Loading...
HomeMy WebLinkAboutExhibit SUBTHIS DOCUMENT IS A SUBSTITUTION. THE ORIGINAL CAN BE SEEN AT THE END OF THE DOCUMENT. CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 REVISED_FINAL_v2 B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40-B30688 Marine Stadium Restoration DREAM $68,000,000.00 04-Dry Run/Permit Citywide 40-B40571 Virrick Park New Pool Facility Parks $13,211,530.00 07-Construction 2 40-B193602 Brickell Key Bridge RPW $6,246,391.00 07-Construction 2 40-B173619 SW 15 Road from SW 3 Avenue and SW 11 Street RPW $6,261,725.00 03-Design 3 40-B30874 Brickell Avenue from SE 15 Road to SE 8 Street RPW $2,097,247.00 08-Final Completion 2 40-B50906 NE 3 Avenue from NE 54 Street to NE 58 Terrace RPW $3,259,046.00 03-Design 5 40-B193511 and 40- B193511A Curtis Park Community Center Design and Construction Parks $15,365,718.00 07-Construction 1 40-B193512 and 40- B193512A Armbrister Park Community Center Design and Construction Parks $12,129,000.00 06-Pre-Construction 2 40-B193513 Moore Park Gym Design and Construction Parks $16,357,564.00 05-Bidding 5 40-B193517 New Woodside Park at 3699/3701 SW 1st AVE Parks $7,449,955.00 07-Construction 3 40-B40566 Spring Garden Point Park Parks $1,954,059.27 03-Design 5 40-B40581 Douglas Park Community Center Parks $15,572,411.00 04-Dry Run/Permit 4 40-B193207 Fire Facilities Resiliency Project (FS10) - Design Public Safety $15,465,000.00 04-Dry Run/Permit Citywide 40-B183603 Miami River Greenway Curtis Park East RPW $5,853,553.00 05-Bidding 1 40-B183611 NW 17th Street from NW 27th AVE to NW 32nd AVE - Road & Drainage Construction RPW $7,856,143.00 03-Design 1 40-B193802 Brickell Bay Drive Seawall, Drainage and Road Improvements RPW $32,261,008.00 07-Construction 2 40-B30606 Flagler Street Beautification OCI $33,104,407.00 07-Construction Citywide 40-B30737 South Bayshore Lane/Fairview Street - East and West RPW $12,420,228.00 05-Bidding 2 40-B193522A Dog Run Park Parks $925,877.00 03-Design 4 40-B233506 Fairlawn Community Park Parks $1,150,000.00 07-Construction 4 40-B233507 Shenandoah Playground Replacement Parks $900,000.00 08-Final Completion 2 40-B233513 Grapeland Heights Park and Baseball Park Parks $2,611,514.00 07-Construction 1 40-B233523 Bayfront Park Fountain Parks $2,833,760.00 01-Planning 2 40-B223801 East Flagami Flood Mitigation RPW $80,137,359.00 05-Bidding 4 FILE NO. 18970 EXHIBIT SUB CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 REVISED_FINAL_v2 B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40-B223802 Auburndale Flood Mitigation Project RPW $74,747,852.00 Multi -Phased Project 4 40-B50413 SW 24th St. from 27th Ave to SW 32nd Ave RPW $8,478,403.00 07-Construction 4 40-B50412 SW 23 Terrace from SW 27 Avenue to SW 32 Avenue RPW $6,649,232.00 01-Planning 4 40-B233822 Localized Flooding Improvements Citywide RPW $10,375,000.00 03-Design Citywide 40-B183611A NW 17 Street from NW 32 to NW 37 Avenue RPW $7,473,497.00 05-Bidding 1 40-6193500 Jose Marti Park Seawall, Shoreline, and Flood Improvements- Construction OCI $26,644,082.00 05-Bidding 3 40-B193501 Little River Mini Park (Outfall Connection) RPW $3,986,499.00 04-Dry Run/Permit 5 40-B233815 Allapattah Flood Improvements - NW 7 Ave to 14 Ave, NW 23 St to RPW $62,674,641.00 03-Design 1 40 6233816 Melrose Flood Improvements - NW 23 Ave to NW 19 Ave, NW 34 St to NW 30 St (Pump Station) RPW $33,642,745.00 03-Design 1 40 6233805 Edgewater Flood Improvements - NE 4 Ave to Biscayne Bay, NE 22 St to NE 24 St (Pump Station) RPW $40,852,943.00 03-Design 2 40-B233811 Replacement of Seawalls Morningside between NE 55 Terr, NE 65 St and Biscayne Bay - D2 RPW $3,378,160.00 03-Design 2 40-B233809 Brickell and Coconut Grove Seawalls between SE 25th Rd to Mathenson Ave. and Biscayne Bay - D2 RPW $1,659,265.00 03-Design 2 40-B233810 Replacement of 8 Seawalls in Edgewater between NE 22 St to NE 34 St. along Biscayne Bay - D2 RPW $3,541,662.00 03-Design 2 40 6233804 East Little Havana Flood Improvements - W 12 Ave to W 17 Ave, NW 2 St to SW 6 St (Pump Station) RPW $64,605,980.00 01-Planning 3 40-B233606 8 Street Flood Improvements - SW 17 Ave to SW 22 Ave, SW 5 St to SW 12 St RPW $40,000,000.00 03-Design 3 40 6233803 Shorecrest South Flood Improvements - NE 8 Ct to NE Bayshore Ct, NE Little River Dr to NE 79 St (Pump Station) RPW $34,607,969.00 05-Bidding 5 40 6233814 South-West Wynwood Flood Improvements - NW 3 Ave to NW 5 PI, NW 16 St to NW 28 St (Pump Station) RPW $70,802,459.00 01-Planning 5 40-B233812 Replacement of Seawalls Shorecrest between NE 84 St and Ademar Canal; NE Bayshore Dr. and Davis Canal - D5 RPW $3,688,974.00 03-Design 5 40-B233817 Clemente Park Flood Improvements - Miami Ave to NW 2 Ave and NW 30 St to 36 St RPW $22,422,143.00 03-Design 5 40-B233806 Immediate Flood Control: Install Backflow Valves CW RPW $4,084,000.00 03-Design Citywide 40-B203801 Citywide Pump Stations Telemetry System RPW $1,536,263.00 03-Design Citywide 40-B233819 Localized Flooding Improvements RPW $5,558,000.00 03-Design 3 CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 REVISED_FINAL_v2 B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40-B233820 Pump Stations RPW $2,500,000.00 03-Design 3 40-B223521 Parks Public WiFi Installation Parks $2,500,000.00 07-Construction 2 40-B50414 SW 24 Terrace from SW 27 Avenue to SW 31 Avenue RPW $4,762,302.00 08-Final Completion 4 40-B50421 SW 25 Street from SW 27 Avenue to SW 32 Avenue D4 RPW $4,853,136.00 08-Final Completion 4 40-B223212 Fire Station 12 - Hardening Fire $1,423,000.00 01-Planning Citywide 40-B213210 Fire Station 2 - Hardening Fire $1,007,027.00 01- Planning Citywide 40-B213209 Fire Station 9 - Hardening Fire $1,322,000.00 01- Planning Citywide 40-B213512 Hadley Park - Resiliency Hub Parks $1,807,056.00 05-Bidding 5 40-B50104 NW 13 Street from NW 35 Avenue to NW 37 Avenue RPW $3,165,866.00 07-Construction 1 40-B30756 NW 30 Street Improvement RPW $6,539,324.00 07-Construction 1 40-B183610 West Grove Roadway Improvements RPW $4,270,918.00 03-Design 2 40-B183612 Charles Avenue from Main Highway to South Douglas Road RPW $5,040,542.00 05-Bidding 2 40-B213606 Kinloch Roadway Neighborhood Improvements RPW $3,516,341.00 03-Design 4 40-B173613 South Golden Pines No Outlet Streets Improvements RPW $10,817,382.00 03-Design 4 40-B243800 Wagner Creek Embankment Stabilization RPW $16,096,190.00 03-Design 1 40-B173511A Morningside Park - Baywalk, Kayak Launch, and Boat Ramp Parks $19,182,327.00 07-Construction 2 40-B193521 Fairlawn Community Park Parks $3,809,461.00 07-Construction 4 40-B203509 Athalie Range Park - New Recreation Building D5 Parks $15,600,000.00 04-Dry Run/Permit 5 40-B243208 Police HQ -Garage Demolition and Sitework Police $3,799,272.00 07-Construction Citywide 40-B233601 Miami River Greenway - NW N River Dr from NW 22 Ave to NW 19 RPW $8,009,423.00 03-Design 1 40-B213605 NW 11 Street from NW 1 Avenue