Loading...
HomeMy WebLinkAboutSubmittal-Godfrey Lamptrey-FDOT Planning StudyEim SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami -Dade County, Florida I FPID No.: 434845-4-22-01 Planning Study City of Miami Commissioners Briefing May 10, 2018 FD;nr Submitted into the public record for item(s) PA.2 . Project L on 05/10/2018 City Clerk 976 F D 9 nT- Submitted into the public record for item(s) PA.2 on 05/10/2018 City Clerk On -Going Projects 976 Foote 976 Project Objective & Goals Submitted into the public record for item(s) PA.2 . M on 05/10/2018 . City Clerk Project Objective Evaluate multimodal corridor improvements that provide connectivity, livability, and complete streets concepts to meet future transportation demand. 1 Evaluate existing transportation conditions and identify deficiencies 2 � Develop future traffic volume and transit Project ridership forecasts Goals Identify and evaluate improvements to 3 address mobility needs 4 )Develop an action plan with a prioritized list of ;short term multimodal improvements FDOT Submitted into the public record for item(s) PA.2 on 05/10/2018 City Clerk ■ Major east -west principal arterial within central Mi Dade County ■ Existing traffic along corridor varies from 32,700 vehicles per day (vpd) to 68,700 vpd. ■ Bus route 40 is the main route along corridor with average weekday ridership of 2,115 passengers ■ Corridor issues identified: • Congestion at major intersections • Access management and safety concerns • High off-peak vehicular speeds • Lack of adequate transit facilities • Reliability of MDT Transit Route 40 • Lack of bicycle facilities and connections to trails and recreational facilities • Pedestrian crossing concerns across Bird Road • Safe crossing concerns for Coral Gables High School Students 976 Project Background Sub into ic ub 'DOT record rfodritem(s) ePPAl2 Existing Traffic Conditions on 05/10/2018 City Clerk # Intersection AM PM Status OS LOS AM peak period 1 SW 117 Avenue F F Fail 2 SW 112 Avenue D F Fail 0 Peak direction is eastbound 3 5W 107 Avenue F Fail 6 Intersections operate at LOS E 4 SW 102 Avenue C C Ok 5 SW 97 Avenue F D Fail 0 7 intersections operate at LOS F 6 SW 92 Avenue Fail Average corridor speed 12 mph 7 SW 87 Avenue Ok 8 5W 84 Avenue D D Ok 9 SW 82 Avenue D Ok PM peak period 10 SW 79 Avenue F D Fail 11 SW 7800 Block B C Ok 0 Peak direction is westbound 12 .SIS 826 SB Off -Ramp D Ok 0 5 Intersections operate at LOS E 13 SR 826 NB Off -Ramp D D Ok 14 SW 72 Avenue F Fail 0 7 intersections operate at LOS F 15 SW 67th Avenue E F Fail 0 Average corridor speed 14 mph 16 SW 62 Avenue C D Ok 17 SVS+ 57 Avenue F D Fail 18 Alhambra Circle D Ok 19 University Drive, Granada Boulevard F F Fail 20 Riviera Drive D C Ok 21 SW 42 Avenue D Ok 22 Ponce de Leon Boulevard D D Ok 23 SW 37 Avenue D F OK 24 SR SJUS-1/South Dixie Highway F F Fail 976 Submitted into the public record foritem(s) PA.2 . Existing Safety Conditions on 05/10/2018 , City Clerk ■ 4,228 total crashes reported for three year period (2011 to 2014) • 6 fatal crashes • 1,083 injury crashes • 40 pedestrian crashes • 30 bicycle crashes ■ High Crash Frequency Locations 1. SW 117th Avenue 2. SW 11500 Block 3. SW 107th Avenue 4. SW 97th Avenue S. SW 87th Avenue ■ Predominant Crashes 6. SR 826 SB Ramp Terminal • Rear End: 46% • Angle: 19% 7• SW 67th Avenue • Sideswipe: 13% 8. Granada Blvd/University Drive • Left Turn: 10% 9. Ponce DeLeon Blvd. 976 G 07 L ftl � dY- :1rIMM �•` Yr* ra�M [ r MaM Yr1..Ya� S 0 aaean Kg3 t � � � � a.