HomeMy WebLinkAboutR-26-0160City of Miami
Resolution R-26-0160
Legislation
City Hall
3500 Pan American Drive
Miami, FL 33133
www.miamigov.com
File Number: 19046 Final Action Date: 4/9/2026
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
PURSUANT TO SECTION 29-B(C) OF THE CHARTER OF THE CITY OF
MIAMI, FLORIDA, AS AMENDED, AUTHORIZING THE CITY MANAGER TO
NEGOTIATE AND EXECUTE A GRANT OF EASEMENT ("EASEMENT"), IN A
FORM ACCEPTABLE TO THE CITY ATTORNEY, TO THE FLORIDA POWER &
LIGHT COMPANY, A FLORIDA PROFIT CORPORATION ("FPL"), FOR A
PERPETUAL, NON-EXCLUSIVE EASEMENT CONTAINING A TOTAL SIZE OF
APPROXIMATELY FIVE HUNDRED NINETY-SEVEN (597) SQUARE FEET, AS
LEGALLY DESCRIBED IN EXHIBIT "A," ATTACHED AND INCORPORATED
("EASEMENT AREA"), WITHIN A PORTION OF CITY OF MIAMI ("CITY")
OWNED PROPERTY IDENTIFIED BY FOLIO NUMBER 30-3129-000-0160,
MIAMI, FLORIDA ("PROPERTY"), FOR THE FPL NORTH LIFT STATION
CONSTRUCTION, OPERATION, AND MAINTENANCE OF ELECTRIC UTILITY
FACILITIES, INCLUDING CABLES, CONDUITS, APPURTENANT EQUIPMENT,
AND APPURTENANT ABOVE GROUND EQUIPMENT, IN ACCORDANCE
WITH THE TERMS AND CONDITIONS OF THE EASEMENT, INCLUDING THE
RIGHT TO RECONSTRUCT, IMPROVE, AND REMOVE ALL OR ANY OF THE
FACILITIES WITHIN SAID EASEMENT AREA.
WHEREAS, the City of Miami ("City") is the fee simple owner of the property identified by
Folio Number 30-3129-000-0160, Miami, Florida ("Property"); and
WHEREAS, Florida Power & Light Company, a Florida profit corporation ("FPL"), has
requested the grant of a perpetual, non-exclusive easement ("Easement") containing a total size
of approximately five hundred ninety-seven (597) square feet, within the Property, as more
particularly described in Exhibit "A," attached and incorporated ("Easement Area"); and
WHEREAS, the purpose of the Easement is for the FPL north lift station construction,
operation, and maintenance, said construction (including cables, conduits, appurtenant
equipment and appurtenant above ground equipment) to be installed from time to time, with the
right to reconstruct, improve, add to, enlarge, change the voltage, change the size of, and
remove all or any of the facilities within said Easement Area located at the Property ("Intended
Purpose"); and
WHEREAS, there will be no cost to the City for constructing the proposed FPL north lift
station within the Easement Area; and
WHEREAS, the Easement shall be granted to implement a project of a governmental
agency or instrumentality in accordance with Section 29-B(c) of the Charter of the City of Miami,
Florida, as amended;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF
City of Miami Page 1 of 2 File ID: 19046 (Revision:) Printed On: 4/22/2026
File ID: 19046
MIAMI, FLORIDA:
Enactment Number: R-26-0160
Section 1. The recitals and findings contained in the Preamble to this Resolution are
adopted by reference and incorporated as if fully set forth in this Section.
Section 2. The City Manager is hereby authorized' to negotiate and execute the
Easement, in a form acceptable to the City Attorney, in favor of FPL for the Intended Purpose
within the Easement Area located at the Property, in accordance with the terms and conditions
of the Easement.
Section 3. This Resolution shall become effective immediately upon its adoption and
signature of the Mayor.2
APPROVED AS TO FORM AND CORRECTNESS:
rge = . Wy j ng II , C ty ttor -y 3/31/2026
1 The herein authorization is further subject to compliance with all legal requirements that may be
imposed, including but not limited to those prescribed by applicable City Charter and City Code
provisions.
2 If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10) calendar days
from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective
immediately upon override of the veto by the City Commission.
City of Miami Page 2 of 2 File ID: 19046 (Revision:) Printed on: 4/22/2026