HomeMy WebLinkAboutBid TabulationIFB 781382
Sidewalk Repair/Replacement
IFS 781882 Citywide Sidewalk Repair and Replace
ISL Engineering and General
,Attachment G - Federally Funded Projects Price Sheet
itt Spencer Construction, LI t
Contractor Corp.
Metro Express, Inc.
Line
No.
Pay Item Description
Unit
Qty
Unit Cost
Total Cost
Unit Cost
Total Cost
Unit
Total Cost
Cost
Install standard 4 inch, 3,000 psi concrete sidewalk, ramp and sidewalk
1
landing, including tree root and branch trimming, tree root rentoval ind
Sgot
200,000
reslnration of the arra.
Foot
$ 3.44
$ fsRR,000.00
0
Install standard 6 -inch 3,000 psi concrete sidewalk/ driveway, ramp and
2
stclewalk landingg g
including tree trimrnin tree root removal and restoration a1
Square
i(}0,000
Iho mva-
Foot
$ 4.11
$ 417,000.00
0
3
Remove and dispose of concrete sidewalk (4" or 6" thick concrete or any
Square
thickness of sidewalk or asphalt pavement), more or less, at any location.
root
300,000
$ 0.51
$ 153,000.00
f1
Standard or depressed concrete curb (any type), more or less, including
4
removal and disposal of existing curb or curb and gutter, base preparation
Linear
and including adjacent pavement restoration, if necessary, as per Misc. 35-85
Foot
,,nflo
22.
5 19.15
5 95,750.00
0
Standard concrete curb and gutter (arty type, more Or less, including renlUVal
rod disposal of existing curb or curb and goiter, bast preparation and
Linear
"'000including
adjacent pavement restoration, if necessary, as per Misc. 35-85-22.
Fool
4 78.88
$ 144,400.00
n
Standard concrete valley gutter )any type, any size), more or 1055, including
6
emoval and disposal of existing valley gutter, curb or concrete gutter, base
Linear
preparation and including adjacent pavement restoration, if necessary, as per
Foot
'`000
Mist. 31; 91, 22.
$ 73.69
S 119,450.00
0
7
liliovide and install water meter boxes located in sidewalk to be. replaced, at
,illy Inration as al}proved by City Fnginrer.
Each
SO
S 311,66
S 15.,593.00
i
1)
8
Type "S III" asphaltic concrete surface course including bituminous tack coat,
Square
as, rioted it, these specifications, as approver] by City Engineer.
yard
r
s,00U
$ 76.67
5 83,350.00
0
R inch thick compacted Ihnerock base will} primer oil surface including
9
necessary clearing and grading, as rioted in these specifications, as approved
Square
500
by City Frigineer.
Yard
$ 12.61
$ 6,305.00
0
Sl. Augustine Solid Sod in place, if necessary, including planting soil,Squ10grading,
10
Ilostall
leveling of the Swale area and top dressing, as approver] by City
are
2,000
I ngu}rer.
Foot
8.33
S ]{i,ffin.011
0
Frect/ stake and brace fallen frees/palms, any size, inclutlinp. all
11
.Ippurlenances on an "as needed" basis at locations citywide, close to the
Each
I
prnjerl loralron
$ 201.29
$ 1n,064.50
!7
Created by: Tahlia Gray April 4, 2018
V
Approved:
IfU 791392
Sidewalk Repair/Replacement
Created by: Tahlia Gray Apltl 4, 7018
Sri0,000.00
$ 10,435,250.00
NON-RESPONSIVE
5
Standard G Inch concrete driveway approach, Vlore or Ie%s, including removal
5 H.Iinon
12
ani) disposal of existing concrete/as{)halt driveway approach, trop trimming,
5rluale
$ 0.53
$ 1.060.00
Irve root tll.11lming, tree root relnuval and re%loratton of [tic, area at ally
font
1,on0
268.3+)
rllywifle hxal9n11.
n
0
n
t]
n
0
550,000 nn
NO BID
13
I'rovlde and install traffic signal pull boxes loc,lled in sidewalk to be replaced'
S 34,600.00
$ 20,740.00
$ 67.10
$ 33,550.00
f nrtessal 11 ,an cit wide" lnf-minn.
