Loading...
HomeMy WebLinkAboutExhibit B-SUBEXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. EXHIBIT B FEE SCHEDULE RESILIENCE AND PUBLIC WORKS CHAPTERS 2, 22.5, 54, 55 INDEX PAGE This official Fee Schedule is to be maintained by the City Manager and available via the City of Miami website, with the various Departments and the City Clerk. This Fee Schedule supersedes any adopted fee currently at issue in the Code of the City of Miami, Florida, as amended ("City Code"). City Code Section Title Sec. 2-268 Sec. 2-269 Sec. 2-272 Sec. 22.5-127 Sec. 54-3 Sec. 54-8 Covenants, Rights -of -Way Dedication Quitclaims Fees Recording Plats, Alley Closures or Vacations Fees Plan Review Fees Administrative Fee Obstruction of Street, Sidewalk, or Traffic Impediment Fees Page No. B2 B2 — B4 B4 — B6 B6 B6 Use of Streets and Sidewalk Fees B7 Sec. 54-43 PROW Excavation, Repair, Resurface, Utility Groundwater monitoring Fees B8 — B10 Sec. 54-224 Sidewalk and Street Cafe Fees B10 Sec. 54-226 Fees for New racks B10 Sec. 55-14 Encroachment Applications B11 Sec. 55-16 Easement Applications B11 Exhibit B / Fee Schedule Page 1 of 11 Exhibit B-SUB EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. FEE SCHEDULE RESILIENCE AND PUBLIC WORKS CHAPTERS 2, 22.5, 54, 55 Based upon the adoption of Ordinance 14456 and Resolution R-26-0200 on April 23, 2026, this official Fee Schedule is to be maintained by the City Manager and available via the City of Miami website, with the various Departments and the City Clerk. This Fee Schedule supersedes any adopted fee currently at issue in the Code of the City of Miami, Florida, as amended ("City Code"). A. Chapter 2 / Article IV / Division 4 1. Fees for Covenants to Run with the Land, Right -of -Way Dedications, Quitclaims; Preparation (Sec. 2-268, City Code) a. Preparation and processing of any legal document running with the land covenanting the construction or postponement of construction of a public right-of-way or on private property b. Preparation and processing of legal documents, including, but not limited to, subdivision improvement bonds and hold harmless agreements, quitclaim deeds with the city as grantor, and any agreement allowing the use of public right-of-way by private entities, excluding permits $495.00 $3,375.00 c. Preparation and processing of a right-of-way dedication deed for all properties other than properties that receive a homestead exemption pursuant to Article VI I, Section 6(a) of the Florida Constitution with the right-of-way being enlarged by dedication not part of the county or state road system $1,125.00 d. Review of covenant in -lieu of unity of title or unity of title for a project pursuant to Article 7 of the Miami 21 Zoning Code $350.00 e. Preparation and processing of a right-of-way dedication waiver $150.00 2. Fees for Recording Plats, Alley Closures or Vacations (Sec. 2-269 City Code) a. Platting determination or determination on folio separation $1,100.00 Exhibit B / Fee Schedule Page 2 of 11 EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. b. Platting exception submittal pursuant to subsection 55-10(c) of the City Code $1,100.00 c. Submittal of tentative plat without closure and vacation/release of one or more right(s)-of-way or d. Submittal of tentative plat with closure and vacation/release of one or more right(s)-of-way or easement(s) $5,500.00 e. Resubmittal of tentative plat for an extension of time $2,400.00 f. Resubmittal of tentative plat by different owner $2,400.00 g. Resubmittal of tentative plat with new boundary without closure and vacation/release of one or more right(s)-of-way or easement(s $3,200.00 h. Resubmittal of tentative plat with new boundary with closure and vacation/release of one or more right(s)-of-way or easement(s)$5,000.00 To accompany final plat when submitted for recording j. For each time limit extension granted for completion of subdivision improvements required in conjunction with a recorded plat (fee or 5% of SIB whichever is greater) k. Fees to be charged pursuant to subsections 55-15(i) and 55-15(j) providing for an alternative method for the closure and vacation of alleys which abut parcels of land zoned solely residential Any combined resubmittal, tentative plat, and final plat fees pursuant to subsection 2-269(a) to be charged for a plat consisting solely of property or properties that receive a homestead exemption(s) pursuant to Article VI I, Section 6(a) of the Florida Constitution shall not exceed m. Fees to be charged pursuant to subsection 55-15(e) providing for an alternate method for the closure or vacation of a platted easement n. Expedited review for processing final plats and recording plats submitted for approval: List of requirements (base fee) Plus fee per tract/lot Mylar review (base fee) Exhibit B / Fee Schedule Page 3 of 11 $3,200.00 $3,700.00 $295.00 $2,350.00 $1, 800.00 $2,000.00 $100.00 $100.00 $1,000.00 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. EXHIBIT B Plus fee per tract/lot $500.00 o. Fees to be charged pursuant to subsection 55-15(1) providing for an alternate method for the closure or vacation of emergency access easement $2,350.00 P. Fees to be charged pursuant to subsection 54-4.1(b) providing for a release of utility easement reservation $2,350.00 q. Processing fee for tolling and extensions of tentative plat approvals $275.00 3. Plan Review Fee (Sec. 2-272, City Code) The fees to be charged by the Department of Resilience and Public Works for processing and reviewing private development plans submitted for approval a. Fence, wall, slab, or sign $50.00 b. Underground tank $155.00 c. Single-family or duplex residential construction, reconstruction, remodeling, renovation, repair, or addition $268.00 d. New multi -family residential (<%2 acre) $1,335.00 e. New commercial (<%2 acre) $1,535.00 f. New multi -family residential (>_A2 acre and <1 acre) $1,995.00 g. New commercial (>_A2 acre and <1 acre) $2,155.00 h. Large development (residential/commercial >_1 acre) $3,500.00 Subdivision improvement engineering plan $2,500.00 j. Review and marking of base building line on signed/sealed boundary survey $125.00 k. Review and marking of base building line for planning/zoning applications $285.00 Underground utility installation $295.00 m. Underground utility service connection, utility structure placement $95.00 n. Monitoring wells, soil borings, coring/sampling, utility locates, minor non -utility excavations $420.00 o. Building construction/maintenance (scaffolding, crane, dumpster) $265.00 p. Interim Parking $650.00 Exhibit B / Fee Schedule Page 4 of 11 EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. q. Right-of-way closure (temporary