A RESOLUTION ACCEPTING THE COMPLETED WORK
PERFORMED BY AD•A..LITE ELECTRIC, INC, AT A
TOTAL COST OF $10,369 AND AUTHORIZING A
FINAL PAYMENT OF $2,369 roR THE ATHALIE
RANGE PARK NO. 1 - COMFORT STATION - 1975.
WHEREAS, there exists a contract dated May 29, 1975
between the City of Miami and Ad-A-Lite Electric, Inc,: and
WHEREAS, the work has been satisfactorily completed
and Ad-A-Lite Electric, Inc. has furnished the reauired documents
certifying that all 1-Alls for labor and materials have peen paid
in full in connection with the aforesaid contract: and
WHEREAS, the Department of Pul-lic Works recommends
that the completed work be accepted and final payment made to
the Contractor:
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OP
THE CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by Ad -A Lite
Electric, Inc. for the ATHALIE RANGE PARK NO. 1 - COMFORT STATION -
1975 be, and is hereby accepted at a total cost of $20,369.
Section 2. The proper officials of the City of
Miami be, and they are hereby, authorized to pay Ad-A-Lite Elec-
tric, Inc. a balance of $2,369 as full and final payment for all
work performed and all materials furnished in connection with the
ATHALIE RANGE PARK NO. 1 - COMFORT STATION - 1975.
PASSED AND ADOPTED this 73 day of
IICTO4EP
1975.
Attests
-/‘ TALIR ICE A FERRE
cAuT4Ettli
CITY CLERK
MAYO %Doc, garejt
ILL
4111MNIMINNOIR
PREPARED AND APPROVED BY: APPROVED AS TO FORM AND CORRECTNESS:
.;
EAft
Robert F. Clark John S. Lloyd - Cit Attor
Assistant City Atty. "SUMY COMMON
DMUMENTS KUM OF
FOLLOW° OCT 23 WS
emswooarr,
INNIMIS **la+ 4114 .44014401,
to P. W. Andrews
City Manac*er,
FkoM iri,e� C
�... es tiregr1
Witikt
ontract
n*tt October " ,
MaLitcj ATHALIZ .1C. 1 N. lcIA'OR'
STATION - 1975 - ~e.-.olu' icon Author-
izing Final F ayrient
1ttFet eNcta
tNCI )SuittS
Ad-A-Lite fectric, Inc. las completi the
construction of a new CBS comfort station an.1
the installation of a new Concrete basketball
backstop? at Athalle Range Park No. 1, locate 9
on NW In Street under I95.
Tt is now in order for th Commisst c to •icc:pt
!Al.? completed work and authorize a Final pa;tr';ent,
after all conditions are let. The construction
was completed for $20,369, which was within the
^ontract amount, and it WAS completed on time.
THE DEPARTMENT OF PUBLIC .4ORKS RECOMMENDS THE
ADOPTION OF A RESOLUTION ACCEPTING THE COMPLETE:
WORK AN AUTHORIZING A F1"AL PAYMENT OF $?,36
T AD-A-LTE ELECTRIC, INC. FOR THE ATHALIE
RANtiE PARK NO. 1 - COMFORT STATION - 1975.
''rV ! 3: n A ,: h t i