COMMUNITY OUTREACH TIMELINE
The following timeline highlights a few of the key engagements between the Eastside Ridge SAP
project team and members of neighboring communities, most notably, with Little Haiti. This
timeline is not an exhaustive listing of engagements with the community.
1. June 26,2016 - Meeting with MiMo Stakeholders (see attached)
2. June 30,2016 - Meeting with Buena Vista Stakeholders (see attached)
3. August 24, 2016 - Follow up meeting with Buena Vista Stakeholders (see attached)
4. August 31, 2016 - Meeting with Principal of Archbishop Curley Notre Dame
(before we or the principal knew that the property would be sold by the
Archdiocese) (see attached)
5. September 8, 2016 - Meeting with Downtown Little Haiti Stakeholders (see
attached)
6. December 21,2016 - UDRB meeting attended by six persons in opposition of the
application. UDRB requested revisions and deferred.
7. January 4, 2017 - Meeting with Little Haiti community organizer,. Marleine
Bastien to discuss project and community benefits.
8. January 7,2017 - At Ms. Bastien's invitation, we made a presentation before the
Little Haiti Advisory Board at Little Haiti Cultural Center
9. January 16, 2017 - We participated in a discussion panel at the Little Haiti Cultural
Center sponsored by NE 2nd Avenue Partnership. The conversation was about the
future of Little Haiti with an emphasis on Eastside Ridge. Other participants
included Executive Director of the NE 2nd Avenue Partnership (Joann Milord), a
community activist in Liberty City (Valencia Gunder), a prominent City activist
(Bob Powers), and Eastside Ridge's land use attorney (Edward Martos). It was
moderated by Grant Stem.
10. January 18, 2017 - UDRB meeting welcomed with significant public comment.
The Board agreed that revisions had been addressed and that best thing would be
to require additional public outreach at separate meetings. UDRB acknowledged
that the vast majority of ills being mentioned by the public do no not relate to
architecture or urban design and are therefore outside the UDRB's jurisdiction.
Furthermore, individual SAP Permits will be subject to subsequent UDRB review.
11. January 18 - February 24, 2017 - Dialogue with community to coordinate a
charrette. Little Haiti community organizer, Ms. Bastien, agreed that February 25
would be an acceptable date. On the eve of the meeting, Ms. Bastien complained
that the charrette was scheduled on an "inconvenient date." We responded by
offering to hold a second meeting rather than cancel the charrette.
12. February 25,2017 - Charette was held at the Little Haiti Community Center. See
attached for a sign in sheet. Sign in sheet does not reflect total attendance. Ms.
Bastien and 20 or more supporters appeared at the meeting, were invited in, were
allowed to make a public statement condemning the meeting as being held at an
inconvenient time, and then refused to constructively participate. They departed
after attending for a little over an hour without providing substantive input.
13. March 14, 2017 - Attended a Community Meeting community leaders, Ms. Gepsie
Metellus, Ms. Leonie Hermantin, Mr. Jan Mapou, and Ms. Bastien, to discuss
Community Benefits and project design. The meeting was hosted by Fr. Reggie at
Notre Dame of Little Haiti Church.
14. March 26, 2017 - A follow up meeting to the charrette was held at the Little Haiti
Community Center. Multiple community leaders, including Ms. Bastien, attended.
15. March 27, 2017 - A meeting at Seven Seas Restaurant with Downtown Little Haiti
Stakeholders to discuss project impact and potential improvements to Downtown
Little Haiti.
16. May 10,2017 - A follow up meeting with Ms. Mettelus and Fr. Reggie on behalf
of group of leaders present at meeting on March 14.
17. May 12,2017 - Eastside Ridge sponsors and attends Sant La annual gala.
18. June 26, 2017 - A follow up meeting with Ms. Mettelus on behalf of group of
leaders present at meeting on March 14.
19. June 26 through November 2017 - Multiple discussions and draft agreements are
exchanged with different community leaders.
20. August 12, 2017 - Little Haiti stakeholders, including Ms. Bastien, organize a
"Little Haiti Forum" to discuss development concerns in Little Haiti. Eastside
Ridge has a representative attend to take note of the issues raised.
21. August 30.2017 - City holds a Little Haiti stakeholder meeting.
22. November 29, 2017 - Meeting with Ms. Mettellus and Executive Director of the
Little Haiti Community Development Corporation to follow up and latest draft
agreement contemplated at meeting on March 14.
23. December 22, 2017 - Meeting with Ms. Mettellus and Executive Director of the
Little Haiti Community Development Corporation to follow up and latest draft
agreement discussed at meeting on November 29.
MIAMI 6130439.1 83885/87055 2
24. January 22, 2018 - Meeting hosted by Fr. Reggie with City Staff and multiple
Community Leaders.
25. February 2, 2018 - Meeting with Ms. Mettellus, Ms. Hermantin, and Fr. Reggie to
discuss Community Benefits package as previously discussed with Staff on January
22 and negotiated on December 22.
