Loading...
HomeMy WebLinkAboutR-77-0532• • Fkt otUTt"oi 'I1O, A•F OttiTtO ' AGOF PTtF1G T' Cb PUE%E13 CONsTRUUOTIh o ►I J, ; oRP.ORATtb bR TFiE Wt TER fi bRAINA r ', 1RoJ 'CT RI B AT A TOTAE COST o• i 9 002y�-14, ADD AUTHORIZINU A '.IhAL RA M W1 OE $16 3 625 r 36 POR TItt tSTERN DRAIWAfl WHEREAS) there exists a contract .dated HoVember 19 i 106 between Tle City oMiami :and::and. EREAS, the work has been satisfactorily cotnleted and A.M.,.T. Corporation` had `furnished the required documents certifY.ir that all bi11s for `Labor and ma serials have >been paid i.n:Tull in connection `tit`th ..the' -aforesaid contract; and• WHEREAS; the City the Department of Public Corks recommend that " the completed work : be payment made tb the, Contractor; NOW). THFRE 'ORE:, •3E IT RE OLVED E COMMISSION aFH THE CTTy : Or MIAnT , FLORIDA . Sec.tion 1. The.. co ipleted 'work ac"ce te' and final performed by A.1�1:J. orprration for the WESTERN DRAINAGE PROJECT E-38 is hereby accepted at a total cost o1$159,OO2:l. Section 2. The proper o ''ficials of The City of Miami are, hereby authorized', to pay A 11.J. Corporation a balance of $16,625"$6 as full and final payment for all work performed and all materials furnished, in connection withthe aforesaid PASSED AND ADOPTED this 21 day o ti.. k.) v.J ATTEST: Cie Clerk contract. .DUNE':, MAIIRIrE A. FF iRE 11 A X:O. 1977. OGOENT• tt . ITEM N0 PREPARED ANT) APPROVED•13Y "D.AS TO Rum AND CORRECTN S Assistant Ct;y'Attorney City Att 18 CITY COMMISSION MEETING OF 'J U N 2 1 1977 REsownon N4 fi Wit .i trt Parkes . .Act -ink; birector be i tmerit of i'ttb is Mot s Corporation has completed the construction of dra.inap;e structures at 32 locations in an area. bounded by .N.14, 20 Street West 2 i Avenue) S, W. 8 Street j and the westerly City limits w th' one location ouvstde th"is °area", The work included3055 feet of Prfanch drain, 1105 feet of 2-foot wade covered dttchh 1175feet of 15-inch concrete Pipe and 160 feet, c`' 12-inch' cast iron pipe . The original: contract amount was ror" ;170, 820 : 87 but the :completed contract amount is 159,O02.14.. and it ias completed on time. now, -in order'for they Commi:.slon ;;o accept •the.-comnleted' ,work R, '�hortA final na yinent a' -tor all Conditions:are DLPA R1.I `IE SIT: ORt S i1ECOrIMEV)S :THE,...aDC" TION or ,"A r E or,atjT Er ACCE:°.TIt•I n T E CMITIA8 E f I.,:OR`ri AND AUTHORIZING A . 1,11 �= + m ' ,g s r.: :CORPORATION; WESTERN �� PA "�?i ��,.�16�,5.:.�.��6 TO fi�.".�,�...,�.: CCJR:QRA.T2C�,"..FC�)~�� , DRAINAGE PROJECT TRACTOR • 8C P2 lEA8?N.• Y.PRLNORK SOURCE OP ?uNbs PROk7ECT MPORY • CONTRACT TIME STARTED CONTRACT TIME SCHEDULED COMPLETION DATE ACTUAL COMPLETION DATE AID AMOUNT: CONTRACT FINAL COST CURRENT ITEM FOR CONSIDERATION COMMISSION TIME< REPORTED Per the CIYPan t Weete *m Drainage P115ject A Corpbra,t . n Conetruet• d1'ainage structures at A2,•locati ins in., 11 area bounded by N.V. PO ;street, . V. ` P7 Avehue, tW� gtreet, and Westerly Oita Limits,• with 1 1otatior outside this area, including 105•feet' of - Pre ich Drain, 1105 feet i `' 2 foot wide Covered Ditch 1175 feet of 15" .Conerote Pipe and 1E0.feet of 12". Oast Iron Pape..• Provide drainage to locations of•greatest need. within the:above boundaries, Storfi 8ewet Dond •Fund Rids Received t 10%2C/fiE Contract Avrrded; 11/11/7E ?reconstruction Meeting: 12/8/7E 1/17/77 100 working days 6/7/77 5/16/77 $170, 820.87 $159 002.114 Resolution to accept completedwork and -authorize final payment=to contractor. 2 minutes