E act
10
$ 25,470.00
$ra0,000.00
$ 2.011,t123,r,0
Prepare 6 Inch SUI) base for locations where there are no existing sidewalks,
Including clearing and grading, new fill material, compaction and leveling of
S(10.11014
2,000
the area, etr
f nor
Remove ex"4111p asphalt, concrete or sod at Swale areas, clear ing anti grading
In (I inches lower than face of sidewalk/ curl) inclo(finp survey work lox new
elevations. filling the swale area with 6 inches of Clean suildblP material,
15
ulrluding but not limit to compaction and leveling around the pruned roots,
Syualf
2,000
i�,l Adv 10 COM PW Standards, placement of sod or asphaltic f)avenlent as
foul
applicable, and rnainlenance the valley drainage area in order to prol)erly
dillst rain water flow into existing catch basins as per Misc. 35 95 27.
16
Install f east in place) detectable wa1 nen! pails, per Mer. 313 95 77.
Each
21io
Remove ill(] reset exMing standard brick paWAs, indllding romovdl of exi4tllll!
belt ks, wwn1 king the %arid base, adding new salld, etc., clearing and gradlllg,
17
tree it poling, tree root removal, new fill lnawfi.il, Compaction and leveling
5roote•
5,000
01 iho .ur.a, etc. and resetting the exi+lint; bl is ks in same area, at any location
loll
f ilywlfle
New standard bllLk pavers installation, including, rellirival of existing broken
bricks, reworking the sandy base, addinp new sand, etc., clearing and Bidding,
18
Iree ltirnning, free root removal, new till material, conll)atlion and leveling
Scluarr`
5,0(t0
M lire arra, utility rill border, etc„ and imiallinf new brick pavers, at any
f out
Ineatinn til hide.
lypical4'x4', more or 4,%%, 6"x12" concrete planter/trailer for ttrrse
localinns whet a the planters/he criers are darnaped or iron exislnlg aril
19
located where the prick sidewalk will be installed/ rf rPt including cledl ing and
I.in`oI
1,000
grading, lice imillilinp, tree root removal, new fill material, compaction and
loot
Ievellllp of the area. etc. at any locatiola citywide.
201
Install root puald per PW taullehn No. 33.
hiwm
F r.et
sot)
21
11eI11,IV1" and ditipcisv al lre_e Stlllllps, int ltldlltg I UUt%, any SIZn at Vat iollS
loralicrns if necessal y, al any location as approved by City Engineer,
I ,Ich
10
c oncrPlP siddewalk grinding to be used only as a temporary n)ea%tile to fix
22
linear
ll lleVell Sidewalk. Collier{tClr Irlll tit pr OVIdP IIs owll wirer for d(lsf control.
fc)Ul 1,000
23 SPECIAL PROVISION = Contingency Allowance
.,;. 1
,
Fota!Bid!
Created by: Tahlia Gray Apltl 4, 7018
Sri0,000.00
$ 10,435,250.00
NON-RESPONSIVE
5
9.11
5 H.Iinon
51,274.86
$ 17,749.60
$ 0.53
$ 1.060.00
1.34
$ 2,690.00
$
268.3+)
$ 67,047.50
n
0
n
t]
n
0
550,000 nn
NO BID
11,450.00
S 0.9)
20.74
S 34,600.00
$ 20,740.00
$ 67.10
$ 33,550.00
$ 335.49
$ 3,354.90
$ 75.97
$ 25,470.00
$ra0,000.00
$ 2.011,t123,r,0
AWARDED VENDOR
Approved
1111 181382
Sidewalk Repair/Heplacurraent
IF8 781382 Citywide Sidewalk Repair and Replace
(3FE Engineering and General
Attachment H -N0n-Federally Funded Projects Price Sheet
111 Spencer Construction, LLC
Contractor corp.
Motto Express, Inc.
Line
No.
Pay Item Description
Unit
Oly
Unit Cost
Total Cost
Unit Cost
Total CostUnit
Cost
Total Cost
Install Standaid 4 Ilt( h, 3,000 psi conciete sidewalk, ralllp and sidowe11k
1
landing, including Uee root and branch trimming, tree root removal anti
Stlll.Il i'
200,000
soslnlatinn of Ihh arra.
l""'
3.42
S 684,000 00
5 4 00
$ 9on,noo.00
Install siaml,lld 6 illc11 3,01,H1 psi concrete sidrlwalk/ deiveway, ramp and
2
Sidt'Wa1k Lill(ij,4; InCliltling tlee teinvllllltl, tive root Iellloval and rc Stolration
5cloal e
100,000
of thn arra.
