This is both a critical and opportune moment to present a compelling, strategic, and forward -
thinking opportunity to the voters of the City of Miami. The City Commission is being asked to
vote upon large categories of projects of the Miami Forever General Obligation Bond Program,
based on public input and the prioritized, professional opinions of the City's engineers and
Department Directors and strategically reduced from the more than $1.4 billion of needs to the
proposed $300 million list. The values of these large categories were developed using the
attached list of projects. Some of these projects are specific in nature, such as parks and the
renovation of a fire station. Other projects, especially those related to sea level rise mitigation
and flood prevention, roadway improvements, or workforce housing are (of necessity) more
Citywide in nature.
The City's Office of Resilience and Sustainability has been developing the City's Resiliency Plan
with the Miami Forever General Obligation Bond Program in mind. Think of the plan as part of
an integrated approach to lifting up the City, one neighborhood at a time, starting with what's
underground up, coordinating and collaborating across silos of departments, jurisdictions,
community based organizations, university partners, and the private sector and with
appropriate input from residents and local businesses.
However, in order to implement the Resiliency Plan, the City will need significant funds. The
cost to upgrade the existing drainage systems and replace coastal infrastructure Citywide is
estimated at over $900 million. This estimate is based on cost estimates from the existing
Stormwater Master Plan and estimates from the Office of Capital Improvements and the Public
Works Department. These investments would also include many roadway, bikeway, walkway,
green space, and other quality of life and resilience -related enhancements. A solid and secured
funding source for these projects can attract other public and private funding or financing
partners.
ZI`b�l-S��m��io�-��te ��•.ear �a��t��- ��a� o� Qco�tc�s �or �Ob
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
Provide affordable housing
opportunities for the lowest of
0001
CD
Affordable Housing
Citywide
CW
Workforce Housing
$20,000,000
incomes and those with moderate
or workforce income levels.
To better address flooding in the
0003
PW
Lawrence Pump Station Upgrade
area, the pump station will be
342 SW 7th Avenue
3
Sea Level Rise Mitigation and Flood
$225,000
upgraded to increase capacity
Prevention
To better address flooding in the
0004
PW
Orange Bowl Pump Station Upgrade
area, the pump station will be
1775 NW 7th Street
3
Sea Level Rise Mitigation and Flood
$457,000
Prevention
upgraded to increase capacity
Antonio Maceo Pump Station
To better address flooding in the
Sea Level Rise Mitigation and Flood
0005
pyo
area, the pump station will be
6311 SW 6th Street
1
$69,000
Upgrade
upgraded to increase capacity
Prevention
To better address flooding in the
0006
pyo
West End Pump Station No.1
area, the pump station will be
6321 SW 2nd Street
1,4
Sea Level Rise Mitigation and Flood
$42,000
Upgrade
upgraded to increase capacity
Prevention
To better address flooding in the
0007
PW
West End Pump Station No.2
area, the pump station will be
501 Tamiami Canal Road
1,4
Sea Level Rise Mitigation and Flood
$44,000
Upgrade
upgraded to increase capacity
Prevention
West End Pump Station No, 3
To better address flooding in the
Sea Level Rise Mitigation and Flood
0008
pyo
area, the pump station will be
6250 Tamiami Canal Road
1,4
$44,000
Upgrade
upgraded to increase capacity
Prevention
To better address flooding in the
0009
pyo
West End Pump Station No. 4
area, the pump station will be
Brickell Avenue median and SE 12th
1 4
Sea Level Rise Mitigation and Flood
$44,000
Upgrade
upgraded to increase capacity
St.
