Loading...
HomeMy WebLinkAboutR-75-0557RESOLUTION NO. A RESOLUTION UTION ORDERING PLAGLER STREET HIGHWAY IMPROVEMENT EXTENSION H.42 91 A litSI ONA '1 NS HE PROPERTY AGAINST WHICH SPECIAL ASSESSMENTS SHALL EE MADE FOR A PORTION OF THE COST THERE. OP AS FLAGLER STREET ' t#1 ttWAY tMPROVEMEN EXTENSION bISTRICT 4 3 91; ALLOCATING THE AMOUNT OF $ 5 , aab .0o PROM THE HIGHWAY tOND PUND FOR PRELIMINARY EXPENSE. WHEREAS, the city of Miami, in cooperation with the Downtown Development Authority is planning for improvements to the downtown business area's curb, gutter's and sidewalks on west Flagler Street; and WHEREAS, the street pavement on west Flagler Street was recently planed to west 2nd Avenue, to improve rideability and to lower the height of the asphalt in relation to the existing curbs and in order to reseal and preserve the surface of the existing pavement it should be remacadamized with asphalt the total length of the improvement; and WHEREAS, W. Flagler Street is in need of improved drainage facilities and a method devised to take care of stand- ing water in the gutters from roof drains; and WHEREAS, the aesthetics of the street could be improved with additional landscaping and planter islands similar to the intersection of Flagler and east First Avenue; and WHEREAS, petitions have been received from property o-,ners on W. Flagler Street to construct these needed improve- ments; NOW, THEREFORE,'BE -IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. A local Improvement described as FLAGLER STREET HIGHWAY IMPROVEMENT EXTENSION H-4391 shall be made CITY COMMISSION MEETING OF JUN121975 iteatinoto sown ,,, efr•,rtret„ „,ttlst., under Section 56 of the Charter of the City of Miami, as amended, on the fo11ow i street: W. ?lagler Street (west of '.t.C. R" to Sast side of EXpressway R/W - 1 95) Section 2. This improvement shall include the re- moval of a d.sting sidewalk, curb and gutter and the construc- tion of a concrete sidewalk with a decorative teXtulr'ed surface or paver block, and concrete curb and gutter. The existing asphalt street will be leveled and remacadamized as needed with an asphalt surface course, drainage facilities and landscaped planter areas will be provided at intersections and other locations as specified. All work will be done in accordance with City of Miami Standard Specifications for Public Works Projects. Section 3. This improvement shall be designated in all proceedings and assessments as FLAGLER STREET HIGHWAY IMPROVEMENT EXTENSION H-4391, and the property against which special assessments shall be made for a portion of the cost thereof shall be designated as FLAGLER STREET HIGHWAY IMPROVEMENT EXTENSION DISTRICT H-4391. Section 4 The sum of $5,000.00 be, and is hereby, allocated from the Highway Bond Fund for preliminary expense. PASSED AND ADOPTED this12 day of JUAE 1975. PR PAgED N9) PPFOVED PY %, Mi ale Carter, ,Asst. City Attorney APPROVED $ TO PO ANDCORRECTNESS is / I'; W. Antir1•, ; city M.It1.07.i. tl i' n'F MIAMI, IFi`T` P'$1Ct MEMO ANOUM Ir; r r ,dune 12, 1975 Contract 4391 i,g4-<: PLAGLEIt :'.TWEET HIC1iWAY IMPR:OVEMF,NT EXTENSION H .4391 Resolution Ordering and Allocating Funds i t �✓ 'f/f Y,�'` ' r �/ t: iC• • RLFEHLNet S. V I ncent E. Grimm) Jr. , Director i;Lbp;trtr .:rat or Public Works oicLosuRts Plans and Specifications a-., being prepared to improve West Flagler Street, including the construction of curb and gutter, remacadamizing, and decorative sidewalk with landscaped planter areas between, west of F.E.C. R/W to east side of expressway R/W. The project wiJ.i also include some new drainage structures and improvement to the existing drainage facilities to take care of existing roof drains flowing into the street. Work on this Improvement is being coordinated with the ef'f'r is of the Downtown Development Authority and in :tdc1 1 t Lon to the City's cost, The Downtown Development Authority will bear the cost of the intersectional improve- ment:;, (planter areas, landscaping, concrete pavement), :;Iml.lar to what they did at the East 1st Avenue Intersection on Plai_," c:r Street. Vund:.; are available from the Highway Bond Fund. ` i i DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OF A }:cjt.Jl)TtON ORDERING FLAGLER STREET HIGHWAY IMPROVEMENT i;i;'i'Er):.ION H-4 391 IN FLAGLER STREET HIGHWAY IMPROVEMENT I:XTEN:;ION UISTRICT H-4391 AND ALLOCATING $5,000 FROM THE HIGHWAY BOND FUND FOR PRELIMINARY EXPENSE. VJ:G: GVC: hh