26. March 1, 2018 - Meeting with former President of Buena Vista East and Little
Haiti property owner, Schiller Jerome, to discuss Community Benefits.
27. March 19,2018 - Representatives participate in community event at Notre Dame
of Little Haiti sponsored by civil society group and featuring multiple elected
officials.
28. March 20, 2018 - Representatives participate in walking tour of Little Haiti by
national planner's organization.
29. March 23, 2018 - Lunch meeting with Mr. Jerome and Downtown Little Haiti
Stakeholders representative, Mr. Francisco Herretes, regarding Community
Benefits Package.
30. April 17, 2018 - Representatives meet with Ms. Mettellus, Ms. Hermantin, Fr.
Reggie, and Mr. Diller to discuss final details of community benefits package and
Foundation Model to community giving.
31. May 21, 2018 - Meeting with Mr. Schiller to discuss Foundation Model of
providing community benefits.
32. May 25.2018 - Eastside Ridge sponsors and attends Sant La annual gala.
33. October 12, 2018 — Meeting at Libreri Mapou in Little Haiti with community
stakeholders.
34. November 8, 2018 — Meeting with Father Reginald Jean -Mary of Notre Dame
D'Haiti Catholic Church regarding community benefits package.
35. November 8, 2018 — Meeting with Reverend Erick Jules of One God in Three
Persons Baptist Church regarding community benefits package.
36. November 26, 2018 — Meeting with Concerned Leaders of Little Haiti regarding
community benefits package.
37. November 28, 2018 — Meeting with FANM / Ms. Marleine Bastien.
MIAMI 6130439.1 83885/87055 3
EASTSIDE RIDGE SPECIAL AREA PLAN
COMMUNITY BENEFITS SUMMARY
Submitted Int• The Record
BENEFIT
SUMMARY DESCRIPTION`
ESTIMATED
VALUE/COST
Community Foundation &
Affordable Housing
Over the course of the project's construction, the Owner will provide $10 million in seed
funding to a 501(c)(3) or similar established nonprofit foundation dedicated to serving
Miami. $7 million of the $10 million will be a revolving fund for affordable housing.
$10,000,000
Trolley Infrastructure
Owner will provide land and construct two trolley stops on site.
$900,000
Right of Way Improvements
Abutting the Project
Owner will contribute funds for improvements along all rights -of -way abutting the
property.
$2,500,000
Park Dedication &
Improvement
Owner will convey to the City of Miami 2.7 acres of improved park land.
$23,000,000
Community Space
Owner will make available up to 2,000 square feet of office and community gathering
space for community use.
$120,000
MPD Substation
Owner will lease for $1.00 to the City of Miami up to 2,000 square feet of space for a
police substation.
$40,000
TOTAL
$36,560,000.00
Train Station
Owner will use best commercial efforts for the location and approval of a station on site.
Workforce Housing
Ten percent of all units built on the property (up to 315 units) will be managed and
operated as Workforce Housing.
Relocation Assistance for
Design Place Residents
Assistance to Design Place Residents displaced by the new construction will be
provided.
Job Fairs & Training
Job opportunities will be provided.
Local Hiring Commitment
for Construction Jobs
Up to 25% of all construction jobs will be set aside for residents of the City of Miami
with first priority to residents of Little Haiti. Up to 40% of all construction jobs will be
set aside for Miami -Dade County residents.
Local Hiring Commitment
for Permanent Jobs
Up to 10% of the permanent jobs with the Owner will be set aside for residents of Little
Haiti. Commercial tenants will be encouraged to hire up to 10% of their labor from
within Little Haiti.
Civic Space
Owner will provide approximately 22.6% of the lot area as open plazas accessible to the
public.
* Benefits are subject to terms of the final Development Agreement approved by the City Commission.
EASTSIDE RIDGE SPECIAL AREA PLAN
ADDITIONAL BENEFITS SUMMARY
SUMMARY DESCRIPTION*
Projected Increase in Property Tax Revenue
$14,050,448
Non -Recurring Labor Income Generated
$480,375,000
Recurring Labor Income Generated
$106,657,300
Building Permit Fees
$3,007,500
City Impact Fees
$10,125,407
School Board Impact Fees
$3,986,048
SUB TOTAL
$637,158,036
GRAND TOTAL
$670,243,056
*Amounts are approximate and subject to configuration of final approved SAP.
M I AM 16358670.1 83885/87055
2
Submitted Into The Record
z" i ci„
LEGEND: HIDE
HOUSING
• ASSISTED HOUSING
• PUBLIC HOUSING
MARKER SIZE INDICATES
NUMBER OF UNITS
NEIGHBORHOODS
NO ATTRIBUTE SELECTED
SECTION 8
POLYGON COLOR INDICATES
TOTAL HOUSING UNITS
PARCELS
POLYGON COLOR INDICATES
LAND USE
HISTORIC PROPERTIES
• DESIGNATED
• NOT DESIGNATED
The red boundaries depicted on this map are according to those of the Little Haiti Net Office.
Assisted Housing: all project -based subsidized rental housing in South Florida, including units that received
local, state, or federal subsidy. Section 8 vouchers are not included.
