Loading...
HomeMy WebLinkAboutExhibitFM# 426113-1-52-01, NW 34'' Avenue Bridge Reconstruction over Comfort Canal Page 1 of 9 OFF -SYSTEM CONSTRUCTION AND MAINTENANCE AGREEMENT Between STATE OF FLORIDA, DEPARTMENT OF TRANSPORTATION ("DEPARTMENT") and THE CITY OF MIAMI, a municipal corporation of the State of Florida (66CITY") THIS AGREEMENT is made and entered into as of , 2016, by and through THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida (the "Department"), and the CITY OF MIAMI, a municipal corporation of the State of Florida, (the "City"), collectively referred to as the "Parties." RECITALS A. Upon approval of the Department's Work Program by the State of Florida Legislature, and adoption by the Department Secretary, the Department shall complete the various projects included in the Department Work Program; and B. Included in the Department's Work Program is Project Number FM# 426113-1-52-01, NW 34th Avenue Bridge Reconstruction over Comfort Canal (the "Project"). The Project includes work on NW 34"' Avenue, from approximately north of SR 836 / Dolphin Expressway to NW 14" Street, in Miami -Dade County„ Florida, a road not on the State Highway System; and C. The City is the holder of ownership rights to NW 34th Avenue, a road not on the State Highway System; and D. The parties agree that it is in the best interest of each party for the Department to undertake and to complete all aspects of the Project, including but not limited to, the design, construction, construction inspection, utilities, permits, easements and other associated tasks; and E. The parties further agree that it is in the best interest of each party to enter into this Agreement in order to allow the Department to construct and complete the Project. FM# 426113-1-52-01, NW 34`h Avenue Bridge Reconstruction over Comfort Canal Page 2 of 9 TERMS NOW THEREFORE, in consideration of the premises, the mutual covenants and other valuable considerations contained herein, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: 1. The recitals in this Agreement are true and correct, and incorporated into and made a part hereof 2. The Parties agree that the Department intends to undertake and complete project number FM# 426113-1-52-01, the Project shall include improvements on NW 34`x' Avenue, a road not on the State Highway System, from approximately north of SR 8361 Dolphin Expressway to NW 10' Street (for purposes of this Agreement, the "Project Limits"). The work within the Project Limits shall include, but may not be limited to: • Bridge reconstruction • Asphalt pavement reconstruction, milling and resurfacing of existing pavement • New sidewalk construction • New signing and pavement markings (the "Local Roadway Improvements"). The Project shall further include all activities associated with, or arising out of the construction of the Local Roadway Improvements. In the event that the Project requires the acquisition of additional right of way within the Project Limits, the Department shall acquire such right of way in order to complete the Project. The City shall cooperate with and shall support the Department's work efforts in these regards. The Department will design and construct the Project in accordance with all applicable federal and state laws and regulations and in accordance with Department design and construction standards as set forth in the Department's guidelines, standards, and procedures. The Department shall have final decision authority with respect to the design, the design review process, and construction of the Local Roadway Improvements, and the relocation of any utilities that the Department may determine to be required. 3. The Parties acknowledge and agree that the City will review the Project Design Plans ("PDP") and shall submit its comments, if any, via Electronic Reviewer Comments ("ERC".) The Department shall provide the City access to the ERC, and the Department shall use the ERC to submit the Project Design Plans for the City to review. When the Department places the Project Design Plans in the ERC, the Department will designate a Comment Due Date and a Response FM# 426113-1-52-01, NW 34`h Avenue Bridge Reconstruction over Comfort Canal Page 3 of 9 Due Date. The City shall submit its comments with regards to the Project Design Plans on or before the Comment Due Date, and the Department shall respond to the City's comments, if any, on or before the Response Due Date. If the City does not submit its comments by the Comment Due Date, the City will be deemed to have approved the Project Design Plans submitted by the