. FIELD REVIEW................................................................................................................................... 8 7. TRAFIC DATA COLLECTION.......................................................................................................... 9 8. TRIP GENERATION ANALYSIS....................................................................................................10 9. OPERATIONAL ANALYSIS............................................................................................................12 Table 14: Projected Volume during AM Peak Period (Vph) for the Scenario 2 (Access via NW 7°i St. only) 10. TRAFFIC PROJECTIONS.............................................................................................................15 Table 15: Projected Volume during PM Peak Period (Vph) for the Scenario 2 (Access via NW 7`h St. only) 11. FUTURE OPERATIONAL ANALYSIS.......................................................................................17 12. FINDINGS / CONCLUSION......................................................................................................... 23 is LIST OF TABLES Table 1: Vehicular Turning Movements — AM Peak Hour Data.................................................................. 9 Table 2: Vehicular Turning Movements - PM Peak Hour Data................................................................... 9 Table 3: Vehicular Trip Generation for the 713L Project............................................................................11 Table 4: Existing Conditions (AM)............................................................................................................12 Table 5: Existing Conditions(PM).............................................................................................................13 Table 6: With Proposed Project - Access NW 7`h ST.(AM).................................................................... 13 Table 7: With Proposed Project - Access NW 7°i ST.(PM)......................................................................14 Table 8: With Proposed Project - Access NW 7'h ST & NW 47`h Ave.(AM)............................................14 Table 9: With Proposed Project - Access NW 7`h ST & NW 47`hAve. (PM).............................................15 Table 10: 2040 Daily Traffic Projections(LRTP)......................................................................................15 Table 11: Projected 2023 Average Daily Volumes along NW 7'h Street .................................................... 16 Table 12: Existing Volumes Projected to the Year 2023 during AM Peak Period (Vph) ..........................16 Table 13: Existing Volumes Projected to the Year 2023 during PM Peak Period (Vph).......................... 16 Table 14: Projected Volume during AM Peak Period (Vph) for the Scenario 2 (Access via NW 7°i St. only) ....................................................................................................................................................................17 Table 15: Projected Volume during PM Peak Period (Vph) for the Scenario 2 (Access via NW 7`h St. only) .................................................................................................................................................................... 17 Page ii • SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk Submitted into the public record for item(s) PZ.8 on 10/25/18, City Clerk TRAFFIC STUDY • Table 16: Projected Volume during AM Peak Period (Vph) for the Scenario 3 (Access via NW 7"' St. & 47"' Ave.)............................................................................ ...............................................................................17 Table 17: Projected Volume during PM Peak Period (Vph) for the Scenario 3 (Access via NW 7"' St. & 47`h Ave.)...........................................................................................................................................................17 Table 18: Projected year 2023 Volumes (Vph)(AM)................................................................................18 Table 19: Projected year 2023 Volumes (Vph)(PM).................................................................................18 Table 20: Existing Volumes projected to the year 2023 plus Proposed Project (Vph) —Access NW 7'h ST. (AM)...........................................................................................................................................................19 Table 21: Existing Volumes projected to the year 2023 plus Proposed Project (Vph) —Access NW 7`h ST. (PM)............................................................................................................................................................19 Table 22: Existing Volumes projected to the year 2023 plus Proposed Project (Vph) - Access NW 7t" ST & NW47th Ave.(AM)................................................................................................................................... 20 Table 23: Existing Volumes projected to the year 2023 plus Proposed Project (Vph) - Access NW 7`h ST & NW47`h Ave.(PM)..................................................................................................................................... 20 Table 24: Vehicular Traffic Volumes Comparison.................................................................................... 23 Table 25: Vehicular Delay Comparison..................................................................................................... 23 Table 26: Level of Service (LOS) Comparison.......................................................................................... 24 LIST OF FIGURES • Figure 1: Location Map. Source: google maps............................................................................................. 7 Figure 2: Location Map. Source: google maps............................................................................................. 8 Figure 3: Illustration of the Existing Turning Volumes. Source: google maps..........................................10 Figure 4. Case 1 (NW 7`h St. only) Ingress/Egress % Trip Distribution.................................................... 11 Figure 5. Case 2 (NW 7`h St. & via 47"' Ave.) Ingress/Egress % Trip Distribution ................................... 