Loading...
HomeMy WebLinkAboutR-73-03132 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 32 J •. RESOLUTION NO. 73-313 A RESOLUTION APPROVING THE CONVEYANCE OF A TEMPORARY CONSTRUCTION EASEMENT TO THE UNITED STATES FOR USE AS A DISPOSAL AREA FOR DREDGED MATERIALS AS PART OF THE MIAMI HARBOR IMPROVEMENTS PROJECT. WHEREAS, by Public Law 90-483, adopted August 13, 1968, Congress authorized the construction of harbor improvements at the Miami Harbor; and WHEREAS, Dade County, by Resolution No. R-1282-68 adopted November 4, 1968, assumed responsibility to provide, without cost to the United States, all lands, rights of way and easements required for the deepening and widening of the entrance channel and turning basins at the Miami Harbor; and WHEREAS, the City of Miami, by Resolution No. 72-143 adopted May 4, 1972 conveyed to the United States a temporary construction easement located on the North end of Virginia Key for the disposal of dredged materials, resulting from the aforementioned harbor improvements; and WHEREAS, a re -assessment of the disposal area needs performed by the Corps of Engineers indicates the necessity of using additional disposal areas; and WHEREAS, the aforementioned additional disposal area may be used in conjunction with future expansions of the Virginia Key Sewage Treatment Plant; and WHEREAS, the required area, which is located on the North end of Virginia Key and owned by the City of Miami, needed by the Corps of Engineers as a temporary construction easement for the disposal of dredged materials and as shown on the attached sketch labeled, "Parcel No. CDA -7A Addition", li '-' ri:r.._ t_K7rticularly d32s•„rib 1 as follows. 1 2 1.6 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 3? TEMPORARY CONSTRUCTION EASEMENT Commence at the Southwest corner of Section 9, Township 54 South, Range 42 East, Dade County, Florida, the Standard Plane Rectangular Coordinates for the East Zone of Florida for said point are X-777,170.42, Y-515, 973.33; thence run S O° 22'53" E Mercator, along the Southerly prolongation of the West line of said Section 9, for a distance of 664.56 feet to a point; thence run N 83° 38'27" E for a distance of 723.94 feet to the point of inter- section with a line that is 720.00 feet East of and aprallel with'the Southerly prolongation of the West line of said Section 9, said point being the Point of Beginning. Other than this, we find no other errors or omissions in the legal description; thence continue to run N 83° 38' 27" for a distance of 3000.00 feet to a point; thence run S 02° 14' 09" W for a distance of 770.00 feet to a point; thence run S 87° 48'27" W or a distance of 2950.00 feet to the point of intersection with a line that is 720.00 feet East of and parallel with the Southerly prolongation of the West line of said Section 9; thence run N 0° 22'53" W, along said line 720.00 feet East of the West line of said Section 9, for a distance of 550.00 feet to the Point of Beginning. AND, WHEREAS, the Corps of Engineers has advised Dade County that it requires the right to enter upon and to use any and all of the hereinabove described temporary construction easement for a period of 3 years from the date of execution of the requested easement, to construct, operate, maintain, repair, replace and remove pipelines used in connection with the transmission of dredged materials to or across said tract of land, and for the purpose of depositing dredged or excavated materials on said land, including the right to construct a dike to contain the deposited materials; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MI?+MI, FLORIDA: Section 1: That the City of Miami adopts and finds those matters scat out in the foregoing recitals, and hereby approves they conveyance of the temporary construction easement, attached h n-to anJ mid :i part of this resolution, to the 1 2 1 3 4 5 6 7 8 q 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 23 29 .J 31 32 33 Section 2: That the City Manager and City Clerk bc2, and they are hereby authorized and directed to execute and deliver to the United States of America the attached temporary construction easement. PASSED AND ADOPTED this 26thday of PREPARED AND APPROVED BY: R. Harris Turner April Assistant City Attorney n REVIEWED BY: /AJ/ John S. Lloyd (,‘Assistant Director of Law APPROVED AS TO FORM AND CORRECTNESS: Alan H. !tothstein City Attorney I I C:T r-f RUM& ..... • ,1973. -3-