Department. The review process for the Project Design Plans will be deemed concluded when the Department has submitted the Final Project Design Plans to the ERC, and the Comment Due Date and Response Due Date for the Final Project Design Plans have passed, and the Department has addressed all of the City's comments that were submitted through the ERG Once the review process is concluded, the City shall authorize its Public Works and Waste Management Department to issue a permit ("the Permit") to the Department's construction Contractor, authorizing the Department to construct the Project in accordance with the Final Project Design Plans submitted through the ERC. The City acknowledges and agrees that, during construction of the Local Roadway Improvements, the Department will only utilize the services of law enforcement officers when required by the Department's Standard Specifications for Road and Bridge Construction, and no additional requirements will be imposed. The City agrees that the Permit will not impose any conditions other than those included in this Agreement, and the terms of this Agreement supersede any conflicting terms in the Permit. Additionally, the City waives any permit fees that may apply to issuance of the Permit. Major modifications of the permitted plans must be submitted to the City for review. A Major Modification is any modification that materially alters the kind or nature of the work depicted in the permitted plans, or that alters the integrity or maintainability of the Local Roadway Improvements, or related components. The City's review shall be within the reasonable time schedule proposed by the Department, in order to avoid delay to the Department's construction contract. In the event that any Major Modifications are required during construction, the Department shall be entitled to proceed with the modifications that are necessary to complete the construction of the Project, and shall, upon identifying the Meed for a Major Modification, immediately notify the City of the required changes, prior to proceeding with implementation of the same. It is specifically understood and agreed that any such changes during construction shall not delay nor affect the timely construction schedule of the Project. The City shall modify the permit in accordance with any plan modifications agreed upon that are required by the Department to duly complete the Project. FM# 426113-1-52-01, NW 34"' Avenue Bridge Deconstruction over Comfort Canal Page 4 of 9 4. The City agrees to fully cooperate with the Department in the construction, reconstruction and relocation of utilities that are located within the City's right-of-way, within the Project Limits. Utility relocations, if any, which may be required by the Department for purposes of the Project, shall be done in accordance with the Department's guidelines, standards and procedures. The Department shall submit the proposed Utility Relocation Schedule to the City. Utility relocations, if any, shall be done in accordance with the provisions of Chapter 337, F. S. Additionally, the City agrees to fully cooperate with the Department in the removal of any encroachments or pennitted improvements located within the City's right-of-way, within the Project Limits, that are in conflict with the Project, including, but not limited to, red light cameras, if any. 5. The City acknowledges that the Department will be utilizing federal funds to construct the Project, and as a result thereof, the City agrees to perpetually maintain the Local Roadway Improvements. To maintain means to perform normal maintenance operations for the preservation of the Local Roadway Improvements, which shall include but is not limited to, roadway surfaces, shoulders, roadside structures, drainage, signing and pavement markers, and such traffic control devices as are necessary for the safe and efficient use of the Local Roadway Improvements. Additionally, the Parties understand and agree that the Department shall transfer the permit(s) to the City as the operational maintenance entity, and the City agrees to accept said transfer and to be fully responsible to comply with all operational and maintenance conditions of the pennit(s), at its sole cost and expense. Notwithstanding the requirements hereof, maintenance during construction shall be the responsibility of the Department and its Contractor, as set forth in paragraph 9 of this Agreement. 