12 LIST OF APPENDICES Appendix A - Existing Conditions TMC Counts Appendix B - ITE Trip Generation Appendix C - LOS Analysis Reports • SW 7`h Street/Blue Lagoon Drive, Miami -Dade Count Page iii g Y g Submitted into the public record for item(s) PZ.8 on 10 25 18 City Clerk TRAFFIC STUDY • Professional Engineer's Certification I, Rafael E. De Arazoza, P.E., certify that I currently hold an active Professional Engineer's License in the State of Florida and I am competent through education and experience to provide engineering services in the civil and traffic engineering disciplines contained in this report. I further certify that this report was prepared by me or under my responsible charge as defined in Chapter 61G15-18.001 F.A.C. and that all statements, conclusions and recommendations made herein are true and correct to the best of my knowledge and ability. Project Description: Traffic Study for the Blue Lagoon Condominium Association. Tasks: Trip Generation, Intersection Existing Conditions Data Collection/Analysis and Roadway Segment Analysis, with and without proposed project. Location: NW 7'h Street/Blue Lagoon Drive, Miami -Dade County Rafael E De Arazoza Digitally signed by Rafael E De Arazoza Date: 2018.07.05 11:40:20 -04'00' Rafael E. De Arazoza, P.E., PTOE P.E. No.24487 R.J. Behar & Company 6861 SW 196`h Avenue, Suite 302 Pembroke Pines, Fl 33332 Certificate of Authorization No. 00008365 SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page iv is Submitted into the public record for item(s) PZ.8 on 10/25/18, City Clerk 0 EXECUTIVE SUMNIARY INTRODUCTION TRAFFIC STUDY The Blue Lagoon Condominium Association (BLCA) is concerned with regards to potential negative impacts to NW 7`h Street and other roadways within the immediate surrounding area, as the result of the vehicular traffic generated by the proposed land development project titled "7 at Blue Lagoon" (713L). Furthermore, it is well-known that significant increase in vehicular traffic has the potential of diminishing the quality of life of adjacent residential communities. The 7BL project is bounded by the Blue Lagoon to the north, 4705 NW 7`h Street to the east, 5091 NW 7`h Street to the west and by the NW 7`h Street to the south. The project consists of 888 apartment units and 294 hotel rooms, as show on page A1.00 of the Rezoning Plans Project Data, dated March 5, 2018. According to the proposed rezoning plans, it appears that the only means of ingress/egress to/from the proposed project is via NW 7th Street. OBJECTIVE The objective is to determine the amount of vehicular traffic generated by the proposed 7BL project and determine the resulting impacts on roadway capacity and Level -of -Service (LOS) on the • easement over the 7BL property leading to the BLCA property (named Blue Lagoon Airport Drive and demarcated in the plat on PB 153, Page 27 of the Public Record of Miami -Dade County, Florida) as well as NW 7`h Street. This analysis will not entail the customary more detailed and comprehensive Traffic Impact Study (TIS). TISs are generally performed by the applicant's traffic engineer during the subsequent project site development phase. PURPOSE The purpose of this task order is to perform a Traffic Study to evaluate the impact of the proposed 713L project to the Blue Lagoon Airport Drive (hereafter referred to as Blue Lagoon Drive) access roadway intersection with NW 7`h Street. FINDINGS/CONCLUSION Based on the analyses of the intersection of NW 7th Street/Blue Lagoon Drive and the roadway segment of NW 7`h Street near Blue Lagoon Drive, including the field reviews, trip generation - distribution and traffic data collection, it is concluded that vehicular traffic generated by the proposed 713L Project will result in significant negative impacts in terms of roadway LOS and substantially increased vehicular delays. Refer to Tables 24, 25 & 26 on pages 23 & 24 for details. SW 7'h Street/Blue Lagoon Drive, Miami -Dade County Pae 5 g g Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk 1. INTRODUC'T'ION TRAFFIC STUDY The BLCA is concerned with regards to potential negative impacts to NW 7`h Street and other roadways within the immediate surrounding area, as the result of the vehicular traffic generated by the proposed land development project titled "7 at Blue Lagoon" (713L). Furthermore, it is well- known that significant increase in vehicular traffic has the potential of diminishing the quality of life of adjacent residential communities. The 713L project is bounded by the Blue Lagoon to the north, 4705 NW 7`h Street to the east, 5091 NW 7`h Street to the west and by the NW 7`h Street to the south. The project consists of 888 apartment units and 294 hotel rooms as show on page A1.00 of the Rezoning Plans Project Data, dated March 5`h, 2018. According to the proposed rezoning plans, it appears that the only means of ingress/egress to/from the proposed project is via NW 7`h Street. 2. OBJECTIVE • The objective is to determine the amount of vehicular traffic generated by the proposed 713L project and determine the resulting impacts on roadway capacity and LOS on the easement over the 713L property leading to the BLCA property (named Blue Lagoon Airport Drive and demarcated in the plat on PB 153 Page 27 of the Public Record of Miami -Dade County, Florida) as well as NW 7`h Street. This analysis will not entail the customary more detailed and comprehensive traffic impact • study (TIS). TISs are generally performed by the applicant's traffic engineer during the subsequent project site development phase. 3. PURPOSE The purpose of this task order is to perform a Traffic Study to evaluate the impact of the proposed 713L project to the Blue Lagoon Airport Drive (hereafter referred to as Blue Lagoon Drive) access roadway intersection with NW 7`h Street. 4. METHODOLOGY The methodology used to perform this study consisted of a field review of the location during the morning and afternoon peak hour periods, reviewing the collected traffic count data, determining the vehicular trip generation by the proposed 7BL project and evaluating of the LOS of the intersection with and without the project. 5. EXISTING CONDITIONS NW 7th Street is a two-way, four lane undivided roadway, which runs west to east within the area of study. This roadway is functionally classified as Minor Arterial and has a posted speed limit of 40 SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 6 • Submitted into the public record for item(s) PZ -8 on 10/25/18 City Clerk RAFFIC STUDY • mph. Blue Lagoon Drive is a two-way, two lane undivided roadway, which runs north to south within the area forming a T -Intersection with NW 7`h Street. The intersection is a signalized on the eastbound, westbound and southbound directions of travel. There are sidewalks located on the north and south side of NW 7`h Street and pedestrian crosswalks to cross north and south. An aerial map showing the location of the intersection of study is presented at Figure 1 and Figure 2. C7 Figure 1: Location Map. Source: Google maps •`h SW 7Street/Blue Lagoon Drive, Miami -Dade County Page 7 Submitted into the public record for item(s) PZ.8 on 10 25 18 City Clerk TRAFFIC STUDY Figure 2: Location Map. Source: Google maps 6. FIELD REVIEW AM and PM peak hour field observations of the study intersections were performed on Tuesday, June 19, 2018. Conclusions from the field observations are included below: General Observations: • During morning peak hour observations, the drivers in the left lane coming from eastbound NW 7`h Street to Blue Lagoon Drive experienced delays. On more than one occasion, it took more than one signal cycle to clear the queue. • The pedestrian crossing time is adequate and pavement crossing marks are in good condition. • On more than one occasion in the morning period, long vehicular queues were observed on Blue Lagoon Drive north of NW 7`h Street with the associated long delays. • Right turn movements from Blue Lagoon Drive to NW 7`h Street during the red signal phase were generally significantly delayed by lack of adequate gaps from westbound vehicles on NW 7`h Street. • • • A significant number of pedestrians, especially during the peak hour (7:45am and 5:00 pm), were observed walking to enter/exit from Blue Lagoon Drive. Also, Blue Lagoon Drive does not have sidewalks for pedestrians; therefore, the pedestrians are sharing the lane with vehicles. SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 8 • • • Submitted into the public record for item(s) PZ -8 on 10/25/18, City Clerk AM Peak Hour Period (7:00-9:00): TRAFFIC STUDY • Most of the time, the eastbound and westbound through movements (NW 7th Street) traffic flow were generally consistent and no significant delays were observed. • Starting at 7:45 am, southbound traffic on Blue Lagoon Drive became heavier and longer vehicular queues developed and on more than one occasion it took more than one signal cycle to clear. • Most of the traffic comes from the west with the highest number of vehicles at 8:30 am. PM Peak Hour Period (4:00-6:00): • Most of the -traffic comes from the east and has the highest number of vehicles at 5:45 pm. • A significant increase in vehicles was observed entering Blue Lagoon Drive from NW 7th Street. 