Loading...
HomeMy WebLinkAboutAgenda Item Summary FormAGENDA ITEM SUMMARY FORM File ID: #3235 Date: 11/03/2017 Requesting Department: Department of Public Works Commission Meeting Date: 12/14/2017 Sponsored By: District Impacted: District 3, District 5 Type: Resolution Subject: Execute Off -System Construction & Maintenance Agreement with FDOT - SR 968/SW 1 Street Purpose of Item: A Resolution of the Miami City Commission authorizing the City Manager to execute an Off -System Construction and Maintenance Agreement between the City of Miami and the State of Florida Department of Transportation ("Department") for SR 968/SW 1 Street from west of SW 5th Avenue to SW 2nd Avenue for reconstruction of the SW 1st Street Bridge (the "Project") which Project entails work on road not on the State Highway System. Background of Item: 1. The Parties agree that the Department intends to undertake and complete project number FM#, 424407-1 on SR968/SW 1st Street, from west of SW 5th Avenue to SW 2nd Avenue. The Project includes work on SW 5th Avenue, SW South River Drive, SW North River Drive, and adjacent or abutting roads not on the State Highway System (for purposes of this Agreement, the "Project Limits"), and entails the following improvements within the Project Limits, hereinafter referred to as the "Local Roadway Improvements": (a) SW 5th Avenue — Work along a 250 ft. section of SW 5th Avenue, including at the intersection of SR968/SW 1 st St and SW 5th Avenue. The intersection approaches along SW 5th Avenue coming up to SW 1st Street must be reconstructed to ramp up to the higher roadway elevations along SW 1st Street East. The work includes construction of new sidewalk, gravity walls, handrail, drainage structures, and storm sewer pipes; (b) SW South River Drive — A 190 ft. section of SW South River Drive will be milled and resurfaced to restore the asphalt surface to new condition after the bridge construction is completed. The work also includes construction of drainage structures and storm sewer pipes; (c) SW North River Drive - A 200 ft. section of SW North River Drive will be milled and resurfaced to restore the asphalt surface to new condition after the bridge construction is completed. The work also includes construction of drainage structures and storm sewer pipes. Project Local Roadway Improvements related to drainage are further identified in Exhibit 1 attached hereto and made part hereof. The Project shall further include all activities associated with, or arising out of the construction of the Local Roadway Improvements. The Department will secure any necessary approvals or permits from Miami -Dade County, if applicable. The City shall cooperate with and shall support the Department's work efforts with respect to the Local Roadway Improvements. The Department will design and construct the Project in accordance with all applicable federal and state laws and regulations and in accordance with Department design and construction standards as set forth in the Department's guidelines, standards, and procedures. The Department shall have final decision authority with respect to the design, the design review process, and construction of the Local Roadway Improvements, and the relocation of any utilities that the Department may determine to be required, but shall coordinate with the City as set forth in Paragraphs 3 and 4. Budget Impact Analysis Item has NO budget impact Item is NOT Related to Revenue Item is NOT funded by Bonds Total Fiscal Impact: N/A Reviewed By Department of Public Works Juvenal Santana Office of Management and Budget Luis Hernandez -Torres Office of Management and Budget Christopher M Rose City Manager's Office Nzeribe Ihekwaba City Manager's Office Daniel J. Alfonso Legislative Division Valentin J Alvarez Office of the City Attorney Amber Ketterer Office of the City Attorney Valentin J Alvarez Office of the City Attorney Victoria Mendez City Commission Nicole Ewan Office of the Mayor Mayor's Office Office of the City Clerk City Clerk's Office Office of the City Clerk City Clerk's Office Department Head Review Completed 11/03/2017 5:05 PM Budget Analyst Review Completed 11/06/2017 7:42 PM Budget Review Completed 11/20/2017 11:12 AM Assistant City Manager Review Completed 11/27/2017 9:58 AM City Manager Review Completed 11/29/2017 7:23 PM Legislative Division