6. The Parties acknowledge and agree that the City's right-of-way and the improvements and structures located within the City's right-of-way, are and will remain under the ownership of the City, and that the Department will not have any ownership interest in the right-of-way, improvements, or structures located thereon or installed therein pursuant to this Project. 7. The Department shall require its construction Contractor to maintain, at all times during the construction to carry Commercial General Liability insurance providing continuous coverage for all work or operations performed under the Construction Contract. Such insurance shall be no more restrictive than that provided by the latest occurrence form edition of the standard FM# 426113-1-52-01, NW 34"' Avenue Bridge Reconstruction over Comfort Canal Page 5 of 9 Commercial General Liability Coverage Fonn (ISO Form CG 00 01) as filed for use in the State of Florida. The limits of coverage shall not be less than $1,000,000 for each occurrence and not less than a $5,000,000 annual general aggregate, inclusive of amounts provided by an umbrella or excess policy, or such other minimum insurance coverage that may be required by the Department for the construction of the Project, in accordance with the Department's Standards and Specifications for Road and Bridge Construction. The Department shall further cause its Contractor to name the City and the Department as additional insured Parties on the afore -stated policies, and to provide evidence of Workers' Compensation Insurance in accordance with the laws of the State of Florida and in amounts sufficient to secure the benefit of the Florida Workers' Compensation law for all employees. 8. The Department shall notify the City at least 48 hours before beginning construction within the City's right-of-way. Such notification may be provided via email, and the notice requirements set forth in paragraph 20 shall not apply to this paragraph. The Department agrees that the City may, at reasonable times during the construction of the Local Roadway Improvements, inspect the Contractor's construction site and perform such tests as are reasonably necessary to determine whether the goods or services required to be provided by the Contractor, pursuant the Contractor's Construction Agreement with the Department, conform to the terms of said Construction Agreement. Upon request by the City, the Department shall coordinate with its Contractor to provide access to the City for performance of said inspections. During the construction work related to the Project, the City shall fully cooperate with any such work being performed by the Department and the Department's contractors. The City shall not commit nor permit any act which may delay or interfere with the performance of any such work by the Department or the Department's contractors, unless the Department agrees in writing that the City may commit or permit said act. 9. Maintenance during construction within the Project Limits, commencing as of the first date of construction, shall be the responsibility of the Department's Contractor. After completion of construction, the City shall assume all maintenance responsibilities. Upon completion of construction, the Department is required to invite the City on the Final Inspection of the work within the Project Limits, and will incorporate valid City concerns that are within the scope of the contract into the final Project punch list to be corrected by the Contractor. However, if the City does not attend the Final Inspection, the Department shall proceed to conduct the Final FM# 426113-I-52-01, NW 34`h Avenue Bridge Reconstruction over Comfort Canal Page 6 of 9 Inspection, finalize the Project punch list, and issue a Notice of Final Acceptance to its Contractor. The Final Inspection shall be performed and the Notice of Final Acceptance shall be issued in accordance with the Department's Standard Specifications for Road and Bridge Construction and the Construction Project Administration Manual (CPAM). Upon issuance of the Notice of Final Acceptance to the Contractor, the Department shall provide a copy of said notice to the City. As of the date of the Notice of Final Acceptance, the City shall be immediately responsible for the maintenance of the Project and the Local Improvements, and shall further accept the Local Improvements and the transfer of any additional right of way acquired by the Department within the Project Limits, for purposes of the Project. The Department, however, shall have the right to assure completion of any punch list by the Contractor. Notwithstanding the issuance of the Notice of Final Acceptance, the City may notify the Department Project Manager of deficiencies in the Local