Prevention
Brickell Avenue Pump Station
To better address flooding in the
Sea Level Rise Mitigation and Flood
0010
PW
area, the pump station will be
7747 NE 8th Avenue
2
$164,000
Upgrade
Prevention
upgraded to increase capacity
To better address flooding in the
Sea Level Rise Mitigation and Flood
0011
PW
Belle Meade Pump Station Upgrade
area, the pump station will be
1515 NW 5th Avenue
5
$189,000
upgraded to increase capacity
Prevention
To better address flooding in the
NW 71st St from N. Miami Avenue
Sea Level Rise Mitigation and Flood
0012
PW
Overtown Pump Station Upgrade
area, the pump station will be
5
$719,000
to NW 17th Ave
Prevention
upgraded to increase capacity
Antonio Maceo Pipe and Manhole
To better address flooding in the
Sea Level Rise Mitigation and Flood
0015
pyo
area, the pump station will be
5105 NW 7th Street
1
$516,000
Lining for Pump Station Influent
upgraded to increase capacity
Prevention
Belle Meade Pump Station Pipe and
To increase pump station capacity,
Sea Level Rise Mitigation and Flood
0016
PW
Manhole Lining for Pump Station
the pipe and manhole lining will be
7747 NE 8th Avenue
5
$987,000
Influent
upgraded
Prevention
Printed: 7/19/2017 Submitted into t) public _ Page 1
m S
record fof ite
on City Clerk
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
ShortScope
Street Address
District
Category
Include $
0017
PW
General Storm Sewer Improvements
Citywide
Citywide
CW
Sea Level Rise Mitigation and Flood$5,000,000
Prevention
Street Condition Category 5 - Very
0019
PW
Citywide
Citywide
CW
Roadway Improvements
$21,838,000
Poor 10.73 miles of Reconstruction
Stormwater Management System to
Drainage in Basin Auburn Storm
address flooding in areas identified
Areas within the Auburndale
Sea Level Rise Mitigation and Flood
0024
Cl
4
$3,564,000
Sewer Ph. I & II
in the pre -2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Stormwater Management System to
Drainage in Basin Belle Meade
address flooding in areas identified
Areas within the Belle Meade
Sea Level Rise Mitigation and Flood
0027
Cl
5
$771,000
Storm Sewers Ph. I
in the pre -2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Stormwater Management System to
0028
Cl
Drainage in Basin Fairway Storm
address flooding in areas identified
Areas within the Fairway
5
Sea Level Rise Mitigation and Flood
$3,832,000
Sewers
in the pre -2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Stormwater Management System to
0029
Cl
Drainage in Basin Garden Storm
address flooding in areas identified
Areas within the Melrose
1
Sea Level Rise Mitigation and Flood
$3,743,000
Sewer - Phase I
in the pre -2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Stormwater Management System to
0030
Cl
Drainage in Basin Lawnview Storm
address flooding in areas identified
Areas within the Lawnview
3
Sea Level Rise Mitigation and Flood
$2,673,000
Sewer
in the pre -2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Stormwater Management System to
Drainage in Basin Liberty Storm
address flooding in areas identified
Areas within the Liberty Square
Sea Level Rise Mitigation and Flood
0031
CI
5
$3,832,000
Sewers
in the pre -2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Submitted into the publ'
record for item s) _
on 17 City Clerk
Printed: 7/19/2017 Page 2
Miami Forever General Obligation Bond - Projects Used to Develop Categories
It
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
Stormwater Management System to
0032
CI
Drainage in Basin Little River Storm
address flooding in areas identified
Areas within the Little River
5
Sea Level Rise Mitigation and Flood
$2,818,000
Sewers Ph. II
in the pre -2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Stormwater Management System to
0033
CI
Drainage in Basin Reid Acres Storm
address flooding in areas identified
Areas within the Little River
5
Sea Level Rise Mitigation and Flood
$706,000
Sewers
in the pre -2012 Stormwater
Industrial Neighborhood
Prevention
Management Master Plan.
Stormwater Management System to
0034
CI
Drainage in Basin C4 -S-17
address flooding in areas identified
Areas within Flagami Neighborhood
4
Sea Level Rise Mitigation and Flood
$2,040,000
in the 2012 Stormwater
Prevention
Management Master Plan.
