HomeMy WebLinkAboutSubstitution Memo from City ManagerCITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM Honorable Mayor and DATE: April 8, 2026 Members of the City Commission SUBJECT: CA 3 - Amending the City of Miami's List of Expedited Projects pursuant to Section 18-117 of the Code of the City of Miami, Florida, as amended ("City Code"), titled "Economic Stimulus Awards and Agreements." FROM: James Reyes City Manager REFERENCES: ENCLOSURES: Item CA 3 on the April 9, 2026, City Commission Meeting Agenda is an item to authorize a Resolution of the Miami City Commission with attachment(s), amending the City of Miami's ("City") list of expedited projects, pursuant to Section 18-117 of the Code of the City of Miami, Florida, as amended ("City Code"), titled "Economic Stimulus Awards and Agreements," enacted December 11, 2008, as amended, by replacing the current "Attachment A - 05/22/2025 REVISED" with "Attachment A - 04/09/2026 REVISED," attached and incorporated, for the purpose of including additional new and on -going capital improvements solicitations and projects. In the Agenda package as distributed, Capital Improvements Projects Revised Expedited List Attachment A - 04/09/2026 REVISED did not include all of the capital solicitations and projects that are in the pipeline; therefore, Capital Improvements Projects Revised Expedited List Attachment A - 04/09/2026 REVISED is hereby substituted with Capital Improvements Projects Revised Expedited List Attachment A - 04/09/2026 REVISED_FINAL_v2 to reflect the incorporation of numerous capital improvement solicitations and projects that were not originally included, m n Ios/as=l�0/1 AQA,‘30 C}:txrviAm-ky,A. CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 REVISED_FINAL_v2 B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40-B30688 Marine Stadium Restoration DREAM $68,000,000.00 04-Dry Run/Permit Citywide 40-B40571 Virrick Park New Pool Facility Parks $13,211,530.00 07-Construction 2 40-B193602 Brickell Key Bridge RPW $6,246,391.00 07-Construction 2 40-B173619 SW 15 Road from SW 3 Avenue and SW 11 Street RPW $6,261,725.00 03-Design 3 40-B30874 Brickell Avenue from SE 15 Road to SE 8 Street RPW $2,097,247.00 08-Final Completion 2 40-B50906 NE 3 Avenue from NE 54 Street to NE 58 Terrace RPW $3,259,046.00 03-Design 5 40-B193511 and 40- B193511A Curtis Park Community Center Design and Construction Parks $15,365,718.00 07-Construction 1 40-B193512 and 40- 6193512A Armbrister Park Community Center Design and Construction Parks $12,129,000.00 06-Pre-Construction 2 40-B193513 Moore Park Gym Design and Construction Parks $16,357,564.00 05-Bidding 5 40-B193517 New Woodside Park at 3699/3701 SW 1st AVE Parks $7,449,955.00 07-Construction 3 40-B40566 Spring Garden Point Park Parks $1,954,059.27 03-Design 5 40-B40581 Douglas Park Community Center Parks $15,572,411.00 04-Dry Run/Permit 4 40-B193207 Fire Facilities Resiliency Project (FS10) - Design Public Safety $15,465,000.00 04-Dry Run/Permit Citywide 40-B183603 Miami River Greenway Curtis Park East RPW $5,853,553.00 05-Bidding 1 40-B183611 NW 17th Street from NW 27th AVE to NW 32nd AVE - Road & Drainage Construction RPW $7,856,143.00 03-Design 1 