Roadway Improvements that may be covered by the warranty provisions in the contract between the Department and its Contractor. The Department shall enforce the warranty if the remedial action is required by the warranty provisions, as determined by the Department. Upon completion of all work related to construction of the Project, the Department will be required to submit to the City final as -built plans for the Local Roadway Improvements and an engineering certification that construction was completed in accordance with the plans. Additionally, the Department shall vacate those portions of the City's right-of-way used to construct the Local Roadway Improvements, and shall remove the Department's property, machinery, and equipment from said portions of the City's right-of-way. Furthermore, the Department shall restore those portions of the City right-of-way disturbed by Project construction activities to the same or better condition than that which existed immediately prior to commencement of the construction of the Project. 10. This Agreement shall become effective as of the date both parties hereto have executed the agreement and shall continue in full force and effect until the Project is completed, as evidenced by the Department's issuance of the Notice of Final Acceptance. Prior to commencement of construction, the Department may, in its sole discretion, terminate this Agreement if it determines that it is in the best interest of the public to do so. If the Department elects to terminate this Agreement, the Department shall deliver formal notice of termination to the City, as set forth in paragraph 20 of this Agreement. FM# 426113-1-52-01, NW 34th Avenue Bridge Reconstruction over Comfort Canal Page 7 of 9 11. In the event that any election, referendum, approval, ratification, or pennit, notice or other proceeding, or authorization is required to carry out the Project, the City agrees to expeditiously initiate and consummate, as provided by law, all actions necessary with respect to any such matters, with time being of the essence. 12. The Parties acknowledge and agree that the Project shall be constructed using federal funds and that all costs incurred must be in conformity with applicable federal and state laws, regulations, and policies and procedures. 13. The Department's performance and obligations under this Agreement are contingent upon an annual appropriation by the Legislature. If the Department's funding for this Project is in multiple fiscal years, funds approval from the Department's Comptroller must be received each fiscal year prior to costs being incurred. Project costs utilizing fiscal year funds are not eligible for reiinbursement if incurred prior to funds approval being received. 14. In the event that this agreement is in excess of $25,000, and the agreement has a term for a period of more than one year, the provisions of Section §339.135(6)(a), Florida Statutes, are hereby incorporated into this agreement and are as follows:: The department, during any fiscal year, shall not expend money, incur any liability, or enter into any contract which, by its terms, involves the expenditure of money in excess of the amounts budgeted as available for expenditure during any such fiscal year. Any contract, verbal or written, made in violation of this subsection is null and void, and no money may be paid on such contract. The department shall require a statement from the comptroller of the department that funds are available prior to entering into any such contract or other binding commitment of funds. Nothing herein contained shall prevent the making of contracts for periods exceeding 1 year, but any contract so made shall be executory only for the value of the services to be rendered or agreed to be paid for in succeeding fiscal years; and this paragraph shall be incorporated verbatim in all contracts of the department which are for an amount in excess of $25,000 and which have a term a for a period of more than 1 year. 15. The Department is a state agency, self-insured and subject to the provisions of Section 768.28, Florida Statutes. Nothing in this Agreement shall be deemed or otherwise interpreted as waiving the Department's sovereign immunity protections, or as increasing the limits of liability as set forth in Section 768.28, Florida Statutes. 16. A modification or waiver of any of the provisions of this Agreement shall be effective only if made in writing and executed with the same formality as this agreement. 