HomeMy WebLinkAboutR-73-0554RAS/bdm
7/10/73
RESOLUTION NO. 13't"ey
A RESOLUTION CONVEYING A PERMANENT EASEMENT TO
THE FIRST STATE BANK OF MIAMI COVERING THE NORTH
TWO AND ONE-HALF (2-1/2) FEET OF LOTS 1 AND 2,
IN BLOCK 8, OF LITTLE RIVER GARDENS, PB 6/8, SAID
EASEMENT FOR STORM SEWER AND DRAINAGE PURPOSES.
;,•
WHEREAS, the City of Miami has recently conveyed to
The First State Bank of Miami the off-street parking area located
on the north one hundred feet of Lots 1 and 2, Block 8, Little
River Gardens, P.B. 6/8 according to Warranty Deed dated April 30,
1973; and
WHEREAS, an easement for storm sewer and drainage purposes
was given to the City of Miami over the north two and one-half feet
of the south ninety-two feet of Lots 1 and 2, Block 8, Little River
Gardens, P.B. 6/8 as set forth in an instrument dated November 21,
1955, recorded in Deed Book 4204, Page 298; and
WHEREAS, the easement was given for the purpose of pro-
viding drainage for the off-street parking area which was conveyed
to The First State Bank of Miami by the above Warranty Deed; and
WHEREAS, it was the intent at the time of the initial
conveyance of the property to include the easement for storm sewer
and drainage purposes;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA:
That the City Manager and City Clerk are hereby
authorized and directed to execute a quit claim deed conveying
a permanent easement to The First State Bank of Miami covering
the north two and one-half (2-1/2) feet of Lots 1 an4-2, in
Block 8, of Little River Gardens, P.B. 6/8, said easement for
storm sewer and drainage purposes.
PASSED AND ADOPTED this Allo day of July, 1973.
PREPARED AND APPROVED BY:
Ronald A. Silver
Assistant City Attorney
REVIEWED BY:
John S. Lloyd
Assistant Director
APPROVED AS TO FORM AD CORRECTNESS:
•
Alan H. Rothstein
City Attorney
PROPOSED ZONING DISTRICTS FOR
MIAMI CBD
District Description
R-4 No basic changes in present district regulations; proposed for mapping
west of Midtown Commercial Area and where now mapped in the NDP area.
R-5 No basic changes in present district regulations; minor expansion of
present mapping in northeast corner of Study Area.
R-CC A new district for apartment and office buildings to be mapped along Miami
River, along Biscayne Boulevard and 2nd Ave. between C-3 District and
1-395, and along Biscayne Bay near Plaza Venetia; maximum F. A.R. 4.0.
r
C-3 The present C-3 Central Commercial District with no basic changes in
the use regulations and building height controls but possibly with new
coverage or other restrictions and some changes in window outlook and
building spacing for residential developments; bulk and density restrictions
being studied further.
C-3A A new district for the Flagler Street area with no basic differences from
the proposed C-3 except for the addition of a retail use requirement.
C-313 A new district to he mapped in the Government Center and Midtown Areas
with same use regulations as present C-3 but with more limited hulk and
density -- up to F. A.R. 1.0.
C-9 A new district replacing the northwest quadrant of the present C-3 and
permitting a wider range of service uses than the C-3 in line with existing
development and future needs; maximum F. A.R. •1.0.
C-6 A new district to be mapped west of N. l . 2nd Ave., which will permit
residential uses but exclude many of the service and industrial uses now
permitted in the area by the existing C--1 and C-5 Districts; maximum
I'. A.R. 2: O.
C-2 Same as present C-2, mapped only west of F. E.C. Railroad.
C-3 Same as present C-4, but less widely mapped.
C-5 Same as present C-5, but less widely mapped.
1-1 Same as present 1-1 with only minor changes in mapping; cut back along
Miami River and expanded north of 1-395.
W-1 Same as present \\'-1 with no change in mapping.