Loading...
HomeMy WebLinkAboutR-73-0701RESOLUTION NO. 73" 70/ A RESOi ';'i'1JN APPROVING 1N PRINCIPLE THE PiiOF'u5D '2H4RING OF COSTS WITH THE MIAMI- DAi F� VATE:: & SEWER AUTIHORITY FOR THE PROJECT EN"ITLEI) N.E. 10 STREET STORM AND SANITARY 01''TFALL ACCEPTING TIHE $154, 696 BID OF CLIFTON LIGHTSEY INC. FOR SAID PROJECT, ALLOCATING FUNDS FROM THE STOFiM AND SANITARY SEWF,R BOND FUNDS AND AUTHORIZING THE CITY INiANAGER TO EXECUTE A CONTRACT. WHEREAS, The City of Miami is currently coordinating plans for the development of the Commercial Docks Property into a cultural and park complex to be designated Bicentennial Park and part of this development requires the relocation of the City's 48-inch by 30-inch box storm sewer outfall and also the 60-inch overflow line from the N.E. 9 Street sanitary interceptor pumping station, which 60-inch line is the responsibility of the Miami -Dade Water and Sewer Authority; and WHEREAS, the City of Miami and the Miami -Dade Water and Sewer Authority have reached an agreement as to the sharing of engineering and construction costs for a junction boX and joint outfall pipe of sufficient size to provide for both the storm sewer and the overflow line; and WHEREAS, in order to meet construction schedules for the Bicentennial Park it is necessary to proceed as quickly as possible with the construction of the joint outfall; and WHEREAS, bido for this work were received September 11, 1973 under the job title N.E. 10 STREET STORM AND SANITARY OUTFALL Ri'.LOCATION and the City Manager reports that the ti 154, 696 bid of Clifton Lightsey, Inc. is the only bid, and it is'acceptable; and ;WHEREAS, fund,; to cover the cr)ct of the work can be made available f'r•:)!:: the Storm Se,;:^r and Sanitary Se,; or Hand Fund:3 with the under- .,tan ..itiiS that upon relf;i1)W:•.,ement by thc .ii::m:i-Dade Water and Sewer AutnL• i ty , for it:, : ,i o1' th a ,.:t , t.ii(: f'und:3 a: i.1.1 be returned to t ;o'op•. r account.. y a Lr;s: 1 RESOLUTION NO. 73i. 7/ A RESOLUTION APPROVING IN PRINCIPLE THE PROPOSED SHARING OF COSTS WITIH THE r4IAI•iI- DADE WATER & SEWER AUTIIORITY FOR THE PROJECT ENTITLED N.E. 10 STREET S`PORN AND SANITARY OUTFALL ACCEPTING THE $154,696 B1D OF CLIFTON LIGHTSEY INC. FOR SAID PROJECT, ALLOCATING FUNDS FROPI THE STORM AND SANITARY SEWER BOND FUNDS AND AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT. WHEREAS, The City of Miami is currently coordinating plans for the development of the Commercial Docks Property into a cultural and park complex to be designated Bicentennial Park and part of this development requires the relocation of the City's 48-inch by 30-inch box storm sewer outfall and also the 60-inch overflow line from the N.E. 9 Street sanitary interceptor pumping station, which 60-inch line is the responsibility of the I•iiami-Dade Water and Sewer Authority; and WIHEREAS, the City of Miami and the Miami -Dade Water and Sewer Authority enf;ineering and construction costs for a junction box and joint outfall pipe of sufficient size to provide for both the storm seer and the overflow line; and WHEREAS, in order to meet construction schedules for the Bicentennial Park it is necessary to proceed as quickly as possible with the construction of the joint outfall; and WHEREAS, bids for this work were received September 11, 1973 under the job title N.E. 10 STREET STORM AND SANITARY OUTFALL RELOCATION and the City Manager reports that the $154,696 bid of Clifton Lightsey, Inc. is the only bid, and it is'acceptable; and have reached an ar,reer,nt as to the sharing of ::Iii:REAS, fund; to cover the coat of the war': can be made available f!.() :: the Storm Sewr and S :_nit rry Bond Fund:; r: I th the under- st.:..,i {.i m that upon relmiJ arement by _ La_r Io Water and Sewer A.i: t,h::rity for its .:'..:r•e of the c.J.:t , the fund:, ;:i1.1 be returned to t'.• i,r0f)'. r account. .;1573� 41/4 NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY O1'' NIAI•II, FLORIDA: Section 1. That the Commission does hereby approve in principle the joint sharing of engineering and construction costs of a joint outfall pipe line to provide for relocation of the 48-;rich by 30-inch storm sewer outfall owned by The City of Miami and the G0-inch overflow line owned by the Miami -Dade Water and Sewer Authority, both lino; currently crossing the Commercial Docks Property which property is being developed into a cultural and park complex to be designated Bicentennial Park. Section 2. That the bid of Clifton Lightsey, Inc. in the estimated amount of $154,696 be and the same is hereby accepted. Section 3. That the amount of $ 88,010 be and it is hereby allocated from the Sanitary Sewer Bond Fund and that the amount of $ 85,250 be and it i.o, hereby allocated from the Storm Sewer Bond Fund to cover the construction and other expenses related to N.E. 10 STREET STORi AIM SANITARY OUTFALL RELOCATION with the under- standing that upon reimbursement t by the Miami -Dade Water and Sewer Authority, the reimbursed funds will be returned to the proper Bond Fund Account. Section 4. Tliat the City Manager be and he is hereby authorized and directed to enter into a contract on behalf of the City of I-Iiami with Clifton Lightsey, Inc. for the project entitled N.E. 10 STREET STORi• AND SANITARY OUTFALL RELOCATION. PASSED AND ADOPTED, this /3 day of 1973.