Loading...
HomeMy WebLinkAboutExhibit C-SUBTHIS DOCUMENT IS A SUBSTITUTION. THE ORIGINAL CAN BE SEEN AT THE EXHIBIT C END OF THE DOCUMENT. EXHIBIT C FEE SCHEDULE BUILDING CHAPTERS 10, 17, 20 INDEX PAGE This official Fee Schedule is to be maintained by the City Manager and available via the City of Miami website, with the various Departments and the City Clerk. This Fee Schedule supersedes any adopted fee currently at issue in the Code of the City of Miami, Florida, as amended ("City Code"). City Code Section Title 10-18 Permit Fee Schedule C2 — C5 10-65 Vacant, Blighted, Unsecured or Abandoned Structures / Defaults C6 10-74 Pre -submittal Meeting Fee C6 17-8 Appeal Fees C6 17-43 Appeal Fees C6 20-16 Flood Prevention Fees C6 — C7 FILE NO 19087 EXHIBIT C SUB Exhibit C / Fee Schedule Page 1 of 7 Page No. EXHIBIT C FEE SCHEDULE BUILDING CHAPTERS 10, 17, 20 Based upon the passage of Ordinance 14456 and Resolution R-26-0200 on April 23, 2026, this official Fee Schedule is to be maintained by the City Manager and available via the City of Miami website, with the various Departments and the City Clerk. This Fee Schedule supersedes any adopted fee currently at issue in the Code of the City of Miami, Florida, as amended ("City Code"). A. Chapter 10/Article I 1. Permit Fee Schedule (Sec. 10-18, City Code) This Fee Schedule does not include required State of Florida Surcharges or Miami -Dade County Surcharges addressed in the City Code and the relevant State and County Codes. a. Building Plumbing, Mechanical and Electrical Residential up to 3 units (estimated additions new or remodeling construction costs) 0.50% b. Residential less than estimated $2,500.00 $45.00 c. Commercial / Multi -Family equal to or less than $30,000,000.00 of construction costs 1.00% Excess over $30,000,000.00 plus 0.50% d. Minimum Permit Fee $110.00 e. Phased Permit (plus applicable surcharges) $1,500.00 f. Work without a Permit (after the fact) base fee plus: $110.00 Homestead Property (Residential) 2x base fee All other Properties (Commercial) 4x base fee g. Solid Waste Residential Surcharge per $100.00 of estimated cost of construction $0.22 Minium Allowed $26.00 Maximum Allowed $600.00 h. Solid Waste Commercial Surcharge: % costs of construction 2.50% Minimum Allowed $57.00 Maximum Allowed $10,500.00 Energy Conservation Surcharge New Construction or Addition per square foot $0.11 Exhibit C / Fee Schedule Page 2 of 7 EXHIBIT C j. Private Provider: Regular Fee with credit for building/ trade Permit fee line: 1/3 k. If Private Provider only reviews or only inspects 1/2 of the 1/3 of permit fee line Dry run/Up-Front per $1,000.00 of estimated construction value $2.80 m. Joint Plants Review per meeting per discipline for projects over 20,000 sq. ft. (2 hour max) $276.00 n. Revisions / Re -works per discipline after 2nd review $56.00 o. Recertification Review $276.00 Three-month extension (2 max) $500.00 p. Permit by Affidavit Pre-2022 Legalization plus any enforcement fee $250.00 Post-2022 Legalization plus any fine 2x Permit Fee q. Annual Facility Permit (based on annual work cost) 2.0% r. Commercial Engineered / Structural Glazing / Curtain Walls Recertification every 6 months for first year after CO $150.00 Every 5 years in accordance with FBC $300.00 s. CO / CC Residential per unit $105.00 t. CO / CC Commercial (incl. multifamily rental) per square foot $.10 Minimum for CO $250.00 Minimum for CC $150.00 u. Extension of TCO / TCC First Request Commercial property per sq. ft. $0.10 Residential property $105.00 Second Request Commercial property per sq. ft. $0.10 Residential property $105.00 Third Request (based on building/trade permit fee line) 50% v. Extension of Expired Permit Application (older than 180 days) SFH/Duplex/Triplex $100.00 Commercial/Multi-Family $500.00 w. Inactive application activation $1,500.00 Exhibit C / Fee Schedule Page 3 of 7 EXHIBIT C x. Expired Permits Extension $100.00 y. Completion of Expired Permit for first $1,000.00 of value of remaining work $32.00 Each additional $1,000.00 $16.00 z. Re -inspection fee $57.00 aa. Expedited plans review of LEED (non-refundable deposit) $500.00 bb. Expedited Overnight Review for Projects Over 20,000 sq. ft. Outside source