traffic control, temporary construction fence) $75.00 r. As -built plan for stormwater $750.00 s. As -built plan for line and grade, pavement, sidewalk, curb, and gutter $480.00 t. As -built plan for underground utilities $800.00 u. As -built plan for above ground utilities $430.00 v. As -built plan for non-standard improvements (pavers, lighting, irrigation, tree grates, etc $430.00 w. Dry run plan for stormwater $585.00 x. Dry run plan for line and grade, pavement, sidewalk, curb, and gutter $585.00 y. Dry run plan for underground utilities $585.00 z. Dry run plan for above ground utilities $430.00 aa. Dry run plan for non-standard improvements (pavers, lighting, irrigation, tree grates, etc $355.00 The fees to be charged by the Department of Resilience and Public Works for processing and reviewing plans for work in the Right -of -Way that is not related to a private development submitted for approval. bb. Underground utility installation $295.00 cc. Underground utility service connection, utility structure placement $75.00 dd. Monitoring wells, soil borings, coring/sampling, utility locates, minor non -utility excavations $350.00 ee. Street construction (sidewalk repair, sidewalk construction, curb and gutter, roadway paving, roadway resurfacing $225.00 ff. Building construction/maintenance (scaffolding, crane, dumpster) $225.00 gg. Right-of-way closure (temporary traffic control, temporary construction fence) $105.00 hh. As -built plan for stormwater $750.00 jj. As -built plan for line and grade, pavement, sidewalk, curb, and gutter $480.00 jj. As -built plan for underground utilities $800.00 kk. As -built plan for above ground utilities $430.00 Exhibit B / Fee Schedule Page 5 of 11 EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. II. As -built plan for non-standard improvements (pavers, lighting, irrigation, tree grates, etc $430.00 mm. Dry run plan for stormwater $585.00 nn. Dry run plan for line and grade, pavement, sidewalk, curb, and gutter $585.00 oo. Dry run plan for underground utilities $585.00 pp. Dry run plan for above ground utilities $430.00 qq. Dry run plan for non-standard improvements (pavers, lighting, irrigation, tree grates, etc $355.00 rr. Expedited Plans Review for special projects (not over 4 hours() $350.00 Each hour over 4 hours $87.50 ss. Trip generation statement inclusive of administrative costs $1,350.00 tt. Administrative fee in connection with the administration of the independent traffic studies - percentage of the estimated expenses for the services of the provider set to perform the independent study 15% B. Chapter 22.5 / Article VI (Sec. 22.5-127, City Code) Stormwater utility fee Permit for any construction project which will disturb 0.5 acres or more of soil $595.00 C. Chapter 54 /Article 1, 11 1. Fees for obstruction of street, sidewalk or impedes traffic (Sec. 54-3, City Code) a. Non-refundable fee with each permit application to the police department $120.00 b. Non-refundable application fee with each permit application to the department of resilience and public works $95.00 c. Non-refundable inspection fee with each permit application to the department of resilience and public works $50.00 d. Non-refundable permit fee prior to issuance of all right-of-way closures $325.00 e. Non-refundable permit fee prior to issuance of all right-of-way closures for helicopter lifting $775.00 f. Non-refundable public right-of-way usage (flat fee) $595.00 Exhibit B / Fee Schedule Page 6 of 11 EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. g. Non-refundable sidewalk/curb/swale usage — linear feet, if applicable $0.30 h. Non-refundable parking lane usage — linear feet, if applicable $0.40 Non-refundable lane closure (or partial) of traffic and auxiliary usage — linear feet, if applicable $0.45 j. Non-refundable fee for temp office, trailer, portable toilets, equipment and storage materials, construction spoils, and/or supplies within the partial or full obstruction for sidewalk/curb/ swale usage $0.15 k. Non-refundable fee for a temporary office, trailer, portable toilets, equipment or storage materials, construction spoils and/or supplies with the partial or full obstruction for parking lane usage $0.20 Non-refundable fee for a temporary office, trailer, portable toilets, equipment or storage materials, construction spoils, and/or supplies within the partial or full obstruction for lane closure or partial lane closure usage $0.25 m. Non-refundable fee per square foot for construction fence screen or construction windscreen containing advertising $0.10 o. Right-of-way closure final inspection $95.00 P. Re -inspection for any work previously inspected and rejected $95.00 q. Processing fee per permit extension $150.00 r. Expired permit reactivation fee (% of original permit fee) 25.00% s. Non-refundable fee with a plans revision after approval of initial plans $325.00 t. Non-refundable fee with a change of contractor after permit issued $120.00 2. Fees for use of street and sidewalk (Sec. 54-8, City Code) a. Non-refundable application and inspection fee per banner in the right-of-way $160.00 b. Monthly permit fee for each banner in the right-of-way $100.00 c. Non-refundable application fee per vertical event banner on streetlight poles $95.00 d. Monthly permit fee for each vertical event banner on streetlight poles $20.00 Exhibit B / Fee Schedule Page 7 of 11 EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. 3. Fees for public right-of-way excavation, repair, resurfacing, utility, groundwater monitoring (Sec. 54-43, City Code) a. Non-refundable application fee for right-of-way or street excavation, sidewalk construction or repair, roadway/ parkway/shoulder area paving or resurfacing, etc.. $95.00 b. Non-refundable right-of-way assessment inspection for right-of-way or street excavation, sidewalk construction or repair, roadway/parkway/ shoulder area paving or resurfacing, building line and grade or sidewalk construction survey, driveway construction, etc $50.00 c. Excavation permit: 50 lineal feet or less $325.00 d. Excavation permit: Each additional lineal foot over 50 lineal feet $6.50 e. Excavation permit: Each point excavation $295.00 f. Sidewalk repair permit: 50 lineal feet or less $82.50 g. Sidewalk repair permit: Each additional lineal foot over 50 lineal feet $1.65 h. Sidewalk construction permit: 50 lineal feet or less $262.50 Sidewalk construction permit: Each additional lineal foot over 50 lineal feet $5.05 j. Paving or resurfacing of travel lanes, parkway, or shoulder area permit: 50 linear feet or less $308.50 k. Paving or resurfacing of travel lanes, parkway, or shoulder area permit: Each additional lineal foot over 50 linear