7. TRAFIC DATA COLLECTION Vehicular Turning Movement Counts (TMCs) summarized by fifteen -minute intervals were collected for two hours during the morning peak hour period (7:00 am to 9:00 am) and afternoon peak hour period (4:00 to 6:00 pm) at the intersection of NW 7th Street and Blue Lagoon Drive. The data can be found in Appendix A. TMCs are shown in Tables 1 and 2. Figure 3 below provides a graphic illustration of the existing peak hour turning volumes. Table l: Vehicular Turning Movements — AM Peak Hour Data Peak From the North From the East From the South From the West Hour Right Thru Left Peds Right « Right Thru Left Peds Right Thru Left Peds ,Right Thru Left Peds Right, Thru Left Peds 7:45:AM 74 0 66 12 15 950 0 19 0 0 0 2 0 1167 24 10 - 8:30 AM Table 2: Vehicular Turning Movements - PM Peak Hour Data Peak Hour From the North From the East From the South From the West Right Thru Left Peds Right « Thru Left Peds Right Thru Left Peds Right Thru Left; Peds 05:00 PM - 36 0 30 4 59 1235 0 16 0 0 0 4 0 1098 76 1 5:45 PM 0 SW 7th Street/Blue Lagoon Drive, Miami -Dade County Page 9 Submitted into the public record for item(s) PZ -8 on 10/25/18 City Clerk TRAFFIC STUDY Figure 3: Illustration of the Existing Turning Volumes. Source: Google maps 8. TRIP GENERATION ANALYSIS To determine the trips that will be generated by the proposed residential and hotel facilities (713L Project), the ITE Trip Generation Manual (91h edition) was used. A summary of the analysis is shown below. • The 713L Project consists of 888 high rise apartment units and 294 hotel rooms. • High Rise Apartment (ITE Code 222) and Hotel (ITE Code 310) were used in the analysis. • Hotel (ITE Code 310) was used in the analysis. • Table 3 depicts the result of the vehicle trip generation analysis. • The trip generation formulas used are shown below in Table 3. • Two Case scenarios were analyzed. Case 1 assumes access to/from NW 7`h Street only. Case 2 assumes access to/from NW 7`h Street and via NW 47`h Avenue. • Generated traffic volumes were distributed to NW 7`h Street based on the % from the collected existing traffic counts, engineering judgment and local knowledge. • The trip distribution for ingress/egress for Case 1 and Case 2 scenarios are shown in Figures 4 and 5. • SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 10 0 • L Submitted into the public record for item(s) PZ -8 on 10/25/1 City Clerk TRAFFIC STUDY Table 3: Vehicular Trip Generation for the 713L Project ITE Code / Formulas: LUC 222 Dwelling units (DUs): Daily formula: Ln (T) = 0.83 Ln(X) + 2.50 LUC 222 DUs: AM Peak --hour of adjacent street traffic formula: Ln (T) = 0.99 Ln(X) — 1.14 LUC 222 DUs: PM Peak -hour of adjacent street traffic formula: (T) = 0.32(X) + 12.30 LUC 310 number of Rooms: Daily formula: T = 8.92(X) LUC 310 Rooms: AM Peak -hour of adjacent street traffic formula: T= 0.78(X) -29.80 LUC 310 Rooms: PM Peak -hour of adjacent street traffic formula: T = 0.70(X) Refer to Appendix B for additional details. Figure 4: Case 1 (NW 7th Street only) Ingress/Egress % Trip Distribution 0 SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 11 Daily Peak Hour of Adjacent Peak Hour of Adjacent Street AM Street PM Land Use Units In Out Total In Out Total In Out Total (vpd) (vph) (vph) (vPd) (Wd), (vPh) (vPh) (vPh) VP LUC 222 High Rise 888 Dwelling 1706 1706 3412 66 199 265 181 115 296 Apartment Units LUC 310 Hotel 294 No. of 1312 1312 2624 116 84 200 101 105 206 rooms Total 6036 182 283 465 282 220 502 ITE Code / Formulas: LUC 222 Dwelling units (DUs): Daily formula: Ln (T) = 0.83 Ln(X) + 2.50 LUC 222 DUs: AM Peak --hour of adjacent street traffic formula: Ln (T) = 0.99 Ln(X) — 1.14 LUC 222 DUs: PM Peak -hour of adjacent street traffic formula: (T) = 0.32(X) + 12.30 LUC 310 number of Rooms: Daily formula: T = 8.92(X) LUC 310 Rooms: AM Peak -hour of adjacent street traffic formula: T= 0.78(X) -29.80 LUC 310 Rooms: PM Peak -hour of adjacent street traffic formula: T = 0.70(X) Refer to Appendix B for additional details. Figure 4: Case 1 (NW 7th Street only) Ingress/Egress % Trip Distribution 0 SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 11 Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk TRAFFIC STUDY Figure 5: Case 2 (NW 7'h Street & via 47`h Avenue) Ingress/Egress % Trip Distribution. 9. OPERATIONAL ANALYSIS Intersection LOS Analysis 0•, To establish a comparison between existing and future vehicular traffic conditions, three analysis scenarios were developed. The First Scenario includes existing traffic conditions, the collected traffic data, field observations and analysis. The Second Scenario includes the vehicular volumes generated by the 7131, Project and assumes that all the ingress/egress vehicular traffic will be via the • NW 7`h Street/Blue Lagoon Drive intersection. The Third Scenario assumes that vehicles going to or from the 713L Project will utilize either the NW 7th Street/Blue Lagoon Drive intersection or via NW 47`h Avenue east of the 713L Project. A summary of the LOS analysis for each scenario is shown in the tables below. Scenariol: Existing Conditions (without the 713L Project) Table 4: Existing Conditions (AM) Existing Conditions AM Peak Hour Intersection Movement/Approach Delay LOS (sec/veh) NW 711' Street & Blue Lagoon Drive EB Left 79.7 E EB Thru 10.7 B EB Approach 12.4 B WB Thru & Right 20.9 C WB Approach 20.9 C SB Left 56.8 E SB Approach 56.8 E Intersection 19.0 B SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 12 0 • • Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk AFFIC STUDY From Table 4, it can be seen that the eastbound left turns from NW 7`h Street to Blue Lagoon Drive and the southbound movement from Blue Lagoon Drive are operating at an undesirable LOS with associated vehicular delays. Table 5: Existing Conditions (PM) Existing Conditions PM Peak Hour Intersection Movement/Approach Delay LOS (sec/veh) NW 7th EB Left 95.4 F EB Thru 10.1 B EB Approach 17.2 B Street & Blue Lagoon Drive WB Thru & Right 25.7 C WB Approach 25.7 C SB Left 42.2 D SB Approach 42.2 D Intersection 22.5 C The eastbound left turns from NW 7`h Street to Blue Lagoon Drive are operating at an undesirable LOS with associated vehicular delays. Note: The above delays and LOS are generally consistent with the field observations. Scenario 2: Existing conditions plus 713L Project's generated vehicular volumes with access via NW 7`h Street only. Table 6: With Proposed Project - Access NW 7th Street (AM) With Proposed Project Access NW 7h Street AM Peak Hour Intersection Movement/Approach Delay (sec/veh) LOS NW 7"' Street & Blue Lagoon Drive EB Left 114.7 F EB Thru 9.8 A EB Approach 22.1 C WB Thru & Right 22.4 C WB Approach 22.4 C SB Left 210.9 F SB Approach 210.9 F Intersection 52.9 D 0 SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 13 Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk TRAFFIC STUDY From Table 6, it can be seen that the eastbound left turns from NW 7th Street to Blue Lagoon Drive and the southbound movements from Blue Lagoon Drive are operating at an undesirables LOS with associated vehicular delays. These delays are significantly higher when compared with those under existing conditions without the 713L Project's generated traffic. Table 7: With Proposed Project - Access NW 7th ST. (PM) With Proposed Project Access NW 7"' Street PM Peak Hour Intersection Movement/Approach Delay LOS ' (sec/veh) NW 7th St ` Blue Lagoon EB Left 373.7 F EB Thru 9.3 A EB Approach 89.2 F WB Thru & Right 28.6 C WB Approach 28.6 C SB Left 107.9 F S13 Approach 107.9 F Intersection 62.6 E Table 7 demonstrates that the eastbound left turns from NW 7th Street to Blue Lagoon Drive, the southbound movement from Blue Lagoon Drive, as well as the entire intersection are operating at an undesirable LOS with associated vehicular delays. These delays are significantly higher when compared with those under existing conditions without the 713L Project's generated traffic. Scenario 3: Existing conditions plus 7131, Project's generated vehicular volumes with access via NW 7th Street and NW 47th Avenue. Table 8: With Proposed Project - Access NW 7`h Street & NW 47`h Avenue (AM) With ProposedProject Access NW 7t Street & NW 47` Avenue AM Peak Hour Intersection Movement/Approach Delay LOS (sec/veh) EB Left 114.2 F EB Thru 9.8 A NW 7th EB Approach 22.1 C Street & WB Thru & Right 21.8 C Blue Lagoon WB Approach 21.8 C Drive SB Left 136.3 F SB Approach 136.3 F Intersection 38.7 D 0 SW 7th Street/Blue Lagoon Drive, Miami -Dade County Page 14 0 Submitted into the public record for item(s) PZ.8 on 10/25/18, City Clerk TRAFFIC STUDY • From Table 8, it can be seen that the eastbound left turns from NW 7`h Street to Blue Lagoon Drive and the southbound movement from Blue Lagoon Drive are operating at an undesirable LOS with associated vehicular delays. These delays are significantly higher when compared with those under existing conditions without the 713L Project's generated traffic. Table 9: With Proposed Project - Access NW 7`h Street & NW 47'h Avenue (PM) With Proposed Project Access NW 7t Street & NW 47` PM Peak Hour Avenue Intersection Movement/Approach Delay (sec/veh) LOS 2040 EB Left 355.7 F EB Thru 9.3 A I1VV 7th EB Approach 84.6 F Street & WB Thru & Right 27.4 C Blue - Lagoon WB Approach 27.4 C Drive ; SB Left 74.3 E SB Approach 74.3 E Intersection 56.9 E From Table 9, it can be seen that the eastbound left turns from NW 7`h Street to Blue Lagoon Drive, • the southbound movement from Blue Lagoon Drive, the eastbound approach, as well as the intersection are operating at an undesirables LOS with associated vehicular delays. These delays are significantly higher when compared with those under existing conditions without the 713L Project's generated traffic. 10.TRAFFIC PROJECTIONS The Following base year 2010 and future year 2040 vehicular traffic volumes on SW 7th Street were obtained from the Miami -Dade Transportation Planning Organization 2040 adopted Long Range Transportation Plan (LRTP). The bi-directional daily traffic volumes of NW 7th Street (within the study area) for the year 2010 and 2040 are shown in the table 10 below. Table 10: 2040 Daily Traffic Projections (LRTP). Year NW 7`h Street Units 2010 25730 v d 2040 45470 v d 1 1so Grow Rate = 45470(257301 — 1.019 isSW 7'h Street/Blue Lagoon Drive, Miami -Dade County Page 15 Submitted into the public record for item(s) PZ -8 on 10/25118, City Clerk TRAFFIC STUDY According to the Miami -Dade LRTP, it can be seen that the traffic volume along NW 71h Street is is expected to increase. It was calculated that NW 7`h Street will experience an annual 1.9 % increase in traffic. The annual growth rate of 1.9% was used to determine the increase in vehicular traffic volumes between the years 2018 and 2023. Table 11 provides the projected average daily traffic along NW 7`h Street within the study area. The projected traffic to the existing AM and PM peak hours are shown in Table 12 and Table 13. Projected traffic volumes to the second and third scenarios are shown in Tables 14 to 17. Table 11: Projected 2023 Average Daily Volumes along NW 7`h Street. Direction 2018 2023' Eastbound 14000 15382 Westbound 13500 14832 Bi -Directional 27500 30214 Table 12: Existing Volumes Projected to the Year 2023 during AM Peak Period (Vph) Peak Hour From the North From the East From the South From the West Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds 7:45 AM - 8:30AM 74 0 66 12 15 950 0 19 0 0 0 2 0 1167 24 10 (2018) 36 0 30 4 59 1235 0 16 0 0 0 4 0 1098 76 1 7:45 AM - 8:30 AM 81 0 73 13 16 1044 0 21 0 0 0 2 0 1282 26 11 (2023) Table 13: Existing Volumes Projected to the Year 2023 during PM Peak Period (Vph). Peak Hour From the North From the East From the South From the West- Right Thru Left Peds Right Thru Left Peds Right I Thru Left Peds Right Thru Left Peds 05:00 PM 5:45 PM 36 0 30 4 59 1235 0 16 0 0 0 4 0 1098 76 1 2018 05:00 PM 5:45 PM 40 0 33 4 65 1357 0 18 0 0 0 4 0 1206 83 1 (2023) The following Tables 14 through 17 include the existing volumes projected to the year 2023 plus the 713L Project's generated volumes. SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 16 0 Submitted into the public record for item(s) PZ.8 on 10 25 18 City Clerk TRAFFIC STUDY • Table 14: Projected Volume during AM Peak Period (Vph) for the Scenario 2 (Access via NW 7'h St. only) 40 Peak Hour From the North From the East From the South From the West Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds - 7:45 AM - 8:30AM 74 0 66 12 15 950 0 19 0 0 0 2 0 1167 24 10 (2018) 36 0 30 4 59 1235 0 16 0 0 0 4 0 1098 76 1 7:45AM - 8:30 AM 319 0 258 13 113 1044 0 21 0 0 0 2 0 1282 150 11 (2023) 204 0 155 4 250 1357 0 18 0 0 0 4 0 1206 315 1 Table 15: Projected Volume during PM Peak Period (Vph) for the Scenario 2 (Access via NW 71h St. only) Peak Hour From the North From the East From the South From the West Right Thru Left Peds Right Thru I Left Peds Right Thru I Left Peds Right Thru I -Left Peds 05:00 PM - 5:45 PM (2018) 36 0 30 4 59 1235 0 16 0 0 0 4 0 1098 76 1 05:00 PM - 5:45 PM (2023) 204 0 155 4 250 1357 0 18 0 0 0 4 0 1206 315 1 Table 16: Projected Volume during AM Peak Period (Vph) for the Scenario 3 (Access via NW 7'h St. & 47'h Ave.) Peak Hour From the North From the East From the South From the West' Right ,Thru Left Peds Right Thru I Left Peds Ri ht Thru Left Peds Right Thru Left Peds 7:45 AM - 8:30 AM (2018) 74 0 66 12 15 950 0 19 0 0 0 2 0 1167 24 10 7:45: AM - 8:30 AM (2023) 319 0 199 13 77 1044 0 21 0 0 0 2 0 1282 150 11 Table 17: Projected Volume during PM Peak Period (Vph) for the Scenario 3 (Access via NW 7'h St. & 47'h Ave.) Peak Hour From the North From the East From the South From the West Right Thru Left Peds Right Thru Left Peds Right Thru I Left Peds Right Thru Left Peds 05:00 PM - 5:45 PM (2018) 36 0 30 4 59 1235 0 16 0 0 0 4 0 1098 76 1 05:00 PM - 5:45 PM (2023) 204 0 109 4 194 1357 0 18 0 0 0 4 0 1206 315 1 I ].FUTURE OPERATIONAL ANALYSIS Future Intersection LOS Analysis To establish a comparison between existing and future vehicular traffic conditions, three analysis scenarios were developed. This part includes the three scenarios previously described, plus year 2023 projections of existing traffic volumes. The First Scenario includes existing traffic projected to the 0 SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 17 Submitted into the public record for item(s) PZ -8 on 10/25/18 City Clerk TRAFFIC STUDY year 2023. The Second Scenario includes the vehicular volumes generated by the 713L Project and • assumes that all the ingress/egress vehicular traffic will be via the NW 7'h Street/Blue Lagoon Drive intersection. The Third Scenario assumes that vehicles going to or from the 713L Project will utilize either the NW 7th Street/Blue Lagoon Drive intersection or via NW 47th Avenue east of the 713L Project. A summary of the LOS analyses for each scenario is shown in tables below. Scenariol: Projected year 2023 Existing Conditions (without the 713L Project's traffic) Table 18: Projected year 2023 Volumes (Vph) (AM) Pro'ected year 2023 Conditions AM Intersection Intersection Movement/Approach Delay LOS EB Left 99.5 --(see/veh) .. 10.7 EB Left 80.5 F B EB Thru 11.3 B NW 7t" EB Approach 13.1 B Street: & D SB Approach 44.6 Blue WB Thru & Right 22.0 C Lagoon WB Approach 22.0 C Drive SB Left 59.7 E SB Approach 59.7 E Intersection 20.0 B Table 19: Projected year 2023 Volumes (Vph) (PM) Pro'ected ear 2023: Conditions PM Intersection Movement /Approach Delay (sec/veh) LOS NW ue Blue Lagoon EB Left 99.5 F EB Thru 10.7 B EB Approach 18.1 B WB Thru & Right 28.2 C WB Approach 28.2 C SB Left 44.6 D SB Approach 44.6 D Intersection 24.2 C From Tables 18 and 19, it can be seen that the eastbound left turns from NW 7`h Street to Blue Lagoon Drive are operating at an undesirable LOS with associated vehicular delays. The southbound movement from Blue Lagoon Drive during the AM peak period is also operating at an undesirable LOS with associated vehicular delays. Comparing the results with existing conditions (Tables 4 & 5), the eastbound left turns, southbound movements and the intersection experienced longer delays. • SW 7th Street/Blue Lagoon Drive, Miami -Dade County Page 18 0 • Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk TRAFFIC STUDY Scenario 2: Existing traffic conditions projected to the year 2023 plus 713L Project's generated vehicular volumes with access via NW 7`h Street only. Table 20: Existing Volumes projected to the year 2023 plus Proposed Project (Vph) Access NW 7th Street. (AM) Projected year 2023 With Proposed Project Access NW 7`h Street AM Peak Hour Intersection Movement/Approach Delay (sec/veh) LOS NW 7m Street & Blue Lagoon Drive EB Left 149.7 F EB Thru 10.4 B EB Approach 28.2 C WB Thru & Right 24.0 C WB proach 24.0 C SB Left 410.3 F SB Approach 410.3 F Intersection 100.2 F From Table 20, it can be seen that the eastbound left turns from NW 7th Street to Blue Lagoon Drive and the southbound movement from Blue Lagoon Drive are operating at an undesirable LOS with • associated vehicular delays, as well as the entire intersection. These delays are significantly higher when compared with those under existing Table 21: Existing Volumes projected to the year 2023 plus Proposed Project (Vph) —Access NW 7'h Street. (PM) Projected year 2023 With Proposed Project Access NW 7` Street PM Peak Hour Intersection Movement/Approach Delay (sec/veh) LOS & Blue NW ue Lagoon EB Left 631.1 F EB Thru 9.8 A EB Approach 170.0 F WB Thru & Right 34.9 C WB Approach 34.9 C SB Left 184.0 F SB Approach 184.0 F Intersection 109.0 F Table 21 demonstrates that the eastbound left turns from NW 7`h Street to Blue Lagoon Drive, the southbound movement from Blue Lagoon Drive, as well as the entire intersection are operating at an undesirable LOS with associated vehicular delays. These delays are significantly higher when compared with those under existing conditions without the 713L Project's generated traffic. • SW 7'h Street/Blue Lagoon Drive, Miami -Dade Count Page 19 g Y g Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk n TRAFFIC STUDY Comparing the results with the existing conditions (Tables 4 & 5), the eastbound left turns, • southbound movements and the entire intersection experienced significantly higher delays. Scenario 3: Existing traffic conditions projected to the year 2023 plus 7131, Project's generated vehicular volumes with access via NW 7`h Street as well as to/from NW 7'h Street and NW 47`h Avenue. Table 22: Existing Volumes projected to the year 2023 plus Proposed Project (Vph) - Access NW 7`h Street & NW 47'h Ave. (AM) Projected year 2023 With ProposedProject Access NW 7h Street & NW 47` Ave, Movement/Approach AM Peak Hour LOS Intersection Movement/Approach Delay (sec%eh) LOS ' EB Left 149.1 F EB Thru 10.5 B NW 7 EB Approach 28.2 C Street"&, , WB Thru & Right 23.3 C ,Blue SB Left 122.1 F Lagoon WB Approach 23.3 C Drive "- SB Left 323.3 F SBApproach 323.3 F Intersection 79.4 E Table 22 demonstrates the eastbound left turns from NW 7`h Street to Blue Lagoon Drive and the • southbound movement from Blue Lagoon Drive are operating at an undesirable LOS with associated vehicular delays, as well as the entire intersection. These delays are significantly higher when compared with those under existing conditions (Tables 4 & 5) without the 7131, Project's generated traffic. Table 23: Existing Volumes projected to the year 2023 plus Proposed Project (Vph) - Access NW 7`h Street & NW 47`h Ave. (PM) Projected year 2023 With Proposed Project Access NW 7th Street & NW 47` Avenue PM Peak Hour Intersection Movement/Approach Delay (sec/veh) LOS EB Left 629.0 F EB Thru 9.8 A EB Approach 169.5 F NW 7th St WB Thru & Right 32.3 C & Blue Lagoon WB Approach 32.3 C SB Left 122.1 F SB Approach 122.1 F Intersection 101.2 F SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 20 0 Submitted into the public record for item(s) pz.8 on 10 25 18 City Clerk TRAFFIC STUDY • Table 23 demonstrates the eastbound left turns from NW 7`h Street to Blue Lagoon Drive, the southbound movement from Blue Lagoon Drive, the eastbound approach as well as the intersection are operating at an undesirable LOS with associated vehicular delays. These delays are significantly higher when compared with those under existing conditions (Tables 4 & 5) without the 713L Project's generated traffic. Roadway Segment Analysis A roadway segment analysis was performed utilizing vehicular volumes from a nearby traffic count station and the 2018 FDOT Generalized LOS/Capacity tables. Calculations for this analysis are show below. 0 SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 21 Submitted into the public record for item(s) PZ.8 on 10/25/18, City Clerk TRAFFIC STUDY Traffic Count Station No. 7052 at NW 7 1 Street, west of NW 42"d Avenue Average Annual Daily Traffic (AADT) = 27,500 vehicles per day (vpd) Eastbound = 14,000 vpd Westbound = 13,500 vpd K= 9.00 (peak hour volume both directions) D = 55.7 (traffic directional split) Peak -hour 2 way = 27,500 (0.09) = 2,475 vehicles per hour (vph) Peak- hour 1 way = 27,500 (0.09) (0.557) = 1,390 vph According FDOT LOS tables: AADT Table 1, Minor roadway adjusted for non -State facility (-10%) and Multi -lane undivided with exclusive left -turn lanes (-5%) Adjusted AADT LOS LOS D (4div) = 2 8, 100 vpd 28,100 (0.90) (0.95) = 24,025 = LOS D LOS E (4div) = 37,200 vpd (0.90) (0.95) = 31,800 = LOS E Existing AADT (count station No 7052) = 27,500 vpd; therefore, Daily LOS = E Peak Hour Two -Way Table 4 (same adjustment factors as in the AADT analysis above) LOS D = 2530 (0.90) (0.95) = 2165 vph LOS E = 3350 (0.90) (0.95) = 2865 vph Existing Two -Way volume = 2475; therefore, LOS E Peak Hour Directional