To NW 3 Avenue RPW $2,412,839.00 06-Pre-Construction 5 40-B70046 Virginia Key Boat Launch & Trailer Parking OCI $3,620,265.00 07-Construction 2 40-B70042 Miami Marine Stadium Marina - Mooring Field DREAM $4,133,205.49 06-Pre-Construction 2 40-B233500 Margaret Pace Park Parks $29,264,866.00 04-Dry Run/Permit 2 40-B243400 New Administration Building and Parking/Other Improvements DREAM $241,483,400.72 01-Planning Citywide 40-B193803 CE&I for Seawall, Baywalk, and Landscape Improvements at Jose Marti Park Parks $20,000,000.00 05-Bidding 3 40-B30541D Baywood Seawall Repair Parks $8,000,000.00 01-Planning 4 40-B243602 Little Havana Pedestrian Priority Zone - Phase II RPW $5,834,069.00 01-Planning 3 40-B243604 Silver Bluff Traffic Flow Modification RPW $7,848,323.00 03-Design 3 40-B233813 North Grapeland Heights Seawall (NGHS) at NW 13 Street RPW $356,406.00 03-Design 1 40-B213606A Kinloch Flooding Mitigation and Road Reconstruction FDEP Grant RPW $2,058,005.00 05-Bidding 4 40-B243600 Tamiami Blvd Roadway Drainage Improvements RPW $4,000,000.00 03-Design 4 40-B253600 Brickell Key Bridge Replacement RPW $30,031,616.00 01-Planning 2 CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 REVISED_FINAL_v2 B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District N/A Construction and Permanent Financing: MLK Residences Housing $2,000,000.00 N/A 5 N/A Construction and Permanent Financing: Liberty Renaissance Housing $1,000,000.00 N/A 5 N/A Affordable Housing and Economic Development Housing $8,000,000.00 N/A Citywide N/A Home Ownership and Economic Development Housing $4,000,000.00 N/A Citywide N/A Citywide Parks Playground Renovations (13 Sites - D1, D2, D3, and Parks $4,059,580.00 01-Planning Citywide N/A Historic Virginia Key Beach Museum VKBPT $20,500,000 01-Planning Citywide 40-B253603 Shoreline Repair Mini Rapids Park RPW $1,625,875 03-Design 1 40-B193519 Sewell Park Seawall Reconstruction - Phase III Parks $24,567,655 02-A/E Selection 1 40-B253105 Allapattah Elderly Center Improvements DREAM $2,853,787 04-Dry Run/Permit 1 40-B253104 Allapattah Child Care Improvements DREAM $1,700,641 04-Dry Run/Permit 1 40-B233501 Peacock Park Parks $3,507,095 04-Dry Run/Permit 2 B-193404 Flagler Worker's House - Structural Renovation Parks $4,275,387 04-Dry Run/Permit 2 40-B263508 2293 SW 17th Terrace - Mini Dog Park Parks $500,000 01-Planning 4 40-B263509 50 SW 68th Ave Parcel Plan Parks $500,000 01-Planning 4 TBD 235 NW 26th Ave - Sensory Park Parks $1,000,000 01-Planning 4 40-B253506 Little Haiti Cultural Complex Caribbean Marketplace Roof Parks $5,464,250 04-Dry Run/Permit 5 40-6203505 Roberto Clemente Park - Irrigation, Drainage, and Baseball Field Improvements Parks $9,429,751 04-Dry Run/Permit 5 40-6233105 Reroofing of Building B-3 Communications/GSA and Repairs for Buildings 1,2,3, and 4-Buildings at Fire Station No. 3 Fire $3,700,000 04-Dry Run/Permit Citywide 40-TBD Domino Park - 1444 SW 8 Street Parks $4,900,000 01-Planning 3 40-B263515 Triangle Park - 420 SW 11 Street Parks $4,000,000 01-Planning 3 40-B263514 Jose Marti Park - Phase II - 362 SW 4 Avenue Parks $20,000,000 01-Planning 3 40-TBD Fisherman Park - 1 SW South River Drive Parks $1,300,000 01-Planning 3 40- Historic Shenandoah Park Parks $1,220,000 01- Planning 3 40-TBD Police North Station - 100 NW 62 Ave. Police $1,500,000 01- Planning Citywide 40-B72928A Police South Roof Renovation and 40/50 Year Repairs - 2200 W. Police $1,400,000 