40-B193802 Brickell Bay Drive Seawall, Drainage and Road Improvements RPW $32,261,008.00 07-Construction 2 40-B30606 Flagler Street Beautification OCI $33,104,407.00 07-Construction Citywide 40-B30737 South Bayshore Lane/Fairview Street - East and West RPW $12,420,228.00 05-Bidding 2 40-B193522A Dog Run Park Parks $925,877.00 03-Design 4 40-B233506 Fairlawn Community Park Parks $1,150,000.00 07-Construction 4 40-B233507 Shenar* A i0 ,Opnnt Parks $900,000.00 08-Final Completion 2 40-B233513 Grapeland Heights Park andlase a 1-Fiarrk Parks $2,611,514.00 07-Construction 1 40-B233523 Bayfront rIlIcEpuiNin 6— gay voz Parks $2,833,760.00 01-Planning 2 40-B223801 East Flagami Flood Mitigation RPW $80,137,359.00 05-Bidding 4 a3AJ3O32J CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 REVISED_FINAL_v2 B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40-B223802 Auburndale Flood Mitigation Project RPW $74,747,852.00 Multi -Phased Project 4 40-B50413 SW 24th St. from 27th Ave to SW 32nd Ave RPW $8,478,403.00 07-Construction 4 40-B50412 SW 23 Terrace from SW 27 Avenue to SW 32 Avenue RPW $6,649,232.00 01-Planning 4 40-B233822 Localized Flooding Improvements Citywide RPW $10,375,000.00 03-Design Citywide 40-B183611A NW 17 Street from NW 32 to NW 37 Avenue RPW $7,473,497.00 05-Bidding 1 40 6193500 Jose Marti Park Seawall, Shoreline, and Flood Improvements Construction OCI $26,644,082.00 05-Bidding 3 40-B193501 Little River Mini Park (Outfall Connection) RPW $3,986,499.00 04-Dry Run/Permit 5 40-B233815 Allapattah Flood Improvements - NW 7 Ave to 14 Ave, NW 23 St to RPW $62,674,641.00 03-Design 1 40 6233816 Melrose Flood Improvements - NW 23 Ave to NW 19 Ave, NW 34 St to NW 30 St (Pump Station) RPW $33,642,745.00 03-Design 1 40-B233805 Edgewater Flood Improvements - NE 4 Ave to Biscayne Bay, NE 22 St to NE 24 St (Pump Station) RPW $40,852,943.00 03-Design 2 40 6233811 Replacement of Seawalls Morningside between NE 55 Terr, NE 65 St and Biscayne Bay - D2 RPW $3,378,160.00 03-Design 2 40 B233809 Brickell and Coconut Grove Seawalls between SE 25th Rd to Mathenson Ave. and Biscayne Bay - D2 RPW $1,659,265.00 03-Design 2 40-B233810 Replacement of 8 Seawalls in Edgewater between NE 22 St to NE 34 St. along Biscayne Bay - D2 RPW $3,541,662.00 03-Design 2 40-B233804 East Little Havana Flood Improvements - W 12 Ave to W 17 Ave, NW 2 St to SW 6 St (Pump Station) RPW $64,605,980.00 01-Planning 3 40 6233606 8 Street Flood Improvements - SW 17 Ave to SW 22 Ave, SW 5 St to SW 12 St RPW $40,000,000.00 03-Design 3 40 B233803 Shorecrest South Flood Improvements - NE 8 Ct to NE Bayshore Ct, NE Little River Dr to NE 79 St (Pump Station) RPW $34,607,969.00 05-Bidding 5 40 B233814 South-West Wynwood Flood Improvements - NW 3 Ave to NW 5 PI, NW 16 St to NW 28 St (Pump Station) RPW $70,802,459.00 01-Planning 5 40 B233812 Replacement of Seawalls Shorecrest between NE 84 St and Ademar Canal; NE Baysh 'i$lada dalaCanalf D5 RPW $3,688,974.00 03-Design 5 40 6233817 Clements Nr7a kid:anwokiae+ gmi Ave to NW 2 Ave and NW30Stto36St RPW $22,422,143.00 03-Design 5 40-6233806 VV �']nj�'� Immediate' kit, Cttt� ro6lfstGae�1OL Valves CW RPW $4,084,000.00 03-Design Citywide 40-B203801 Citywide