Loading...
HomeMy WebLinkAboutR-17-0583City of Miami Legislation Resolution R-17-0583 File Number: 3235 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com Final Action Date: 12/14/2017 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING THE CITY MANAGER TO EXECUTE AN OFF -SYSTEM CONSTRUCTION AND MAINTENANCE AGREEMENT, IN SUBSTANTIALLY THE ATTACHED FORM, WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ("FDOT"), FOR IMPROVEMENTS ON STATE ROAD 968/SOUTHWEST 1 STREET FROM WEST OF SOUTHWEST 5TH AVENUE TO SOUTHWEST 2ND AVENUE, MIAMI, FLORIDA, FOR RECONSTRUCTION OF THE SOUTHWEST 1ST STREET BRIDGE, INCLUDING IMPROVEMENTS ON ROADS NOT ON THE STATE HIGHWAY SYSTEM. WHEREAS, the Florida Department of Transportation ("FDOT") has developed design plans Financial Management ("FM") Project No. 424407-1 for State Road ("SR") 968/Southwest 1 Street from west of Southwest 5t" Avenue to Southwest 2nd Avenue for the reconstruction of the Southwest 1 st Street Bridge ("Project") in the City of Miami ("City"); and WHEREAS, FDOT intends to undertake and complete the Project, which includes work on Southwest 5t" Avenue, Southwest South River Drive and Southwest North River Drive, roads not on the State Highway System, and entails the following improvements within the Project Limits, hereinafter referred to as the "Local Roadway Improvements"; and WHEREAS, the Project improvements on Southwest 5t" Avenue include work along a two hundred fifty foot (250') section of Southwest 5t" Avenue, including the intersection of SR 968/Southwest 1 st Street and Southwest 5t" Avenue, Miami, Florida, the reconstruction of the intersection ramp approach(es) along SW 5th Avenue coming up to SW 1 st Street to the higher roadway elevations along SW 1 st Street East, as well as construction of new sidewalk, gravity walls, handrail, drainage structures and storm sewer pipes; and WHEREAS, the Project improvements on Southwest South River Drive include work along a one hundred ninety foot (190') section of Southwest South River Drive that will be milled and resurfaced to restore the asphalt surface to new condition after the bridge construction is completed and construction of drainage structures and storm sewer pipes; and WHEREAS, the Project improvements on Southwest North River Drive include a two hundred foot (200') section of Southwest North River Drive that will be milled and resurfaced to restore the asphalt surface to new condition after the bridge construction is completed and will include construction of drainage structures and storm sewer pipes; and WHEREAS, the Project improvements shall further include all activities associated with, or arising out of the construction of the Local Roadway Improvements, further identified in Exhibit 1, attached and incorporated; and WHEREAS, the Off -System Construction and Maintenance Agreement establishes the terms, conditions and responsibilities of the Department and the City to accomplish the improvements on the City's streets; and City of Miami Page 1 of 2 File ID: 3235 (Revision:) Printed On: 3/22/2018 File ID: 3235 Enactment Number: R-17-0583 WHEREAS, the City agrees with the terms and conditions in the Off -System Construction and Maintenance Agreement, attached and incorporated; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. The City Manager is authorized' to execute the Off -System Construction and Maintenance Agreement, in substantially the attached form, with FDOT, for improvements on SR 968/Southwest 1 Street from west of Southwest 5th Avenue to Southwest 2nd Avenue, Miami, Florida, for reconstruction of the Southwest 1 st Street bridge, that includes improvements on roads not on the state highway system. Section 3. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.2 APPROVED AS TO FORM AND CORRECTNESS: 1 i ria i . ndez, City ttor ey=2;� 12/5/2017 ' The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to, those prescribed by applicable City Charter and City Code provisions. 2 If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10) calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. City of Miami Page 2 of 2 File ID: 3235 (Revision:) Printed on: 3/22/2018