Table 7 (same adjustment factors as in the AADT analysis above) LOS D = 1390 (0.90) (0.95) = 1190 vph LOS E = 1840 (0.90) (0.95) = 1575 vph Existing Peak Hour Directional volume = 1390; therefore, LOS E Above analysis indicate that the NW 7th Street segment near Blue Lagoon Drive will be operating at capacity (LOS E) during 24 -hours, peak-hour/two-way and peak-hour/peak direction; consequently, it is obvious that the additional generated vehicular volumes from the 7BL Project will significantly negatively impact the LOS as reflected by the intersection LOS analyses. SW 7th Street/Blue Lagoon Drive, Miami -Dade County Page 22 • • :7 Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk TRAFFIC STUDY 12. FINDINGS/CONCLUSION Based on the analyses of the intersection of NW 7`h Street/Blue Lagoon Drive and the roadway segment of NW 7`h Street near Blue Lagoon Drive, including the field reviews, trip generation - distribution and traffic data collection, it is concluded that the vehicular traffic generated by the proposed 713L Project will result in significant negative impacts in terms of roadway LOS and substantially increased vehicular delays. Tables 24, 25 & 26 below present a summary of the analyses. Table 24: Vehicular Traffic Volumes Comparison. VEHICULAR TRAFFIC VOLUMES AM Peak Hour Access via NW 7th St. With 7BL Existing Project Veh per Veh per Hour Hour Impact Blue SB Laeoon Dr. auuroach 140 423 202.1% AM Peak Hour Access via NW 7th St. & NW 47 Ave. With 7BL Existing Project Veh per Veh per Hour Hour Impact 140 1 364 1 160.0% VEHICULAR TRAFFIC VOLUMES PM Peak Hour Access via NW 71h St. With 7BL Existing Project Veh per Veh per Hour Hour Impact Blue SB Laeoon Dr. approach 66 286 333.3% PM Peak Hour Access via NW 7`h St. & NW 47`h Ave. With 7BL Existing Project Veh per Veh per Hour Hour Impact 66 1 240 1 263.6% Table 25: Vehicular Delay Comparison. VEHICULAR DELAY AM Peak Hour Access via NW 7`h St. With 7BL Existing Project Seconds per Seconds per Veh Veh Impact Blue Lagoon SB Drive aanroach 56.8 219.9 287.1% AM Peal: Hour Access via NW 7'h St. & NW 47`h Ave. With 7BL Existing Project Seconds per Seconds per Veh Veh Impact 56.8 136.3 140.0% • th SW 7Street/Blue Lagoon Drive, Miami -Dade County Page 23 Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk TRAFFIC STUDY VEHICULAR DELAY PM Peak Hour Access via NW 7`h St. With 7BL Existing Project Seconds per Seconds per Veh Veh Impact Blue Lagoon SB Drive approach 42.2 107.9 155.7% PM Peak Hour Access via NW 7`h St. & NW 47`h Ave. With 7BL Existing Project Seconds per Seconds per Impact Veh Veh Impact 42.2 1 74.3 76.1% Table 26: Level of Service Comparison. LEVEL OF SERVICE (LOS) AM Peak Hour Access via NW 7`h St. With 7BL ExistingT Project LOS LOS Impact Blue Lagoon SB Drive approach E F E`TO F AM Peak Hour Access via NW 7`h St. & NW 47`h Ave. With 7BL Existing Project LOS LOS Impact E I F I ETOF LEVEL OF SERVICE (LOS) PM Peak Hour Access via NW 7`h St. With 7BL Existing Project LOS LOS Impact- Blue m actBlue Lagoon SB Drive approach D F D TO F PM Peak Hour Access via NW 7`h St. & NW 47`h Ave. With 7BL Existing Project Seconds per Veh LOS Impact D E DTOE SW 7`h Street/Blue Lagoon Drive, Miami -Dade County Page 24 • • • Submitted into the public record for item(s) PZ -8 on 10/25/18 City Clerk • Appendix A Existing Conditions TMC Counts • Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk R.J. Behar & Company, Inc. 6869 SW 196 Avenue, Suite 302 • Pembroke Pines, FI 33332 Engineers - Planners Blue Lagoon Drive and NW 7th Street Tuesday, June 19, 2018 (,mine Prinfoli_ 1 Inchift-4 _ P -L, 1 File Name : TMC Data Site Code :00000013 Start Date : 6/19/2018 Page No : 1 08:00 AM 22 Southbound 14 5 Westbound 0 209 Northbound 17 0 Eastbound 2 35 Start Time Right Thru Left Peds T.wt Right Thru Left Peds Tubi Right Thru Left Peds .T- Right Thru Left Peds .mi Im. rmel 07:00 AM 31 8 21 0 60 21 77 0 1 99 0 0 0 0 0 0 168 8 0 176 335 07:15 AM 14 0 5 0 19 37 166 0 0 203 0 0 0 0 0 0 255 3 0 258 480 07:30 AM 26 0 19 0 45 3 229 0 1 233 0 0 0 0 0 0 317 3 0 320 598 07:45 AM 22 0 16 2 40 7 230 0 2 239 0 0 0 0 0 0 289 8 1 298 577 Total 93 8 61 2 164 68 702 0 4 774 0 0 0 0 0 0 1029 22 1 1052 1990 08:00 AM 22 0 14 5 41 0 209 08:15 AM 17 0 16 2 35 4 251 08:30 AM 13 0 20 3 36 4 260 08:45 AM 24 0 19 0 43 1 216 Total 76 0 69 10 155 9 936 *** BREAK *** 0 0 0 0 0 0 282 04:00 PM 10 0 12 2 24 15 306 04:15 PM 10 0 11 0 21 12 329 04:30 PM 14 0 5 3 22 5 285 04:45 PM 8 0 4 3 15 9 296 Total 42 0 32 8 82 41 1216 05:00 PM 12 0 8 1 21 20 256 05:15 PM 6 0 5 2 13 12 315 05:30 PM 7 0 7 1 15 18 318 05:45 PM 11 0 10 0 21 9 346 Total 36 0 30 4 70 59 1235 Grand Total 247 8 192 24 471 177 4089 Apprch % 52.4 1.7 40.8 5.1 274 4.1 94.7 Total % 2.6 0.1 2 0.3 5 1.9 43.6 Unshifted 247 8 192 22 469 177 4054 % Unshifted 100 100 100 91.7 99.6 100 99.1 Bank 1 0 0 0 2 2 0 35 % Bank 1 0 0 0 8.3 0.4 0 0.9 0 7 216 0 0 0 1 1 0 267 5 1 273 531 0 3 258 0 0 0 0 0 0 301 6 1 308 601 0 7 271 0 0 0 1 1 0 310 5 7 322 630 0 0 217 0 0 0 0 0 0 282 6 2 290 550 0 17 962 0 0 0 2 21 0 1160 22 11 1193 2312 0 1 322 0 0 0 0 0 0 245 13 1 259 605 0 7 348 0 0 0 0 0 0 272 15 0 287 656 0 2 292 0 0 0 1 1 0 283 9 0 292 607 0 6 311 0 0 0 0 0 0 294 18 1 313 639 0 16 1273 0 0 0 1 1 1 0 1094 55 2 1151 2507 0 7 283 0 0 0 1 1 0 265 9 0 274 579 0 2 329 0 0 0 0 0 0 273 22 1 296 638 0 5 341 0 0 0 2 2 0 276 26 0 302 660 0 2 357 0 0 0 1 1 0 284 19 0 303 682 0 16 1310 0 0 0 4 41 0 1098 76 1 1175 2559 0 53 4319 0 0 0 7 7 0 4381 175 15 4571 9368 0 1.2 0 0 0 100 0 95.8 3.8 0.3 0 0.6 46.1 0 0 0 0.1 0.1 0 46.8 1.9 0.2 48.8 4347 0 84.9 99 0 0 0 71.4 71.4 0 99.2 100 80 99.2 99.1 0 8 43 0 0 0 2 2 0 34 0 3 37 84 0 15.1 1 0 0 0 28.6 28.6 0 0.8 0 20 0.8 0.9 0 R.J. Behar & Company, Inc. 6869 SW 196 Avenue, Suite 302 Pembroke Pines, FI 33332 Engineers - Planners Blue Lagoon Drive and NW 7th Street Tuesday, June 19, 2018 Submitted into the public record for item(s) PZ -8 on 10/25/18, City Clerk File Name : TMC Data Site Code :00000013 Start Date : 6/19/2018 Page No :2 int. Totn� reaK flour Analysis rrOM U1:UU AM TO 71:45 AM - NeaK l OT 1 Southbound Westbound Northbound Eastbound Start Time Right g Thru Left Peds aoo.Tar Right Thru Left Peds y,.rori Right Thru Lett Peds •o,.,ori Right Thru Left Peds .Tori int. Totn� reaK flour Analysis rrOM U1:UU AM TO 71:45 AM - NeaK l OT 1 T r NO NiC� Thru N N 0 J 0 1 0 non` uY�tO Peak Hour for Entire Intersection Begins at 07:45 AM C pOp�O _ � N 0 F-� 2 000.. r 0 O`o. O O 07:45 AM 22 0 16 2 40 7 230 0 2 239 0 0 0 0 0 0 289 8 1 298 577 08:00 AM 22 0 14 5 41 0 209 0 7 216 0 0 0 1 1 0 267 5 1 273 531 08:15 AM 17 0 16 2 35 4 251 0 3 258 0 0 0 0 0 0 301 6 1 308 601 08:30 AM 13 0 20 3 36 4 260 0 7 271 0 0 0 1 1 0 310 5 7 322 630 Total Volume 74 0 66 12 152 15 950 0 19 984 0 0 0 2 2 0 1167 24 10 1201 2339 % Apo. Total 48.7 0 43.4 7.9 1.5 96.5 0 1.9 0 0 0 100 0 97.2 2 0.8 PHF .841 .000 .825 .600 .927 .536 .913 .000 .679 .908 .000 .000 .000 .500 .500 .000 .941 .750 .357 .932 .928 Unshifted 74 0 66 10 15015 940 0 19 974 0 0 0 1 1 0 1157 % Unshifted 100 0 100 83.3 98.7 100 98.9 0 100 99.0 0 0 0 50.0 50.0 0 99.1 100 70.0 98.9 98.9 Bank 1 0 0 0 2 2 0 10 0 0 10 0 0 0 1 1 0 10 0 3 13 26 % Bank 1 0 0 0 16.7 1.3 0 1.1 0 0 1.0 0 0 0 50.0 50.0 0 0.9 0 30.0 1.1 1.1 r� y00�N T r NO NiC� Thru N N 0 J 0 1 0 non` uY�tO 0 C pOp�O _ � N 0 F-� 2 000.. r 0 O`o. O O ISMO y 2 2 Out In Total a • Out In Total 39 150189 0 2 2 3 11 74 0 661 10 0 0 01 2 741 01 661 12 Right Thru Left Peds Peak Hour Data North