EXHIBIT B FEE SCHEDULE
RESILIENCE AND PUBLIC WORKS
CHAPTERS 2, 22.5, 54, 55
INDEX PAGE
This official Fee Schedule is to be maintained by the City Manager and available via the City of
Miami website, with the various Departments and the City Clerk. This Fee Schedule supersedes
any adopted fee currently at issue in the Code of the City of Miami, Florida, as amended ("City
Code").
City Code Section Title
Sec. 2-268
Sec. 2-269
Sec. 2-272
Sec. 22.5-127
Sec. 54-3
Sec. 54-8
Covenants, Rights -of -Way Dedication
Quitclaims Fees
Recording Plats, Alley Closures or
Vacations Fees
Plan Review Fees
Administrative Fee
Obstruction of Street, Sidewalk, or
Traffic Impediment Fees
Page No.
B2
B2 — B4
B4 — B6
B6
B6
Use of Streets and Sidewalk Fees B7
Sec. 54-43 PROW Excavation, Repair, Resurface, Utility
Groundwater monitoring Fees B8 — B10
Sec. 54-224 Sidewalk and Street Cafe Fees B10
Sec. 54-226 Fees for New racks B10
Sec. 55-14 Encroachment Applications B11
Sec. 55-16 Easement Applications B11
Exhibit B / Fee Schedule Page 1 of 11
Exhibit B-SUB
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
FEE SCHEDULE
RESILIENCE AND PUBLIC WORKS
CHAPTERS 2, 22.5, 54, 55
Based upon the adoption of Ordinance 14456 and Resolution R-26-0200 on April 23, 2026, this
official Fee Schedule is to be maintained by the City Manager and available via the City of Miami
website, with the various Departments and the City Clerk. This Fee Schedule supersedes any
adopted fee currently at issue in the Code of the City of Miami, Florida, as amended ("City Code").
A. Chapter 2 / Article IV / Division 4
1. Fees for Covenants to Run with the Land, Right -of -Way Dedications, Quitclaims;
Preparation (Sec. 2-268, City Code)
a. Preparation and processing of any legal document running
with the land covenanting the construction or postponement
of construction of a public right-of-way or on private property
b. Preparation and processing of legal documents, including, but
not limited to, subdivision improvement bonds and hold harmless
agreements, quitclaim deeds with the city as grantor, and any
agreement allowing the use of public right-of-way by private
entities, excluding permits
$495.00
$3,375.00
c. Preparation and processing of a right-of-way dedication deed for
all properties other than properties that receive a homestead exemption
pursuant to Article VI I, Section 6(a) of the Florida Constitution with the
right-of-way being enlarged by dedication not part of the county
or state road system $1,125.00
d. Review of covenant in -lieu of unity of title or unity of title for a
project pursuant to Article 7 of the Miami 21 Zoning Code $350.00
e. Preparation and processing of a right-of-way dedication waiver $150.00
2. Fees for Recording Plats, Alley Closures or Vacations (Sec. 2-269 City Code)
a. Platting determination or determination on folio separation $1,100.00
Exhibit B / Fee Schedule Page 2 of 11
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
b. Platting exception submittal pursuant to subsection 55-10(c)
of the City Code $1,100.00
c. Submittal of tentative plat without closure and vacation/release
of one or more right(s)-of-way or
d. Submittal of tentative plat with closure and
vacation/release of one or more right(s)-of-way or easement(s) $5,500.00
e. Resubmittal of tentative plat for an extension of time $2,400.00
f. Resubmittal of tentative plat by different owner $2,400.00
g. Resubmittal of tentative plat with new boundary without
closure and vacation/release of one or more right(s)-of-way
or easement(s $3,200.00
h. Resubmittal of tentative plat with new boundary with closure
and vacation/release of one or more right(s)-of-way or easement(s)$5,000.00
To accompany final plat when submitted for recording
j. For each time limit extension granted for completion of
subdivision improvements required in conjunction with
a recorded plat (fee or 5% of SIB whichever is greater)
k. Fees to be charged pursuant to subsections 55-15(i) and
55-15(j) providing for an alternative method for the closure
and vacation of alleys which abut parcels of land zoned solely
residential
Any combined resubmittal, tentative plat, and final plat fees
pursuant to subsection 2-269(a) to be charged for a plat
consisting solely of property or properties that receive a
homestead exemption(s) pursuant to Article VI I, Section 6(a)
of the Florida Constitution shall not exceed
m. Fees to be charged pursuant to subsection 55-15(e)
providing for an alternate method for the closure or vacation
of a platted easement
n. Expedited review for processing final plats and recording plats
submitted for approval:
List of requirements (base fee)
Plus fee per tract/lot
Mylar review (base fee)
Exhibit B / Fee Schedule Page 3 of 11
$3,200.00
$3,700.00
$295.00
$2,350.00
$1, 800.00
$2,000.00
$100.00
$100.00
$1,000.00
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
EXHIBIT B
Plus fee per tract/lot $500.00
o. Fees to be charged pursuant to subsection 55-15(1) providing
for an alternate method for the closure or vacation of
emergency access easement $2,350.00
P. Fees to be charged pursuant to subsection 54-4.1(b) providing
for a release of utility easement reservation $2,350.00
q. Processing fee for tolling and extensions of tentative plat
approvals $275.00
3. Plan Review Fee (Sec. 2-272, City Code)
The fees to be charged by the Department of Resilience and Public Works for
processing and reviewing private development plans submitted for approval
a. Fence, wall, slab, or sign $50.00
b. Underground tank $155.00
c. Single-family or duplex residential construction,
reconstruction, remodeling, renovation, repair, or addition $268.00
d. New multi -family residential (<%2 acre) $1,335.00
e. New commercial (<%2 acre) $1,535.00
f. New multi -family residential (>_A2 acre and <1 acre) $1,995.00
g. New commercial (>_A2 acre and <1 acre) $2,155.00
h. Large development (residential/commercial >_1 acre) $3,500.00
Subdivision improvement engineering plan $2,500.00
j. Review and marking of base building line on
signed/sealed boundary survey $125.00
k. Review and marking of base building line for
planning/zoning applications $285.00
Underground utility installation $295.00
m. Underground utility service connection,
utility structure placement $95.00
n. Monitoring wells, soil borings, coring/sampling, utility locates,
minor non -utility excavations $420.00
o. Building construction/maintenance (scaffolding, crane,
dumpster) $265.00
p. Interim Parking $650.00
Exhibit B / Fee Schedule Page 4 of 11
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
q. Right-of-way closure (temporary traffic control,
temporary construction fence) $75.00
r. As -built plan for stormwater $750.00
s. As -built plan for line and grade, pavement, sidewalk, curb,
and gutter $480.00
t. As -built plan for underground utilities $800.00
u. As -built plan for above ground utilities $430.00
v. As -built plan for non-standard improvements (pavers, lighting,
irrigation, tree grates, etc $430.00
w. Dry run plan for stormwater $585.00
x. Dry run plan for line and grade, pavement, sidewalk, curb,
and gutter $585.00
y. Dry run plan for underground utilities $585.00
z. Dry run plan for above ground utilities $430.00
aa. Dry run plan for non-standard improvements
(pavers, lighting, irrigation, tree grates, etc $355.00
The fees to be charged by the Department of Resilience and Public Works for
processing and reviewing plans for work in the Right -of -Way that is not related to a
private development submitted for approval.