Stormwater Management System to
address flooding in areas identified
Sea Level Rise Mitigation and Flood
0035
Cl
Drainage in Basin C4 -S-18
Areas within Flagami Neighborhood
4
$13,216,000
in the 2012 Stormwater
Prevention
Management Master Plan.
Stormwater Management System to
address flooding in areas identified
Areas within Flagami and Lejeune
Sea Level Rise Mitigation and Flood
0036
Cl
Drainage in Basin C4 -S-23
in the 2012 Stormwater
Gardens Neighborhoods
1, 4
Prevention
$8,275,000
Management Master Plan.
Stormwater Management System to
0037
Cl
Drainage in Basin C6 N-17
address flooding in areas identified
Areas within Melrose Neighborhood
1
Sea Level Rise Mitigation and Flood
$11,406,000
in the 2012 Stormwater
and the Allapattah Industrial District
Prevention
Management Master Plan.
Stormwater Management System to
0038
Cl
Drainage in Basin C6 5-12
address flooding in areas identified
Areas within North Grapeland
1
Sea Level Rise Mitigation and Flood
$7.777,000
in the 2012 Stormwater
Heights Neighborhood
Prevention
Management Master Plan.
Stormwater Management System to
Areas within the Liberty Square and
0039
Cl
Drainage in Basin CC4-S-21
address flooding in areas identified
Northwestern Estates
5
Sea Level Rise Mitigation and Flood
$14,052,000
in the 2012 Stormwater
Prevention
Neighborhoods
Management Master Plan.
Stormwater Management System to
0040
Cl
Drainage in Basin CC6-N-11
address flooding in areas identified
Areas within Hadley Park
5
Sea Level Rise Mitigation and Flood
$12,408,000
in the 2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Printed: 7/19/2017
Submitted into theP ub 'c _
record f r ite (s) ,_____
on L City Clerk Page 3
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
Stormwater Management System to
0041
Cl
Drainage in Basin CC6 N 12
address flooding in areas identified
Areas within Melrose Neighborhood
1
Sea Level Rise Mitigation and Flood
$4,730,000
in the 2012 Stormwater
Prevention
Management Master Plan.
Stormwater Management System to
0042
Cl
Drainage in Basin CC7-S-21
address flooding in areas identified
Areas within Flagami Neighborhood
4
Sea Level Rise Mitigation and Flood
$5,802,000
in the 2012 Stormwater
Prevention
Management Master Plan.
Stormwater Management System to
Areas within Edison, little River
0043
Cl
Drainage in Basin CC7-S-24
address flooding in areas identified
Industrial District, Little River Central
5
Sea Level Rise Mitigation and Flood
$2,836,000
in the 2012 Stormwater
Neighborhoods
Prevention
Management Master Plan.
Stormwater Management System to
address flooding in areas identified
Areas within King Heights, Orchard
Sea Level Rise Mitigation and Flood
0044
Cl
Drainage in Basin CC7-S-25
5
$8,034,000
in the 2012 Stormwater
Villa Neighborhoods
Prevention
Management Master Plan.
Stormwater Management System to
address flooding in areas identified
Areas within Flora Park, Hadley Park
Sea Level Rise Mitigation and Flood
0045
Cl
Drainage in Basin CC7 5-26
5
$2,814,000
in the 2012 Stormwater
and Orchard Villas Neighborhoods
Prevention
Management Master Plan,
Stormwater Management System to
address flooding in areas identified
Areas within West Grove
Sea Level Rise Mitigation and Flood
0046
Cl
Drainage in Basin SB04
in the 2012 Stormwater
Neighborhood
2
Prevention
$12,818,000
Management Master Plan.
Stormwater Management System to
address flooding in areas identified
Areas within Douglas Park
Sea Level Rise Mitigation and Flood
0047
Cl
Drainage in Basin SB06
in the 2012 Stormwater
Neighborhood
4
Prevention
$3,311,000
Management Master Plan.