04-Dry Run/Permit Citywide 40-TBD Police Training Center - 360 NW 2 Av. Police $600,000 01-Planning Citywide 40-B253517 Legion Park Living Shoreline - 6447 NE 7 Ave. Parks $8,050,000 02- A/E Selection 5 40-B253527 Miami Rowing Club 40/50 Year Recertification - 3601 Rickenbaker Causeway Parks $2,700,000 03- Design 2 40-TBD Simonhoff Mini Park - 1850 NW 54 Street Parks $12,900,000 01- Planning 5 40-TBD Billie Rolle Domino Park - 3400 Grand Avenue Parks $10,000,000 01- Planning 2 CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 REVISED_FINAL_v2 B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40 6263510 Sewell Park Equipment and Site Improvements (Lighting, walkways, parking lot, gazebos) - 1815 South River Drive Parks $2,000,000 01- Planning 1 40-B263403 Edgewater Baywalk - 100 NW 17 St. DREAM $24,000,000 02- A/E Selection 2 40-B193402A Dinner Key Marina Breakwaters Mitigation 406 Parks/DREAM $22,271,227 01-Planning 2 SUBSTITUTED. CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 B Number Project Name Project Owner Current Estimated Total Project Cost Current P .e District 40-B30688 Marine Stadium Restoration DREAM $68,000,000.00 04-Dry ' Permit Citywide 40-B40571 Virrick Park New Pool Facility Parks $13,211,530.00 07- truction 2 40-B193602 Brickell Key Bridge RPW $6,246,391.00 0 •nstruction 2 40-B173619 SW 15 Road from SW 3 Avenue and SW 11 Street RPW $6,261,725.00 03-Design 3 40-B30874 Brickell Avenue from SE 15 Road to SE 8 Street RPW $2,097,247.00 :-Final Completion 2 40-B50906 NE 3 Avenue from NE 54 Street to NE 58 Terrace RPW $3,259,046.00 03-Design 5 40-B193511 and 40- B193511A Curtis Park Community Center Design and Construction Parks $15,365,718.00 07-Construction 1 40-B193512 and 40- B193512A Armbrister Park Community Center Design and Construction Parks $12,129,001 • 06-Pre-Construction 2 40-B193513 Moore Park Gym Design and Construction Parks $16,357 .00 05-Bidding 5 40-B193517 New Woodside Park at 3699/3701 SW 1st AVE Parks $7,55.00 07-Construction 3 40-B40566 Spring Garden Point Park Parks . 4,059.27 03-Design 5 40-B40581 Douglas Park Community Center Parks 5,572,411.00 04-Dry Run/Permit 4 40-B193207 Fire Facilities Resiliency Project (FS10) - Design Public Safety $15,465,000.00 04-Dry Run/Permit Citywide 40-B183603 Miami River Greenway Curtis Park East RPW $5,853,553.00 05-Bidding 1 40-B183611 NW 17th Street from NW 27th AVE to NW 32nd AVE - Road & Drainage Construction RP $7,856,143.00 03-Design 1 40-B193802 Brickell Bay Drive Seawall, Drainage and Road Improvements $32,261,008.00 07-Construction 2 40-B30606 Flagler Street Beautification OCI $33,104,407.00 07-Construction Citywide 40-B30737 South Bayshore Lane/Fairview Street - East and West RPW $12,420,228.00 05-Bidding 2 40-B193522A Dog Run Park Parks $925,877.00 03-Design 4 40-B233506 Fairlawn Community Park Parks $1,150,000.00 07-Construction 4 40-B233507 Shenandoah Playground Replacement Parks $900,000.00 08-Final Completion 2 40-B233513 Grapeland Heights Park and Baseball Park Parks $2,611,514.00 07-Construction 1 40-B233523 Bayfront Park Fountain Parks $2,833,760.00 01-Planning 2 40-B223801 East Flagami Flood Mitigation RPW $80,137,359.00 05-Bidding 4 40-B223802 Auburndale Flood Mitigation Project RPW $74,747,852.00 Multi -Phased Project 4 40-B50413 SW 24th St. from 27th Ave to SW 32nd Ave RPW $8,478,403.00 07-Construction 4 40-B50412 SW 23 Terrace from SW 27 Avenue to SW 32 , ue RPW $6,649,232.00 