Pump Stations Telemetry System RPW $1,536,263.00 03-Design Citywide 40-B233819 Localized Floo¢}(g.,lrr prpugrp@nt; % 1 RPW $5,558,000.00 03-Design 3 CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 REVISED_FINAL_v2 B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40-B233820 Pump Stations RPW $2,500,000.00 03-Design 3 40-B223521 Parks Public WiFi Installation Parks $2,500,000.00 07-Construction 2 40-1350414 SW 24 Terrace from SW 27 Avenue to SW 31 Avenue RPW $4,762,302.00 08-Final Completion 4 40-B50421 SW 25 Street from SW 27 Avenue to SW 32 Avenue D4 RPW $4,853,136.00 08-Final Completion 4 40-B223212 Fire Station 12 - Hardening Fire $1,423,000.00 01-Planning Citywide 40-B213210 Fire Station 2 - Hardening Fire $1,007,027.00 01- Planning Citywide 40-B213209 Fire Station 9 - Hardening Fire $1,322,000.00 01- Planning Citywide 40-B213512 Hadley Park - Resiliency Hub Parks $1,807,056.00 05-Bidding 5 40-B50104 NW 13 Street from NW 35 Avenue to NW 37 Avenue RPW $3,165,866.00 07-Construction 1 40-B30756 NW 30 Street Improvement RPW $6,539,324.00 07-Construction 1 40-B183610 West Grove Roadway Improvements RPW $4,270,918.00 03-Design 2 40-B183612 Charles Avenue from Main Highway to South Douglas Road RPW $5,040,542.00 05-Bidding 2 40-B213606 Kinloch Roadway Neighborhood Improvements RPW $3,516,341.00 03-Design 4 40-B173613 South Golden Pines No Outlet Streets Improvements RPW $10,817,382.00 03-Design 4 40-B243800 Wagner Creek Embankment Stabilization RPW $16,096,190.00 03-Design 1 40-B173511A Morningside Park - Baywalk, Kayak Launch, and Boat Ramp Parks $19,182,327.00 07-Construction 2 40-B193521 Fairlawn Community Park Parks $3,809,461.00 07-Construction 4 40-B203509 Athalie Range Park - New Recreation Building D5 Parks $15,600,000.00 04-Dry Run/Permit 5 40-B243208 Police HQ -Garage Demolition and Sitework Police $3,799,272.00 07-Construction Citywide 40-B233601 Miami River Greenway - NW N River Dr from NW 22 Ave to NW 19 RPW $8,009,423.00 03-Design 1 40-B213605 NW 11 Street from NW 1 Avenue To NW 3 Avenue RPW $2,412,839.00 06-Pre-Construction 5 40-B70046 Virginia Key Boat Launch & Trailer Parking OCI $3,620,265.00 07-Construction 2 40-B70042 Miami Marine Stadium Marina - Mooring Field DREAM $4,133,205.49 06-Pre-Construction 2 40-B233500 Margaret Pace Park Parks $29,264,866.00 04-Dry Run/Permit 2 40-B243400 New Administration Building and Parking/Other Improvements DREAM $241,483,400.72 01-Planning Citywide 40-B193803 CE&I for Seawall, Baywalk, and Landscape Improvements at Jose Marti Park Parks $20,000,000.00 05-Bidding 3 40-B30541D Baywood Seawall Repair Parks $8,000,000.00 01-Planning 4 40 6243602 Little Havanked9 i%�r,Zc�r�5- Phase II RPW $5,834,069.00 01-Planning 3 40-B243604 Silve} f31Lif� r filovd S" ificatllion RPW $7,848,323.00 03-Design 3 40-B233813 North Grapeland ei is jj HS) at NW 13 Street RPW $356,406.00 03-Design 1 40-B213606A KinlochMlInlitiitioPa i5 Reconstruction FDEP Grant RPW $2,058,005.00 05-Bidding 4 40-B243600 Tamiami Blvd Roadway Drainage Improvements RPW $4,000,000.00 03-Design 4 40-B253600 Brickell Key„firidg*Rcpl@,i RPW $30,031,616.00 01-Planning 2 � i CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 REVISED_FINAL_v2 