HomeMy WebLinkAboutR-77-0559,00t DtON i40,. 7 S5
A REkSOiUT10N ACG�EI'TI1dr= Ti COm 'L1 Eb W i11C pi✓Rli'Oi M1 1i
tO8.14c CORa'ORATION' AT A TOTAL c0 T QE `(1 80 35 1"
ry e,
ATfi)� AUTI-�bF2I�1NCI A; FI�1P,L PAYMEt4T,
tM oN ANTTAR ; Et1ER I�l?�RO'VEtEWT: SR 539i C,. (capteriine .
sewe'r). ANb 1 � i391 S (sicleline: sewer) :Ifi1 IMP N SANiTA1 Y
r1 OVF a11'I'• i)I TRICT 1 .5391 C ('centerl%tie sel�rer�
ANt SR•5 9i (sideli•tze serer) i
iE'RI Ad', there,-
istsa contract
dated Febrizarv,
1976 betWeen
'the• 0.1 Miami and Roenca.Corporationg and
DJHERRAS, uhe 14ork has been satisf'actori1v cottpleted and
Roenca Cdr oration has f.itrnished the renuireri ,,documents,cei°ti ` in ;
that all billy for labor and.materials have been paid in fia11 in
connection i,,rith the aforesaid contract; and
WHEREAS, the, City Manager and the.Department Of Public Works
recommend that the completed .work be accepted and final payment made
Cont.r,ac.t0r;
11%1 ' TRERI ORE
-III , FLORIDA ::<`
:Sect i n: i'.
r ' S p TswO!$ �AT1TTAW1 SE11ER IMPROVEMENT SR 5391 C.;. (centerline sewer)
poi .aI,�1 C?f�
AND SR-5 �c1-S� (:s•ideline sewer) in SIT.WSOIJ S.Ai ITARY SEWER IMPROVEMENT
DISTRIC"' SF' S391-C (centerline. sewer.) AT D SR-5391 S (,sideline' sewe•
r)
at atotal cost of ''$,718,0)5.17 is hereby_ approved.
The proper officials of: the: City of Miami .are
•
hereby: authorized .to pay 71,656. C `to Roenca Corporation as `full- and
final-.awrnent 'or a.11 : work performed and all materials furnished i
connection with SIMPSON SAUITAR!' SE}•JER •:IMPROVIIMENT SR-5:91-C
ectlon
.ire: sewer)
BE: -IT RESOLVED •Rv TuE CQMMISSION OF THE CiITY
The completed wort performed by Roenca Corporation
(center
AND SR-539.1-S ). its SIMPSOII SANITARY SEWER
(sideline sewer
',IT4PME?.'ST
ROVE1)IR,I.CT ,SR-539.1
ideline sewer)''
C (centerline ` sewer)
and SR-539 -s'
PASSEI) Aldi) ADOPTED this 1i TH day
UPPQFMV
•
CITY COMMISSION
MEETING OF
JUL 141977
war "..5
City Cle It
PREPARED A 1I) APPROVED B` t
Assistant` 'City Attorney
'PPROV TO ;FORM AtND CoR.RECTNF,S
t.ci ne y
= i # lyitM45n4.1915qtfl
r �
41 I. � ;
ihrirdS�si
C.t M;iaefi
OoMt Wiliam Er Patikes
Acting Director
�epartfent or Public Work8
10
OtLt
1
r�' Of�1 A J1 A t : $EWE1 tN 15,tOVEMEt T
5 �5 �i (oente ire sewer) Atm
• 8ESideline eWet )
Cs(c LcsotttS, ,..
Rpeh'.,6e.7 Corporation has completed the pfroject consistitg.oa
new sanitar approdimate1Y; 26; 800
0 feet
::feet,° of �;8 inch=���8�itzch ��clay : ands caste -iron pipe � 5, 35-
` ion areas The pY,oject is located between $01th.
of 6 inch la�erals, manholes sideitalk'and pavement replace ft
t
:in the � � � �, iriclrzding �the�� Vi�ca�,a�Ar't
5�32. Roads ,and Siscayrie, Bay and I-95 j -
T. e.:or ' final, contract amount,.,.was; for: $783,000..00 but,
PRusoirl, h
the completed contract amount is''$718;035.1.7 and_it was completed
on tune
It is not.: in order for the Commission to :accept the completed
work and authorize final payment;' after; all conditions are
THE DLi AHT LENT OF PUBLIC .:WORKS RECOMMENDS' THE 'ADOPTION'; OF .A
P� ESOLuTIOU _`ACCEPTING THE COMPLETED jdOFK AND AUTHORIZING. A FINAL
PAY'P1 :T: OF 71;'656. u0 TO HOENcAi CORPORATION FOR SI 1PSOi1 S:ANITAR'
SEWER :(ceriterliile sewer) 'AND SR-5391-S
'_(sideline sewer) in- SIMPSON SAHITARY',,SEWER IMPROVEMENT DISTRICT
SR-5391 C (centerline series) AND SR-5391-S "(sideline sewer).
•1.JEp:rAEs ,s..
LLW"
1':. I1C :0 ty impal e
OE MAME timPton 8anitfry AeWerTM /161e!tint , P . MS
nAONTRACTO Re5thda Co'rporaticn
fib$:SCCP,E Conttruet heW fnnita.rv_ eewrer ayatot includi i P6,806.
l .near Peet of'8" - 18". clay pie and czat-iron, pipe,
5050L linear. Peet or 6".lateral, manholeA, eidewa1k
a.nd pavement replacement in construction area iodated'
between 8. W. 15-82 Read and fiiscayne tay and 1-55
including Vizcaya Art Museum.
REASON
rot . won Provide sanitary sewers in area served ,by Septic` Tankt.
,s(7UPCfi b'
• urn Saritary Sewer':florid. Iiurid
PHO,IECT fiicis Received: 1/8/76.
I-IISTORY Contract Awarded: 1/22/76
Precoristruction I-eetina 2/17/76
CONTRACT
TIME'
STARTED
/5/76
CONTRACT
• TIME 140 working; days
SCI'EDULED.
;COMPLETION;
DATE
ACTUAL
COMPLETIO?
DATE
12/16/77
12/16/77
BID AMOUNT $783,000.00
CONTRACT
FINAL` COST
$718 O35,
plus 18 days delay from rain
and 12 days delay from water main relocations
and 7 clays delay from gas main relocations.
CURRENT
ITEM FOR
CONSIDERATION Resolution to accept. comp1etedwork and authorize final
payment to : the contractor.
COM ISSIOU
TIME
REPORTED two minutes