01-Planning 4 40-B233822 Localized Flooding Improvements Citywide RPW $10,375,000.00 03-Design Citywide 40-B183611A NW 17 Street from NW 32 to NW 37 Aven RPW $7,473,497.00 05-Bidding 1 40-B193500 Jose Marti Park Seawall, Shoreline, and • •d Improvements- Construction OCI $26,644,082.00 05-Bidding 3 40-B193501 Little River Mini Park (Outfall Conn. •n) RPW $3,986,499.00 04-Dry Run/Permit 5 40-B233815 Allapattah Flood Improvements - 7 Ave to 14 Ave, NW 23 St to RPW $62,674,641.00 03-Design 1 40-6233816 Melrose Flood Improvements - 23 Ave to NW 19 Ave, NW 34 St to NW 30 St (Pump Station) RPW $33,642,745.00 03-Design 1 40-B233805 Edgewater Flood Improve ' is - NE 4 Ave to Biscayne Bay, NE 22 St to NE24St(PumpSta ) RPW $40,852,943.00 03-Design 2 40-B233811 Replacement of Seaw• orningside between NE 55 Terr, NE 65 St and Biscayne Bay RPW $3,378,160.00 03-Design 2 40-B233809 Brickell and Coco rove Seawalls between SE 25th Rd to Mathenson Ave d Biscayne Bay - D2 RPW $1,659,265.00 03-Design 2 40-B233810 Replacement Seawalls in Edgewater between NE 22 St to NE 34 St. alon: .cayne Bay - D2 RPW $3,541,662.00 03-Design 2 40-6233804 East Littl- .vana Flood Improvements - W 12 Ave to W 17 Ave, NW 2 . SW 6 St (Pump Station) RPW $64,605,980.00 01-Planning 3 40-B233606 8 Str: food Improvements - SW 17 Ave to SW 22 Ave, SW 5 St to S St RPW $40,000,000.00 03-Design 3 40-6233803 ecrest South Flood Improvements - NE 8 Ct to NE Bayshore Ct, Little River Dr to NE 79 St (Pump Station) RPW $34,607,969.00 OS -Bidding 5 40-8233814 South-West Wynwood Flood Improvements - NW 3 Ave to NW 5 PI, NW 16 St to NW 28 St (Pump Station) RPW $70,802,459.00 01-Planning 5 40-8233r Replacement of Seawalls Shorecrest between NE 84 St and Ademar Canal; NE Bayshore Dr. and Davis Canal - D5 RPW $3,688,974.00 03-Design 5 40-: • 817 Clemente Park Flood Improvements - Miami Ave to NW 2 Ave and NW 30 St to 36 St RPW $22,422,143.00 03-Design 5 4 33806 Immediate Flood Control: Install Backflow Valves CW RPW $4,084,000.00 03-Design Citywide -B203801 Citywide Pump Stations Telemetry System RPW $1,536,263.00 03-Design Citywide 40-B233819 Localized Flooding Improvements RPW $5,558,000.00 03-Design 3 40-B233820 Pump Stations RPW $2,500,000.00 03-Design 3 40-B223521 Parks Public WiFi Installation Parks $2,500,000.00 07-Construction 2 SUBSTITUTED. CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 04/09/2026 B Number Project Name Project Owner Current Estimated Total Project Cost Current P District 40-B50414 SW 24 Terrace from SW 27 Avenue to SW 31 Avenue RPW $4,762,302.00 08-Final C. rletion 4 40-B50421 SW 25 Street from SW 27 Avenue to SW 32 Avenue D4 RPW $4,853,136.00 08-Final ' pletion 4 40-B223212 Fire Station 12 - Hardening Fire $1,423,000.00 0 : nning Citywide 40-B213210 Fire Station 2 - Hardening Fire $1,007,027.00 r •lanning Citywide 40-B213209 Fire Station 9 - Hardening Fire $1,322,000.00 - Planning Citywide 40-B213512 Hadley Park - Resiliency Hub Parks $1,807,056.00 05-Bidding 5 40-B50104 NW 13 Street from NW 35 Avenue to NW 37 Avenue RPW $3,165,866.00 07-Construction 1 40-B30756 NW 30 Street Improvement RPW $6,539,324.00 07-Construction 1 40-B183610 West Grove Roadway Improvements RPW $4,270,918.00 03-Design 2 40-B183612 Charles Avenue from Main Highway to South Douglas Road RPW $5,040,542.00 05-Bidding 2 40-B213606 Kinloch Roadway Neighborhood Improvements RPW $3,516,341. .' 