Review Completed 11/30/2017 10:08 AM ACA Review Completed 12/04/2017 1:43 PM Deputy City Attorney Review Skipped 12/04/2017 1:47 PM Approved Form and Correctness Completed 12/05/2017 3:43 PM Meeting Completed 12/14/2017 9:00 AM Signed by the Mayor Completed 12/22/2017 11:56 AM Signed and Attested by the City Clerk Completed 12/22/2017 12:44 PM Rendered Completed 12/22/2017 12:44 PM File Number: 3235 City of Miami Legislation Resolution Enactment Number: R-17-0583 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com Final Action Date:12/14/2017 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING THE CITY MANAGER TO EXECUTE AN OFF -SYSTEM CONSTRUCTION AND MAINTENANCE AGREEMENT, IN SUBSTANTIALLY THE ATTACHED FORM, WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ("FDOT"), FOR IMPROVEMENTS ON STATE ROAD 968/SOUTHWEST 1 STREET FROM WEST OF SOUTHWEST 5TH AVENUE TO SOUTHWEST 2ND AVENUE, MIAMI, FLORIDA, FOR RECONSTRUCTION OF THE SOUTHWEST 1ST STREET BRIDGE, INCLUDING IMPROVEMENTS ON ROADS NOT ON THE STATE HIGHWAY SYSTEM. WHEREAS, the Florida Department of Transportation (TDOT") has developed design plans Financial Management (TM") Project No. 424407-1 for State Road ("SR") 968/Southwest 1 Street from west of Southwest 51" Avenue to Southwest 2nd Avenue for the reconstruction of the Southwest 1 sl Street Bridge ("Project") in the City of Miami ("City"); and WHEREAS, FDOT intends to undertake and complete the Project, which includes work on Southwest 5t" Avenue, Southwest South River Drive and Southwest North River Drive, roads not on the State Highway System, and entails the following improvements within the Project Limits, hereinafter referred to as the "Local Roadway Improvements"; and WHEREAS, the Project improvements on Southwest 5t" Avenue include work along a two hundred fifty foot (250') section of Southwest 5t" Avenue, including the intersection of SR 968/Southwest 1 sl Street and Southwest 5t" Avenue, Miami, Florida, the reconstruction of the intersection ramp approach(es) along SW 5th Avenue coming up to SW 1st Street to the higher roadway elevations along SW 1 st Street East, as well as construction of new sidewalk, gravity walls, handrail, drainage structures and storm sewer pipes; and WHEREAS, the Project improvements on Southwest South River Drive include work along a one hundred ninety foot (190') section of Southwest South River Drive that will be milled and resurfaced to restore the asphalt surface to new condition after the bridge construction is completed and construction of drainage structures and storm sewer pipes; and WHEREAS, the Project improvements on Southwest North River Drive include a two hundred foot (200') section of Southwest North River Drive that will be milled and resurfaced to restore the asphalt surface to new condition after the bridge construction is completed and will include construction of drainage structures and storm sewer pipes; and WHEREAS, the Project improvements shall further include all activities associated with, or arising out of the construction of the Local Roadway Improvements, further identified in Exhibit 1, attached and incorporated; and WHEREAS, the Off -System Construction and Maintenance Agreement establishes the terms, conditions and responsibilities of the Department and the City to accomplish the improvements on the City's streets; and WHEREAS, the City agrees with the terms and conditions in the Off -System Construction and Maintenance Agreement, attached and incorporated; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. The City Manager is authorized' to execute the Off -System Construction and Maintenance Agreement, in substantially the attached form, with FDOT, for improvements on SR 968/Southwest 1 Street from west of Southwest 5th Avenue to Southwest 2nd Avenue, Miami, Florida, for reconstruction of the Southwest 1 st Street bridge, that includes improvements on roads not on the state highway system. Section 3. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.2 APPROVED AS TO FORM AND CORRECTNESS: ­-\� 1 i t6ria i ' ndez, City Attor i ey 12/5/2017 ' The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to, those prescribed by applicable City Charter and City Code provisions. 2 If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10) calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission.