HomeMy WebLinkAboutMultimodal Transportation Impact Fee PresentationProgress Briefing
JUNE 2017
• Introductions
• Legal Overview
•Implementation Issues
• Fee Calculation Methodology
• Sample Multimodal Program
Dual Rational Nexus Test
• 'A relationship between the proposed development and the
need for the regulation," and
• 'A direct and relatively exclusive benefit to be received by the
feepayerfrom the payment."
Implementation Constraints
• Must fund projects that increase capacity
• Cannot fund existing capacity deficiencies
• Excludes streets under federal and state jurisdiction
• Excludes operations and maintenance costs
The Florida Bar. Florida Environmental and Land Use Law, Volume 11, Chapter 17, Impact Fees in Florida (ELUII FL -CLE 17-1),1994.
• Miami Comprehensive Neighborhood Plan
— Good starting point but does not provide adopted project list
• Adopted project list will require net cost estimates
• Timing of establishing initial fee schedule
— Project selection and timing of expenditures
• Competition for Financial Resources
— Miami -Dade County Roadway Impact Fee
— SMART Plan
• Emerging case law in Florida
• Updates for shifts in growth and eligible multimodal projects
• Cost and methods for administration (fee collection, appeals
and refund processes, audits, enforcement, etc.)
Fee = Demand x Net Cost/PMC
Demand =New Person -Miles of Capacity (PMC)
✓ Needed to satisfy travel demand generated by new development
V/ Based on ITE Trip Generation Rates for each land use type
✓ Cannot exceed Miami travel demand increase modeled by SERPM
Net Cost/PMC
✓ New capital cost for Multimodal Program
✓ Excludes available funding
Trip Generation RateskitDAILY
NE MILES
by Land Use.
2010 & 2040
Primary Trips (%New)
VOLUMES
by Land Use
. 2014 S 2040
Vacancy Rates
MM
Round Trip
by Land Use
J_
Niggigigia—_ TRIP RATES
DAILY TRIPS
x
TRIP LENGTHS
by Land Use
SUM OF ALL LAND U
2Ot6 VMT
Generated in Miami
Round Trip
Reduction Factor
1♦
City Travel
Reduction Factor
2016 VMT
Traveled in Miami
Local Roads 2016 VMT
Reduction factor Non -Local Major Street
2016 VMT
Miami Local Only
Input I Result
NON -LOCAL
Major Streets VMT
Miami Non -Local
CAGB
REGIONAL VMT
2010 & Z040
INSIDE MIAMI
Major Streets VMT
LOCAL
Major Streets VMT
Miami Local
CAGB
Trip Generation Rates
LAND USE
by Land Use
2016-2040
(IX
VMT GROWT
Round Trip
Reduction Factor
Primary Trips (%New)
by Land Use
TRIP RATE
per Land Use Unit
Trip Length
by Land Use
DAILY TRIPS
per Land Use Unit
2040 VMT
City Travel
Miami Local -Only
Reduction Factor
TRIP LENGTH
MDAILY VMT
per Land Use Unit
PMC RATE
Program PMC
Cost / PMC DAILY PMC
51 per Land Use Unit
2016-2040 VMT
Miami Local -Only
IMPACT FEE
LAND USE
QUANTITY
IMPACT FEE
per Land Use Unit
TOTAL
IMPACT FEE
• Multimodal Program adopted prior to implementation
— Miami Comprehensive Neighborhood Plan provides basis
• Sample Project List provided by the City of Miami
• Projects address future person -trip capacity needs
— Person -miles of capacity (PMC) for each project based on FDOT
guidance, research, and peer studies
• Half of project costs funded through other sources
District 1 Sidewalks & ADA Improvements
5.0
7,500
$5,000,000
District 2 Sidewalks & ADA Improvements
5.0
7,500
$5,000,000
District 3 Sidewalks & ADA Improvements
5.0
7,500
$5,000,000
District 4 Sidewalks & ADA Improvements
5.0
7,500
$5,000,000
District 5 Sidewalks & ADA Improvements
Greenways
5.0
7,500
$5,000,000
Greenways
6.5
19,500
$17,000,000
Trails
Bike Lane
8.4
25,200
$24,000,000
Complete Street
5.0
17,500
$10,000,000
Traditional Bike Lanes
30.0
60,000
$6,000,000
Protected Bike Lanes
25.0
50,000
$ 8,125,000
Neighborhood Bicycle Boulevards
20.0
40,000
$3,000,000
First and Last -Mile Transit Connections
10.0
20,000
$5,000,000
Transit
Miami Streetcar
6.5
11,074
I
$284,600,000
Waterborne Transit Dockage
3.0
15,975
$4,000,000
Purchase 15 Trolleys for New Routes
n/a
6,480
$3,750,000
TOTAL
Net Cost (assume SO% funded)
Net Cost/PMC =
303,229
$390,475,000
$195,237,500
Program Capacity/ Expected Demand Growth = .047
Sample Multimodal Program Net Cost/PMC = $644
Single -Family Detached $6,491 $8,114
Townhouse / Duplex
Multi Family - Low Rise
Multi Family - High Rise
$3,928
$4,500
$2,864
$4,968
$5,697
$3,561
Streetcar Only
Net Cost/PMC = $12,550
Single -Family Detached $129,553
Townhouse / Duplex
Multi Family - Low Rise
Multi Family - High Rise
Bike/Ped Only
$78,385
$89,816
$57,156
Net Cost/PMC = $182
Single -Family Detached $1,834
Townhouse / Duplex
Multi Family - Low Rise
Multi Family - High Rise
$1,272