Peak Hour Begins at 07:45 A Unshifted Bank 1 +-, T r Left Thru Ri ht Peds 0 0 0 1 0 0 0 1 0 0 0 2 0 0 1 1 2 2 Out In Total N N O G WOW.. Submitted into the public record for item(s) PZ -8 on 10/25/18, City Clerk R.J. Behar &Company, Inc. 6869 SW 196 Avenue, Suite 302 Pembroke Pines, FI 33332 Engineers - Planners Blue Lagoon Drive and NW 7th Street Tuesday, June 19, 2018 File Name : TMC Data Site Code :00000013 Start Date : 6/19/2018 Page No :3 Peak Flour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 Southbound Westbound Northbound Eastbound J Start Time Ri g ht Thru Lefte Pds .. Right 9 Thru Left Peds A-T -i Rig nt Thru Left I Peds I App. T,wi Right Thru Left Peds I w,.,om iot.Tot�i Peak Flour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 .0. O r �� 6 N N J tow rnrnm` Peak Hour for Entire Intersection Begins at 05:00 PM �2 N N 0 0 0 M -4 rrn-� E i N N 05:00 PM 12 0 8 1 21 20 256 0 7 283 0 0 0 1 1 0 265 9 0 274 579 05:15 PM 6 0 5 2 13 12 315 0 2 329 0 0 0 0 0 0 273 22 1 296 638 05:30 PM 7 0 7 1 15 18 318 0 5 341 0 0 0 2 2 0 276 26 0 302 660 05:45 PM 11 0 10 0 21 9 346 0 2 357 0 0 0 1 1 0 284 19 0 303 682 Total volume 36 0 30 4 70 59 1235 0 16 1310 0 0 0 4 4 0 1098 76 1 1175 2559 % Aoo. Total 51.4 0 42.9 5.7 4.5 94.3 0 1.2 0 0 0 100 0 93.4 6.5 0.1 Unshifted 36 0 30 4 7059 1227 1089 % Unshifted 100 0 100 100 100 100 99.4 0 68.8 99.0 0 0 0 75.0 75.0 0 99.2 100 100 99.2 99.1 Bank1 0 0 0 0 0 0 8 0 5 13 0 0 0 1 1 0 9 0 0 9 23 % Bank 1 0 0 0 0 0 0 0.6 0 31.3 1.0 0 0 0 25.0 25.0 0 0.8 0 0 0.8 0.9 N N? .0. O r �� 6 N N J tow rnrnm` �2 N N 0 0 0 M -4 rrn-� E i N N O O y owe a Out In Total 135 F 70 205 0 0 0 13520 Right TI Peak Hour Data North Peak Hour Begins at 05:00 P Unshifted Bank 1 *-i T r Left Thru Ri ht Peds 0 00 3 0 0 0 1 01 01 of 4 go3 31 4 4 Out In Total C7 UO tow �2 N N M -4 r �000 owe 0 rn— d C7 Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk • Appendix B ITE Trip Generation Tables 0 is Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk High -Rise Apartment (222) Average Vehicle Trip Ends vs: Dwelling Units On a: Weekday Number of Studies: 9 Avg. Number of Dwelling Units: 435 Directional Distribution: 50% entering, 50% exiting Trin Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 4.20 3.00 - 6.45 2.32 Data Plot and Eauation 4,000 3,000 y C W ,.I F- a U > 2,000 d N Q F- 1,000 0 X X X ;........X....X.. _i-... ....__ ....... ...... X 1- 100 200 300 400 500 600 X = Number of Dwelling Units X Actual Data Points Fitted Curve Fitted Curve Equation: Ln(T) = 0.83 Ln(X) + 2.50 700 800 900 ------ Average Rate R2 = 0.82 1000 1 Trip Generation, 9th Edition • Institute of Transportation Engineers 375 • Submitted into the public record for item(s) PZ.8 High -Rise Apartment on 10 25 18 City Clerk (222) Average Vehicle Trip Ends vs: Dwelling Units On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Number of Studies: 17 Avg. Number of Dwelling Units: 420 Directional Distribution: 25% entering, 75% exiting Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.30 0.18 - 0.47 0.55 Uata Niot ana tquation 400 300 F- 100 0 -t 0 i • 376 Trip Generation, 9th Edition • Institute of Transportation Engineers i .X .X X X X X X XX 0 -t 0 i • 376 Trip Generation, 9th Edition • Institute of Transportation Engineers i Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk High -Rise Apartment (222) Average Vehicle Trip Ends vs: Dwelling Units On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Number of Studies: 17 Avg. Number of Dwelling Units: 420 Directional Distribution: 61% entering, 39% exiting Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.35 0.23 - 0.50 0.59 Data Plot ana tcluavon 400 300 E-' 100 0 ;....... . ;..... ......... . X---; ... X ............ ........ I X X X X X k.. ...-. .............. ..... --- X X X. (X 0 100 200 300 400 500 600 X = Number of Dwelling Units X Actual Data Points Fitted Curve Fitted Curve Equation: T = 0.32(X) + 12.30 700 800 900 1000 1100 ------ Average Rate R2 = 0.92 Trip Generation, 9th Edition • Institute of Transportation Engineers • • • 377 0 • • Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk Hotel (310) Average Vehicle Trip Ends vs: Occupied Rooms On a: Weekday Number of Studies: 4 Average Number of Occupied Rooms: 216 Directional Distribution: 50% entering, 50% exiting Trip Generation per uccupiea tioom Average Rate Range of Rates Standard Deviation 8,92 4.14 - 11.44 6.04 Data Piot and tquation 4,000 --T N C W 3,000 1 [,aU[10r7' VSd k kFfU[VUj' - 0171[Df Jalle(JIV . Jzu X a 1,000 In 0 1 1 1 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 X = Number of Occupied Rooms X Actual Data Points Fitted Curve Equation: Not given 604 Trip Generation, 9th Edition 9 Institute of Transportation Engineers ----"- Average Rate R2 = .... Submitted into the public record for item(s) PZ.8 Hotel on 10/25/18 City Clerk (310) Average Vehicle Trip Ends vs: Occupied Rooms On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Number of Studies: 17 Average Number of Occupied Rooms: 256 Directional Distribution: 58% entering, 42% exiting Trip veneration per uccupiea moom Average Rate Range of Rates Standard Deviation 0.67 0.35 - 1.10 0.84 uata Plot ana tquation 7— 500 -1- 400 N .6 C W n. 300 a) U r Q) a) N `m 200 Q H 100 X X .................. ..... . ---..X ... . ........ ..... X X X : X X ;X-------- X ......... -- --------------- ' X X Ix 0 100 200 300 X = Number of Occupied Rooms X Actual Data Points Fitted Curve Fitted Curve Equation: T = 0.78(X) - 29.80 400 500 ------ Average Rate R2 = 0.69 ,o • Tri Generation 9th Edition • Institute of Transportation Engineers 605• Trip P C7 • Submitted into the public record for item(s) PZ.8 H t on 10/25/18 City Clerk oe (310) Average Vehicle Trip Ends vs: Occupied Rooms On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Number of Studies: 20 Average Number of Occupied Rooms: 243 Directional Distribution: 49% entering, 51% exiting drip Generation per Occupied Room Average Rate Range of Rates Standard Deviation 0.70 0.25 - 1.11 0.87 Data Plot and Equation 500 400 300 200 100 0 X 0 100 200 300 400 500 X Actual Data Points Fitted Curve Equation. Not Given X = Number of Occupied Rooms 606 Trip Generation, 9th Edition • Institute of Transportation Engineers ----- Average Rate R2 = *— ,r X X ; X' • •X X : X X X X, ..... ....... . ................ ......... ... X X X X 0 100 200 300 400 500 X Actual Data Points Fitted Curve Equation. Not Given X = Number of Occupied Rooms 606 Trip Generation, 9th Edition • Institute of Transportation Engineers ----- Average Rate R2 = *— Submitted into the public record for item(s) PZ.8 on 10/25/18 City Clerk Appendix C 40 LOS Analysis Reports • 0 Submitted into the public record for item(s) PZ.8 on 10/25/18, City Clerk • Existing Conditions AM 6/19/2018 Baseline Synchro 9 Report Page 1 Existing Conditions AM Page 1 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations 'i TT T1a 'r' Traffic Volume (vph) 24 1167 950 15 66 74 Future Volume (vph) 24 1167 950 15 66 74 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 0.95 0.95 1.00 1.00 Frt 0.996 0.929 Flt Protected 0.950 0.977 Satd. Flow (prot) 1770 3539 3525 0 1691 0 Flt Permitted 0.950 0.977 Satd. Flow (perm) 1770 3539 3525 0 1691 0 Right Turn on Red Yes Yes Satd. Flow (RTOR) 3 27 Link Speed (mph) 40 40 15 Link Distance (ft) 220 223 231 Travel Time (s) 3.8 3.8 10.5 Peak Hour Factor 0.75 0.94 0.91 0.54 0.82 0.84 Adj. Flow (vph) 32 1241 1044 28 80 88 Shared Lane Traffic (%) Lane Group Flow (vph) 32 1241 1072 0 168 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Left Left Right Left Right Median Width(ft) 12 12 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 Number of Detectors 1 2 2 1 Detector Template Left Thru Thru Left Leading Detector (ft) 20 100 100 20 Trailing Detector (ft) 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 Detector 2 Size(ft) 6 6 Detector 2 Type CI+Ex CI+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 Turn Type Prot NA NA Prot Protected Phases 1 12 2 3 Permitted Phases Detector Phase 1 1 2 2 3 Switch Phase Minimum Initial (s) 18.0 114.0 40.0 • Existing Conditions AM 6/19/2018 Baseline Synchro 9 Report Page 1 Submitted into the public record for item(s) PZ.8 on 10125/18, City Clerk Existing Conditions AM Page 2 Lane Group EBL EBT WBT WBR SBL SBR Minimum Split (s) 22.5 120.5 44.5 Total Split (s) 23.0 120.5 44.5 Total Split (%) 12.2% 64.1% 23.7% Maximum Green (s) 18.5 116.0 40.0 Yellow Time (s) 4.0 4.0 4.0 All -Red Time (s) 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 Recall Mode None None None Walk Time (s) 22.