Stormwater Management System to
address flooding in areas identified
Areas within Douglas Park
Sea Level Rise Mitigation and Flood
0048
Cl
Drainage in Basin SB09
in the 2012 Stormwater
Neighborhood
2, 4
Prevention
$4,259,000
Management Master Plan.
Stormwater Management System to
address flooding in areas identified
Areas within Coral Gate and
Sea Level Rise Mitigation and Flood
0049
Cl
Drainage in Basin SB10
in the 2012 Stormwater
Parkdale South Neighborhoods
4
Prevention
$1,876,000
Management Master Plan.
Stormwater Management System to
address flooding in areas identified
Areas within Douglas Park and Silver
Sea Level Rise Mitigation and Flood
0050
Cl
Drainage in Basin SB12
in the 2012 Stormwater
Bluff Neighborhoods
2,4
Prevention
$9,466,000
Management Master Plan.
Printed: 7/19/2017 Submitted into the publ'
1 Page 4
record for items) J
on rj . City Clerk
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
Stormwater Management System to
address flooding in areas identified
Areas within La Pastorita and Coral
Sea Level Rise Mitigation and Flood
0051
Cl
Drainage in Basin SB13
in the 2012 Stormwater
Gate Neighborhoods
4
Prevention
$5,913,000
Management Master Plan.
Stormwater Management System to
0052
Cl
Drainage in Basin SB14
address flooding in areas identified
Areas within Silver Bluff
4
Sea Level Rise Mitigation and Flood
$7,505,000
in the 2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Stormwater Management System to
Areas within Miami Avenue, Bay
address flooding in areas identified
Heights, East Grove, Fair Isle, North
Sea Level Rise Mitigation and Flood
0053
Cl
Drainage in Basin SB18
in the 2012 Stormwater
Grove and Grove Center
2
Prevention
$4,728,000
Management Master Plan.
Neighborhoods.
Stormwater Management System to
0054
CI
Drainage in Basin SB20
address flooding in areas identified
Areas within Auburndale
4
Sea Level Rise Mitigation and Flood
$11,201,000
in the 2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Stormwater Management System to
0060
Cl
Drainage in Basin SB34
address flooding in areas identified
Areas within Latin Quarter
3
Sea Level Rise Mitigation and Flood
$7,056,000
in the 2012 Stormwater
Neighborhood
Prevention
Management Master Plan.
Retrofitting of walkways, steps,
ADA Mandates and Aging Friendly
access points, and facilities to be
0091
PR
compliant with DOJ agreement, and
City wide
CW
Parks and Cultural Facilities
$5,000,000
Improvements
make parks friendly to those with
limited mobility.
Renovation and necessary
replacements to the park amenities
0092
PR
Legion Park Enhancements
and facility. Maintain historical
6448 NE 7th Avenue (33138)
5
Parks and Cultural Facilities
$1,000,000
structure and address aging site
fixtures, walkways, lighting, and
playground.
Provide updated facility and
0093
PR
Armbrister Park Enhancements
amenities at the park to completethe
236 Grand Avenue (33133)
2
Parks and Cultural Facilities
$3,000,000
renovation of the park started in
2013 with the new field.
Funding to allow
0094
PR
Buena Vista Park Enhancements
renovation/replacement of currentfacility
5300 NW 2nd Avenue (33127)
5
Parks and Cultural Facilities
$1,500,000
and site amenities at the
park.
Printed: 7/19/2017 Submitted into the public Page s
record f ite(s)
on City Clerk
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
ShortScope
Street Address
District
Category
Include $
Complete renovation of park to
Facilitate a new recreation
building/gymnasium, and allow
parking, walkway, lighting,
0095
PR
Curtis Park Enhancements
restroom, and sport court
1901 NW 24th Avenue (33125)
1
Parks and Cultural Facilities
$7,500,000
improvements. Deliver to the district
a regional park offering a variety of
amenities in addition to the current
track, artificial turf sports field, and
pool.