feet $6.10 Line and grade (curb and gutter, sidewalk construction, and driveway approach) permit: 50 linear feet or less $360.00 m. Line and grade (curb and gutter, sidewalk construction, and driveway approach) permit: Each additional linear foot over 50 linear feet $7.20 n. Driveway approach construction permit, each driveway $115.00 o. Utility placement/replacement/repair/removal permit (poles, splice pits, bore pits, manholes, handholes, drainage catch basins/inlets, pedestals, vaults, cabinets, etc): First on a city block $295.00 Exhibit B / Fee Schedule Page 8 of 11 EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. P. Utility placement/replacement/repair/removal permit (poles, splice pits, bore pits, manholes, handholes, drainage catch basins/inlets, pedestals, vaults, cabinets, etc): Each additional on same block, same permit $29.50 q. Underground utility service connection permit from base building line to the utility located within the public right-of-way (water, sanitary sewer, gas, electric, telephone, cable television, communication): For each connection $295.00 r. Underground utility installation permit (watermain, sanitary sewer main, gas main, electric, telephone, cable television, communication, or stormwater): 50 linear feet or less $325.00 s. Underground utility installation permit (watermain, sanitary sewer main, gas main, electric, telephone, cable television, communication, or stormwater): Each additional linear foot over 50 linear feet $6.50 t. Soft dig utility permit for locates, soil borings, soil/asphalt/ concrete core samples, or any other minor point excavations or borings: For each location $295.00 u. Groundwater monitoring well permit: For each well $295.00 v. Dewatering permit fees: 6 days or less $520.00 w. Dewatering permit fees: 7 - 30 days $950.00 x. Dewatering permit fees: 31- 90 days $1,300.00 y. Stormwater inspection fee inlcudes initial inspection, during the excavaction process and final inspection of proposed stormwater management system in the public right-of-way $395.00 z. Stormwater inspection fee: Pipe/structure bedding and layout $190.00 aa. Stormwater inspection fee: SW System partial backfill and compaction $190.00 bb. Stormwater inspection fee: SW System final - backfill, compaction, interior mud work and pipe tamping $350.00 cc. Initial Dewatering Inspection Fee $320.00 dd. Final Dewatering Inspection Fee $320.00 ee. NPDES Inspection Fee: Field compliance check (proactive and reactive inspections)-0.5 up to 1 acre $2,500.00 Exhibit B / Fee Schedule Page 9 of 11 EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ff. NPDES Inspection Fee: Field compliance check (proactive and reactive inspections)— 1 acre and above gg. NPDES Inspection Fee: Final —0.5 up to 1 acre hh. NPDES Inspection Fee: Final — 1 acre and above ii. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Initial Inspection Fee $85.00 jj. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Structure placement $110.00 kk. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Installation temporary restoration$110.00 II. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Restoration limits determination $110.00 mm. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Final restoration $300.00 nn. Reinspection for work previously inspected and rejected $195.00 oo. Renewal prior to expiration (90 day extension) $150.00 pp. New application and reactivation of expired permits 25% qq. Non-refundable fee with a plans revision after approval of initial plans $425.00 rr. Non-reundable fee for change of contractor $120.00 4. Fees for Sidewalks and Street Cafes (Sec. 54-224, City Code) $3,950.00 $625.00 $875.00 a. Sidewalk cafe: Non-refundable application fee $175.00 b. Sidewalk cafe: Non-refundable inspection fee $450.00 c. Sidewalk cafe: Reinspection fee for failed permit inspection $95.00 d. Sidewalk cafe: Annual Permit fee $13.50 d. Street cafe: Non-refundable application fee $175.00 e. Street cafe: Non-refundable inspection fee $450.00 f. Street cafe: Reinspection fee for failed permit inspection $95.00 5. Fees for Newsracks (Sec. 54-266, City Code) a. Initial Inspection of location fee (per location) $11.50 b. Annual Permit fee (per newsrack) $11.50 c. Initial fee pro -ration $0.96 d. Failed Permit inspection fee $5.75 Exhibit B / Fee Schedule Page 10 of 11 EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. D. Chapter 55 1. Encroachments involving rights -of -way, public, private or emergency easements (Sec. 55-14, City Code) Non-refundable application $2,500.00 (all additional recording and copying fees are not included in the application amount) 2. Consideration of easements (55-16, City Code) Non-refundable application (process to abandon easements or alley) $2,500.00 Exhibit B / Fee Schedule Page 11 of 11 SUBSTITUTED This official Fee Schedule is Miami website, with the vario any adopted fee currently at Code"). City Code Section Sec. 2-268 Sec. 2-269 Sec. 2-272 Sec. 22.5-127 Sec. 54-3 Sec. 54-8 Sec. 54-43 Sec. 54-224 Sec. 54-226 Sec. 55-14 Sec. 55-16 EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKU ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. EXHIBIT B FEE SCHEDULE PUBLIC WORKS CHAPTERS 2, 22.5, 54, 55 INDEX PAGE to be maintained by the City Manager and available via e City of us Departments and the City Clerk. This Fee Schedul--upersedes issue in the Code of the City of Miami, Florida, as ended ("City Title Covenants, Rights -of -Way Dedicatio Quitclaims Fees Recording Plats, Alley Closure Vacations Fees • Plan Review Fees Administrative Fee Obstruction of St et, Sidewalk, or Traffic Impedi nt Fees Use of Str- s and Sidewalk Fees PROW xcavation, Repair, Resurface, Utility Gro dwater monitoring Fees • ewalk and Street Cafe Fees Fees for New racks Encroachment Applications Easement Applications Exhibit B / Fee Schedule Page 1 of 11 Page No. B2 B2 — B4 B4 — B6 B6 B6 B7 B8—B10 B10 B10 B11 •9 w •J a3A13038 9087 Exhibit B-SUB SUBSTITUTED EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. FEE SCHEDULE RESILIENCE AND PUBLIC WORKS CHAPTERS 2, 22.5, 54 Based upon the passage of Ordinance and Resolution R-26- o pril 9, 2026, this Fee Schedule was adopted on [date]. This official Fee Schedule is to be ma ained by the City Manager and available via the City of Miami website, with the various Deg rtments and the City Clerk. This Fee Schedule supersedes any adopted fee currently at issu the Code of the City of Miami, Florida, as amended ("City Code"). A. Chapter 2 /Article 1V/ Division 4 1. Fees for Covenants to Run with the Land, Right -of -Way Dedic - ons, Quitclaims; Preparation (Sec. 2-268, City Code) a. Preparation and processing of any legal document