RE„oturrioN 40,
:106tAltiON OPnRiM 8,W, 22 STREET 11IONAY IMPROVEMENT
H,f04A88 lit 1:1,--10119 AND DESIGNATING THE PROPERTY AGAINST
WHICH SPECIAL ASSESSMENTS SHALT, 8E MADP FOR A PORTION OF
THE COST THEREOF AS S.W. 22 STREET HIGHWAY IMPROVEMENT
DISTRICT - PHASE ITT - H-4412); AND ALLOCATING THE AMOUNT
OF $10,000 FROM THE HTIHWAY BOND FUND FOR PRELIMINARY
EXPENSE.
'..WHEREAS, the Coral Way area between S.W.12 Avenue andSW .
22 Avenue is heavily traveled and has developed into an
office) restaurant, apartment and shopping area; and
-.-
WHEREAS, the side parkways and pavement areas are deteriorated
_ -
and in need of improvement with proper drainage; and
WHEREAS, renovation of side
gutters and curbing, landscaping and drainage facilities;
parkways will include new paVement,
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY,
F MIAMI, FLORIDA:
Section 1. A local improvement described as S.W. 22 STREET
HIGHWAY. IMPROVEMENT - PHASE TIT - H1R shall be made under
Section 56 of the Charter of The City of Miami as amended, located
on S.W. 22 StrePt (Coral Wav) between S.W. 12 and 3.W. 22 Avenues.
Section 2. This Improvement shall include clearing and
rradint7, construction of asphaltic concrete pavement consisting of
8 inch limerock base and 115 inch asnhaltic surface course, concrete
curb and r,utter, concrete valley gutter, concrete curb, construction
of It inch concrete sidewalk and 6 inch concrete sidewalks at drive-
ways, drainage facilities and landscaping of the side parkway as
specified and described in the Standard City f Miami Specifications
for Public Works rrojects.
Section This Improvement shall be designated in all proceedin-
:and assesments as S.W, 22 STREET HIGHWAY IMPROVEIENT - PHASE III -
p -441P and the property against which special assessments shall be
made for a portion of the cost thereof, hereunder shall be desivnated
as S,W, 27 STREET HinlIWAv IMPROVEMENT DISTRICT - PHASE III - -L041°.
"DOCUMENT INDEX
ITEM NO.
ICITY COMMISSION
MEETING OF
JUL 2 8 1977
RIZOLUDON no..707- gL.C.17
REMARKS:
are
MAURICE Al FtiRE
MA 0 R
MWM
MMIPMC
6t4oi Ai The gut or,$1O3OOO be3 and is het'eby3 a11odated
trot► the Hi€;hWay t3ond Fund for Preliminary t dense i
PASSED AND ADOPTED? this 28 day of JUL
19771
PREPATiED AN.. APPT,OVED B',
APPI;`T IF,0' ) RPE(7NESS
277
I
CitS Attom
JoSePh R4 (1ras 4ie
Cit: M narer
. [ l�i. A l..'L. !'S 7 c LL. t1
William E, Parkes
ActinActinr Director
Department of Public Works,
A Y ,1917 4h1?
Si,'Wi 22 STREET uI =HWA`i I[ PROVE -
ME t HAS iII 14tnti418
liesoiution Ordering and Allocat'..:
funds
Plans and specificationt are being" prepared to construct approximately
one mile of pavement on the north and south sides of S.'ri, 22 Street
(coral Way) between S,W. 12 Avenue and S.W. 22 Avenue; including gutters
and curbinF", land3capinr and drainage facilities.
This improvement shall include, clearing and r;radinE"_, construction of
asphaltic concrete pavement con: i sting or B-inch limei'ock base and a
1?5-I1^i asphaltic surface course, concrete valley ruV.e'S, concrete
er r curb, construction of t:-inch concrete side-
walks and ;-inch concrete sidewalks at driveways, drainaf;e facilities
and la:" 'idra' s. The approximate cost of this
t'1.,^,:ping of se parkways, r
L be $600 003 and funds are available from
Improvement is estimated to �. �'� ,� ;,
the .. ir,la ,a: „Dnd t' and and the .'tort Sewer =S`nd und. T 7 {
'1 E "^ - '�" c PT1BT TO .����� : R .,}:::l: Tji... A�i'2 _���TO:: 07 A R S LTJTTO
.�. �' . f":....;... _ _�_ -- • � � �'� .� PHASE III - t?-�'�l � Tat
,. .:„ 27 ;'TREE' ?Il?:':.A'• I:�'?Eo�'E'•?E _ - .:::"�..._ .
�:1±J:'..:2? 277: " HIGEWA•_ TM? C:',iV;:.':.Y _ I5:RT - PHASE Ill - _ 11, 1 Q
r.t;,T •/, :n0 n(�r� FROM •-�u:, :zl,^• .!A•� BO:!`i FL. 7 . . RELI.l_,
A:: � i•: Ts :�� �.l: , f i l .... t J t � 'J J ,'t . a_. r :. i
1
JOB NAME,
JOB SCOPE!
JOB SITE:
,8►14. 22 Street 1I1r away Imnrovereht.-t'hase
Rebuild side parkways with asphaltic concrete, 8' wide,
to be used as a parking area where off-street parking
facilities are insufficient. Parking lane is to be
bordered on one side by a concrete valley cutter with
an additional 11' of asphaltic concrete te transition ion area
into the exiting driving lane. On
f
the parking lane, a monolithic concrete curb shall be
constructed abutting the existing sidewalk. At loca-
tions where off-street parkin: facilities are sufficient
a landscaned parkway 10.5' wide shall be installed be-
tween the sidewalk and new concrete curb and gutter.
A storm drainage srstem will be provided. This, will be
an assessnLle i.mnrovement.
S.W. 22 Street (Coral Way) between S.W. 12 Avenue and
S.W. 22 Avenue.
REASON FOR WORK: The side parkways have deteriorated and a number of
small potholes have occurred. Drainage problems exist,
covering large areas. This improvement is in keeping
with the new redeveloFrent and landscaping of Coral 'ay
between F.W. 22 Avenue and S.W. 37 Avenue.
SOURCE OF FUNDS: Ilirhway 0.0. Fond Funds
JOE COST: Estimated Total Cost: $600,00.0.
CURRENT ITEM FOP
CONSIDERATION: Order Highway District July 28, 1977
ESTIMATED C014-
i•1ISSION TIME: Five minutes.