Renovate and replace amenities at
the park to facilitate the delivery of
state of the art and improved access
0096
PR
Dorsey Park Enhancements
for all residents. Allow a general
1701 NW 1st Avenue (33136)
5
Parks and Cultural Facilities
$1,000,000
pian process to design recreation
facilities that meet the needs of the
neighborhood.
Allow a general plan process to
design recreation facilities that meet
the needs of the neighborhood.
and replace amenities at
0099
PR
JuaRenovate
Pablo Duarte Park
the park to Facilitate the delivery of
1776 NW 28th St. (33142)
1
Parks and Cultural Facilities
$3,000,000
Enh
Enhancements
state-of-the-art and improved
access for all residents. Incorporate
energy efficient upgrades to provide
long-term savings for the City.
Allow a general plan process to
design recreation facilities that meet
the needs of the neighborhood.
Renovate and replace amenities at
0101
PR
Lemon City Park Enhancements
the park to facilitate the delivery of
27 NE 58th St. (33137)
5
Parks and Cultural Facilities
$1,500,000
state-of-the-art and improved
access for all residents. Incorporate
energy efficient upgrades to provide
long-term savings for the City.
Printed: 7/19/2017
Submitted into the publ'c
record forite (s)
on -)277 City Clerk Page 6
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
Implementation of design
recommendations from current
ongoing General Plan. Provide the
ability to renovate and rebuild areas
to better meet user needs for the
0102
PR
Morningside Park Enhancements
park, to include a possible new pool
750 NE 55th Terrace (33137)
2
Parks and Cultural Facilities
$5,500,000
due to current one being deemed
structurally unsafe. Allow improved
waterfront access and drainage in
the park, and expand programming
capacity of current facilities.
Develop a program plan that
identifies neighborhood needs to
direct the renovation and
replacement of current facilities
with consideration of an older onsite
recreation center. Facilitate overall
0103
PR
Range Park Enhancements
park improvements that allow
525 NW 62nd St. (33150)
5
Parks and Cultural Facilities
$11,500,000
improved access, walking paths,
security features, lighting
improvements, upgrades to
mechanical equipment of pool
facilities, etc. Make this a Regional
destination park for the community.
New pool facility based on structural
0108
PR
West End Park Enhancements
assessment that has deemed the
250 SW 60th Avenue (33144)
4
Parks and Cultural Facilities
$5,000,000
facility at the end of its lifecycle.
0111
PR
Citywide Safety
Parks security lighting
City wide
CW
Parks and Cultural Facilities
$2,000,000
enhancements.
0126
FR
Fire Station 10 Renovation
Fire Station 10 Renovation
4101 NW 7 Street
CW
Police and Fire Infrastructure
$7,000,000
0272
DDA
Permanent Public Restrooms
Two additional locations
Downtown
2
Parks and Cultural Facilities
$400,000
Submitted into the publ'c
Printed: 7/19/2017 record f it {s C , Page 7
on -7 JL7 City Clerk
Miami Forever General Obligation Bond - Projects Used to Develop Categories
#
Dep
Project Name
Short Scope
Street Address
District
Category
Include $
0273
DDA
Citywide Lighting Improvements
Install new lighting
Citywide
2
Roadway Improvements
$1,000,000
0283
PF
Cultural and Historic Facilities
Renovation and improvement of
existing cultural and historic facilities
in the City of Miami
Citywide
2
Parks and Cultural Facilities
$10,000,000
L0285
PR
Town Park
17 Street and 5 Avenue
5
Parks and Cultural Facilities
$300,000
Total
$300,000,000
Submitted into the publ'c
record forjte s) _ �l . J
on _ City Clerk
Printed: 7/19/2017 Page 8