ru ing with the land covenanting the construction or post• - ement of construction of a public right-of-way or on pri . e property $495.00 b. Preparation and processing of legal docu ► - nts, including, but not limited to, subdivision improvemen •onds and hold harmless agreements, quitclaim deeds with t city as grantor, and any agreement allowing the use of p •Iic right-of-way by private entities, excluding permits $3,375.00 c. Preparation and proce ng of a right-of-way dedication deed for all properties other t, = n properties that receive a homestead exemption pursuant to Articl: II, Section 6(a) of the Florida Constitution with the right-of-way b= g enlarged by dedication not part of the county or state ro.. system d. Revi= of covenant in -lieu of unity of title or unity of title for a $1,125.00 0 N ect pursuant to Article 7 of the Miami 21 Zoning Code $350:40 C) c-s P-1 Preparation and processing of a right-of-way dedication waiver $150.,00 2. ees for Recording Plats, Alley Closures or Vacations (Sec. 2-269 City C) s a. Platting determination or determination on folio separation $1,117.00 • .)v Exhibit B / Fee Schedule Page 2 of 11 SUBSTITUTED EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKU ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. b. Platting exception submittal pursuant to subsection 55-10(c) of the City Code $1,100.00 c. Submittal of tentative plat without closure and vacation/release of one or more right(s)-of-way or d. Submittal of tentative plat with closure and vacation/release of one or more right(s)-of-way or easement(s) ,500.00 e. Resubmittal of tentative plat for an extension of time $2,400.00 f. Resubmittal of tentative plat by different owner $2,400.00 g. Resubmittal of tentative plat with new boundary without closure and vacation/release of one or more right(s)-of ay or easement(s $3,200.00 h. Resubmittal of tentative plat with new boundary closure and vacation/release of one or more right(s)-o ay or easement(s)$5,000.00 i. To accompany final plat when submitted fo ecording $3,700.00 j. For each time limit extension granted fo ompletion of subdivision improvements required i onjunction with a recorded plat (fee or 5% of SIB ichever is greater) $295.00 k. Fees to be charged pursuant t• ubsections 55-15(i) and 55-15(j) providing for an alt= ative method for the closure and vacation of alleys w h abut parcels of land zoned solely residential $2,350.00 Any combined res •mittal, tentative plat, and final plat fees pursuant to sub ction 2-269(a) to be charged for a plat consisting s ly of property or properties that receive a homeste- - exemption(s) pursuant to Article VII, Section 6(a) of the . orida Constitution shall not exceed m. Fe to be charged pursuant to subsection 55-15(e) • oviding for an alternate method for the closure or vacation of a platted easement n. Expedited review for processing final plats and recording plats submitted for approval: List of requirements (base fee) Plus fee per tract/lot Mylar review (base fee) Exhibit B / Fee Schedule Page 3 of 11 $3,200 4 0 0 rn �r� SUBSTITUTED EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKU ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. Plus fee per tract/lot o. Fees to be charged pursuant to subsection 55-15(I) providing for an alternate method for the closure or vacation of emergency access easement p. Fees to be charged pursuant to subsection 54-4.1(b) providing for a release of utility easement reservation q. Processing fee for tolling and extensions of tentative plat approvals 3. Plan Review Fee (Sec. 2-272, City Code) $500.00 $2,350 40 ,350.00 $275.00 The fees to be charged by the Department of Resilience and ' blic Works for processing and reviewing private development plans subm ed for approval a. Fence, wall, slab, or sign $50.00 b. Underground tank $155.00 c. Single-family or duplex residential cons ction, reconstruction, remodeling, renovati ' , repair, or addition $268.00 d. New multi -family residential (<1/2 re) $1,335.00 e. New commercial (<'/2 acre) $1,535.00 f. New multi -family residentia _'/2 acre and <1 acre) $1,995.00 g. New commercial (W% a and <1 acre) $2,155.00 h. Large development sidential/commercial >_1 acre) $3,500.00 i. Subdivision impro ment engineering plan $2,500.00 j. Review and m ing of base building line on signed/sea l-• boundary survey $125.00 k. Review d marking of base building line for plann' g/zoning applications $285.00 I. U erground utility installation $295.0 M. 4 nderground utility service connection, utility structure placement $9§A Monitoring wells, soil borings, coring/sampling, utility locates, c f; minor non -utility excavations $422eo o. Building construction/maintenance (scaffolding, crane, =-< dumpster) $265.b0 p. Interim Parking $650.db Exhibit B / Fee Schedule Page 4 of 11 d3A13O38 SUBSTITUTED EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. q. Right-of-way closure (temporary traffic control, temporary construction fence) $75.00 r. As -built plan for stormwater $750.00 s. As -built plan for line and grade, pavement, sidewalk, curb, and gutter $4: ',.00 t. As -built plan for underground utilities •00.00 u. As -built plan for above ground utilities $430.00 v. As -built plan for non-standard improvements (pavers, lightin irrigation, tree grates, etc $430.00 w. Dry run plan for stormwater $585.00 x. Dry run plan for line and grade, pavement, sidewalk urb, and gutter $585.00 y. Dry run plan for underground utilities $585.00 z. Dry run plan for above ground utilities $430.00 aa. Dry run plan for non-standard improve is (pavers, lighting, irrigation, tree grate , etc $355.00 The fees to be charged by the Departme of Resilience and Public Works for processing and reviewing plans for w• in the Right -of -Way that is not related to a private development submitted for • proval. • bb. Underground utility insta tion cc. Underground utility s= ice connection, utility structure pla' -ment dd. Monitoring well , soil borings, coring/sampling, utility locates, minor non-u ' ty excavations ee. Street co, truction (sidewalk repair, sidewalk construction, $295.00 $75.00 $350.00 curb . ' . gutter, roadway paving, roadway resurfacing $225.00 ff. Su' . ing construction/maintenance (scaffolding, crane, dumpster) $225.00 gg. ' ght-of-way closure (temporary traffic control, temporary construction fence) $105.43) h As -built plan for stormwater $75031) csrR j. As -built plan for line and grade, pavement, sidewalk, curb, =4(3 and gutter $48;. jj. As -built plan for underground utilities $80 .12? kk. As -built plan for above ground utilitiesrn $4 Exhibit B / Fee Schedule Page 5 of 11 m rn 0 SUBSTITUTED EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ll. As -built plan for non-standard improvements (pavers, lighting, irrigation, tree grates, etc mm. Dry run plan for stormwater nn. Dry run plan for line and grade, pavement, sidewalk, curb, and gutter oo. Dry run plan for underground utilities Dry run plan for above ground utilities Dry run plan for non-standard improvements (pavers, lighting, irrigation, tree grates, etc rr. Expedited Plans Review for special projects (not over 4 h , rs0 Each hour over 4 hours ss. Trip generation statement inclusive of administrative osts tt. Administrative fee in connection with the admini ation of the independent traffic studies - percentage of the stimated expenses for the services of the provider t to perform the independent study B. Chapter 22.5 /Article VI (Sec. 22.5-127, C' Code) pp• qq• Stormwater utility fee Permit for any co ruction project which will disturb 0.5 acres or more of soil C. Chapter 54 /Article 1, 11 1. Fees for obstruction of s et, sidewalk or impedes traffic (Sec. 54-3, a. Non-refundable "-e with each permit application to the police partment b. Non-refu , able application fee with each permit application to the . -partment of resilience and public works c. No efundable inspection fee with each permit application the department of resilience and public works d. Non-refundable permit fee prior to issuance of all right-of-way closures Non-refundable permit fee prior to issuance of all right-of-way closures for helicopter lifting f. Non-refundable public right-of-way usage (flat fee) Exhibit B / Fee Schedule Page 6 of 11 $430.00 $585.00 $585. $5 11 .00 430.00 $355.00 $350.00 $87.50 $1,350.00 15% $595.00 City Code) $120.00 $95.00 C7 m 0 SUBSTITUTED EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BAC ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. g. Non-refundable sidewalk/curb/swale usage — linear feet, if applicable h. Non-refundable parking lane usage — linear feet, if applicable $0.40 Non-refundable lane closure (or partial) of traffic and auxiliary usage — linear feet, if applicable $0. j. Non-refundable fee for temp office, trailer, portable toilets, equipment and storage materials, construction spoils, and/or supplies within the partial or full obstruction for sidewalk/curb swale usage $0.15 k. Non-refundable fee for a temporary office, trailer, porta , e toilets, equipment or storage materials, construction spoils d/or supplies with the partial or full obstruction for parking lane 4sage $0.20 I. Non-refundable fee for a temporary office, tra r, portable toilets, equipment or storage materials, construct', spoils, and/or supplies $0.30 within the partial or full obstruction for I e closure or partial lane closure usage $0.25 m. Non-refundable fee per square fo' for construction fence screen or construction windscr en containing advertising $0.10 o. Right-of-way closure final i pection $95.00 p. Re -inspection for any w• previously inspected and rejected $95.00 q. Processing fee per p: it extension $150.00 r. Expired permit re ivation fee (% of original permit fee) 25.00% s. Non-refundabl= ee with a plans revision after approval of initial plans $325.00 t. Non-refu - :able fee with a change of contractor after permit issues $120.00 2. Fees for e of street and sidewalk (Sec. 54-8, City Code) a. on -refundable application and inspection fee per banner in the right-of-way Monthly permit fee for each banner in the right-of-way c Non-refundable application fee per vertical event banner on streetlight poles d. Monthly permit fee for each vertical event banner on streetlight poles • Exhibit B / Fee Schedule Page 7 of 11 `i, -71 $16020 $1g«C o -u. $95;Eil rn $20. 00 SUBSTITUTED EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACK ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. 3. Fees for public right-of-way excavation, repair, resurfacing, utility, groundwater monitoring (Sec. 54-43, City Code) a. Non-refundable application fee for right-of-way or street excavation, sidewalk construction or repair, roadway/ parkway/shoulder area paving or resurfacing, etc.. .00 b. Non-refundable right-of-way assessment inspection for right -of- or street excavation, sidewalk construction or repair, roadway/pay/ shoulder area paving or resurfacing, building line and grad or sidewalk construction survey, driveway construction, etc $50.00 c. Excavation permit: 50 lineal feet or less $325.00 d. Excavation permit: Each additional lineal foot over 50 lineal feet $6.50 e. Excavation permit: Each point excavation $295.00 f. Sidewalk repair permit: 50 lineal feet or -ss $82.50 g. Sidewalk repair permit: Each additio . I lineal foot over 50 lineal feet $1.65 h. Sidewalk construction permit: 1 lineal feet or Tess $262.50 Sidewalk construction perm Each additional lineal foot over 50 lineal feet $5.05 j. Paving or resurfacing travel lanes, parkway, or shoulder area permit: 50 lin = r feet or less $308.50 k. Paving or resu ing of travel lanes, parkway, or shoulder area permit: ' ch additional lineal foot over 50 linear feet $6.10 I. Line and • ade (curb and gutter, sidewalk construction, and drivew approach) permit: 50 linear feet or Tess $360.00 m. Lin= -nd grade (curb and gutter, sidewalk construction, and veway approach) permit: Each additional linear foot over 50 linear feet Driveway approach construction permit, each driveway Utility placement/replacement/repair/removal permit (poles, splice pits, bore pits, manholes, handholes, drainage catch basins/inlets, pedestals, vaults, cabinets, etc): First on a city block • • Exhibit B / Fee Schedule Page 8 of 11 � N $7.2P' N 23 c ;! r• n n e7 111 $29 i00 SUBSTITUTED THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BAC EXHIBIT B ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT p. Utility placement/replacement/repair/removal permit (poles, splice pits, bore pits, manholes, handholes, drainage catch basins/inlets, pedestals, vaults, cabinets, etc): Each additional on same block, same permit q. Underground utility service connection permit from base building line to the utility located within the public right-of-way (water, sanitary sewer, gas, electric, telephone, cable television communication): For each connection r. Underground utility installation permit (watermain, sanita sewer main, gas main, electric, telephone, cable televi - • n, $29.5 $295.00 communication, or stormwater): 50 linear feet or Ies $325.00 s. Underground utility installation permit (watermai sanitary sewer main, gas main, electric, telephone, ca - e television, communication, or stormwater): Each additional linear foot over 50 line- eet $6.50 t. Soft dig utility permit for locates, soil orings, soil/asphalt/ concrete core samples, or any ot r