HomeMy WebLinkAboutExhibit CEXHIBIT C
Downtown Miami - Increment III - Development of Regional Impact
Transit Mode
Project Name
Location
Description
Capital Costs
18% Shared Requested by DTPW
This project consists of upgrades to the existing Government Center Metrorail Station in the form
Government Center Station
of new elevators, escalators, new pedestrian bridge connecting to adjacent Brighlline Station
Upgrade
101 NW 1st Street
(Intercity Passenger Rail/Tri-Rail Downtown Link (Commuter Rail), upgrades to existing flooring
and roofing, fare collection updates, security equipment updates, new rolling gales and automatic
sliding doom
$14,094,000
$2.536,920
Metrorail
This project consist of upgrades to the existing Historic Overtown/Lyric Theatre Metrorail Station
Historic Overtown/Lyric
in the form of new elevators, escalators, upgrades to existing flooring, fare collection, fare gates,
Theatre
100 NW 6th Street
and Ticket Vending Machines (TVM) updates, security equipment updates. This project will also
reconfigure the alleyway between Overtown Transit Village and the Station to include new
stamped concrete as well as a shared use Promenade with canopy from NW 61h Street to NW Blh
Street.
$5,356,00
$964,08
The Brickell Station serves as an intermodal station that provides passenger connections with the
local circulator (City of Miami Trolley), local fixed route service (Melrobus), regional bus service,
regional bus (BCT 1-595 Express) as well as Metromover and Metrorail. The station area is a
Metrorail
Brickell Station
1001 SW 1 at Avenue
linear site that spans between SW 8th Street and SW 13th Street. The primary goal of the
Metromover
Brickell Metrorail/Metromover Station improvements is to enhance passenger and pedestrian
access to transit. Specifically, the recommended implementation plan includes additional bus
passenger pick-up/drop areas, additional shuffle pick-up/drop-off capacity, provide a new
designated kiss -n -ride area, upgrade pedestrian connections between neighboring development
and improve passenger convenience through wayfinding, upgraded/ADA compliant sidewalks,
continuous passenger canopies, and additional bike storage
$2,300,00
$414,000
This project consists of construction of a new downtown bus terminal with approximately 27 bus
bays, customer service areas including but not limited to passenger waiting areas with seating,
Downtown Intermodal
112 NW 3rd Street
ticket vending machines, video/audio displays, reslrooms as well as security office, service
Terminal
support areas (driver comfort area, janitor/supply closet, bus supervisor booth, stall parking- B
spaces total), and bicycle parking/station, kiss -and -ride area. conversion of NW 1st Street to bus
drop-olf area with 7 saw -tooth bus bays, dedicated text and jitney areas, landscaping, lighting and
Metrobus
unified directional signage
10.705,716
_ 1,9;7,029
Various Locations in
SW/SE 1st Street (from 1-95 to SE list Avenue)
NE/NW 1st Slreel (from NE 2nd Avenue to 1-95)
Bus -Only Lanes in
Downtown
(total length approximately
NE/NW 6th Street (from Biscayne Blvd., to 1-95)
Downtown Miami
4 55 miles)
NW 5th Street (from 1-95 to NW 1st Avenue)
NE 2nd Avenue (from NE 20th Street to NE 1st Street)
BENE 1st Avenue (south of NE 6th Street) (from SE flat Street to NE 17th Street)
NE 1st Avenue north of NE 6th Street from NE 6th Street to NE 17th Street
$910-000
0
$163,800
TOTALS
$33,365,716
6.005,8
6181