bb. Underground utility installation $295.00
cc. Underground utility service connection,
utility structure placement $75.00
dd. Monitoring wells, soil borings, coring/sampling, utility locates,
minor non -utility excavations $350.00
ee. Street construction (sidewalk repair, sidewalk construction,
curb and gutter, roadway paving, roadway resurfacing $225.00
ff. Building construction/maintenance (scaffolding, crane, dumpster) $225.00
gg. Right-of-way closure (temporary traffic control,
temporary construction fence) $105.00
hh. As -built plan for stormwater $750.00
jj. As -built plan for line and grade, pavement, sidewalk, curb,
and gutter $480.00
jj. As -built plan for underground utilities $800.00
kk. As -built plan for above ground utilities $430.00
Exhibit B / Fee Schedule Page 5 of 11
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
II. As -built plan for non-standard improvements (pavers, lighting,
irrigation, tree grates, etc $430.00
mm. Dry run plan for stormwater $585.00
nn. Dry run plan for line and grade, pavement, sidewalk, curb,
and gutter $585.00
oo. Dry run plan for underground utilities $585.00
pp. Dry run plan for above ground utilities $430.00
qq. Dry run plan for non-standard improvements
(pavers, lighting, irrigation, tree grates, etc $355.00
rr. Expedited Plans Review for special projects (not over 4 hours() $350.00
Each hour over 4 hours $87.50
ss. Trip generation statement inclusive of administrative costs $1,350.00
tt. Administrative fee in connection with the administration of the
independent traffic studies - percentage of the estimated
expenses for the services of the provider set to perform the
independent study 15%
B. Chapter 22.5 / Article VI (Sec. 22.5-127, City Code)
Stormwater utility fee Permit for any construction project which will disturb
0.5 acres or more of soil $595.00
C. Chapter 54 /Article 1, 11
1. Fees for obstruction of street, sidewalk or impedes traffic (Sec. 54-3, City Code)
a. Non-refundable fee with each permit application
to the police department $120.00
b. Non-refundable application fee with each permit application
to the department of resilience and public works $95.00
c. Non-refundable inspection fee with each permit application
to the department of resilience and public works $50.00
d. Non-refundable permit fee prior to issuance of all right-of-way
closures $325.00
e. Non-refundable permit fee prior to issuance of all right-of-way
closures for helicopter lifting $775.00
f. Non-refundable public right-of-way usage (flat fee) $595.00
Exhibit B / Fee Schedule Page 6 of 11
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
g. Non-refundable sidewalk/curb/swale usage —
linear feet, if applicable $0.30
h. Non-refundable parking lane usage — linear feet, if applicable $0.40
Non-refundable lane closure (or partial) of traffic and
auxiliary usage — linear feet, if applicable $0.45
j. Non-refundable fee for temp office, trailer, portable toilets,
equipment and storage materials, construction spoils, and/or
supplies within the partial or full obstruction for sidewalk/curb/
swale usage $0.15
k. Non-refundable fee for a temporary office, trailer, portable toilets,
equipment or storage materials, construction spoils and/or supplies
with the partial or full obstruction for parking lane usage $0.20
Non-refundable fee for a temporary office, trailer, portable toilets,
equipment or storage materials, construction spoils, and/or supplies
within the partial or full obstruction for lane closure or partial
lane closure usage $0.25
m. Non-refundable fee per square foot for construction fence
screen or construction windscreen containing advertising $0.10
o. Right-of-way closure final inspection $95.00
P. Re -inspection for any work previously inspected and rejected $95.00
q. Processing fee per permit extension $150.00
r. Expired permit reactivation fee (% of original permit fee) 25.00%
s. Non-refundable fee with a plans revision after approval of
initial plans $325.00
t. Non-refundable fee with a change of contractor after permit
issued $120.00
2. Fees for use of street and sidewalk (Sec. 54-8, City Code)
a. Non-refundable application and inspection fee per banner
in the right-of-way $160.00
b. Monthly permit fee for each banner in the right-of-way $100.00
c. Non-refundable application fee per vertical event banner
on streetlight poles $95.00
d. Monthly permit fee for each vertical event banner on
streetlight poles $20.00
Exhibit B / Fee Schedule Page 7 of 11
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
3. Fees for public right-of-way excavation, repair, resurfacing, utility, groundwater
monitoring (Sec. 54-43, City Code)
a. Non-refundable application fee for right-of-way or
street excavation, sidewalk construction or repair, roadway/
parkway/shoulder area paving or resurfacing, etc.. $95.00
b. Non-refundable right-of-way assessment inspection for right-of-way or
street excavation, sidewalk construction or repair, roadway/parkway/
shoulder area paving or resurfacing, building line and grade or sidewalk
construction survey, driveway construction, etc $50.00
c. Excavation permit: 50 lineal feet or less $325.00
d. Excavation permit: Each additional lineal foot
over 50 lineal feet $6.50
e. Excavation permit: Each point excavation $295.00
f. Sidewalk repair permit: 50 lineal feet or less $82.50
g. Sidewalk repair permit: Each additional lineal foot
over 50 lineal feet $1.65
h. Sidewalk construction permit: 50 lineal feet or less $262.50
Sidewalk construction permit: Each additional lineal foot
over 50 lineal feet $5.05
j. Paving or resurfacing of travel lanes, parkway, or shoulder
area permit: 50 linear feet or less $308.50
k. Paving or resurfacing of travel lanes, parkway, or shoulder
area permit: Each additional lineal foot over 50 linear feet $6.10
Line and grade (curb and gutter, sidewalk construction, and
driveway approach) permit: 50 linear feet or less $360.00
m. Line and grade (curb and gutter, sidewalk construction, and
driveway approach) permit: Each additional linear foot over
50 linear feet $7.20
n. Driveway approach construction permit, each driveway $115.00