minor point excavations or borings: For each locati. $295.00 u. Groundwater monitoring w= permit: For each well $295.00 v. Dewatering permit fees: • days or less $520.00 w. Dewatering permit fe : 7 - 30 days $950.00 x. Dewatering perm i ees: 31- 90 days $1,300.00 y. Stormwater ins' -ction fee inlcudes initial inspection, during the excava • n process and final inspection of proposed stormw. - r management system in the public right-of-way $395.00 z. Stor ater inspection fee: Pipe/structure bedding and layout $190.00 aa. St• water inspection fee: SW System partial backfill and mpaction $190.00 bb. Stormwater inspection fee: SW System final - backfill, compaction, interior mud work and pipe tamping $350.0 N cc. Initial Dewatering Inspection Fee $32@0 z dd. Final Dewatering Inspection Fee $326SOd ee. NPDES Inspection Fee: Field compliance check (proactive and reactive inspections)-0.5 up to 1 acre $2,5060400 Exhibit B / Fee Schedule Page 9 of 11 CO 9c SUBSTITUTED EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. ff. NPDES Inspection Fee: Field compliance check (proactive and reactive inspections)— 1 acre and above gg. NPDES Inspection Fee: Final —0.5 up to 1 acre hh. NPDES Inspection Fee: Final — 1 acre and above ii. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Initial Inspection Fee $: -.00 jj. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Structure placement $110.00 kk. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Installation temporary storation$110.00 II. Utility (water, gas, electric, telephone, communication cable television, sanitary sewer): Restoration limit etermination $110.00 mm. Utility (water, gas, electric, telephone, communi tion, cable television, sanitary sewer): Final restor ion $300.00 nn. Reinspection for work previously inspect and rejected $195.00 oo. Renewal prior to expiration (90 day e nsion) $150.00 pp. New application and reactivation of xpired permits 25% qq. Non-refundable fee with a plans vision after approval of initial plans $425.00 rr. Non-reundable fee for ch- •e of contractor $120.00 4. Fees for Sidewalks and Str et Cafes (Sec. 54-224, City Code) a. Sidewalk cafe: . n-refundable application fee b. Sidewalk cafe. on -refundable inspection fee c. Sidewalk c e: Reinspection fee for failed permit inspection d. Sidewal cafe: Annual Permit fee d. Stre= cafe: Non-refundable application fee e. S et cafe: Non-refundable inspection fee f. treet cafe: Reinspection fee for failed permit inspection 5. Fe = - for Newsracks (Sec. 54-266, City Code) Initial Inspection of location fee (per location) b Annual Permit fee (per newsrack) c. Initial fee pro -ration d. Failed Permit inspection fee Exhibit B / Fee Schedule Page 10 of 11 $3,950.00 $625.00 $875.00 $175.00 $450.00 $95.00 $13.50 $175.00 $450.00 0 $95.Ij* C)rri $ P $1 SC ..*(1 x a3A13O31 SUBSTITUTED D. Chapter 55 EXHIBIT B THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL. BACKUP ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT. 1. Encroachments involving rights -of -way, public, private or emergency easements (Sec. 55-14, City Code) Non-refundable application $2,500 0 (all additional recording and copying fees are not included in the application a • unt) 2. Consideration of easements (55-16, City Code) Non-refundable application (process to abandon easements or alley) $2,500.00 4 Exhibit B / Fee Schedule Page 11 of 11 EXHIBIT B EXHIBIT B FEE SCHEDULE PUBLIC WORKS CHAPTERS 2, 54 INDEX PAGE SUBSTITUTED This official Fee Schedule is to be maintained by the City Manager and available vi. e City of Miami website, with the various Departments and the City Clerk. This Fee Schedu supersedes any adopted fee currently at issue in the Code of the City of Miami, Florida, as . mended ("City Code"). City Code Section Title Page No. Sec. 2-268 Covenants, Rights -of -Way Dedicati Quitclaims Fees B2 Sec. 2-269 Recording Plats, Alley Closur=. or Vacations Fees B2 — B4 Sec. 2-272 Plan Review Fees B4 — B6 Sec. 22.5-127 Administrative Fee B6 Sec. 54-3 Sec. 54-8 Sec. 54-43 Sec. 54-224 Obstruction of eet, Sidewalk, or Traffic Impedi► ent Fees B6 Use of Str ets and Sidewalk Fees B7 PRO Excavation, Repair, Resurface, Utility Gro dwater monitoring Fees B7 — B10 idewalk and Street Cafe Fees B10 Exhibit B / Fee Schedule Page 1 of 10 EXHIBIT B SUBSTITUTED FEE SCHEDULE RESILIENCE AND PUBLIC WORKS CHAPTERS 2, 22.5, 54 Based upon the passage of Ordinance and Resolution R-26- • April 9, 2026, this Fee Schedule was adopted on [date]. This official Fee Schedule is to be m ntained by the City Manager and available via the City of Miami website, with the various D' •artments and the City Clerk. This Fee Schedule supersedes any adopted fee currently at iss in the Code of the City of Miami, Florida, as amended ("City Code"). A. Chapter 2 / Article IV / Division 4 1. Fees for Covenants to Run with the Land, Right -of -Way Dedi • tions, Quitclaims; Preparation (Sec. 2-268, City Code) a. Preparation and processing of any legal document r ning with the land covenanting the construction or pos •onement of construction of a public right-of-way or on p ate property $495.00 b. Preparation and processing of legal doc ents, including, but not limited to, subdivision improvemebonds and hold harmless agreements, quitclaim deeds with e city as grantor, and any agreement allowing the use of ► blic right-of-way by private entities, excluding permits $3,375.00 c. Preparation and proc- sing of a right-of-way dedication deed for all properties other an properties that receive a homestead exemption pursuant to Arti - VI I, Section 6(a) of the Florida Constitution with the right-of-way • -ing enlarged by dedication not part of the county or state ro d system $1,125.00 d. Rev w of covenant in -lieu of unity of title or unity of title for a ect pursuant to Article 7 of the Miami 21 Zoning Code $350.00 Preparation and processing of a right-of-way dedication waiver $150.00 2. Fees for Recording Plats, Alley Closures or Vacations (Sec. 2-269 City Code) a. Platting determination or determination on folio separation $1,100.00 Exhibit B / Fee Schedule Page 2 of 10 EXHIBIT B SUBSTITUTED b. Platting exception submittal pursuant to subsection 55-10(c) of the City Code $1,100.00 c. Submittal of tentative plat without closure and vacation/release of one or more right(s)-of-way or d. Submittal of tentative plat with closure and vacation/release of one or more right(s)-of-way or easement(s) $ 00.00 e. Resubmittal of tentative plat for an extension of time ,2,400.00 f. Resubmittal of tentative plat by different owner $2,400.00 g. Resubmittal of tentative plat with new boundary without closure and vacation/release of one or more right(s)-of- or easement(s $3,200.00 h. Resubmittal of tentative plat with new boundary wi closure and vacation/release of one or more right(s)-of- ay or easement(s)$5,000.00 To accompany final plat when submitted for cording j. For each time limit extension granted for • •mpletion of subdivision improvements required in njunction with a recorded plat (fee or 5% of SIB wF' chever is greater) k. Fees to be charged pursuant to - bsections 55-15(i) and 55-15(j) providing for an alter►.tive method for the closure and vacation of alleys whi• abut parcels of land zoned solely residential Any combined resu• ittal, tentative plat, and final plat fees pursuant to subs= tion 2-269(a) to be charged for a plat consisting sol= of property or properties that receive a homestea. -xemption(s) pursuant to Article VII, Section 6(a) $3,200 $3,700.00 $295.00 $2,350.00 of the F ' ida Constitution shall not exceed $1,800.00 m. Fees • be charged pursuant to subsection 55-15(e) priding for an alternate method for the closure or vacation f a platted easement $2,000.00 n. Fees to be charged pursuant to subsection 55-15(1) providing for an alternate method for the closure or vacation of emergency access easement $2,350.00 o. Fees to be charged pursuant to subsection 54-4.1(b) providing for a release of utility easement reservation $2,350.00 Exhibit B / Fee Schedule Page 3 of 10 EXHIBIT B SUBSTITUTED P. Processing fee for tolling and extensions of tentative plat approvals 3. Plan Review Fee (Sec. 2-272, City Code) $275.00 The fees to be charged by the Department of Resilience and Public Works for processing and reviewing private development plans submitted for approval a. Fence, wall, slab, or sign $50.00 b. Underground tank $155.00 c. Single-family or duplex residential construction, reconstruction, remodeling, renovation, repair, or add on $268.00 d. New multi -family residential (<%2 acre) $1,335.00 e. New commercial (<%2 acre) $1,535.00 f. New multi -family residential (>_A2 acre and < -cre) $1,995.00 g. New commercial (>_A2 acre and <1 acre) $2,155.00 h. Large development (residential/comm- cial >_1 acre) $3,500.00 Subdivision improvement engineer g plan $2,500.00 j. Review and marking of base bu . ing line on signed/sealed boundary surv- $125.00 k. Review and marking of b..e building line for planning/zoning applic. ons $285.00 Underground utility stallation $295.00 m. Underground util service connection, utility structur' placement $95.00 n. Monitoring ells, soil borings, coring/sampling, utility locates, minor n' -utility excavations $420.00 o. Buil• g construction/maintenance (scaffolding, crane, d pster) $265.00 nterim Parking $650.00 Right-of-way closure (temporary traffic control, temporary construction fence) $75.00 As -built plan for stormwater $750.00 s. As -built plan for line and grade, pavement, sidewalk, curb, and gutter $480.00 p. Exhibit B / Fee Schedule Page 4 of 10 EXHIBIT B SUBSTITUTED t. As -built plan for underground utilities $800.00 u. As -built plan for above ground utilities $430.00 v. As -built plan for non-standard improvements (pavers, lighting, irrigation, tree grates, etc $430 w. Dry run plan for stormwater $5: %.00 x. Dry run plan for line and grade, pavement, sidewalk, curb, and gutter $585.00 y. Dry run plan for underground utilities $585.00 z. Dry run plan for above ground utilities $430.00 aa. Dry run plan for non-standard improvements (pavers, lighting, irrigation, tree grates, etc $355.00 The fees to be charged by the Department of Resilience . nd Public Works for processing and reviewing plans for work in the Right -Way that is not related to a private development submitted for approval. bb. Underground utility installation $295.00 cc. Underground utility service connecti utility structure placement $75.00 dd. Monitoring wells, soil borings, •ring/sampling, utility locates, minor non -utility excavation $350.00 ee. Street construction (side .Ik repair, sidewalk construction, curb and gutter, road . y paving, roadway resurfacing $225.00 ff. Building constructi • /maintenance (scaffolding, crane, dumpster) $225.00 gg. Right-of-way cl. •ure (temporary traffic control, temporary c• struction fence) $105.00 hh. As -built p for stormwater $750.00 jj. As-bui •Ian for line and grade, pavement, sidewalk, curb, an. .utter $480.00 jj. i .-built plan for underground utilities $800.00 kk. As -built plan for above ground utilities $430.00 II. As -built plan for non-standard improvements (pavers, lighting, irrigation, tree grates, etc $430.00 mm. Dry run plan for stormwater $585.00 nn. Dry run plan for line and grade, pavement, sidewalk, curb, and gutter $585.00 Exhibit B / Fee Schedule Page 5 of 10 EXHIBIT B SUBSTITUTED oo. Dry run plan for underground utilities pp. Dry run plan for above ground utilities qq. Dry run plan for non-standard improvements (pavers, lighting, irrigation, tree grates, etc rr. Expedited Plans Review for special projects (not over 4 hours() Each hour over 4 hours ss. Trip generation statement inclusive of administrative costs tt. Administrative fee in connection with the administration of the independent traffic studies - percentage of the estimated expenses for the services of the provider set to perfor independent study B. Chapter 22.5 / Article VI (Sec. 22.5-127, City Code) Stormwater utility fee Permit for any construction ect which will disturb $585.00 $430.00 $355.0 $35 0 $.50 $1,350.00 1 5% 0.5 acres or more of soil $595.00 C. Chapter 54 /Article 1, 11 1. Fees for obstruction of street, side : Ik or impedes traffic (Sec. 54-3, City Code) a. Non-refundable fee with e- permit application to the police departme $120.00 b. Non-refundable appl ation fee with each permit application to the departmen •f resilience and public works $95.00 c. Non-refundabl- inspection fee with each permit application to the depa► ent of resilience and public works $50.00 d. Non -ref dable permit fee prior to issuance of all right-of-way closu s $325.00 e. N • -refundable permit fee prior to issuance of all right-of-way osures for helicopter lifting $775.00 Non-refundable public right-of-way usage (flat fee) $595.00 Non-refundable sidewalk/curb/swale usage — linear feet, if applicable $0.30 Non-refundable parking lane usage — linear feet, if applicable $0.40 Non-refundable lane closure (or partial) of traffic and Exhibit B / Fee Schedule Page 6 of 10 EXHIBIT B SUBSTITUTED auxiliary usage — linear feet, if applicable j. Non-refundable fee for temp office, trailer, portable toilets, equipment and storage materials, construction spoils, and/or supplies within the partial or full obstruction for sidewalk/curb/ swale usage $0.1 k. Non-refundable fee for a temporary office, trailer, portable toilets, equipment