•rr � wrw+i. #^.r -` � sYn .rwp � .r..yr�r� tai �� #.� L ,.�..y r r` t L ! n 976 G 07 L ftl � dY- :1rIMM �•` Yr* ra�M [ r MaM Yr1..Ya� S 0 aaean Kg3 t � � � � a.•rr � wrw+i. #^.r -` � sYn .rwp � .r..yr�r� tai r` 976 G 07 L ftl � tbl�•( `. L�. :1rIMM �•` Yr* ra�M [ r MaM Yr1..Ya� S MM+ I COOK 4 = 14V ZTM ST S VV87 S7 H ST A • 6 • � P W i hy! • N-rN 9T Submitted into the public record for item(s) PA -2 on 05/10/2018 City Clerk tE �' X s T �.. A .. r n q L { 5W S6-, 14 aW- Transit Characteristics Atq r�r p� h a SRa� z V 14 S rI T �- r—F--T- I IFF- I r" Owrdings • Bus route 40 runs eastbound and westbound along 5 Tag 0 10 project corridor WRITH T � 11 25 • 20 Minutes Headway during peak periods "THS: • zs-50 ��" � • 95 bus stops along the corridor (48 EB and 47 WB) 51-250 4 0 76% of have benches and 24% have no benches d 0 251.600 0 16% have a shelter while the remaining 84% have no shelter a�aiora� 1976 RAM 63 ; W �Y•1 > 9- Q Q m < L 00� n U ^ N M MAW �- y rI T �- r—F--T- I IFF- I r" Owrdings • Bus route 40 runs eastbound and westbound along 5 Tag 0 10 project corridor WRITH T � 11 25 • 20 Minutes Headway during peak periods "THS: • zs-50 ��" � • 95 bus stops along the corridor (48 EB and 47 WB) 51-250 4 0 76% of have benches and 24% have no benches d 0 251.600 0 16% have a shelter while the remaining 84% have no shelter a�aiora� 1976 "DOT Complete Streets Planning & Design Submitted into the public record for item(s) PA.2 on _ 05/10/2018 0 City Clerk Step 1: Understand the Issues Step 2: Define the Purpose, Needs and Performance Measures Step 3: Define and Evaluate Project Alternatives Tier 1— Initial Screening • Corridor Context Classification • Corridor Cross Sectional Elements • Identification of Focus Areas • Conceptual Strategies Tier 2 — Refine Alternatives • Develop Conceptual Plans • Engineering Impacts • Environmental Impacts Tier 3 — Prioritization & Implementation Plai • Project Ranking & Prioritization • Implementation Plan 976 Fo9 nT-. Growth between 2015 to 2040 Population 2040 Project Traffic Forecast Employment Traffic JOB 0RK 0 Submitted into the public record for item(s) PA.2 on 05/10/2018. City Clerk Transit 25% t 12% t 13%1 976 -L Ti 976 M 976 Conceptual Strategies — Short Term • Adaptive traffic signals • Enhanced signal visibility (add signal backplates) • Improve pedestrian lighting at signalized intersections • Provide bus shelters along the corridor • Upgrade ADA facilities at all intersections • Provide high -visibility crosswalks at all signalized intersections • Improve access management by consolidating median openings & driveways Submitted into the public record for item(s) PA.2 on 05/10/2018 City Clerk F? 976 Conceptual Strategies — Long Term Submitted into the public record for item(s) PA.2 on 05/10/2018 City Clerk ■ Landscape buffer and shade trees ■ Smart bus stations with real-time information ■ Exclusive left -turn and right -turn lanes ■ Sidewalk on south side between SW 57th Ave and SW 42nd Ave ■ Bike lanes east of SW 57th Ave ■ Park and ride locations / mobility hubs ■ New intersection & interchange concepts ■ Ludlam trail crossing over Bird Road ■ Dedicated bus lanes for an enhanced bus service ■ Bicycle facilities along parallel facilities 976 Refined Alternatives Submitted into the public record for items) PA.2 on 05/10/2018 City Clerk Build Alternative Access Management and Pedestrian Mobility Improvements Build Alternative 2 Capacity Improvements at Various Intersections Build Alternative 34 Displaced Left Turns at Various Intersections FDOT Submitted into