Font
S 4,10
S 410,000.00
S 4.75
S 475,000.00
Remove arsd dispose of concrete sidewalk (4" or 6" thick concrete or any
i(luare
3
thickness of sidewalk or asphalt pavement), more or less, at any locatirlra.
loot
300,000
S 0.41
S 159,000.00
$ 0.50
$ 150,000.00
Standard or depressed c.onclele curl) (any tyke), Inore or less, including
Icnloval and diillnsal of existing Curb or curl) and gutter, hase preparation
Lino.rl
4
tnd including adjacent pavement restoration, if necessary, aS per Misc. 35-85
Foot
(111)
')
S }9.56
S 97,900,00
S 18.00
$ 9(1,(100.00
Mand aid conucte curls and gutter (any type), InOW or less, inc111ding
removal And disposal of existing curl) or curl) and gutter, base preparation
I illi' li
5
and including adjacent pavement restoration, if necessary, as per Misc. 35-85
Foot
�21
29.4)
S 147,100.00
; 19,00
$ 90,000.00
Scandal d concrete valley Futter (any type, any size), mare 01 less, Intlurting
5
removal and disposal of existing valley gutter, Curb or Concrete gutter, base
Lineal
p re laration and in(luclin ad acent
i k 1 pavement restoration, if neetssary, as
Foot
11(1(1
per Misr. 35-85 2)
$ 24,04
S 120,450.00
S 18.00
5 90,0OO.Of1
Provide ;Md install watel meter poxes located in sidewalk to he +e{(laced, At
�
Ira(arioll as approvrd by City Lrlgina'er.
Each
W.ally
S 31133
$ 15,666.50
5 300.00
$ 15,OW00
Type "S-111" asphaltic Concrete surface course inCtcrclhlg bituminous tack coat,
Square
8
as noted in Ihese specifications, as approved by City Engineer.
yard
5.000
S 16.97
S 84,350_Orl
5,000.00
thick ccanlpacted hruetock base with primer oil surface including
9
18-hich
necessary clearing; and grading, as noted ill these specifications, as approved
S(IUare
Soo
by City Fngirlrer.
Valli
$ 12.74
$ 6,370.00
15.f)O
$ 7,1i00.00
5t. Augustine Solid Scali ill place, if nccessaly, 1116Uding planting scud,
10
lInStAll
grading, leveling of the Swale area and top dressing, as approved by City
Sr1u`rt e
2,000
t ngineer.
loot
16,191) nn
S J fin
I t 4,000.00
E rest/ stake and brace fallen trees/palms, any size, including all
11
appultenalices On all "as needed" basis at torratiolls citywide, close to the
Frl(.Il
SO
1
prnjecl Incation.
$ 201 `,h
1 S 10,079.00
)170.00
$ 18.000.00
Standard 6 inch conclete dsiveway approach, shote or less, including
12
renloval and disposal of existing Concrete/asphalt (Iliveway,approach, tree
Square
trimming, lice root tlimnling, Tree root removal and restoralioll of the .area
Font
1,000
1
,11 ,any ritywide Inratinn.
$ 9.17
$ 8,170.00
S (1.00
$ 6,1H1.0.00
Created by: TahliA Cray Apt it 4, 1018
Approved by; )—v
11 B 781382
Sidewalk Repair/Rel)I,tcenlent
13 1 m1ltle and imtall traffic signal pull boxes I0G1ted in sidewalk In be IepLl(ed,
,f nerect.u" .1t .in„ rilvu,H" 6xnla,.,, [,1011 10
Remove existing.lsph,ill, conclete or svtl at %wale Iters, cleatiT1g and gratfing
to 6 inhe% power titan face of sidewalk/ curb including survey work for new
plevatiolls. I illing the Swale area with 6- incites of clean suitable material,
15 Inrhldlni; but licit lilllit to (nnlp,lCtiun and leveling around the pluned snots,
,rade tri COM PW Standards, placement of sod or asphaltic pavement as
,111plicable, and maiulenance the Valley dlainagQ area in carder to plopelly
.ldjusl rain water flow into existing catch basins a5 per Misc- 35-85-21.
Still
Foot
1,000
16
Ilrepate 6 Inch sit[) IFA se flit 10C itions wbele thele ale 110 exlslllig sidewalks,
tae It
1`,n
14
inc lulling clearing Intl gra(irlt„ clew fill owterial, compaction and leveling of
Sri (1.11 e
2,000
19
the a1e,1- etc.