o. Utility placement/replacement/repair/removal permit
(poles, splice pits, bore pits, manholes, handholes, drainage
catch basins/inlets, pedestals, vaults, cabinets, etc):
First on a city block $295.00
Exhibit B / Fee Schedule Page 8 of 11
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
P. Utility placement/replacement/repair/removal permit
(poles, splice pits, bore pits, manholes, handholes, drainage
catch basins/inlets, pedestals, vaults, cabinets, etc):
Each additional on same block, same permit $29.50
q. Underground utility service connection permit from base
building line to the utility located within the public right-of-way
(water, sanitary sewer, gas, electric, telephone, cable television,
communication): For each connection $295.00
r. Underground utility installation permit (watermain, sanitary
sewer main, gas main, electric, telephone, cable television,
communication, or stormwater): 50 linear feet or less $325.00
s. Underground utility installation permit (watermain, sanitary
sewer main, gas main, electric, telephone, cable television,
communication, or stormwater):
Each additional linear foot over 50 linear feet $6.50
t. Soft dig utility permit for locates, soil borings, soil/asphalt/
concrete core samples, or any other minor point excavations or
borings: For each location $295.00
u. Groundwater monitoring well permit: For each well $295.00
v. Dewatering permit fees: 6 days or less $520.00
w. Dewatering permit fees: 7 - 30 days $950.00
x. Dewatering permit fees: 31- 90 days $1,300.00
y. Stormwater inspection fee inlcudes initial inspection, during
the excavaction process and final inspection of proposed
stormwater management system in the public right-of-way $395.00
z. Stormwater inspection fee: Pipe/structure bedding and layout $190.00
aa. Stormwater inspection fee: SW System partial backfill and
compaction $190.00
bb. Stormwater inspection fee: SW System final - backfill,
compaction, interior mud work and pipe tamping $350.00
cc. Initial Dewatering Inspection Fee $320.00
dd. Final Dewatering Inspection Fee $320.00
ee. NPDES Inspection Fee: Field compliance check (proactive
and reactive inspections)-0.5 up to 1 acre $2,500.00
Exhibit B / Fee Schedule Page 9 of 11
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
ff. NPDES Inspection Fee: Field compliance check (proactive
and reactive inspections)— 1 acre and above
gg. NPDES Inspection Fee: Final —0.5 up to 1 acre
hh. NPDES Inspection Fee: Final — 1 acre and above
ii. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Initial Inspection Fee $85.00
jj. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Structure placement $110.00
kk. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Installation temporary restoration$110.00
II. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Restoration limits determination $110.00
mm. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Final restoration $300.00
nn. Reinspection for work previously inspected and rejected $195.00
oo. Renewal prior to expiration (90 day extension) $150.00
pp. New application and reactivation of expired permits 25%
qq. Non-refundable fee with a plans revision after approval of
initial plans $425.00
rr. Non-reundable fee for change of contractor $120.00
4. Fees for Sidewalks and Street Cafes (Sec. 54-224, City Code)
$3,950.00
$625.00
$875.00
a. Sidewalk cafe: Non-refundable application fee $175.00
b. Sidewalk cafe: Non-refundable inspection fee $450.00
c. Sidewalk cafe: Reinspection fee for failed permit inspection $95.00
d. Sidewalk cafe: Annual Permit fee $13.50
d. Street cafe: Non-refundable application fee $175.00
e. Street cafe: Non-refundable inspection fee $450.00
f. Street cafe: Reinspection fee for failed permit inspection $95.00
5. Fees for Newsracks (Sec. 54-266, City Code)
a. Initial Inspection of location fee (per location) $11.50
b. Annual Permit fee (per newsrack) $11.50
c. Initial fee pro -ration $0.96
d. Failed Permit inspection fee $5.75
Exhibit B / Fee Schedule Page 10 of 11
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
D. Chapter 55
1. Encroachments involving rights -of -way, public, private or emergency easements
(Sec. 55-14, City Code)
Non-refundable application $2,500.00
(all additional recording and copying fees are not included in the application amount)
2. Consideration of easements (55-16, City Code)
Non-refundable application (process to abandon easements or alley) $2,500.00
Exhibit B / Fee Schedule Page 11 of 11
SUBSTITUTED
This official Fee Schedule is
Miami website, with the vario
any adopted fee currently at
Code").
City Code Section
Sec. 2-268
Sec. 2-269
Sec. 2-272
Sec. 22.5-127
Sec. 54-3
Sec. 54-8
Sec. 54-43
Sec. 54-224
Sec. 54-226
Sec. 55-14
Sec. 55-16
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKU
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
EXHIBIT B FEE SCHEDULE
PUBLIC WORKS
CHAPTERS 2, 22.5, 54, 55
INDEX PAGE
to be maintained by the City Manager and available via e City of
us Departments and the City Clerk. This Fee Schedul--upersedes
issue in the Code of the City of Miami, Florida, as ended ("City
Title
Covenants, Rights -of -Way Dedicatio
Quitclaims Fees
Recording Plats, Alley Closure
Vacations Fees
•
Plan Review Fees
Administrative Fee
Obstruction of St et, Sidewalk, or
Traffic Impedi nt Fees
Use of Str- s and Sidewalk Fees
PROW xcavation, Repair, Resurface, Utility
Gro dwater monitoring Fees
•
ewalk and Street Cafe Fees
Fees for New racks
Encroachment Applications
Easement Applications
Exhibit B / Fee Schedule Page 1 of 11
Page No.
B2
B2 — B4
B4 — B6
B6
B6
B7
B8—B10
B10
B10
B11
•9
w
•J
a3A13038
9087 Exhibit B-SUB
SUBSTITUTED
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
FEE SCHEDULE
RESILIENCE AND PUBLIC WORKS
CHAPTERS 2, 22.5, 54
Based upon the passage of Ordinance and Resolution R-26- o pril
9, 2026, this Fee Schedule was adopted on [date]. This official Fee Schedule is to be ma ained
by the City Manager and available via the City of Miami website, with the various Deg rtments
and the City Clerk. This Fee Schedule supersedes any adopted fee currently at issu the Code
of the City of Miami, Florida, as amended ("City Code").