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 18.5 137.0 114.0 40.0 Actuated g/C Ratio 0.10 0.74 0.61 0.22 v/c Ratio 0.18 0.48 0.50 0.44 Control Delay 79.7 10.7 20.9 56.8 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 79.7 10.7 20.9 56.8 LOS E B C E Approach Delay 12.4 20.9 56.8 Approach LOS B C E Intersection Summary Area Type: Other Cycle Length: 188 Actuated Cycle Length: 186 Natural Cycle: 190 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.50 Intersection Signal Delay: 19.0 Intersection LOS: B Intersection Capacity Utilization 135.8% ICU Level of Service H Analysis Period (min) 15 its and Phases: 3: • • Existing Conditions AM 6/19/2018 Baseline Synchro 9 Report • Page 2 Submitted into the public record for items) PZ -8 With Proposed Project Access NW 7Th St. (AM) Lane Group EBL EBT WBT WBR SBL on 10 25 18, City Clerk Page 1 SBR Lane Configurations 'i ?T TA 'r' Traffic Volume (vph) 124 1167 950 97 185 238 Future Volume (vph) 124 1167 950 97 185 238 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 0.95 0.95 1.00 1.00 Frt 0.978 0.923 Flt Protected 0.950 0.979 Satd. Flow (prot) 1770 3539 3461 0 1683 0 Flt Permitted 0.950 0.979 Satd. Flow (perm) 1770 3539 3461 0 1683 0 Right Turn on Red Yes Yes Satd. Flow (RTOR) 19 32 Link Speed (mph) 40 40 15 Link Distance (ft) 220 223 231 Travel Time (s) 3.8 3.8 10.5 Peak Hour Factor 0.75 0.94 0.91 0.54 0.84 0.82 Adj. Flow (vph) 165 1241 1044 180 220 290 Shared Lane Traffic (%) Lane Group Flow (vph) 165 1241 1224 0 510 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Left Left Right Left Right Median Width(ft) 12 12 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 Number of Detectors 1 2 2 1 Detector Template Left Thru Thru Left Leading Detector (ft) 20 100 100 20 "railing Detector (ft) 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 Detector 2 Size(ft) 6 6 Detector 2 Type CI+Ex CI+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 Turn Type Prot NA NA Prot Protected Phases 1 12 2 3 Permitted Phases Detector Phase 1 1 2 2 3 Switch Phase Minimum Initial (s) 18.0 114.0 40.0 • With Proposed Project Access NW 7Th St. (AM) 6/27/2018 Baseline Synchro 9 Report Page 1 Submitted into the public record for item(s) PZ.8 on 10/25/18, City Clerk With Proposed Project Access NW 7Th St. (AM) Page 2 41 � r Lane Group EBL EBT WBT WBR SBL SBR Minimum Split (s) 22.5 120.5 44.5 Total Split (s) 23.0 120.5 44.5 Total Split (%) 12.2% 64.1% 23.7% Maximum Green (s) 20.5 116.0 40.0 Yellow Time (s) 2.0 4.0 4.0 All -Red Time (s) 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 2.5 4.5 4.5 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 Recall Mode None None None Walk Time (s) 22.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 20.5 139.4 114.4 40.0 Actuated g/C Ratio 0.11 0.75 0.61 0.21 v/c Ratio 0.85 0.47 0.57 1.32 Control Delay 114.7 9.8 22.4 210.9 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 114.7 9.8 22.4 210.9 LOS F A C F Approach Delay 22.1 22.4 210.9 Approach LOS C C F Intersection Summary Area Type: Other Cycle Length: 188 Actuated Cycle Length: 186.4 Natural Cycle: 190 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 1.32 Intersection Signal Delay: 52.9 Intersection LOS: D Intersection Capacity Utilization 143.5% ICU Level of Service H Analysis Period (min) 15 and Phases: 3: With Proposed Project Access NW 7Th St. (AM) 6/27/2018 Baseline Synchro 9 Report Page 2 • • Submitted into the public record for item(s) PZ.8 on 10/25/18, City Clerk With Proposed Project Access NW 7th St. and NW 47 Ave. (AM) Page 1 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Vi TT T1a y Traffic Volume (vph) 124 1167 950 61 126 238 Future Volume (vph) 124 1167 950 61 126 238 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 0.95 0.95 1.00 1.00 Frt 0.985 0.911 Flt Protected 0.950 0.983 Satd. Flow (prot) 1770 3539 3486 0 1668 0 Flt Permitted 0.950 0.983 Satd. Flow (perm) 1770 3539 3486 0 1668 0 Right Turn on Red Yes Yes Satd. Flow (RTOR) 11 47 Link Speed (mph) 40 40 15 Link Distance (ft) 220 223 231 Travel Time (s) 3.8 3.8 10.5 Peak Hour Factor 0.75 0.94 0.91 0.54 0.84 0.82 Adj. Flow (vph) 165 1241 1044 113 150 290 Shared Lane Traffic (%) Lane Group Flow (vph) 165 1241 1157 0 440 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Left Left Right Left Right Median Width(ft) 12 12 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 • Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 Number of Detectors 1 2 2 1 Detector Template Left Thru Thru Left Leading Detector (ft) 20 100 100 20 Trailing Detector (ft) 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 Detector 2 Size(ft) 6 6 Detector 2 Type CI+Ex CI+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 Turn Type Prot NA NA Prot Protected Phases 1 12 2 3 Permitted Phases Detector Phase 1 12 2 3 Switch Phase Minimum Initial (s) 18.0 114.0 40.0 • With Proposed Project Access NW 7th St. and NW 47 Ave. (AM) 6/2712018 Baseline Synchro 9 Report Page 1 Submitted into the public record for item(s) PZ.8 on 10/25/18, City Clerk With Proposed Project Access NW 7th St. and NW 47 Ave. (AM) Page 2 Analysis Period (min) 15 its and Phases: 3: C, • With Proposed Project Access NW 7th St. and NW 47 Ave. (AM) 6/27/2018 Baseline Synchro 9 Report Page 2 0 '_ lk - �. d Lane Group EBL `EBT WBT NlBR SBL SBR Minimum Split (s) 22.5 120.5 44.5 Total Split (s) 23.0 120.5 44.5 Total Split (%) 12.2% 64.1% 23.7% Maximum Green (s) 20.5 116.0 40.0 Yellow Time (s) 2.0 4.0 4.0 All -Red Time (s) 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 2.5 4.5 4.5 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 Recall Mode None None None Walk Time (s) 22.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 20.5 139.0 114.0 40.0 Actuated g/C Ratio 0.11 0.75 0.61 0.22 v/c Ratio 0.85 0.47 0.54 1.11 Control Delay 114.2 ° 9.8 21.8 136.3 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 114.2 9.8 21.8 136.3 LOS F A C F Approach Delay 22.1 21.8 136.3 Approach LOS C C F IntersectionSummary Area Type: Other Cycle Length: 188 Actuated Cycle Length: 186 Natural Cycle: 190 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 1.11 Intersection Signal Delay: 38.7 Intersection LOS: D Intersection Capacity Utilization 143.5% ICU Level of Service H Analysis Period (min) 15 its and Phases: 3: C, • With Proposed Project Access NW 7th St. and NW 47 Ave. (AM) 6/27/2018 Baseline Synchro 9 Report Page 2 0