17. This agreement shall be governed by the laws of the State of Florida. Any provision hereof found to be unlawful or unenforceable shall be severable and shall not affect the validity of the FM# 426113-1-52-01, NW 34"' Avenue Bridge Reconstruction over Comfort Canal Page 8 of 9 remaining portions hereof. Venue for any and all actions arising out of or in any way related to the interpretation, validity, perfonnance or breach of this Agreement shall lie exclusively in a state court of appropriate jurisdiction in Leon County, Florida. 18. No term or provision of this Agreement shall be interpreted for or against any party because that party's legal counsel drafted the provision. 19. In accordance with Executive Order No. 11-02 the Department's Vendor/Contractor(s) shall utilize the U.S. Department of Homeland Security's E -Verify system, in accordance with the terms governing use of the system, to confine the employment eligibility of; i. all persons employed by the Vendor/Contractor during the term of the Contract to perform employment duties within Florida; and ii. all persons, including subcontractors, assigned by the Vendor/Contractor to perfonn work pursuant to the contract with the Department. 20. All notices required pursuant to the terms hereof, shall be in writing and shall be sent by first class United States Mail, facsimile transmission, hand delivery or express mail. Notices shall be deemed to have been received by the end of five (5) business days from the proper sending thereof unless proof of prior actual receipt is provided. Unless otherwise notified in writing, notices shall be sent to the following: To the City: (insert City information) To the Department: Director of Transportation Operations State of Florida, Department of Transportation 1000 N. W. 111 "' Avenue Miami, Florida 33172 FM# 426113-1-52-01, NW 34" Avenue Bridge Reconstruction over Comfort Canal Page 9 of 9 21, The City, by and through Resolution No. , attached hereto as Exhibit , has duly authorized the execution and delivery of this Agreement and agrees to be bound by the terms hereunder, and has further authorized the Mayor or his designee to take all necessary steps to effectuate the terms of this Agreement, including the authorization to accept the additional right of way acquired by the Department within the Project Limits, if any, from the Department. IN WITNESS WHEREOF, the parties hereto have executed this agreement on the dates exhibited, by the signatures below. CITY OF MIAMI By: Name: Title: Date: Attest: + By: Title: Clerk Approved as to form and legality: By: City Attorney STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION By: _ Name: Title: Date: Department Legal Review: f SURVEY NW 34 AVE-- 1 ' r --q OF CONST R/W 1507 _ CLEARING AND 6NUBH1N,: 00.+ R!W LIKE r A/W LINE VAR1F5 f0'I SFr! � 1 27 NATURAL 6AOUNU� 1 PGP I I ! I NATURAI 6ROUAI ... O,U! I,N_' 11,12 n♦n� 90n.Fr urns t -A PROPOSED CONCRETE SIPEWALK - PROPOSED c'UNCRET€ SIDEV/ALK PROPO}LO ARTICULATLD PPVLRS - P17:Jpc'S[U ARTLCULAFCD PAVERS TYPICAL SECTION rYPF n STARIL.N7'ATION NW 34 AVE IRR .1U STA. 31+92.00 TO STA. 32+46.50 STA. 32+86.50 TO STA. 33+41.00 RECONSTRUCTION OPTIONAL BASE GROUP 6 WTIM TYPE 5P 5T RULTURAL LOURSE (TRAFFIC 11112'1 MILLING WILL CNISFING ASPIIALr PAVt FIt Ul FOR UEPIH 11-1 RESURFACING TYPE SP SIRO !URAL C041RSE ITRAfFIC 811x1 NATURAL GAl1UNLI V SURVEY NW 34 AVE-) ' r4. OF LUNST RJR MY) NATURAL GROUND O.O.' e n=n CLEARING AND 6A1+8QlN'G Ii[rAND I R111 Ll NE VAAIFS (tr-1 Sd1 L. R/IV LINE TRAFFIC DATA PROPOSED CONCRETE SIDEWALK ��T T �7 r7� T }-� T'nn- I ! f 171 f Tr 1 r r 7 T' -7f f f�PR:)PI � SfO CnNCRk Tf 510E MA N �PROPOSE.P .r <URRENT YEAR - "014 AADT - 5300 5' 9' 11' I 11 VARIES S' I ESTIMATED OPENING YEAR = 2019 AADT = 5700 (6' 8) RECONSTRUCTION OPTIONAL BASE GROUP 6 WTIM TYPE 5P 5T RULTURAL LOURSE (TRAFFIC 11112'1 MILLING WILL CNISFING ASPIIALr PAVt FIt Ul FOR UEPIH 11-1 RESURFACING TYPE SP SIRO !URAL C041RSE ITRAfFIC 811x1 NATURAL GAl1UNLI I'll, I �'�2 002 Ij(12 0-G1 I ().vX07 NATURAL GROUND O.O.' n=n TRAFFIC DATA PROPOSED CONCRETE SIDEWALK ��T T �7 r7� T }-� T'nn- I ! f 171 f Tr 1 r r 7 T' -7f f f�PR:)PI � SfO CnNCRk Tf 510E MA N �PROPOSE.P <URRENT YEAR - "014 AADT - 5300 PROPOSED ARTICULA,TFO PAVERS ARTICULATED PAVERS ESTIMATED OPENING YEAR = 2019 AADT = 5700 TYPICAL SECTION ESr !MATED PFSIGN YEAR = 7039 aADr - 7800 k G 9,tl0°x. 124 HOURI EAIST SUQSFRUCTVA€ LTO FE6rAfN/ NW 34 AVE DESIGN HOUR 1 = 9M" UE516N SPEED - 3U MPH STA. 31+65.00 TO STA. 31+92.00 STA. 33+41.00 TO STA. 34+60.00 RFwI51oN5 CARL 05 FRANCIS, PF., PTOE P.E. LICENSE NUMBER 513w1 CHOICE ENGINEERING CONSULTANTS, INC - j1855 SW 131NA STREET. SURE 104 47:4 Tb' alp' h'LI)XTIki UR'iNXT.