B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District N/A Construction and Permanent Financing: MLK Residences Housing $2,000,000.00 N/A 5 N/A Construction and Permanent Financing: Liberty Renaissance Housing $1,000,000.00 N/A 5 N/A Affordable Housing and Economic Development Housing $8,000,000.00 N/A Citywide N/A Home Ownership and Economic Development Housing $4,000,000.00 N/A Citywide N/A Citywide Parks Playground Renovations (13 Sites D1, D2, D3, and Parks $4,059,580.00 01-Planning Citywide N/A Historic Virginia Key Beach Museum VKBPT $20,500,000 01-Planning Citywide 40-B253603 Shoreline Repair Mini Rapids Park RPW $1,625,875 03-Design 1 40-8193519 Sewell Park Seawall Reconstruction - Phase III Parks $24,567,655 02-A/E Selection 1 40-8253105 Allapattah Elderly Center Improvements DREAM $2,853,787 04-Dry Run/Permit 1 40-8253104 Allapattah Child Care Improvements DREAM $1,700,641 04-Dry Run/Permit 1 40-B233501 Peacock Park Parks $3,507,095 04-Dry Run/Permit 2 B-193404 Flagler Worker's House - Structural Renovation Parks $4,275,387 04-Dry Run/Permit 2 40-B263508 2293 SW 17th Terrace - Mini Dog Park Parks $500,000 01-Planning 4 40-8263509 50 SW 68th Ave Parcel Plan Parks $500,000 01-Planning 4 TBD 235 NW 26th Ave - Sensory Park Parks $1,000,000 01-Planning 4 40-B253506 Little Haiti Cultural Complex Caribbean Marketplace Roof Parks $5,464,250 04-Dry Run/Permit 5 40 B203505 Roberto Clemente Park - Irrigation, Drainage, and Baseball Field Improvements Parks $9,429,751 04-Dry Run/Permit 5 40-B233105 Reroofing of Building 8 3 Communications/GSA and Repairs for Buildings 1,2,3, and 4-Buildings at Fire Station No. 3 Fire $3,700,000 04-Dry Run/Permit Citywide 40-TBD Domino Park -1444 SW 8 Street Parks $4,900,000 01-Planning 3 40-B263515 Triangle Park - 420 SW 11 Street Parks $4,000,000 01-Planning 3 40-B263514 Jose Marti Park - Phase II - 362 SW 4 Avenue Parks $20,000,000 01-Planning 3 40-TBD Fisherman Park - 1 SW South River Drive Parks $1,300,000 01-Planning 3 40- Historic Shenandoah Park Parks $1,220,000 01- Planning 3 40-TBD Police North Station -100 NW 62 Ave. Police $1,500,000 01- Planning Citywide 40-B72928A Police South Roof Renovation and 40/50 Year Repairs - 2200 W. Police $1,400,000 04-Dry Run/Permit Citywide 40-TBD Police Training Center - 360 NW 2 Av. Police $600,000 01-Planning Citywide 40-B253517 Le ion Pail`iLr° � pE 7 Ave. Parks $8,050,000 02- A/E Selection 5 40 B253527 M de vinV u$ Causewa r, Ye"rtification - 3601 Rickenbaker Parks $2,700,000 03- Design 2 40-TBD �,t� Simcintio UPa - 18,, d'p7�5i Street Parks $12,900,000 01- Planning 5 40-TBD Billie Rolle Domino Park - 3400 Grand Avenue Parks $10,000,000 01- Planning 2 CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 REVISED_FINAL_v2 B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40 B263510 Sewell Park Equipment and Site Improvements (Lighting, walkways, parking lot, gazebos) -1815 South River Drive Parks $2,000,000 01- Planning 1 40-B263403 Edgewater Baywalk -100 NW 17 St. DREAM $24,000,000 02- A/E Selection 2 40-B193402A Dinner Key Marina Breakwaters Mitigation 406 Parks/DREAM $22,271,227 O1-Planning 2 MIN ;0 AII3 )4U l3 A1I3 31120 3 1 J30 I :6 WV 6- WV 9Z0Z a3AI 3