review is actual cost of review plus 10.00% In-house review fee per discipline, max 4 hours and max 1 review per fee $350.00 cc. All Permits non-refundable application fee $40.00 dd. Change of architect, engineer, contractor per Permit $100.00 ee. Recertification of lost plans percent of original plan fee 30.00% Minimum $100.00 ff. Revised plans or shop drawings Per sheet reviewed $20.00 Minimum $100.00 Maximum $5,000.00 gg. Cookie Cutter Permit / per sheet $20.00 hh. Replacement of lost permit card / plan duplicates per sheet $17.00 ii. Electrified Fence — flat fee $40.00 jj. Administrative services fees Computer printouts per sheet $2.00 File search $44.00 Notarization $2.00 Certification per page of plans $1.00 Folio change $26.00 kk. Tree Permit — per tree $12.00 II. Case initiation fee for work without a Permit & Unsafe Structures $500.00 Digital pictures Unsafe Structures each $1.00 Each addition Unsafe Structures inspection after violation issued $150.00 Posting of Unsafe Structures Notice $50.00 Unsafe Structure Panel Hearing $200.00 Lien recordation/cancellation actual cost plus per every 10 pages $1.00 Exhibit C / Fee Schedule Page 4 of 7 EXHIBIT C Bid processing fee $150.00 Corporate information and lender search $25.00 Extension/Breach of Unsafe Structure Order Hearing $150.00 mm. Cert of Operations per elevator/escalator $200.00 nn. Elevator/escalator duplicate certificate per $100.00 oo. Elevator/escalator delinquent certificate per $50.00 pp. Temp. Certificate of Operations per elevator/escalator $100.00 qq. Elevator/escalator annual inspection per $200.00 rr. Elevator/escalator re -inspection per $100.00 ss. Elevator witness: One-year test $200.00 Five-year test $250.00 tt. Elevator emergency power/fire recall per test $1,000.00 uu. Elevator/escalator removal per $500.00 vv. High pressure boiler annual inspection per $135.00 ww. Low pressure boiler annual inspection per $85.00 xx. Water heater, pool heater, miniature boiler, yy. Kettles, and Unfired pressure vessel annual inspection per $85.00 zz. Escalator Final Inspection $1,200.00 aaa. Hydraulic elevator final inspection $600.00 bbb. Traction elevator final inspection $600.00 ccc. Traction elevator final inspection (more than 20 landings) $750.00 ddd. Initial Temporary use inspection $600.00 eee. Temporary use renewal inspection $200.00 fff. Overtime inspections rate per hour $225.00 ggg. Overtime inspections rate per hour (minimum four hour block) $900.00 hhh. Wheelchair lift $300.00 Robotic parking $1,200.00 jjj. Generator/ Fire recall test $1,000.00 kkk. Reinspection/Finals $400.00 III. Minor Repairs/DLM/Cab interiors/etc. $300.00 Exhibit C / Fee Schedule Page 5 of 7 EXHIBIT C B. Chapter 10, Article IV Vacant, blighted, unsecured or abandoned structures / Defaulted mortgages (Sec. 10-65) Vacant, blighted, unsecured or abandoned structure: First year $262.50 Second year $394.00 Third and each subsequent year $525.00 Structures over three stories plus non-refundable per square foot $0.30 C. Chapter 10, Article V Building fees (Sec. 10-74, City Code) Pre -submittal meeting D. Chapter 17, Article I Appeals (Sec. 17-8, City Code) a. Appeals to HEPB (excluding abutting property owner) b. Appeals to HEPB by nonprofit as defined, homeowners association as defined, c. Appeals to City Commission from HEPB Plus per mail piece cost E. Chapter 17, Article II Environmental Preservation Districts Fees (Sec. 17-43, City Code) Appeal Fee (excl. parties as defined) F. Chapter 20, Flood Prevention 1. Schedule of Fees (Sec. 20-16, City Code) $250.00 $315.00 $157.00 $525.00 $4.50 $300.00 (a) Application for waiver from subsection 20-3. Residential $210.00 Each additional structure $26.25 Commercial $394.00 Each additional structure $26.25 Recertification drainage system $276.00 (b) Application filing fee for variance from sections 20-4 and 20-5. Exhibit C / Fee Schedule Page 6 of 7 EXHIBIT C Single-family residential (per house) Commercial, industrial or other (per building) $840.00 (c) Appeal to decision of the building official. Residential (per house) Commercial (per building) $420.00 $473.00 $840.00 (d) Application fees for variances (after the fact). Application fees for variances (after the