+TP'.51' Y+P' 3'NaA;YI+r+Ra'AT'7r+N y 1� TYPICAL SECTIONS SHEET ND. P !D - fi.ATF ofe'rRlvrrON UNROAD NO. COTY fINANCIAL PROTECT 10 NW34AV MIAMI.OADE 426113-1-52-01 M1AM1. FLOATDA 33186 5 CERTIFICATE OF AUTHORIZATION 00031116 ..r r.. u.�,a rr .�.�:� ..nr.,,,ro,...w,.w,.n,•...:. .-ma�,u...,. .... �n. �, Rer! STA ®�1�lw t riLlRVEr s PCL 33 N 1" 56 52" W i { i1 5' SWK DV/r 0 5 20� Feer REI.IOVE 5A' LF UT FENCE CIINST 54' IF OF (INCL E A19! BUS IO RL RL'LP NlAM1-llAUE CONST 5' SWK LA RJW LlNEJ , T f ra: nn 1 L � S 13. ?S IRr1 11.00' )ATI I 1U END $RIDGE g 6l GIN (OK SWK. �' r29.J0 F-� STA. 32+86.50- .y blAl Clf Cx15TINY j +90ui V7 51'.1. OI I9.5J 17Lk71AT1 R!W LINE cl ENO 3r' VFRTICAL RAILING Ili5rA 35 VERY It'AI RAIL (N[: STA. 32+5063 ��. cam5r. s' swx sra 3lrsatia _ F I51 FFNCr s ' SEE ShrET NO. 7 �- = REPOVE 60'[.F OF FENCE in. ES Ire LInonud� � � DETAlI. B rTTP1 � Q CONST. 00' IF OF FENCE tEGFND. Z! n X.CONST. FENCE r� L� GATL rG" OPLNINGI ® DENOTES HARMONIZATION F- C5 p IA R1W LINE CC ... Q ® DENOTES PERMEABLE PAVERS 0LL I U [� DENOTES MILLING AND RESURf ACING U DENOTES CONCRETE A" SIDEWALK DENOTES CONCRETE 6.51DE-WALK Q DENOTES DETECTABLE WARNING AFVLSIONS CARLOS FRANCIS. P -E., PTOE ,Y7ATly (01 PL(N('IVA DAFF I)Fs AIAII(v bnrF SHEET F.E. LICENSE NUMBER 513e4 OF:F+AF(7:HF.'.\-'!' (+F" T!{A.\'.SI•l)NT":1T'fIl\' NO CHOICE ENGINEERING CONSULTANTS. INC. 1.1855 5W 132NO STREET, SUITE 200 ROAD NO, COUNTY FINANCIAL PAOIFCr TO ROAD IT A Y PLANS MIAMI, FLORIDA 33196 NW34AV MIAMI -DARE 12.W-1-2141 IB CCATIFICATE OF AUTHORIZATTON 00031115 LA R/W LINE END FENCE REPLACE f STA 32,_'591 j RE NOYf 35- If OF FENCE - S4 D:AST 35' LF OF fENL MAICH LXISI BEGIN 51 COLIC 5WK fe GE LIN 3t yERIIL'u RAVING BFL�IN fFHCE REPLACEMENT STA 31,1136 L�jq SrA 31 LY7.CN7 r_'3.G0 Q: W END MILLING AND RESURFACING 17.00 I1 BEGIN RECON5TROCTtON BEGIN APPAOACH SLA. BEGWN PGL SHIFT STA. 3:+16.50 q STA. 31+92.00 SEE SHEET NO 7 — BEGIN PROJECT 150' 1RTI /Of r41L AtrTPI BEGIN MILLING AND RESURFACING I STA. 31+65.00 1)2.55 19.63' ELT: R1W LINE r:;5i ;yin i i 31 qSURVEY 32 - NW 34th AVE EXIST. PGL EAST SWK ®�1�lw t riLlRVEr s PCL 33 N 1" 56 52" W i { i1 5' SWK DV/r 0 5 20� Feer REI.IOVE 5A' LF UT FENCE CIINST 54' IF OF (INCL E A19! BUS IO RL RL'LP NlAM1-llAUE CONST 5' SWK LA RJW LlNEJ , T f ra: nn 1 L � S 13. ?S IRr1 11.00' )ATI I 1U END $RIDGE g 6l GIN (OK SWK. �' r29.J0 F-� STA. 32+86.50- .y blAl Clf Cx15TINY j +90ui V7 51'.1. OI I9.5J 17Lk71AT1 R!W LINE cl ENO 3r' VFRTICAL RAILING Ili5rA 35 VERY It'AI RAIL (N[: STA. 32+5063 ��. cam5r. s' swx sra 3lrsatia _ F I51 FFNCr s ' SEE ShrET NO. 7 �- = REPOVE 60'[.F OF FENCE in. ES Ire LInonud� � � DETAlI. B rTTP1 � Q CONST. 00' IF OF FENCE tEGFND. Z! n X.CONST. FENCE r� L� GATL rG" OPLNINGI ® DENOTES HARMONIZATION F- C5 p IA R1W LINE CC ... Q ® DENOTES PERMEABLE PAVERS 0LL I U [� DENOTES MILLING AND RESURf ACING U DENOTES CONCRETE A" SIDEWALK DENOTES CONCRETE 6.51DE-WALK Q DENOTES DETECTABLE WARNING AFVLSIONS CARLOS FRANCIS. P -E., PTOE ,Y7ATly (01 PL(N('IVA DAFF I)Fs AIAII(v bnrF SHEET F.E. LICENSE NUMBER 513e4 OF:F+AF(7:HF.'.\-'!' (+F" T!{A.\'.SI•l)NT":1T'fIl\' NO CHOICE ENGINEERING CONSULTANTS. INC. 1.1855 5W 132NO STREET, SUITE 200 ROAD NO, COUNTY FINANCIAL PAOIFCr TO ROAD IT A Y PLANS MIAMI, FLORIDA 33196 NW34AV MIAMI -DARE 12.W-1-2141 IB CCATIFICATE OF AUTHORIZATTON 00031115 o, T RT Q DIYT. 14.50' IRTI � . C L FENCt ;A7e R/W (INF IJr oPENInGJ � �, w U-1 END MILLING AND RESURFACING rt J — END PROJECT STA. 34+60.00 I li M DFNCtES HARMONIZATION END CUNC, SWI: �LJMITS OF MILLING R/W LINE OFNOTFS PERMEA6LE PAVERS MATCH EATSTING AND RESURFACING DENOTES MILLING AND AESURFACING ♦5 47 MATCHEAISTING j =:STA. 3.+32.51 - DENOTES CONCRETE 4" SIDEWALK R1W LINE - FA1$T aSPHA ! - � DENOTES CONCRETE 6" SIDEWALK OFNOTFS DETECTABLE WARNING RFVISroNs CARLOS FRANCIS. P -F., PTOF 17:§7L (IF PLPRYA.'J SHEET uA __ I OATF I Rl T ON PC LICENSE NUMBER 5)364 OF.'P3 R4'.HE "1'r F Chili" LNGINEERING C0115ULIAN IS, II'E 11955 5W 132NO STREET, SUITE 2UU ROAD Net- {puNTr, FINANC[aL PR01FC7 10 ,ry DB; , Y PLA MIAMI. FLORIDA 33166 NW 34AV MIAMI-DADE 4261t3 -I -52 -OI 1 CERTIIICATE OF AUTHORIZATION 00031115 _ 35 00' 35 (Ify ly I5 -3r 1 J 8G' ►..d. URIT5 OF MWINO R/W !!NE AND RESURFACING 0 5 20 FNJ)CONI SWK 1391' (LT1 9tp' END AGY. SHJf! l STING MATCH CAWING MATCH Ek15TINti - �- w 31A. 29x4.1.66 F® eet sTA 7,.17 — Cr1 _.._�_ ----- 180.