A. Chapter 2 /Article 1V/ Division 4
1. Fees for Covenants to Run with the Land, Right -of -Way Dedic - ons, Quitclaims;
Preparation (Sec. 2-268, City Code)
a. Preparation and processing of any legal document ru ing
with the land covenanting the construction or post• - ement
of construction of a public right-of-way or on pri . e property $495.00
b. Preparation and processing of legal docu ► - nts, including, but
not limited to, subdivision improvemen •onds and hold harmless
agreements, quitclaim deeds with t city as grantor, and any
agreement allowing the use of p •Iic right-of-way by private
entities, excluding permits
$3,375.00
c. Preparation and proce ng of a right-of-way dedication deed for
all properties other t, = n properties that receive a homestead exemption
pursuant to Articl: II, Section 6(a) of the Florida Constitution with the
right-of-way b= g enlarged by dedication not part of the county
or state ro.. system
d. Revi= of covenant in -lieu of unity of title or unity of title for a
$1,125.00
0 N
ect pursuant to Article 7 of the Miami 21 Zoning Code $350:40
C)
c-s P-1
Preparation and processing of a right-of-way dedication waiver $150.,00
2. ees for Recording Plats, Alley Closures or Vacations (Sec. 2-269 City C) s
a. Platting determination or determination on folio separation $1,117.00 •
.)v
Exhibit B / Fee Schedule Page 2 of 11
SUBSTITUTED
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKU
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
b. Platting exception submittal pursuant to subsection 55-10(c)
of the City Code $1,100.00
c. Submittal of tentative plat without closure and vacation/release
of one or more right(s)-of-way or
d. Submittal of tentative plat with closure and
vacation/release of one or more right(s)-of-way or easement(s) ,500.00
e. Resubmittal of tentative plat for an extension of time $2,400.00
f. Resubmittal of tentative plat by different owner $2,400.00
g. Resubmittal of tentative plat with new boundary without
closure and vacation/release of one or more right(s)-of ay
or easement(s $3,200.00
h. Resubmittal of tentative plat with new boundary closure
and vacation/release of one or more right(s)-o ay or easement(s)$5,000.00
i. To accompany final plat when submitted fo ecording $3,700.00
j. For each time limit extension granted fo ompletion of
subdivision improvements required i onjunction with
a recorded plat (fee or 5% of SIB ichever is greater) $295.00
k. Fees to be charged pursuant t• ubsections 55-15(i) and
55-15(j) providing for an alt= ative method for the closure
and vacation of alleys w h abut parcels of land zoned solely
residential $2,350.00
Any combined res •mittal, tentative plat, and final plat fees
pursuant to sub ction 2-269(a) to be charged for a plat
consisting s ly of property or properties that receive a
homeste- - exemption(s) pursuant to Article VII, Section 6(a)
of the . orida Constitution shall not exceed
m. Fe to be charged pursuant to subsection 55-15(e)
• oviding for an alternate method for the closure or vacation
of a platted easement
n. Expedited review for processing final plats and recording plats
submitted for approval:
List of requirements (base fee)
Plus fee per tract/lot
Mylar review (base fee)
Exhibit B / Fee Schedule Page 3 of 11
$3,200
4
0
0
rn
�r�
SUBSTITUTED
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKU
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
Plus fee per tract/lot
o. Fees to be charged pursuant to subsection 55-15(I) providing
for an alternate method for the closure or vacation of
emergency access easement
p. Fees to be charged pursuant to subsection 54-4.1(b) providing
for a release of utility easement reservation
q. Processing fee for tolling and extensions of tentative plat
approvals
3. Plan Review Fee (Sec. 2-272, City Code)
$500.00
$2,350 40
,350.00
$275.00
The fees to be charged by the Department of Resilience and ' blic Works for
processing and reviewing private development plans subm ed for approval
a. Fence, wall, slab, or sign $50.00
b. Underground tank $155.00
c. Single-family or duplex residential cons ction,
reconstruction, remodeling, renovati ' , repair, or addition $268.00
d. New multi -family residential (<1/2 re) $1,335.00
e. New commercial (<'/2 acre) $1,535.00
f. New multi -family residentia _'/2 acre and <1 acre) $1,995.00
g. New commercial (W% a and <1 acre) $2,155.00
h. Large development sidential/commercial >_1 acre) $3,500.00
i. Subdivision impro ment engineering plan $2,500.00
j. Review and m ing of base building line on
signed/sea l-• boundary survey $125.00
k. Review d marking of base building line for
plann' g/zoning applications $285.00
I. U erground utility installation $295.0
M. 4 nderground utility service connection,
utility structure placement $9§A
Monitoring wells, soil borings, coring/sampling, utility locates, c
f;
minor non -utility excavations $422eo
o. Building construction/maintenance (scaffolding, crane, =-<
dumpster) $265.b0
p. Interim Parking $650.db
Exhibit B / Fee Schedule Page 4 of 11
d3A13O38
SUBSTITUTED
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
q. Right-of-way closure (temporary traffic control,
temporary construction fence) $75.00
r. As -built plan for stormwater $750.00
s. As -built plan for line and grade, pavement, sidewalk, curb,
and gutter $4: ',.00
t. As -built plan for underground utilities •00.00
u. As -built plan for above ground utilities $430.00
v. As -built plan for non-standard improvements (pavers, lightin
irrigation, tree grates, etc $430.00
w. Dry run plan for stormwater $585.00
x. Dry run plan for line and grade, pavement, sidewalk urb,
and gutter $585.00
y. Dry run plan for underground utilities $585.00
z. Dry run plan for above ground utilities $430.00
aa. Dry run plan for non-standard improve is
(pavers, lighting, irrigation, tree grate , etc $355.00
The fees to be charged by the Departme of Resilience and Public Works for
processing and reviewing plans for w• in the Right -of -Way that is not related to a
private development submitted for
•
proval.
•
bb. Underground utility insta tion
cc. Underground utility s= ice connection,
utility structure pla' -ment
dd. Monitoring well , soil borings, coring/sampling, utility locates,
minor non-u ' ty excavations
ee. Street co, truction (sidewalk repair, sidewalk construction,
$295.00
$75.00
$350.00
curb . ' . gutter, roadway paving, roadway resurfacing $225.00
ff. Su' . ing construction/maintenance (scaffolding, crane, dumpster) $225.00
gg. ' ght-of-way closure (temporary traffic control,
temporary construction fence) $105.43)
h As -built plan for stormwater $75031)
csrR
j. As -built plan for line and grade, pavement, sidewalk, curb, =4(3
and gutter $48;.
jj. As -built plan for underground utilities $80 .12?
kk. As -built plan for above ground utilitiesrn
$4
Exhibit B / Fee Schedule Page 5 of 11
m
rn
0
SUBSTITUTED
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
ll. As -built plan for non-standard improvements (pavers, lighting,
irrigation, tree grates, etc
mm. Dry run plan for stormwater
nn. Dry run plan for line and grade, pavement, sidewalk, curb,
and gutter
oo. Dry run plan for underground utilities
Dry run plan for above ground utilities
Dry run plan for non-standard improvements
(pavers, lighting, irrigation, tree grates, etc
rr. Expedited Plans Review for special projects (not over 4 h , rs0
Each hour over 4 hours
ss. Trip generation statement inclusive of administrative osts
tt. Administrative fee in connection with the admini ation of the
independent traffic studies - percentage of the stimated
expenses for the services of the provider t to perform the
independent study
B. Chapter 22.5 /Article VI (Sec. 22.5-127, C' Code)
pp•
qq•
Stormwater utility fee Permit for any co ruction project which will disturb
0.5 acres or more of soil
C. Chapter 54 /Article 1, 11
1. Fees for obstruction of s et, sidewalk or impedes traffic (Sec. 54-3,
a. Non-refundable "-e with each permit application
to the police partment
b. Non-refu , able application fee with each permit application
to the . -partment of resilience and public works
c. No efundable inspection fee with each permit application
the department of resilience and public works
d. Non-refundable permit fee prior to issuance of all right-of-way
closures
Non-refundable permit fee prior to issuance of all right-of-way
closures for helicopter lifting
f. Non-refundable public right-of-way usage (flat fee)
Exhibit B / Fee Schedule Page 6 of 11
$430.00
$585.00
$585.