the public record for item(s)Proposed Typical Sections PA.2 on 05/10/2018 . City Clerk �4 RNV LINE E SURVEY SR 9796 RD ROAD RNV LINE QauvaQtcc iw WYE Q1W VNiKff fUT WYI T .71 11' 11' 11" 1 16' 11' 11' Ill Ir T SWK LANE LANE LANE MEDIAN LANE LANE LANE SWK 1 1 1 1 1 1 003 0.04 002 1 002 002 0 03 CONIC. SIDEWALK CONC SITM NTH SIL% CM TYPE F CURB & GUTTER TYPE F CURB 8 GUTTER VISTTYPEF CURB & GUTTER From SR 821/HEFT to SR 826/Palmetto Expressway CONC SIOE1NAlK J p ®_ �```yyyyyy CONC SIDEVMLK VITH SILVA CELLS '""'�' "' - — ""`"� WITH SILVA CELLS TYPE F CURB & GUTTER \` TYPE F CURB & GUTTER IST CURB & 0 From SR 826/Palmetto Expressway to SW 57th Avenue 976 A - RMI UNE E SURVEY SR 976AURD ROAD ROW UNE RNVVAWES SO MIN RNVVARIES SVMHN SYNC MILL d RESURFACE 7 WIDELING MILL d RESURFACE SWK RECONST, RECONST T 7 11' 11' 11" i6' 11' 11' 11' 7 T SVNC LANE LANE LANE MEDIAN LANE LANE LANE SWK 1 1 1 I 1 1 1 003 _0.04 0 04 0 02 0 OQ_ 003 CONC SIOE1NAlK J p ®_ �```yyyyyy CONC SIDEVMLK VITH SILVA CELLS '""'�' "' - — ""`"� WITH SILVA CELLS TYPE F CURB & GUTTER \` TYPE F CURB & GUTTER IST CURB & 0 From SR 826/Palmetto Expressway to SW 57th Avenue 976 FD OT Submitted into the public record for item(s) PA.2 proposed Typical Sections on 05/10/2018 City Clerk f SURVEY SR 976MIRD ROAD RNV LINE r RIWLINE 50° RNV 50' RM SHOULDER MILL 6 RESURFACE MILL 3 RESURFACE SHOULDER RECONSTRUCTION RECONSTRUCTION 10' 4' 6 11' 11' 20' 11' 11' 5' 12' SHARED SOD BIKE LANE LANE MEDIAN LANE LANE BIKE SWALE USE LANE LANE PATH 1 1 005 0 02 002 0 02 [:02 CONIC. SHARED USE PATH EXIST. TYPE F CURB b GUTTER From SW 57th Avenue to Ponce de Leon Boulevard 1 RAW LINE £ SURVEY SR 976/81RD ROAD R/W LINE R/W VARIES (36 MIN) 0 r_-R/W VARIES (35' MINN) PAVEMENT 3 SIDEWALK RECONSTRUCTION 10' 2' 10' 10' 10' 10' 10' 2' 6' SHARED LANE LANE MEDIAN LANE LANE ' M( USE PATH t t i 0.02 0.02 0.02 0.02 jP0NC. SHARED CONC. SED PATH SIDEWALK EXIST. TYPE F CURB &BUTTER From Ponce de Leon Boulevard to SR 5/US-1 976 FDCOT Alternative 1- Access Manag'ement' Submitted into the public 976 •Y�k�alow t. 6 F D nT- Alternative 1- Access Management Submitted into the public on 05/1012018 , City Clerk 4f- 41 record for item(s) PA.2 "IF r "40 9 j 976 I nr -. SII !£ - " ,r'i- moi•/ 3w, i _ w _ f6 W.e ■- • — I ; twin -,.f...+r..�.rrr.l..�rsrrrrrisssrrrrrr.�/r . _ SR 976/SW 40TH ST/BIRD ROAD _ _ _ _ _ SR 976/SW 40TH ST/BIRD ROAD _ i a w V1 TV U r N dhw m Ell • Bird Road Planning Study Miami -Dade County, Florida, FPID: 434845-4-22-01 T • •IL> ,Rap81 , # r " e Pe 21 seep SR?S+'S+ 40TH ST/BIRD ROAD SR 976/SW 40TH STLBIRD ROAD _— ��.�- /� Ifs F . 0 m Bird Road Planning Study Miami -Dade County, Florida, FPID: 434845-4-22-01 1 goo Granada Boulevard - Alternative 2 Submitted into the public Notice to Proceed Data Collection 976 Schedule & Process Submitted into the public record for item(s)--EA-.2. on 05/10/2018 City Clerk Traffic &Transit Purpose and Project Project Project Need Advisory Advisory Refined Advisory Recommen- Team Forecasts Team Alternatives Team dations and Existing Meeting Conceptual Meeting Evaluation Meeting Action Plan Conditions #1 Alternatives #2 #3 FDT ■ Alternatives Evaluation Next Steps Submitted into the public ' record for item(s) PA.2 on 05/10/2018. City Clerk • Evaluate and quantify impacts • Develop preliminary cost estimates ■ Select Recommended Alternatives or strategies ■ Project Advisory Meeting #3 ■ Miami -Dade TPO Meetings ■ Conclude Study 976 Thank You 976 Submitted into the public record for item(s) PA -2 on 05/10/2018 , City Clerk