Foot
1,000
Remove existing.lsph,ill, conclete or svtl at %wale Iters, cleatiT1g and gratfing
to 6 inhe% power titan face of sidewalk/ curb including survey work for new
plevatiolls. I illing the Swale area with 6- incites of clean suitable material,
15 Inrhldlni; but licit lilllit to (nnlp,lCtiun and leveling around the pluned snots,
,rade tri COM PW Standards, placement of sod or asphaltic pavement as
,111plicable, and maiulenance the Valley dlainagQ area in carder to plopelly
.ldjusl rain water flow into existing catch basins a5 per Misc- 35-85-21.
Still
Foot
1,000
16
Install (cast ill place] deteftable wairling pails, 1mr Misc. 35 85-11.
tae It
1`,n
'M0.00
Remove and reset existing standard brick pavers, iur In(ing removal of
5 0.'A
S
19
exisling bricks, reworking the sand base, adding new sand, etc., clearing alld
I ine;n
1,000
$ i, i/
grading, tree trimming, lave tont It+neoval, new fill material, (onlpaction andf d1),000leveilllg
S
1),00017
4.01
of the area, etc. and Iesetting the expstpng blicks in sante area, at any
001
f out
20
Infalinn cit wide.
L}nL'Al
JL}n
S 1.93
New %Lamar(l snick lams installation, including removal of existing broken
Inn(
S
21
bricks, immking the 5alldy ba%e, addill,g new smid, etc., cleming an(i
18
gladlllg, live tl Illimilig, bee root rellloval, new fill material, compaction alt(
SrillalL'
1(}
22
leveling of the area, utility rim borer, etc., and instilling new brick pavers,
I oot
2
Cleated by: Til hlia GI ayAplri14, 2018
$50,01717.0{
S 10,43.5,250.00
NON-RESPONSIVE
1,276,50
Typical 4'x4', [dote lir less, 6"x12" concrele planter/healer for those
12,765.00
5
'M0.00
locations where the punters/header's are Ilanl,lgt d or non existing Intl
5 0.'A
S
19
located whore the brick sidewalk will be installed/ testi iltcludiny clearing
I ine;n
1,000
$ i, i/
and ipatling, flee trimming, trot: nxtl rernuvll, new fill Inalelial, cnntpaalEittll
I lists
$
4.01
and Il'VOItig, of the ales, etc, at mly location citywidt'.
5 269 73
20
trlst,tll "MI 1,0,ml put PW (31111etin No. .31.
L}nL'Al
JL}n
S 1.93
$
Inn(
S
21
trl'move and dispose of Ilcc stumps, intlutfillg louts, ally sire at various
Ir1(ations if octessaly, at any locabun as applow,ti pay City Fngiviver,
I ,(.It
1(}
22
(nnuete sidewalk grin(linp; to Ise uses] only ,')% a temporary laleasule to fix
i III,- ,r
18. of}
uneven sidewalk. Contractus nlusl provide its own water for dust control.
5 G7 Iia
1,000
23
5PECIA;_ PROVISION = Contingency Allowance
10.00
S 5,000.00
Tota; Bid
2
Cleated by: Til hlia GI ayAplri14, 2018
$50,01717.0{
S 10,43.5,250.00
NON-RESPONSIVE
1,276,50
S
12,765.00
5
'M0.00
,,017M.00
5 0.'A
S
l,ngo no
2,0(1
S 4,000 nn
$ i, i/
1,/1(1.1111
$
4.01
S 8,(100.170
5 269 73
67,182.50
S
Soo no
5 75,Onn.00
S 1.93
$
9,650.n1t
S
6.00
$ 30,000.00
1) 00
5 45,17)(10 00
S 21.15
$
21,15n.(n
18. of}
5 18,1`100 (10
5 G7 Iia
;
33,Y)S.nn
10.00
S 5,000.00
5 335.97
t
3359.2(1
$ 1,000.00
S 10,On0.00
$ ]6.00
S
S
26,oco.nn
$50,00000
2.071,936.20
S
10.00
5 1n,nnO.nn
$5n,nnn.a(1
S 2,132,Sno.00
PRIMARY VENDOR SECONDARY VENDOR
r�
IZ
Approved by: _