$5
11
.00
430.00
$355.00
$350.00
$87.50
$1,350.00
15%
$595.00
City Code)
$120.00
$95.00
C7
m
0
SUBSTITUTED
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BAC
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
g. Non-refundable sidewalk/curb/swale usage —
linear feet, if applicable
h. Non-refundable parking lane usage — linear feet, if applicable $0.40
Non-refundable lane closure (or partial) of traffic and
auxiliary usage — linear feet, if applicable $0.
j. Non-refundable fee for temp office, trailer, portable toilets,
equipment and storage materials, construction spoils, and/or
supplies within the partial or full obstruction for sidewalk/curb
swale usage $0.15
k. Non-refundable fee for a temporary office, trailer, porta , e toilets,
equipment or storage materials, construction spoils d/or supplies
with the partial or full obstruction for parking lane 4sage $0.20
I. Non-refundable fee for a temporary office, tra r, portable toilets,
equipment or storage materials, construct', spoils, and/or supplies
$0.30
within the partial or full obstruction for I e closure or partial
lane closure usage $0.25
m. Non-refundable fee per square fo' for construction fence
screen or construction windscr en containing advertising $0.10
o. Right-of-way closure final i pection $95.00
p. Re -inspection for any w• previously inspected and rejected $95.00
q. Processing fee per p: it extension $150.00
r. Expired permit re ivation fee (% of original permit fee) 25.00%
s. Non-refundabl= ee with a plans revision after approval of
initial plans $325.00
t. Non-refu - :able fee with a change of contractor after permit
issues $120.00
2. Fees for e of street and sidewalk (Sec. 54-8, City Code)
a. on -refundable application and inspection fee per banner
in the right-of-way
Monthly permit fee for each banner in the right-of-way
c Non-refundable application fee per vertical event banner
on streetlight poles
d. Monthly permit fee for each vertical event banner on
streetlight poles
•
Exhibit B / Fee Schedule Page 7 of 11
`i,
-71
$16020
$1g«C o
-u.
$95;Eil
rn
$20. 00
SUBSTITUTED
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACK
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
3. Fees for public right-of-way excavation, repair, resurfacing, utility, groundwater
monitoring (Sec. 54-43, City Code)
a. Non-refundable application fee for right-of-way or
street excavation, sidewalk construction or repair, roadway/
parkway/shoulder area paving or resurfacing, etc.. .00
b. Non-refundable right-of-way assessment inspection for right -of- or
street excavation, sidewalk construction or repair, roadway/pay/
shoulder area paving or resurfacing, building line and grad or sidewalk
construction survey, driveway construction, etc $50.00
c. Excavation permit: 50 lineal feet or less $325.00
d. Excavation permit: Each additional lineal foot
over 50 lineal feet $6.50
e. Excavation permit: Each point excavation $295.00
f. Sidewalk repair permit: 50 lineal feet or -ss $82.50
g. Sidewalk repair permit: Each additio . I lineal foot
over 50 lineal feet $1.65
h. Sidewalk construction permit: 1 lineal feet or Tess $262.50
Sidewalk construction perm Each additional lineal foot
over 50 lineal feet $5.05
j. Paving or resurfacing travel lanes, parkway, or shoulder
area permit: 50 lin = r feet or less $308.50
k. Paving or resu ing of travel lanes, parkway, or shoulder
area permit: ' ch additional lineal foot over 50 linear feet $6.10
I. Line and • ade (curb and gutter, sidewalk construction, and
drivew approach) permit: 50 linear feet or Tess $360.00
m. Lin= -nd grade (curb and gutter, sidewalk construction, and
veway approach) permit: Each additional linear foot over
50 linear feet
Driveway approach construction permit, each driveway
Utility placement/replacement/repair/removal permit
(poles, splice pits, bore pits, manholes, handholes, drainage
catch basins/inlets, pedestals, vaults, cabinets, etc):
First on a city block
•
•
Exhibit B / Fee Schedule Page 8 of 11
� N
$7.2P' N
23
c ;! r• n
n e7
111
$29 i00
SUBSTITUTED
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BAC
EXHIBIT B ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT
p. Utility placement/replacement/repair/removal permit
(poles, splice pits, bore pits, manholes, handholes, drainage
catch basins/inlets, pedestals, vaults, cabinets, etc):
Each additional on same block, same permit
q. Underground utility service connection permit from base
building line to the utility located within the public right-of-way
(water, sanitary sewer, gas, electric, telephone, cable television
communication): For each connection
r. Underground utility installation permit (watermain, sanita
sewer main, gas main, electric, telephone, cable televi - • n,
$29.5
$295.00
communication, or stormwater): 50 linear feet or Ies $325.00
s. Underground utility installation permit (watermai sanitary
sewer main, gas main, electric, telephone, ca - e television,
communication, or stormwater):
Each additional linear foot over 50 line- eet $6.50
t. Soft dig utility permit for locates, soil orings, soil/asphalt/
concrete core samples, or any ot r minor point excavations or
borings: For each locati. $295.00
u. Groundwater monitoring w= permit: For each well $295.00
v. Dewatering permit fees: • days or less $520.00
w. Dewatering permit fe : 7 - 30 days $950.00
x. Dewatering perm i ees: 31- 90 days $1,300.00
y. Stormwater ins' -ction fee inlcudes initial inspection, during
the excava • n process and final inspection of proposed
stormw. - r management system in the public right-of-way $395.00
z. Stor ater inspection fee: Pipe/structure bedding and layout $190.00
aa. St• water inspection fee: SW System partial backfill and
mpaction $190.00
bb. Stormwater inspection fee: SW System final - backfill,
compaction, interior mud work and pipe tamping $350.0 N
cc. Initial Dewatering Inspection Fee $32@0 z
dd. Final Dewatering Inspection Fee $326SOd
ee. NPDES Inspection Fee: Field compliance check (proactive
and reactive inspections)-0.5 up to 1 acre $2,5060400
Exhibit B / Fee Schedule Page 9 of 11 CO
9c
SUBSTITUTED
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
ff. NPDES Inspection Fee: Field compliance check (proactive
and reactive inspections)— 1 acre and above
gg. NPDES Inspection Fee: Final —0.5 up to 1 acre
hh. NPDES Inspection Fee: Final — 1 acre and above
ii. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Initial Inspection Fee $: -.00
jj. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Structure placement $110.00
kk. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Installation temporary storation$110.00
II. Utility (water, gas, electric, telephone, communication
