Loading...
HomeMy WebLinkAboutBack-up - Transit ImprovementsEXHIBIT C Downtown Miami - Increment III - Development of Regional Impact Transit Mode Project Name Location Description Capital Costs 18% Shared Requested by DTPW This project consists of upgrades to the existing Government Center Metrorail Station in the form Government Center Station of new elevators, escalators, new pedestrian bridge connecting to adjacent Brighlline Station Upgrade 101 NW 1st Street (Intercity Passenger Rail/Tri-Rail Downtown Link (Commuter Rail), upgrades to existing flooring and roofing, fare collection updates, security equipment updates, new rolling gales and automatic sliding doom $14,094,000 $2.536,920 Metrorail This project consist of upgrades to the existing Historic Overtown/Lyric Theatre Metrorail Station Historic Overtown/Lyric in the form of new elevators, escalators, upgrades to existing flooring, fare collection, fare gates, Theatre 100 NW 6th Street and Ticket Vending Machines (TVM) updates, security equipment updates. This project will also reconfigure the alleyway between Overtown Transit Village and the Station to include new stamped concrete as well as a shared use Promenade with canopy from NW 61h Street to NW Blh Street. $5,356,00 $964,08 The Brickell Station serves as an intermodal station that provides passenger connections with the local circulator (City of Miami Trolley), local fixed route service (Melrobus), regional bus service, regional bus (BCT 1-595 Express) as well as Metromover and Metrorail. The station area is a Metrorail Brickell Station 1001 SW 1 at Avenue linear site that spans between SW 8th Street and SW 13th Street. The primary goal of the Metromover Brickell Metrorail/Metromover Station improvements is to enhance passenger and pedestrian access to transit. Specifically, the recommended implementation plan includes additional bus passenger pick-up/drop areas, additional shuffle pick-up/drop-off capacity, provide a new designated kiss -n -ride area, upgrade pedestrian connections between neighboring development and improve passenger convenience through wayfinding, upgraded/ADA compliant sidewalks, continuous passenger canopies, and additional bike storage $2,300,00 $414,000 This project consists of construction of a new downtown bus terminal with approximately 27 bus bays, customer service areas including but not limited to passenger waiting areas with seating, Downtown Intermodal 112 NW 3rd Street ticket vending machines, video/audio displays, reslrooms as well as security office, service Terminal support areas (driver comfort area, janitor/supply closet, bus supervisor booth, stall parking- B spaces total), and bicycle parking/station, kiss -and -ride area. conversion of NW 1st Street to bus drop-olf area with 7 saw -tooth bus bays, dedicated text and jitney areas, landscaping, lighting and Metrobus unified directional signage 10.705,716 _ 1,9;7,029 Various Locations in SW/SE 1st Street (from 1-95 to SE list Avenue) NE/NW 1st Slreel (from NE 2nd Avenue to 1-95) Bus -Only Lanes in Downtown (total length approximately NE/NW 6th Street (from Biscayne Blvd., to 1-95) Downtown Miami 4 55 miles) NW 5th Street (from 1-95 to NW 1st Avenue) NE 2nd Avenue (from NE 20th Street to NE 1st Street) BENE 1st Avenue (south of NE 6th Street) (from SE flat Street to NE 17th Street) NE 1st Avenue north of NE 6th Street from NE 6th Street to NE 17th Street $910-000 0 $163,800 TOTALS $33,365,716 6.005,8 6181