03-Design 4 40-B173613 South Golden Pines No Outlet Streets Improvements RPW $10,817,38 , 03-Design 4 40-B243800 Wagner Creek Embankment Stabilization RPW $16,096, ..00 03-Design 1 40-B173511A Morningside Park - Baywalk, Kayak Launch, and Boat Ramp Parks $19,1: 7.00 07-Construction 2 40-B193521 Fairlawn Community Park Parks $3,: ,461.00 07-Construction 4 40-B203509 Athalie Range Park - New Recreation Building D5 Parks $ . •0,000.00 04-Dry Run/Permit 5 40-B243208 Police HQ -Garage Demolition and Sitework Police , 99,272.00 07-Construction Citywide 40-B233601 Miami River Greenway - NW N River Dr from NW 22 Ave to NW 19 RPW .8,009,423.00 03-Design 1 40-B213605 NW 11 Street from NW 1 Avenue To NW 3 Avenue RPW $2,412,839.00 06-Pre-Construction 5 40-B70046 Virginia Key Boat Launch & Trailer Parking OCI $3,620,265.00 07-Construction 2 40-B70042 Miami Marine Stadium Marina - Mooring Field DREAM $4,133,205.49 06-Pre-Construction 2 40-B233500 Margaret Pace Park Par - $29,264,866.00 04-Dry Run/Permit 2 40-B243400 New Administration Building and Parking/Other Improvements DR. $241,483,400.72 01-Planning Citywide 40-13193803 CE&I for Seawall, Baywalk, and Landscape Improvements at Jose Marti Park ks $20,000,000.00 05-Bidding 3 40-B30541D Baywood Seawall Repair Parks $8,000,000.00 01-Planning 4 40-B243602 Little Havana Pedestrian Priority Zone - Phase II RPW $5,834,069.00 01-Planning 3 40-B243604 Silver Bluff Traffic Flow Modification RPW $7,848,323.00 03-Design 3 40-B233813 North Grapeland Heights Seawall (NGHS) at NW 13 Street RPW $356,406.00 03-Design 1 40-B213606A Kinloch Flooding Mitigation and Road Reconstruction FDEP Gr RPW $2,058,005.00 05-Bidding 4 40-B243600 Tamiami Blvd Roadway Drainage Improvements RPW $4,000,000.00 03-Design 4 40-B253600 Brickell Key Bridge Replacement RPW $30,031,616.00 01-Planning 2 N/A Construction and Permanent Financing: MLK Residence Housing $2,000,000.00 N/A 5 N/A Construction and Permanent Financing: Liberty Renai ce Housing $1,000,000.00 N/A 5 N/A Affordable Housing and Economic Development Housing $8,000,000.00 N/A Citywide N/A Home Ownership and Economic Development Housing $4,000,000.00 N/A Citywide N/A Citywide Parks Playground Renovations (13 Sit- D1, D2, D3, and Parks $4,059,580.00 01-Planning Citywide N/A Historic Virginia Key Beach Museum VKBPT $20,500,000 01-Planning Citywide 40-B253603 Shoreline Repair Mini Rapids Park RPW $1,625,875 03-Design 1 40-B193519 Sewell Park Seawall Reconstruction - Ph III Parks $24,567,655 02-A/E Selection 1 40-B253105 Allapattah Elderly Center Improveme DREAM $2,853,787 04-Dry Run/Permit 1 40-B253104 Allapattah Child Care Improvement DREAM $1,700,641 04-Dry Run/Permit 1 40-B233501 Peacock Park Parks $3,507,095 04-Dry Run/Permit 2 B-193404 Flagler Worker's House - Struct Renovation Parks $4,275,387 04-Dry Run/Permit 2 40-B263508 2293 SW 17th Terrace - Mini r : Park Parks $500,000 01-Planning 4 40-B263509 50 SW 68th Ave Parcel Pla Parks $500,000 01-Planning 4 TBD 235 NW 26th Ave - Senso ark Parks $1,000,000 01-Planning 4 40-B253506 Little Haiti Cultural Co r -x Caribbean Marketplace Roof Parks $5,464,250 04-Dry Run/Permit 5 40-B203505 Roberto Clemente P. Irrigation, Drainage, and Baseball Field Improvements Parks $9 429,751 04-Dry Run/Permit 5 B-233105 Reroofing of Buil : B-3 Communications/GSA and Repairs for Buildings 1,2,3 d 4-Buildings at Fire Station No. 3 Fire $3,508,574 04-Dry Run/Permit Citywide 40-B193402A Dinner Key na Breakwaters Mitigation 406 Parks/DREAM $22,271,227 01-Planning 2