cable television, sanitary sewer): Restoration limit etermination $110.00
mm. Utility (water, gas, electric, telephone, communi tion,
cable television, sanitary sewer): Final restor ion $300.00
nn. Reinspection for work previously inspect and rejected $195.00
oo. Renewal prior to expiration (90 day e nsion) $150.00
pp. New application and reactivation of xpired permits 25%
qq. Non-refundable fee with a plans vision after approval of
initial plans $425.00
rr. Non-reundable fee for ch- •e of contractor $120.00
4. Fees for Sidewalks and Str et Cafes (Sec. 54-224, City Code)
a. Sidewalk cafe: . n-refundable application fee
b. Sidewalk cafe. on -refundable inspection fee
c. Sidewalk c e: Reinspection fee for failed permit inspection
d. Sidewal cafe: Annual Permit fee
d. Stre= cafe: Non-refundable application fee
e. S et cafe: Non-refundable inspection fee
f. treet cafe: Reinspection fee for failed permit inspection
5. Fe = - for Newsracks (Sec. 54-266, City Code)
Initial Inspection of location fee (per location)
b Annual Permit fee (per newsrack)
c. Initial fee pro -ration
d. Failed Permit inspection fee
Exhibit B / Fee Schedule Page 10 of 11
$3,950.00
$625.00
$875.00
$175.00
$450.00
$95.00
$13.50
$175.00
$450.00
0
$95.Ij*
C)rri
$ P
$1
SC
..*(1
x
a3A13O31
SUBSTITUTED
D. Chapter 55
EXHIBIT B
THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP
ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT.
1. Encroachments involving rights -of -way, public, private or emergency easements
(Sec. 55-14, City Code)
Non-refundable application $2,500 0
(all additional recording and copying fees are not included in the application a • unt)
2. Consideration of easements (55-16, City Code)
Non-refundable application (process to abandon easements or alley) $2,500.00
4
Exhibit B / Fee Schedule Page 11 of 11
EXHIBIT B
EXHIBIT B FEE SCHEDULE
PUBLIC WORKS
CHAPTERS 2, 54
INDEX PAGE
SUBSTITUTED
This official Fee Schedule is to be maintained by the City Manager and available vi. e City of
Miami website, with the various Departments and the City Clerk. This Fee Schedu supersedes
any adopted fee currently at issue in the Code of the City of Miami, Florida, as . mended ("City
Code").
City Code Section Title Page No.
Sec. 2-268 Covenants, Rights -of -Way Dedicati
Quitclaims Fees B2
Sec. 2-269 Recording Plats, Alley Closur=. or
Vacations Fees B2 — B4
Sec. 2-272 Plan Review Fees B4 — B6
Sec. 22.5-127 Administrative Fee B6
Sec. 54-3
Sec. 54-8
Sec. 54-43
Sec. 54-224
Obstruction of eet, Sidewalk, or
Traffic Impedi► ent Fees B6
Use of Str ets and Sidewalk Fees B7
PRO Excavation, Repair, Resurface, Utility
Gro dwater monitoring Fees B7 — B10
idewalk and Street Cafe Fees B10
Exhibit B / Fee Schedule Page 1 of 10
EXHIBIT B
SUBSTITUTED
FEE SCHEDULE
RESILIENCE AND PUBLIC WORKS
CHAPTERS 2, 22.5, 54
Based upon the passage of Ordinance and Resolution R-26- • April
9, 2026, this Fee Schedule was adopted on [date]. This official Fee Schedule is to be m ntained
by the City Manager and available via the City of Miami website, with the various D' •artments
and the City Clerk. This Fee Schedule supersedes any adopted fee currently at iss in the Code
of the City of Miami, Florida, as amended ("City Code").
A. Chapter 2 / Article IV / Division 4
1. Fees for Covenants to Run with the Land, Right -of -Way Dedi • tions, Quitclaims;
Preparation (Sec. 2-268, City Code)
a. Preparation and processing of any legal document r ning
with the land covenanting the construction or pos •onement
of construction of a public right-of-way or on p ate property $495.00
b. Preparation and processing of legal doc ents, including, but
not limited to, subdivision improvemebonds and hold harmless
agreements, quitclaim deeds with e city as grantor, and any
agreement allowing the use of ► blic right-of-way by private
entities, excluding permits
$3,375.00
c. Preparation and proc- sing of a right-of-way dedication deed for
all properties other an properties that receive a homestead exemption
pursuant to Arti - VI I, Section 6(a) of the Florida Constitution with the
right-of-way • -ing enlarged by dedication not part of the county
or state ro d system $1,125.00
d. Rev w of covenant in -lieu of unity of title or unity of title for a
ect pursuant to Article 7 of the Miami 21 Zoning Code $350.00
Preparation and processing of a right-of-way dedication waiver $150.00
2. Fees for Recording Plats, Alley Closures or Vacations (Sec. 2-269 City Code)
a. Platting determination or determination on folio separation $1,100.00
Exhibit B / Fee Schedule Page 2 of 10
EXHIBIT B
SUBSTITUTED
b. Platting exception submittal pursuant to subsection 55-10(c)
of the City Code $1,100.00
c. Submittal of tentative plat without closure and vacation/release
of one or more right(s)-of-way or
d. Submittal of tentative plat with closure and
vacation/release of one or more right(s)-of-way or easement(s) $ 00.00
e. Resubmittal of tentative plat for an extension of time ,2,400.00
f. Resubmittal of tentative plat by different owner $2,400.00
g. Resubmittal of tentative plat with new boundary without
closure and vacation/release of one or more right(s)-of-
or easement(s $3,200.00
h. Resubmittal of tentative plat with new boundary wi closure
and vacation/release of one or more right(s)-of- ay or easement(s)$5,000.00
To accompany final plat when submitted for cording
j. For each time limit extension granted for • •mpletion of
subdivision improvements required in njunction with
a recorded plat (fee or 5% of SIB wF' chever is greater)
k. Fees to be charged pursuant to - bsections 55-15(i) and
55-15(j) providing for an alter►.tive method for the closure
and vacation of alleys whi• abut parcels of land zoned solely
residential
Any combined resu• ittal, tentative plat, and final plat fees
pursuant to subs= tion 2-269(a) to be charged for a plat
consisting sol= of property or properties that receive a
homestea. -xemption(s) pursuant to Article VII, Section 6(a)
$3,200
$3,700.00
$295.00
$2,350.00
of the F ' ida Constitution shall not exceed $1,800.00
m. Fees • be charged pursuant to subsection 55-15(e)
priding for an alternate method for the closure or vacation
f a platted easement $2,000.00
n. Fees to be charged pursuant to subsection 55-15(1) providing
for an alternate method for the closure or vacation of
emergency access easement $2,350.00
o. Fees to be charged pursuant to subsection 54-4.1(b) providing
for a release of utility easement reservation $2,350.00
Exhibit B / Fee Schedule Page 3 of 10
EXHIBIT B
SUBSTITUTED
P. Processing fee for tolling and extensions of tentative plat
approvals
3. Plan Review Fee (Sec. 2-272, City Code)