fact) shall be assessed at double the amount indicated above. Exhibit C / Fee Schedule Page 7 of 7 SUBSTITUTED. EXHIBIT C EXHIBIT C FEE SCHEDULE BUILDING CHAPTERS 10, 17, 20 INDEX PAGE This official Fee Schedule is to be maintained by the City Manager and available ' the City of Miami website, with the various Departments and the City Clerk. This Fee Sched . supersedes any adopted fee currently at issue in the Code of the City of Miami, Florida, a amended ("City Code"). City Code Section Title 10-18 Permit Fee Schedule C2 — C5 10-65 Vacant, Blighted, Unsecured or Abandoned Structures / Defau' C6 10-74 Pre -submittal Meeting Fee C6 17-8 Appeal Fees C6 17-43 Appeal Fees C6 20-16 Flood Preventior ees C6 — C7 Exhibit C / Fee Schedule Page 1 of 7 Page No. SUBSTITUTED. EXHIBIT C FEE SCHEDULE BUILDING CHAPTERS 10, 17 Based upon the passage of Ordinance and Resolution R-26- on April 9, 2026, this Fee Schedule was adopted on [date]. This official Fee Schedule is •e maintained by the City Manager and available via the City of Miami website, with the v. us Departments and the City Clerk. This Fee Schedule supersedes any adopted fee current issue in the Code of the City of Miami, Florida, as amended ("City Code"). A. Chapter 10/Article I 1. Permit Fee Schedule (Sec. 10-18, City Code) This Fee Schedule does not include required State of Florida S arges or Miami -Dade County Surcharges addressed in the City Code and the relev.. State and County Codes. a. Building Plumbing, Mechanical and Electr Residential up to 3 units (estimated ad• •ns new or remodeling construction costs) 0.50% b. Residential less than estimated $ 40.00 $45.00 c. Commercial / Multi -Family equ. • or less than $30,000,000.00 of construction costs 1.00% Excess over $30,000,000 plus 0.50% d. Minimum Permit Fee $110.00 e. Phased Permit (plus plicable surcharges) $1,500.00 f. Work without a P= it (after the fact) base fee plus: $110.00 Homestead Pr• rty (Residential) 2x base fee All other Pro ies (Commercial) 4x base fee g. Solid Wa ' esidential Surcharge per $1 . 40 of estimated cost of construction $0.22 Mini Allowed $26.00 mum Allowed $600.00 h. •lid Waste Commercial Surcharge: % costs of construction 2.50% Minimum Allowed $57.00 Maximum Allowed $10,500.00 Energy Conservation Surcharge New Construction or Addition per square foot $0.11 Exhibit C / Fee Schedule Page 2 of 7 SUBSTITUTED. EXHIBIT C j. Private Provider: Regular Fee with credit for building/ trade Permit fee line: 1/3 k. If Private Provider only reviews or only inspects 1/2 of the 1/3 of permit fee line Dry run/Up-Front per $1,000.00 of estimated construction value ° .80 m. Joint Plants Review per meeting per discipline for projects over 20,000 sq. ft. (2 hour max) $276.00 n. Revisions / Re -works per discipline after 2nd review $56.00 o. Recertification Review $276.00 Three-month extension (2 max) $500.00 p. Permit by Affidavit Pre-2022 Legalization plus any enforcement fee $250.00 Post-2022 Legalization plus any fine 2x Permit Fee q. Annual Facility Permit (based on annual we . cost) 2.0% r. Commercial Engineered / Structural Gla- ,g / Curtain Walls Recertification every 6 months for firs+ aar after CO $150.00 Every 5 years in accordance with F' $300.00 s. CO / CC Residential per unit $105.00 t. CO / CC Commercial (incl. mi .family rental) per square foot $.10 Minimum for CO $250.00 Minimum for CC $150.00 u. Extension of TCO / Tr , First Request Commercial prof , ty per sq. ft. $0.10 Residential pr Jerty $105.00 Second Re Jest Commer al property per sq. ft. $0.10 Resit' itial property $105.00 Th' Request (based on building/trade permit fee line) 50% v. r .tension of Expired Permit Application (older than 180 days) SFH/Duplex/Triplex $100.00 Commercial/Multi-Family $500.00 Inactive application activation $1,500.00 Exhibit C / Fee Schedule Page 3 of 7 SUBSTITUTED. EXHIBIT C x. Expired Permits Extension $100.00 y. Completion of Expired Permit for first $1,000.00 of value of remaining work $32 Each additional $1,000.00 $1 z. Re -inspection fee .00 aa. Expedited plans review of LEED (non-refundable deposit) „500.00 bb. Expedited Overnight Review for Projects Over 20,000 sq. ft. Outside source review is actual cost of review plus 10.00% In-house