Loading...
HomeMy WebLinkAboutR-73-0775FHW:nla 9-18-73 RESOLUTION NO. 7.3_77* A RESOLUTION ORDERING TRAIL VIEW HIGHWAY IMPROVEMENT H-4366 AND DESIGNATING THE PROPERTY AGAINST WHICHI SPECIAL ASSESSMENTS SHALL BE MADE FOR A PORTION OF THE COST THEREOF AS TRAIT. VIEW HIGHWAY IMPROVEMENT DISTRICT H-4366; AND ALLOCATING THE AMOUNT OF $3,000.00 FROM THE HIGHWAY BOND FUND FOR PRELIMINARY EXPENSE. WHEREAS, the area in the vicinity of S. W. 9 Street, S. W. 10 Street and S. W. 11 Street between S. W. 4 Avenue and S. W. 8 Avenue has developed rapidly as a multi -family resi- dential area; and WHEREAS, increased traffic circulation and on -street parking on many streets have resulted in deteriorated pavement conditions and eroded side parkway areas; and WHEREAS, there is a need to rebuild some of the existing streets, redevelop others in the area and to provide concrete gut- ters and curbing for vehicular and pedestrian safety, with proper drainage. NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. That a local Improvement described as TRAIL VIEW HIGHWAY IMPROVEMENT H-4366 shall be made under Section 56 of the Charter of The City of Miami as amended, located as follows: S. W. 9 Street (between S.W. 4 Avenue and S.W. 8 Avenue) S. W. 10 Street (between S.W. 4 Avenue and S.W. 8 Avenue) S. W. 11 Street (between S.W. 4 Avenue and S.W. 8 Avenue) S. W. 5 Avenue (between S.W. 8 Street and S.W. 11 Street) S. W. 6 Avenue (between S.W. 8 Street and S.W. 11 Street) S. W. 7 Avenue (between S.W. 8 Street and S.W. 11 Street) S. W. 8 Avenue (between S.W. 8 Street and S.W. 11 Street) ?-3 77( 1 2 3 4 Section 2. This Improvement shall include clearing and grading of the street right-of-way, constructionof asphaltic concrete pavement consisting of 8-inch limerock base and a 1-inch thick Type I asphaltic concrete surface course. It will also in- clude necessary intersections, returns, concrete gutter and curb- ing, drainage facilities and landscaping. Section 3. This Improvement shall be designated in all proceedings and assessments as TRAIL VIEW HIGHWAY IMPROVEMENT H-4366 and the property against which special assessments shall be made for a portion of the cost thereof, hereunder shall be designated as TRAIL VIEW HIGHWAY IMPROVEMENT H-4366. Section 4. The sum of $3,000.00 is allocated from the Highway Bond Fund for preliminary expense. PASSED AND ADOPTED this 24 day of aP7Z 56 is1973. PREPARED AND APPROVED BY: FRANK H. WESTON, ASSISTANT CITY ATTORNEY REVIEWED BY: JOHN S. LLOYD, ASSISTANT DIRECTOR APPROVED AS TO FORM AN, CORRECTNESS: , .1 A 1 / 11. ALAN H. ROTHSTEIN, CITY ATTORNEY 2