Loading...
HomeMy WebLinkAboutR-75-03654,40.4 5 MCeeb RESOLUTION N0, 75-365 ................ _..... A RESOLUTION ORDERING FLAGLER STREET HIGHWAY IMPROVEMENT H-4372 AND DESIGNATING THE PROPERTY AGAINST WHICH SPECIAL ASSESSMENTS SHALL BE MADE FOR A PORTION OF THE COST THERE- OF AS FLAGLER STREET HIGHWAY IMPROVEMENT H-4372 AND ALLOCATING THE AMOUNT OF $10,000.00 FROM THE HIGHWAY BOND FUND FOR PRELIMINARY EXPENSE. WHEREAS, the City of Miami, in cooperation with the Downtown Development Authority is planning for improvements to the downtown business area which will require restoring to good condition the curbs, gutters, sidewalks,street pavement, and improving drainage facilities; and WHEREAS, the aesthetics of the street can be enhanced with additional landscaping and planter islands similar to those at the intersection of Flagler and East First Avenue; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. A local improvement described as FLAGLER STREET HIGHWAY IMPROVEMENT H-4372 shall be made under Section 56 of the Charter of the City of Miami, as amended, on the following streets: Flagler Street (West 1st Avenue - Biscayne Blvd.) South 1st Street (West 1st Avenue - Biscayne Blvd.) Section 2. Improvement shall consist of the following: 1. Removal of existing sidewalk, curb and gutter, and the construction of a concrete sidewalk with a decorative textured surface or paver block and concrete curb and gutter. 2. The existing asphalt streets will be leveled and remacadamized as needed with an asphalt surface course, plus providing drainage facilities. 3. Planter areas will be provided at intersections and other locations as specified, CITY COMMI`'SION MEETING OF APR 2 21975 RESOLUTION NU.,;'• REMARKS: Section 2. All of the aforementioned improvements will be done in accordance with City of Miami Standard Speci fications for Public Works Projects to be designated in all proceedings and assessments as Flagler Street Highway Improve- ment H-4372, and the property against which special assess- ments shall be made for a portion of the cost thereof shall be designated as Flagler Street Highway Improvement District H-4372. Section 3. The amount of $10,000.00 be, and is here- by, allocated from the Highway Bond Fund for preliminary expense. PASSED AND ADOPTED this 22 day of npn1L 1975. 14Ut;t CF '1, FF'?T_ MA Y 0 R Attest: PREPARED AND APPROVED BY: Mikele Carter Assistant City Attorney APPROVED AS TO FORM AND CORRECTNESS: ') gnUT9LIn City Clerk 41..A6t4Art.-., John S. Lloya— - City Attorney 2 To: P.W,Artdrews t-r ,. City Manager I.l VirymIt E. Gri 4m, Jr. FRAM: CITY or MIAMI. FLORIOA a INt-oPPIOE IVIEMORAN%UM cto 7 rtment of Public Works ( aATE: April 4, l°75 j B 4372 SUBJECT: Flagler Street Highway Improvement Resolution H-4372 Ordering anc Allocating Funds RiEFERENCE9: ENCLOSURES: Plans and specifications are being prepared to improve Flagler Street, including the construction of curb and gutter remacadamizing, and decorative sidewalk with landscaped planter areas between Biscayne Boulevard and West 1st Avenue. The project will include the remacadamizing of South 1st Street from West 1st Avenue to Biscayne Boulevard. This will be an assessable: improvement. The project willalso include some new drainage structures and improve- ment to the existing drainage facilities to take care of existing roof drains flowing into the street. Work on this improvement is being coordinated with the efforts of the Downtown. Development Authority and in addition to the City's cost, the Downtown Development Authority will bear the cost of the intersectional improvements (planter areas, landscaping,conorete pavement) similar to what they did at the East 1st Avenue intersection on Flagler Street. i'cndf- are available from the highway Bond Fund. THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OF THE ATTACHED RESOLUTION ORDERING FLAGLER STREET HIGHWAY IMPROVEMENT H-4372 IN FLAGLER STREET HIGHWAY IMPROVEMENT DISTRICT H-4372 AND ALLOCATING $10,000 FROM THE HIGHWAY BOND FUND FOR PRELIMINARY EXPENSE. VEC:MGB:ek