review fee per discipline, max 4 hours and max 1 review per fee $350.00 cc. All Permits non-refundable application fee $40.00 dd. Change of architect, engineer, contractor per P- $100.00 ee. Recertification of lost plans percent of origina . n fee 30.00% Minimum $100.00 ff. Revised plans or shop drawings Per sheet reviewed $20.00 Minimum $100.00 Maximum $5,000.00 gg. Cookie Cutter Permit / per sh• $20.00 hh. Replacement of lost permi rd / plan duplicates per sheet $17.00 ii. Electrified Fence — flat f- $40.00 jj. Administrative servic= ees Computer printout- -r sheet $2.00 File search $44.00 Notarization $2.00 Certificati• •er page of plans $1.00 Folio c •e $26.00 kk. Tree ' mit — per tree $12.00 II. C- initiation fee for work without a Permit & Unsafe Structures $500.00 ital pictures Unsafe Structures each $1.00 ach addition Unsafe Structures inspection after violation issued $150.00 Posting of Unsafe Structures Notice $50.00 Unsafe Structure Panel Hearing $200.00 Lien recordation/cancellation actual cost plus per every 10 pages $1.00 Exhibit C / Fee Schedule Page 4 of 7 SUBSTITUTED. EXHIBIT C Bid processing fee $150.00 Corporate information and lender search $25.00 Extension/Breach of Unsafe Structure Order Hearing $150 mm. Cert of Operations per elevator/escalator $20 nn. Elevator/escalator duplicate certificate per " 40.00 oo. Elevator/escalator delinquent certificate per 50.00 pp. Temp. Certificate of Operations per elevator/escalator $100.00 qq. Elevator/escalator annual inspection per $200.00 rr. Elevator/escalator re -inspection per $100.00 ss. Elevator witness: One-year test $200.00 Five-year test $250.00 tt. Elevator emergency power/fire recall per test $1,000.00 uu. Elevator/escalator removal per $500.00 vv. High pressure boiler annual inspection • $135.00 ww. Low pressure boiler annual inspectio -r $85.00 xx. Water heater, pool heater, miniaturoiler, yy. Kettles, and Unfired pressure v -I annual inspection per $85.00 zz. Escalator Final Inspection $1,200.00 aaa. Hydraulic elevator final ins- tion $600.00 bbb. Traction elevator final in -ction $600.00 ccc. Traction elevator fina pection (more than 20 landings) $750.00 ddd. Initial Temporary u• nspection $600.00 eee. Temporary use ewal inspection $200.00 fff. Overtime ins • ions rate per hour $225.00 ggg. Overtime it sections rate per hour (minimum four hour block) $900.00 hhh. Wheelc► lift $300.00 Rob• •arking $1,200.00 jjj. G= ator/ Fire recall test $1,000.00 kkk. nspection/Finals $400.00 III. inor Repairs/DLM/Cab interiors/etc. $300.00 Exhibit C / Fee Schedule Page 5 of 7 SUBSTITUTED. EXHIBIT C B. Chapter 10, Article IV Vacant, blighted, unsecured or abandoned structures / Defaulted mortgag - ec. 10-65) Vacant, blighted, unsecured or abandoned structure: First year 62.50 Second year $394.00 Third and each subsequent year $525.00 Structures over three stories plus non-refundable per square foo $0.30 C. Chapter 10, Article V Building fees (Sec. 10-74, City Code) Pre -submittal meeting D. Chapter 17, Article I Appeals (Sec. 17-8, City Code) $250.00 a. Appeals to HEPB (excluding abutf property owner) $315.00 b. Appeals to HEPB by nonprofit a -fined, homeowners association as defined, $157.00 c. Appeals to City Commission HEPB $525.00 Plus per mail piece cost $4.50 E. Chapter 17, Article II Environmental Preserva" n Districts Fees (Sec. 17-43, City Code) Appeal Fee (excl. parti as defined) F. Chapter 20, Flood revention 1. Schedule of Fr s (Sec. 20-16, City Code) $300.00 (a) Appl° ation for waiver from subsection 20-3. R( ,dential $210.00 ach additional structure $26.25 Commercial $394.00 Each additional structure $26.25 Recertification drainage system $276.00 (b) Application filing fee for variance from sections 20-4 and 20-5. Exhibit C / Fee Schedule Page 6 of 7 SUBSTITUTED. EXHIBIT C Single-family residential (per house) $420.00 Commercial, industrial or other (per building) $840.00 (c) Appeal to decision of the building official. Residential (per house) P. /3.00 Commercial (per building) 4;840.00 (d) Application fees for variances (after the fact). Application fees ( variances (after the fact) shall be assessed at double the amount indicated ove. Exhibit C / Fee Schedule Page 7 of 7