HomeMy WebLinkAboutR-15-0459Vop City of Miami
Legislation
< U R �O
Resolution: R-15-0459
File Number: 15-01237
City Hall
3500 Pan American
Drive
Miami, FL 33133
www.miamigov.com
Final Action Date: 10/22/2015
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
AUTHORIZING THE CITY MANAGER TO EXECUTE A GRANT OF AN
UNDERGROUND EASEMENT, IN SUBSTANTIALLY THE ATTACHED FORM, TO
FLORIDA POWER AND LIGHT COMPANY ("FPL"), A FOR-PROFIT FLORIDA
CORPORATION, FOR A PERPETUAL NON-EXCLUSIVE UNDERGROUND
EASEMENT FOR A PORTION OF CITY OF MIAMI OWNED PROPERTY,
DESIGNATED AS "FPL VAULT WEST," LOCATED AT 3511 RICKENBACKER
CAUSEWAY, MIAMI, FLORIDA, AND LOCATED AT THE MIAMI MARINE STADIUM
PROJECT, AS MORE PARTICULARLY DESCRIBED IN EXHIBIT "A," ATTACHED
AND INCORPORATED, FOR THE CONSTRUCTION, OPERATION, AND
MAINTENANCE OF ELECTRIC UTILITY FACILITIES, WITH THE RIGHT TO
RECONSTRUCT, IMPROVE, ADD TO, ENLARGE, CHANGE THE VOLTAGE OF,
CHANGE THE SIZE OF, AND REMOVE ALL OR ANY OF THE FACILITIES WITHIN
SAID UNDERGROUND EASEMENT.
WHEREAS, Florida Power & Light Company ("FPL"), a for-profit Florida corporation, has
requested a grant of an underground easement of an area of City of Miami ("City") owned property
located at 3511 Rickenbacker Causeway, Miami, Florida, and located at the Miami Marine Stadium
Project designated as the FPL Vault West ("FPL Vault West"); and
WHEREAS, this underground easement will be used to construct, operate, and maintain electric
utility facilities, including wires, guys, cables, conduits, and appurtenant equipment, to be installed
from time to time to service exclusively City -owned Property, with the right to reconstruct, improve,
add to, enlarge, change the voltage of, change the size of, and remove such facilities or any of them
within said underground easement, with full right of ingress thereto and egress therefrom; and
WHEREAS, the underground easement is necessary in order to bring electrical service to the
City -owned Property;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by
reference and incorporated as fully set forth in this Section.
Section 2. The City Manager is authorized{1} to execute a grant of an underground easement, in
substantially the attached form, to FPL, a perpetual non-exclusive underground easement of the FPL
Vault West, as more particularly described in Exhibit "A," attached and incorporated, for the
construction, operation, and maintenance of electric utility facilities, with the right to reconstruct,
improve, add to, enlarge, change the voltage, change the size of, and remove all or any of the
facilities within said underground easement.
City of Miand Page 1 of 2 File Id. 15-01237 (Version: 1) Printed On: 4/3/2018
File Number: 15-01237
Enactment Number: R-15-0459
Section 3. This Resolution shall become effective immediately upon its adoption and signature of
the Mayor.{2}
Footnotes:
{1} The herein authorization is further subject to compliance with all requirements that may be
imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter
and Code provisions.
{2} If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10)
calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall
become effective immediately upon override of the veto by the City Commission.
City of Miami Page 2 of 2 File Id. 15-01237 (Version: 1) Panted On: 4/3/2018