$275.00
The fees to be charged by the Department of Resilience and Public Works for
processing and reviewing private development plans submitted for approval
a. Fence, wall, slab, or sign
$50.00
b. Underground tank $155.00
c. Single-family or duplex residential construction,
reconstruction, remodeling, renovation, repair, or add on $268.00
d. New multi -family residential (<%2 acre) $1,335.00
e. New commercial (<%2 acre) $1,535.00
f. New multi -family residential (>_A2 acre and < -cre) $1,995.00
g. New commercial (>_A2 acre and <1 acre) $2,155.00
h. Large development (residential/comm- cial >_1 acre) $3,500.00
Subdivision improvement engineer g plan $2,500.00
j. Review and marking of base bu . ing line on
signed/sealed boundary surv- $125.00
k. Review and marking of b..e building line for
planning/zoning applic. ons $285.00
Underground utility stallation $295.00
m. Underground util service connection,
utility structur' placement $95.00
n. Monitoring ells, soil borings, coring/sampling, utility locates,
minor n' -utility excavations $420.00
o. Buil• g construction/maintenance (scaffolding, crane,
d pster) $265.00
nterim Parking $650.00
Right-of-way closure (temporary traffic control,
temporary construction fence) $75.00
As -built plan for stormwater $750.00
s. As -built plan for line and grade, pavement, sidewalk, curb,
and gutter $480.00
p.
Exhibit B / Fee Schedule Page 4 of 10
EXHIBIT B
SUBSTITUTED
t. As -built plan for underground utilities $800.00
u. As -built plan for above ground utilities $430.00
v. As -built plan for non-standard improvements (pavers, lighting,
irrigation, tree grates, etc $430
w. Dry run plan for stormwater $5: %.00
x. Dry run plan for line and grade, pavement, sidewalk, curb,
and gutter $585.00
y. Dry run plan for underground utilities $585.00
z. Dry run plan for above ground utilities $430.00
aa. Dry run plan for non-standard improvements
(pavers, lighting, irrigation, tree grates, etc $355.00
The fees to be charged by the Department of Resilience . nd Public Works for
processing and reviewing plans for work in the Right -Way that is not related to a
private development submitted for approval.
bb. Underground utility installation $295.00
cc. Underground utility service connecti
utility structure placement $75.00
dd. Monitoring wells, soil borings, •ring/sampling, utility locates,
minor non -utility excavation $350.00
ee. Street construction (side .Ik repair, sidewalk construction,
curb and gutter, road . y paving, roadway resurfacing $225.00
ff. Building constructi • /maintenance (scaffolding, crane, dumpster) $225.00
gg. Right-of-way cl. •ure (temporary traffic control,
temporary c• struction fence) $105.00
hh. As -built p for stormwater $750.00
jj. As-bui •Ian for line and grade, pavement, sidewalk, curb,
an. .utter $480.00
jj. i .-built plan for underground utilities $800.00
kk. As -built plan for above ground utilities $430.00
II. As -built plan for non-standard improvements (pavers, lighting,
irrigation, tree grates, etc $430.00
mm. Dry run plan for stormwater $585.00
nn. Dry run plan for line and grade, pavement, sidewalk, curb,
and gutter $585.00
Exhibit B / Fee Schedule Page 5 of 10
EXHIBIT B
SUBSTITUTED
oo. Dry run plan for underground utilities
pp. Dry run plan for above ground utilities
qq. Dry run plan for non-standard improvements
(pavers, lighting, irrigation, tree grates, etc
rr. Expedited Plans Review for special projects (not over 4 hours()
Each hour over 4 hours
ss. Trip generation statement inclusive of administrative costs
tt. Administrative fee in connection with the administration of the
independent traffic studies - percentage of the estimated
expenses for the services of the provider set to perfor
independent study
B. Chapter 22.5 / Article VI (Sec. 22.5-127, City Code)
Stormwater utility fee Permit for any construction
ect which will disturb
$585.00
$430.00
$355.0
$35
0
$.50
$1,350.00
1 5%
0.5 acres or more of soil $595.00
C. Chapter 54 /Article 1, 11
1. Fees for obstruction of street, side : Ik or impedes traffic (Sec. 54-3, City Code)
a. Non-refundable fee with e- permit application
to the police departme $120.00
b. Non-refundable appl ation fee with each permit application
to the departmen •f resilience and public works $95.00
c. Non-refundabl- inspection fee with each permit application
to the depa► ent of resilience and public works $50.00
d. Non -ref dable permit fee prior to issuance of all right-of-way
closu s $325.00
e. N • -refundable permit fee prior to issuance of all right-of-way
osures for helicopter lifting $775.00
Non-refundable public right-of-way usage (flat fee) $595.00
Non-refundable sidewalk/curb/swale usage —
linear feet, if applicable $0.30
Non-refundable parking lane usage — linear feet, if applicable $0.40
Non-refundable lane closure (or partial) of traffic and
Exhibit B / Fee Schedule Page 6 of 10
EXHIBIT B
SUBSTITUTED
auxiliary usage — linear feet, if applicable
j. Non-refundable fee for temp office, trailer, portable toilets,
equipment and storage materials, construction spoils, and/or
supplies within the partial or full obstruction for sidewalk/curb/
swale usage $0.1
k. Non-refundable fee for a temporary office, trailer, portable toilets,
equipment or storage materials, construction spoils and/or suppli
with the partial or full obstruction for parking lane usage $0.20
Non-refundable fee for a temporary office, trailer, portable t• ets,
equipment or storage materials, construction spoils, and •r supplies
within the partial or full obstruction for lane closure or •artial
lane closure usage $0.25
m. Non-refundable fee per square foot for constru on fence
screen or construction windscreen containing advertising
o. Right-of-way closure final inspection
P. Re -inspection for any work previously spected and rejected
q. Non-refundable fee with a plans re ion after approval of
initial plans
r. Non-refundable fee with a chge of contractor after permit
issued
2. Fees for use of street and si • -walk (Sec. 54-8, City Code)
$0.45
$0.10
$95.00
$95.00
$325.00
$120.00
a. Non-refundable ap• cation and inspection fee per banner
in the right-of-w.. $160.00
b. Monthly per fee for each banner in the right-of-way $100.00
c. Non-refu ble application fee per vertical event banner
on stre- ight poles $95.00
d. Mo ly permit fee for each vertical event banner on
eetlight poles $20.00
3. Fe
for public right-of-way excavation, repair, resurfacing, utility, groundwater
nitoring (Sec. 54-43, City Code)
Non-refundable application fee for right-of-way or
street excavation, sidewalk construction or repair, roadway/
parkway/shoulder area paving or resurfacing, etc..
