Loading...
HomeMy WebLinkAboutR-74-0404Meseb 5 93 i74 RESOLUTION No. , 0" ✓e A RESOLUTION ACCEPTING THE COMPLETED CONSTRUCTION OF GUNITE CONSTRUCTION AND RENTALS, INC. FOR THE MARINE STADttiM .. STRUCTURAI, REPAIRS - 1974 AT A TOTAL COST OF $28,504.66; AUTHORIZING AN INCREASE OF THE SCOPE OF THE CONTRACT IN THE NET AMOUNT OF $17,959.66; ALLOCATING THE ADDITIONAL AMOUNT OF $17,959.66 FROM THE ACCOUNT ENTITLED "CAPITAL IMPROVEMENT FUND - UNALLOCATED FUNDS; ALLOCATING THE ADDITIONAL AMOUNT OF $1,795 FROM THE AFORESAID ACCOUNT TO COVER THE ADDITIONAL COST OF PROJECT EXPENSE, WHICH INCLUDES ENGINEERING, SURVEY AND INSPECTION WORK PERFORMED BY CITY FORCES; AND AUTHORIZING THE CITY MANAGER TO INSTRUCT THE PROPER OFFICIALS OF THE CITY OF MIAMI TO MAKE A FINAL PAYMENT OF $19,105.06 TO GUNITE CONSTRUCTION AND RENTALS, INC. AS A FULL AND FINAL PAYMENT FOR ALL WORK PERFORMED AND ALL MATERIALS FURNISHED IN CONNECTION WITH THE AFORESAID CONTRACT. WHEREAS, there exists a contract dated January 14, 1974 between the City of Miami and Gunite Construction and Rentals, Inc.; and WHEREAS, the work has been satisfactorily completed and Gunite Construction and Rentals, Inc. has furnished the required documents certifying that all bills for labor, materials, etc., have been paid in full in connection with the aforesaid contract; and WHEREAS, immediately after start of repair work it became apparent that deterioration was much more extensive than anticipated and that the quantities of cement required would be more than three times of that estimated. The City Commission, by Resolution No. 74-202, on March 14, 1974 approved extension of contract for materials; and WHEREAS, funds for the increase in the scope of the contract and for additional cost of Project Expense, which includes Engineering, Survey and Inspection Work performed by City Forces are available from the account entitled "Capital Improvement Fund - Unallocated Funds;" and "DOCUMENT INDE ITEM NO._ 7 MAY n 3 1974 RESOLIJI L t, �,- /� - 4404 WHEREAS, the Department of Public Works recomMenda the increase of $17,959.66 in the scope of the contract; allocating the additional amount of $17,959.66; allocating the additional amount of $1,795 to cover the additional cost of Project Expense, which includes Engineering, Survey and Inspection Work performed by City Forces; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. That the scope of work and the amount of the contract be increased in the amount of $17,959.66. Section 2. That the completed work performed by Gunite Construction and Rentals, Inc. for the MARINE STADIUM - STRUCTURAL REPAIRS - 1974 at a total cost of $28,504.66 be accepted. Section 3. That the additional amount of $17,959.66 be allocated from the account entitled "Capital Improvement Fund - Unallocated Funds." Section 4. That the additional amount of $1,795 be allocated from the aforesaid account to cover the additional cost of Project Expense, which includes Engineering, Survey, and Inspection Work performed by City Forces. Section 5. That the proper officials of the City of Miami be authorized to pay to Gunite Construction and Rentals, Inc. a balance of $19,105.06 as full and final payment for all work performed and all materials furnished in connection with the aforesaid Contract. + � PASSED AND ADOPTED this '"`3day o±' "97 1974. - 2 - PREPARED AND APPROVED `: Mikele Carter Assistant City Attorney APPROVED AS TO FORM AND CORRECTNESS: dor hn S. Lloyd ity Attorney