•16 { 2 Exf5T. PGLjY 340A' It r) NW 34th AVE ^ - STA. 34t1007 f SURVEY NW 34th AVE= i R/W LINE :::,%`r' 3 STA. 30+00.00 ¢ SURVE'( NW 1411r ST 8.J91LT1 - ,/6.01 ICT) .1I vG 2U.uI iL! +GS dG - R 1 LINE LOW 5' SWA 1•� ,1 o, T RT Q DIYT. 14.50' IRTI � . C L FENCt ;A7e R/W (INF IJr oPENInGJ � �, w U-1 END MILLING AND RESURFACING rt J — END PROJECT STA. 34+60.00 I li M DFNCtES HARMONIZATION END CUNC, SWI: �LJMITS OF MILLING R/W LINE OFNOTFS PERMEA6LE PAVERS MATCH EATSTING AND RESURFACING DENOTES MILLING AND AESURFACING ♦5 47 MATCHEAISTING j =:STA. 3.+32.51 - DENOTES CONCRETE 4" SIDEWALK R1W LINE - FA1$T aSPHA ! - � DENOTES CONCRETE 6" SIDEWALK OFNOTFS DETECTABLE WARNING RFVISroNs CARLOS FRANCIS. P -F., PTOF 17:§7L (IF PLPRYA.'J SHEET uA __ I OATF I Rl T ON PC LICENSE NUMBER 5)364 OF.'P3 R4'.HE "1'r F Chili" LNGINEERING C0115ULIAN IS, II'E 11955 5W 132NO STREET, SUITE 2UU ROAD Net- {puNTr, FINANC[aL PR01FC7 10 ,ry DB; , Y PLA MIAMI. FLORIDA 33166 NW 34AV MIAMI-DADE 4261t3 -I -52 -OI 1 CERTIIICATE OF AUTHORIZATION 00031115 M c ^'1 1391' (LT1 9tp' END AGY. SHJf! c eEGJN MluJVJ AND RESuRF4CJNG SURi'EY 35 3 = ti V7 sTA. 3T>er �Ir• 34 q — _.._�_ ----- 2 Exf5T. PGLjY NW 34th AVE ^ - p. 05 10 M _ o, T RT Q DIYT. 14.50' IRTI � . C L FENCt ;A7e R/W (INF IJr oPENInGJ � �, w U-1 END MILLING AND RESURFACING rt J — END PROJECT STA. 34+60.00 I li M DFNCtES HARMONIZATION END CUNC, SWI: �LJMITS OF MILLING R/W LINE OFNOTFS PERMEA6LE PAVERS MATCH EATSTING AND RESURFACING DENOTES MILLING AND AESURFACING ♦5 47 MATCHEAISTING j =:STA. 3.+32.51 - DENOTES CONCRETE 4" SIDEWALK R1W LINE - FA1$T aSPHA ! - � DENOTES CONCRETE 6" SIDEWALK OFNOTFS DETECTABLE WARNING RFVISroNs CARLOS FRANCIS. P -F., PTOF 17:§7L (IF PLPRYA.'J SHEET uA __ I OATF I Rl T ON PC LICENSE NUMBER 5)364 OF.'P3 R4'.HE "1'r F Chili" LNGINEERING C0115ULIAN IS, II'E 11955 5W 132NO STREET, SUITE 2UU ROAD Net- {puNTr, FINANC[aL PR01FC7 10 ,ry DB; , Y PLA MIAMI. FLORIDA 33166 NW 34AV MIAMI-DADE 4261t3 -I -52 -OI 1 CERTIIICATE OF AUTHORIZATION 00031115 .... Temporary Poo -I—'. Tr xlNr Aaellny - Rr r:igr i3T vel lfrat Face) ` l' Innex No 4,-3'N f . :.......................... prr ertron of Stdhoni+egj, III .D DP APn,,, „ .�• ., II Ill �.:•'' III ----------------- _ .— HR -2 ........ _ I^ _ -. rs BetOn APP Stab tler errdgrp I Fnd Hear 2 i;ndmi. Ri N 51 a. 32+26.50 Ff DW Sfa. 32+86.50 $tat Enrr Be 1 99:I0 ii j.. yy^'alldg' Trarf'f RaOHar? — PGL ; Soro-ey ., M1 Index No. 423 - -PLAN �4 I I 3: b - Trafh(Rdrtwit(32-Yer'rrrrtl ! - S I ecce) We, ND. 423 'r ID 20-D" - 4vdJ" N V 56' 52 W -M 5Zw 10 APP. Sldb (Bridge Lenyll0 a APP, Sldb apynr Bridge 2' Fxp. J. 2" Exp. J, End Br,doe LEGEND End bent I End Bc.,l 2 EL 3.66 EL. 4.U3 __ -"'- SLructures to ApProarh Stab � APO,oarh Slap _ be RE'n1V4'a(i --- HR -2 I^ _ rs Ri N I� .4 Trarf'f RaOHar? 132" Verriral Fare) `! ., YJn Tall (TYP) '� Index No. 423 - -PLAN �4 a - - Trafh(Rdrtwit(32-Yer'rrrrtl ! - S I ecce) We, ND. 423 ID 20-D" - 4vdJ" 2(r 0" 10 APP. Sldb (Bridge Lenyll0 APP, Sldb apynr Bridge 2' Fxp. J. 2" Exp. J, End Br,doe LEGEND End bent I End Bc.,l 2 EL 3.66 EL. 4.U3 __ -"'- SLructures to _ be RE'n1V4'a(i --- Vel r. C1. yy _ III `. Falsring Bridge Dhvl _q0 soflonl of tI. +096 to he Remrwed 19 E xrcr. fla�nne! — Proposed Cna,m el ELEVATION EL. -5,00 (_' $ od bridge Nr Hfge No. BOLTON PEREZ $ ASSOCIATES ur YIAMAI>G +203 COPPOUTE L-F4TE.9 DRIVE. SUITE 301 tAACrG00y IFI;—H.MB\-I'— l'WANSt41p TA'I10N PLAN ANS ELEVATION M71.f LDNIU< 33F16 R Y. RJMrvJ '.11Nr} nuvxN.Y w F"n r x ' 'ilt. u: OrF1'111"TF OF M'THOWZArlau TVM nr®u,ra a� V I' 10 Ulu PEr0'Z. e3. -.1— .4,'A arawr-aqua 72BII3 I s2 e1 NW 34TH AVENUE BRIDGE REPLACEMENT OVER COMFORT CANAL Or 3 'E MEW NUMbEII 37336 J.P 38-4' four to outl 9r Ryw RJW - Construction Joint PGI r Q 5u-ey It' 0' 17'-Q' 6'-0" 5hldr Linc Lane Shoulder Sidewalk Bare, ri Ternpor ary Pedestrian Bridge ��oPt^' d.67 rr fr Slopr 003 Ft/Fr &C1P COnrrete Topfrfny with shrnrkage re.lUrirr adrruzCrrd e. SiUpP 0 02 FIfFi _ .--._._.T-. 57 Ft—da Sl an Beams ExlSuri Br,d a to g g fader V20451 1 J' U 74'-3' UC RCptafCd � - - 8 - 1l.'rr i 1w,d o Scam Seaws wrrh IW Max. Gay PHASE 1 (Looking Ahcad 5lation) 1. Place remprarypedestrian bridge and support existing utilities. 7. Detour pedestrian flallic to temporary pedestrian bridge and detour vehicular nalftc. 3. Demolish exrsnmg budge. 4- Conscrurt portion of new bridge - 5.. ©pen portmn of newly constructed bridge to traffic. g' 4$'-6" foul to null RFW RJy! Survey 6'-Z 6,011 11,_0„ 7t°_0. 6�,-0. 6_Z. 1_t•• Barrier SrdewWk 5houfder Lane Lane Shoulder Sidewalk Bnrrrel Tral hr Rdohoq Type 32" Vertical f=ace rd IDLY, 4rd); fnaex 4233 wllh Pedesi roan Rif We Bullet Railing FDOr Standard Index 822.. ll yp.l Slope: 0.42 Fr/Fr 1� 51ope� 0.07 ft,r r 5fope' 0-02 Fr/FI �� 6'CIP Conrrcle a TOpPrng wish sadhrvpkage redvc,a rmxrure. Slope. 