Exhibit B / Fee Schedule Page 7 of 10
$95.00
f. Sidewalk repair permit: 50 lineal feet or less
g. Sidewalk repair permit: Each additional lineal foot
over 50 lineal feet $1.65
h. Sidewalk construction permit: 50 lineal feet or les $262.50
Sidewalk construction permit: Each additional 1' eal foot
over 50 lineal feet
j. Paving or resurfacing of travel lanes, par ay, or shoulder
area permit: 50 linear feet or less
k. Paving or resurfacing of travel lane parkway, or shoulder
area permit: Each additional line foot over 50 linear feet
Line and grade (curb and gut r, sidewalk construction, and
driveway approach) permi 0 linear feet or less
m. Line and grade (curb a • gutter, sidewalk construction, and
driveway approach) ermit: Each additional linear foot over
50 linear feet
n. Driveway app ach construction permit, each driveway
o. Utility plac ent/replacement/repair/removal permit
(poles, • ice pits, bore pits, manholes, handholes, drainage
catc •asins/inlets, pedestals, vaults, cabinets, etc):
Fi on a city block
P. tility placement/replacement/repair/removal permit
(poles, splice pits, bore pits, manholes, handholes, drainage
catch basins/inlets, pedestals, vaults, cabinets, etc):
Each additional on same block, same permit
q. Underground utility service connection permit from base
building line to the utility located within the public right-of-way
EXHIBIT B
SUBSTITUTED
b. Non-refundable right-of-way assessment inspection for right-of-way or
street excavation, sidewalk construction or repair, roadway/parkway/
shoulder area paving or resurfacing, building line and grade or sidewalk
construction survey, driveway construction, etc $50.00
c. Excavation permit: 50 lineal feet or less $325 i0
d. Excavation permit: Each additional lineal foot
over 50 lineal feet ,6.50
e. Excavation permit: Each point excavation $295.00
$82.50
Exhibit B / Fee Schedule Page 8 of 10
$5.05
$308.50
$6.10
$360.00
$7.20
$115.00
$295.00
$29.50
u.
v.
w.
x.
y.
z.
aa.
bb.
cc.
dd.
ee.
ff.
g.
hh.
ii.
EXHIBIT B
SUBSTITUTED
(water, sanitary sewer, gas, electric, telephone, cable television,
communication): For each connection
r. Underground utility installation permit (watermain, sanitary
sewer main, gas main, electric, telephone, cable television,
communication, or stormwater): 50 linear feet or less
s. Underground utility installation permit (watermain, sanitary
sewer main, gas main, electric, telephone, cable television,
communication, or stormwater):
Each additional linear foot over 50 linear feet
t. Soft dig utility permit for locates, soil borings, soil/aspha
concrete core samples, or any other minor point exc- - ations or
borings: For each location
Groundwater monitoring well permit: For each
Dewatering permit fees: 6 days or less
Dewatering permit fees: 7 - 30 days
Dewatering permit fees: 31- 90 days
Stormwater inspection fee inlcude
the excavaction process and fi
ell
itial inspection, during
inspection of proposed
stormwater management sy em in the public right-of-way
Stormwater inspection fe ipe/structure bedding and layout
Stormwater inspection e: SW System partial backfill and
compaction
Stormwater insp- tion fee: SW System final - backfill,
compaction,' erior mud work and pipe tamping
Initial Dew ering Inspection Fee
Final D atering Inspection Fee
NPDS Inspection Fee: Field compliance check (proactive
a
reactive inspections)-0.5 up to 1 acre
PDES Inspection Fee: Field compliance check (proactive
and reactive inspections)— 1 acre and above
NPDES Inspection Fee: Final —0.5 up to 1 acre
NPDES Inspection Fee: Final — 1 acre and above
Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Initial Inspection Fee
Exhibit B / Fee Schedule Page 9 of 10
$295.00
$32
$6.50
$295.00
$295.00
$520.00
$950.00
$1,300.00
$395.00
$190.00
$190.00
$350.00
$320.00
$320.00
$2,500.00
$3,950.00
$625.00
$875.00
$85.00
EXHIBIT B
SUBSTITUTED
jj. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Structure placement $110.00
kk. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Installation temporary restoration$110.00
II. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Restoration limits determination $1 1.00
mm. Utility (water, gas, electric, telephone, communication,
cable television, sanitary sewer): Final restoration $300.00
nn. Reinspection for work previously inspected and rejected $195.00
oo. Renewal prior to expiration (90 day extension) $150.00
pp. New application and reactivation of expired permits 25%
qq. Non-refundable fee with a plans revision after appral of
initial plans $425.00
rr. Non-reundable fee for change of contractor $120.00
4. Fees for Sidewalks and Street Cafes (Sec. 5 24, City Code)
a. Sidewalk cafe: Non-refundable app ation fee $175.00
b. Sidewalk cafe: Non-refundable i pection fee $450.00
c. Sidewalk cafe: Reinspection e for failed permit inspection $95.00
d. Sidewalk cafe: Annual Per' it fee $13.50
d. Street cafe: Non-refun• , •le application fee $175.00
e. Street cafe: Non -ref dable inspection fee $450.00
f. Street cafe: Rein -section fee for failed permit inspection $95.00
5. Fees for Newsracks .ec. 54-266, City Code)
a. Initial Insp= tion of location fee (per location) $11.50
b. Annual ' ermit fee (per newsrack) $11.50
c. Initi- ee pro -ration $0.96
d. F. ed Permit inspection fee $5.75
Exhibit B / Fee Schedule Page 10 of 10