Loading...
HomeMy WebLinkAboutR-74-0539RESOLUTION NO. i 1"` A RESOLUTION AGREEING IN PRLNCIPLE FOR THE DOWNTOWN DEVELOPMENT AUTHORITY TO INCREASE THE SCOPE OF THE CONTRACT WITH C. A. DAVIS FOR THE CONSTRUCTION OF THE FIRST PHASE OF THE MIAMI RIVER WALKWAY IN THE AMOUNT OF $25, 000; AND AUTHORIZING FUNDS FOR THIS INCREASE BE MADE AVAILABLE FROM THE $1, 800, 000 AUTHORIZED FOR THE DOWNTOWN MIAMI RIVERFRONT DEVELOP- MENT IN THE PARKS FOR PEOPLE BOND PROGRAM. WHEREAS, a bid has been awarded for the construction of Phase 1 of the Miami. River Walkway and due to the unavailability of Mariner Alloy Steel originally specified for this project, it has been necessary to substitute a Carbon Steel for the bulkhead; and WHEREAS, to properly protect this Carbon Steel it is necessary that the tie -back system be placed below the low water level to protect and increase the life of the improvement; and WHEREAS, the contractor has submitted a price for these changes in the amount of $25, 000; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. That the increase in the scope of the contract with C. A. Davis for the construction of the first phase of the Miami River Walkway in the amount of $25, 000 by the Downtown Development Authority is hereby agreed to in principle. Section 2. That funds for this increase are hereby authorized to be made available from the $1, 800, 000 authorized for the Downtown Miami Riverfront Development in the Parks for People Bond Program. PASSED AND ADOPTED this 02, day of , 1974. APPROVED AS TO FORM AND CORRECTNESS John S. Lloyd, City Attorney "DOCUMENT INDEX ITEM NO. 28 CITY C�^ONN1 s,: ;N tri 3UN 2719753 BESDW'ttDtt it0.7.6 •• �•