Public Housing: all housing developments publicly owned and operated by Miami -Dade County.
3.9 SPECIAL AREA PLANS
MIAMI 21
AS ADOPTED - JANUARY 2018
ARTICLE 3. GENERAL TO ZONES
Visibility Triangles shall be maintained to include an area bounded by the first ten (10) feet along
the intersecting edges of the Base Building Line, projected where rounded, and a line running
across the Lot and connecting the ends of such ten -foot lines. See Article 4, Table 8.
3.8.4.2. Variances prohibited.
No Variances from the provisions of Section 3.8.4 are permitted. Submitted Into The Record
`161161..
The purpose of a Special Area Plan is to allow parcels greater than nine (9) Abutting acres in size
to be master planned so as to allow greater integration of public improvements and Infrastructure,
and greater flexibility so as to result in higher or specialized quality building and Streetscape design
within the Special Area Plan.
The purpose of a Special Area Plan further is to encourage the assembly and master planning of
parcels greater than nine (9) Abutting acres in size, in order to provide greater integration of public
and private improvements and Infrastructure; to enable Thoroughfare connectivity; to encourage
a variety of Building Heights, massing and Streetscape design, and to provide high quality design
elements, all in order to further the intent of this Code expressed in Article 2.
3.9.1 General
a. The single or multiple owner(s) of Abutting properties in excess of nine (9) acres may apply for
a rezoning to a Special Area Plan.
b. A Special Area Plan shall be approved by the process of rezoning with or without Transect
changes.
c. A Special Area Plan shall assign Thoroughfares, Transect Zones and Civic Space Types, with
appropriate transitions to Abutting areas. Guidelines for Thoroughfares and Public Frontages
may be adjusted to the particular circumstances of the Special Area Plan.
d. A Special Area Plan shall include a map of the Thoroughfares and Transect Zones, and the
standards that deviate from the requirements of Article 5.
e. A Special Area Plan shall assign at least five percent (5%) of its aggregated Lot Area to a Civic
Space Type. Civic Building sites are to be located within or adjacent to Civic Space Types or at
the axial termination of significant Thoroughfares. The developer shall be responsible for con-
structing the public improvements within the Special Area Plan, including but not limited to the
Civic Space Types and Thoroughfares.
f. Development within the Special Area Plan shall be pursuant to a recorded development agree-
ment that will establish the allocation of Thoroughfares and Civic Space Types and Building Area
among the Building sites, and the creation and retention of the public benefits.
9.
Unless a Building is specifically approved as part of the Special Area Plan, any Building shall
be reviewed by the Planning Director, after referral to and recommendation from the CRC for
111.19
MIAMI 21 ARTICLE 3. GENERAL TO ZONES
AS ADOPTED - JANUARY 2018
conformance to the Plan, prior to issuance of the Building Permit.
h. A Special Area Plan may include:
1. A differentiation of the Thoroughfares as a Primary -Grid (A -Grid) and a Secondary -Grid
(B-Grid). Buildings along the A -Grid shall be held to the highest standard of this Code in
support of pedestrian activity. Buildings along the B-Grid may be more readily considered
for automobile -oriented standards allowing surface parking lots, unlined parking decks, and
drive-throughs. The Frontages assigned to the B-Grid shall not exceed thirty percent (30%)
of the total length within a Special Area Plan. For Frontages on the B-Grid, parking areas
may be allowed in the Second Layer.
2. Retail Frontage requiring that a Building provide a Commercial Use at sidewalk level along
the entire length of the Frontage. The Commercial Use Building shall be no less than seventy
percent (70%) glazed in clear glass and provided with an Awning overlapping the sidewalk
as generally illustrated in Article 4, Table 6. The first floor should be confined to Retail Use
through the depth of the Second Layer.
3. Gallery or Arcade Frontage, requiring that a Building provide a permanent cover over the
sidewalk, either cantilevered or supported by columns. The Gallery or Arcade Frontage may
be combined with a Retail Frontage as shown in Article 4, Table 6. Gallery or Arcade Front-
age within the First Layer may apply towards Open Space requirements.
4. Build -to -lines that differ from Transect Zone Setback requirement.
5. ATerminated Vista location, requiring that the Building be provided with architectural articula-
tion of a Type and character that responds to the location.
6. A Pedestrian Passage, requiring a minimum ten (10) foot wide pedestrian access be reserved
between Buildings.
7. A preservation plan acceptable to the Historic and Environmental Preservation Board for any
historic resources in the area of the Special Area Plan.
8. Area Design Guidelines.
9. A parking management program that enables shared parking among public and private Uses.
10. Flexible allocation of development capacity and Height, excluding Density on individual sites
within the Special Area Plan shall be allowed so long as the capacity or Height distribution
does not result in development that is out of Scale or character with the surrounding area,
and provides for appropriate transitions.
3.10 HISTORIC PRESERVATION STANDARDS
See Chapter 23 of the City Code, titled Historic Preservation, for regulations and additional height
requirements.
111.20