or storage materials, construction spoils and/or suppli with the partial or full obstruction for parking lane usage $0.20 Non-refundable fee for a temporary office, trailer, portable t• ets, equipment or storage materials, construction spoils, and •r supplies within the partial or full obstruction for lane closure or •artial lane closure usage $0.25 m. Non-refundable fee per square foot for constru on fence screen or construction windscreen containing advertising o. Right-of-way closure final inspection P. Re -inspection for any work previously spected and rejected q. Non-refundable fee with a plans re ion after approval of initial plans r. Non-refundable fee with a chge of contractor after permit issued 2. Fees for use of street and si • -walk (Sec. 54-8, City Code) $0.45 $0.10 $95.00 $95.00 $325.00 $120.00 a. Non-refundable ap• cation and inspection fee per banner in the right-of-w.. $160.00 b. Monthly per fee for each banner in the right-of-way $100.00 c. Non-refu ble application fee per vertical event banner on stre- ight poles $95.00 d. Mo ly permit fee for each vertical event banner on eetlight poles $20.00 3. Fe for public right-of-way excavation, repair, resurfacing, utility, groundwater nitoring (Sec. 54-43, City Code) Non-refundable application fee for right-of-way or street excavation, sidewalk construction or repair, roadway/ parkway/shoulder area paving or resurfacing, etc.. Exhibit B / Fee Schedule Page 7 of 10 $95.00 f. Sidewalk repair permit: 50 lineal feet or less g. Sidewalk repair permit: Each additional lineal foot over 50 lineal feet $1.65 h. Sidewalk construction permit: 50 lineal feet or les $262.50 Sidewalk construction permit: Each additional 1' eal foot over 50 lineal feet j. Paving or resurfacing of travel lanes, par ay, or shoulder area permit: 50 linear feet or less k. Paving or resurfacing of travel lane parkway, or shoulder area permit: Each additional line foot over 50 linear feet Line and grade (curb and gut r, sidewalk construction, and driveway approach) permi 0 linear feet or less m. Line and grade (curb a • gutter, sidewalk construction, and driveway approach) ermit: Each additional linear foot over 50 linear feet n. Driveway app ach construction permit, each driveway o. Utility plac ent/replacement/repair/removal permit (poles, • ice pits, bore pits, manholes, handholes, drainage catc •asins/inlets, pedestals, vaults, cabinets, etc): Fi on a city block P. tility placement/replacement/repair/removal permit (poles, splice pits, bore pits, manholes, handholes, drainage catch basins/inlets, pedestals, vaults, cabinets, etc): Each additional on same block, same permit q. Underground utility service connection permit from base building line to the utility located within the public right-of-way EXHIBIT B SUBSTITUTED b. Non-refundable right-of-way assessment inspection for right-of-way or street excavation, sidewalk construction or repair, roadway/parkway/ shoulder area paving or resurfacing, building line and grade or sidewalk construction survey, driveway construction, etc $50.00 c. Excavation permit: 50 lineal feet or less $325 i0 d. Excavation permit: Each additional lineal foot over 50 lineal feet ,6.50 e. Excavation permit: Each point excavation $295.00 $82.50 Exhibit B / Fee Schedule Page 8 of 10 $5.05 $308.50 $6.10 $360.00 $7.20 $115.00 $295.00 $29.50 u. v. w. x. y. z. aa. bb. cc. dd. ee. ff. g. hh. ii. EXHIBIT B SUBSTITUTED (water, sanitary sewer, gas, electric, telephone, cable television, communication): For each connection r. Underground utility installation permit (watermain, sanitary sewer main, gas main, electric, telephone, cable television, communication, or stormwater): 50 linear feet or less s. Underground utility installation permit (watermain, sanitary sewer main, gas main, electric, telephone, cable television, communication, or stormwater): Each additional linear foot over 50 linear feet t. Soft dig utility permit for locates, soil borings, soil/aspha concrete core samples, or any other minor point exc- - ations or borings: For each location Groundwater monitoring well permit: For each Dewatering permit fees: 6 days or less Dewatering permit fees: 7 - 30 days Dewatering permit fees: 31- 90 days Stormwater inspection fee inlcude the excavaction process and fi ell itial inspection, during inspection of proposed stormwater management sy em in the public right-of-way Stormwater inspection fe ipe/structure bedding and layout Stormwater inspection e: SW System partial backfill and compaction Stormwater insp- tion fee: SW System final - backfill, compaction,' erior mud work and pipe tamping Initial Dew ering Inspection Fee Final D atering Inspection Fee NPDS Inspection Fee: Field compliance check (proactive a reactive inspections)-0.5 up to 1 acre PDES Inspection Fee: Field compliance check (proactive and reactive inspections)— 1 acre and above NPDES Inspection Fee: Final —0.5 up to 1 acre NPDES Inspection Fee: Final — 1 acre and above Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Initial Inspection Fee Exhibit B / Fee Schedule Page 9 of 10 $295.00 $32 $6.50 $295.00 $295.00 $520.00 $950.00 $1,300.00 $395.00 $190.00 $190.00 $350.00 $320.00 $320.00 $2,500.00 $3,950.00 $625.00 $875.00 $85.00 EXHIBIT B SUBSTITUTED jj. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Structure placement $110.00 kk. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Installation temporary restoration$110.00 II. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Restoration limits determination $1 1.00 mm. Utility (water, gas, electric, telephone, communication, cable television, sanitary sewer): Final restoration $300.00 nn. Reinspection for work previously inspected and rejected $195.00 oo. Renewal prior to expiration (90 day extension) $150.00 pp. New application and reactivation of expired permits 25% qq. Non-refundable fee with a plans revision after appral of initial plans $425.00 rr. Non-reundable fee for change of contractor $120.00 4. Fees for Sidewalks and Street Cafes (Sec. 5 24, City Code) a. Sidewalk cafe: Non-refundable app ation fee $175.00 b. Sidewalk cafe: Non-refundable i pection fee $450.00 c. Sidewalk cafe: Reinspection e for failed permit inspection $95.00 d. Sidewalk cafe: Annual Per' it fee $13.50 d. Street cafe: Non-refun• , •le application fee $175.00 e. Street cafe: Non -ref dable inspection fee $450.00 f. Street cafe: Rein -section fee for failed permit inspection $95.00 5. Fees for Newsracks .ec. 54-266, City Code) a. Initial Insp= tion of location fee (per location) $11.50 b. Annual ' ermit fee (per newsrack) $11.50 c. Initi- ee pro -ration $0.96 d. F. ed Permit inspection fee $5.75 Exhibit B / Fee Schedule Page 10 of 10