0.02 F,lFf - - ______________ CE!7 57 Flnrid:y S1aL Rearms Index D204.51_- 10 - 12x57 1`101,da Sial, Reams wen IV" Max. Gap PHASE 11 ILookrng Ahead 51ar1011) 1. Relocate existing unhtles and fkede5trians to east side of new bridge. 2. Remove fenapovary pedestrian bridge. 3. Consifuct remaining portion of new Bridge. 4. Place povenrenl +.Marking and open enrire new bridge to traffic. wEvr�loo.,s BOLTON PEiiEZ &ASSOCIATES >745 CCRAgAATE CfMEA n111, SVITF 741 M1AM1. rLnNfOA 73fd6 'Hr O."—"L' , ra'rr. ,r3 rLokon.. K5 u • °���° CONSTRUCTION SEQUENCE .. N1- NW 34TH AVENUE BRIDGE REPLACEMENT OVER COMFORT CANAL rtr . Crin"ICATE of rArrMOR7ZAill]N 794+ ,oapwoo xrwz. rr. PE LICENSE NIIMSER 37776 ��r y� ..m 11.7 ur N A rirndr DAD'[ raerl; I s2 •,1 8f 6 RAN � Coast ru[uon Jd+n! SX Bars Alternate 5 _ - W)dlr Sr Bat 5 4E•-6" ruin Io_ou11 (typ.) See Note 1 6"C!P Cairwild d e to SSO7 Bits L1 1T' (ryp.) Seo Note 1 at Sidewalk f7 PGL ! rp 5urvcy I 32'. V F 32" Vertical Face pi. Sidewalk FOOT 51arldarJ ! .- UCn.SRTmL•'i IH IRA.'.+PI)li'rkT1()e: Mcfex 423 17yp.) Barrier — Sidewalk Shoulder Laic Lane Traffic Raping Type Sec FOOT flack 423 32'vertical Face See rr,n• 'F . FDO7 5ta "lard Mile- 423 with I Retail d ST2 Bars t4, 6" •xJ.P N A rar4uf FAtIF ;?(,if; 1-s: nl NW 34TH AVENUE BRIDGE REPLACEMENT OVER COMFORT CANAL Pedestrian Sirycle I Bullet RailintJ. - 5T7 gars F D07 Sf dndard 51dpe�0.02 f!!f[ s \. Index 872. (Typ.) 5T3 Bars —� Slope 0-02 FlrFt Slope: 0.01 Ft/� (TyP) � L 4 Ra+s sir 191 (TYRE Belwear+ FSEs! — 12y57 Florida Bars 55 (Typ.) ' See FDOT bide, 423 I 5lao Beams Videx D20451 10 - 12.57 Florid, 50h Beams with IW' MawGap TYPICAL BRIDGE SECTION LooOng Alread Station 5T2 Bars q, 6" 5T) 4;01 s cn' 9" 5508 Bars (� f2- 9� Sfde Jfk RIVV g. l Sldewalk 9-5501 Eq Spa SX Bars Alternate SldeWafA Reinlortemeal W)dlr Sr Bat 5 BOLTON PEREZ & ASSOCIATES (typ.) See Note 1 6"C!P Cairwild d e to SSO7 Bits L1 1T' (ryp.) Seo Note 1 at Sidewalk r Aarl Type 5$07 Sars 32'. V F 32" Vertical Face pi. Sidewalk FOOT 51arldarJ ! .- UCn.SRTmL•'i IH IRA.'.+PI)li'rkT1()e: Mcfex 423 17yp.) . — C7 DETAIL 1 Bars 55 flypJ CQUOAATE CFArFFA DE, 50) Tr 101 MfAMI, rLOWCA 33116RIV Sec FOOT flack 423 5lao Beams Videx D20451 10 - 12.57 Florid, 50h Beams with IW' MawGap TYPICAL BRIDGE SECTION LooOng Alread Station 5T2 Bars q, 6" 5T) 4;01 s cn' 9" 5508 Bars (� f2- 9� Sfde Jfk RIVV g. l Sldewalk ) Bars ars & ars a NOTES I. gamier firmf arrinq Steel per lode, 423 Le,,y?lr ori verlual legs pf bars 5: and 51 5)lal) a(reuot rot torr sidewalt thrrincss. 2. 6" High curb (onrour Shall n+ar(h Tvpe F (uel3 on the approaches to tfre Bridge. rKt�'�'ati� SX Bars Altel Date BOLTON PEREZ & ASSOCIATES whit SI Ears 6"C!P Cairwild d e to (ryp.) Seo Note 1 Topping 51upe. A02 Ft/Ft �- — si ulkaye i arhl(nit It ddf111F1U1-C - uv UCn.SRTmL•'i IH IRA.'.+PI)li'rkT1()e: - �" (A LOnduirs . ------ ---- (1nde, ztzro)sryn.l ) Bars ars & ars a NOTES I. gamier firmf arrinq Steel per lode, 423 Le,,y?lr ori verlual legs pf bars 5: and 51 5)lal) a(reuot rot torr sidewalt thrrincss. 2. 6" High curb (onrour Shall n+ar(h Tvpe F (uel3 on the approaches to tfre Bridge. rKt�'�'ati� BOLTON PEREZ & ASSOCIATES at +incl: OF II01i3DA an. ',05 - uv UCn.SRTmL•'i IH IRA.'.+PI)li'rkT1()e: SUPERSTRUCTURE TYPICAL SECTION CQUOAATE CFArFFA DE, 50) Tr 101 MfAMI, rLOWCA 33116RIV H.V rF4tlyirATE or AUTHowzAr1UN 19o4 rr,n• 'F . 3pAQ1UfN FFAF7. Pk •xJ.P N A rar4uf FAtIF ;?(,if; 1-s: nl NW 34TH AVENUE BRIDGE REPLACEMENT OVER COMFORT CANAL PE UCENSE NUMBER 37336 4 d � O f 2��� Uf1O13O _ NW 37th AV.-- ♦ _ a iI DETOUR o DETOUR 2 0 °1 NNW 3CT. ' � �6th � " fflvg NW 36th AV. USII Z-1 Z� : NW 36th AV, z, I i SNAG DETOUR NW 35th GT. ca } DETOUR Leo -o o l LQ L i ''S n r � Ln Lade 1GerN+/eraldon ann Or+e[[lon of Trafi is Type Ill 8a—ca0e No+E zone sr�rr ;co co S Ln c DETOUR z Pur laLfe fHanyea6fe (var ra�Ve1 W-4. Sryrr NW 35th AV. Lf) IEATPORARY YEOESIRIAN �� BRIOW Vp t.. — . Liu, Nnufr fi f3ef eur jM1No-rrr•harle Ir arisr�! L OO 4 4a 0 !�V. NW 3407 AV. / /v0 r NW 34th — _ _ ... _ _ . - ftk DETOUR DETOUR DETOUR TO ,. ..J� :. C9 `w —_► m a �r .. #4� and z l7 DE TC3 7)? �L 1 AFv+sraxs tpxl OS FNANCIS, Pt., v7oF P.E LICENSE Nu"EN S13u4 CHOICE ENGINEENING CbN5WAW5. INC. ST -Ir'!- (IF hLflHZU.i LJKP-4r1T.diF.-.Vr r)}• 7'N 1XL: 1 IRT.477( .\' T `I�!-f S� n [>• TR ,i � r� V,1 )l ,! x SHEET N© f)F CNdNTlydNI DATE OESCRIPT1aN ROAD NO Cr70NTT rfNANCLAL PFOdECT !P 12855 5W 132Nd) STNEET. SUITE 200 MIAMI. FLORMA 33166 CCNrlrfCATE or APTNOAIZATION 00031116 CONTROLFL 4,V 22 ArW34Av MIAMI.OAOE 426113-1-52-M