HomeMy WebLinkAboutR-77-0532• • Fkt otUTt"oi 'I1O,
A•F OttiTtO ' AGOF PTtF1G T' Cb PUE%E13 CONsTRUUOTIh o
►I J, ; oRP.ORATtb bR TFiE Wt TER fi bRAINA r ', 1RoJ 'CT
RI B AT A TOTAE COST o• i 9 002y�-14, ADD AUTHORIZINU
A '.IhAL RA M W1 OE $16 3 625 r 36 POR TItt tSTERN DRAIWAfl
WHEREAS) there exists a contract .dated HoVember 19 i 106
between Tle
City oMiami :and::and.
EREAS,
the work has been satisfactorily
cotnleted and
A.M.,.T. Corporation` had `furnished the required documents certifY.ir
that all bi11s for `Labor and ma serials have >been paid i.n:Tull in
connection `tit`th ..the' -aforesaid contract; and•
WHEREAS; the City the Department of Public
Corks recommend that
" the completed work : be
payment made tb the, Contractor;
NOW). THFRE 'ORE:, •3E IT RE OLVED E COMMISSION aFH THE
CTTy : Or MIAnT , FLORIDA .
Sec.tion 1. The.. co ipleted 'work
ac"ce te'
and final
performed by A.1�1:J.
orprration for the WESTERN DRAINAGE PROJECT E-38 is hereby
accepted at a total cost o1$159,OO2:l.
Section 2. The proper o ''ficials of The City of Miami are,
hereby authorized', to pay A 11.J. Corporation a balance of $16,625"$6
as full and final payment for all work performed and all materials
furnished, in connection withthe aforesaid
PASSED AND ADOPTED this 21 day o
ti.. k.)
v.J
ATTEST:
Cie Clerk
contract.
.DUNE':,
MAIIRIrE A. FF iRE
11 A X:O.
1977.
OGOENT•
tt .
ITEM N0
PREPARED ANT) APPROVED•13Y "D.AS TO Rum AND CORRECTN S
Assistant Ct;y'Attorney
City Att
18
CITY COMMISSION
MEETING OF
'J U N 2 1 1977
REsownon N4
fi
Wit .i trt Parkes .
.Act -ink; birector
be i tmerit of i'ttb is Mot s
Corporation has completed the construction of dra.inap;e
structures at 32 locations in an area. bounded by .N.14, 20
Street West 2 i Avenue) S, W. 8 Street j and the westerly City
limits w th' one location ouvstde th"is °area", The work
included3055 feet of Prfanch drain, 1105 feet of 2-foot wade
covered dttchh 1175feet of 15-inch concrete Pipe and 160
feet, c`' 12-inch' cast iron pipe . The original: contract amount
was ror" ;170, 820 : 87 but the :completed contract amount is
159,O02.14.. and it ias completed on time.
now, -in order'for they Commi:.slon ;;o accept •the.-comnleted'
,work R, '�hortA final na yinent a' -tor all Conditions:are
DLPA R1.I `IE SIT: ORt S i1ECOrIMEV)S :THE,...aDC" TION or ,"A
r E or,atjT Er ACCE:°.TIt•I n T E CMITIA8 E f I.,:OR`ri AND AUTHORIZING A
. 1,11 �= + m ' ,g s r.: :CORPORATION; WESTERN
�� PA "�?i ��,.�16�,5.:.�.��6 TO fi�.".�,�...,�.: CCJR:QRA.T2C�,"..FC�)~�� ,
DRAINAGE PROJECT
TRACTOR •
8C P2
lEA8?N.•
Y.PRLNORK
SOURCE OP
?uNbs
PROk7ECT
MPORY •
CONTRACT
TIME
STARTED
CONTRACT
TIME
SCHEDULED
COMPLETION
DATE
ACTUAL
COMPLETION
DATE
AID AMOUNT:
CONTRACT
FINAL COST
CURRENT
ITEM FOR
CONSIDERATION
COMMISSION
TIME<
REPORTED
Per the CIYPan t
Weete *m Drainage P115ject
A
Corpbra,t . n
Conetruet• d1'ainage structures at A2,•locati ins in., 11
area bounded by N.V. PO ;street, . V. ` P7 Avehue, tW�
gtreet, and Westerly Oita Limits,• with 1 1otatior
outside this area, including 105•feet' of - Pre ich Drain,
1105 feet i `' 2 foot wide Covered Ditch 1175 feet of 15"
.Conerote Pipe and 1E0.feet of 12". Oast Iron Pape..•
Provide drainage to locations of•greatest need. within
the:above boundaries,
Storfi 8ewet Dond •Fund
Rids Received t 10%2C/fiE
Contract Avrrded; 11/11/7E
?reconstruction Meeting: 12/8/7E
1/17/77
100 working days
6/7/77
5/16/77
$170, 820.87
$159 002.114
Resolution to accept completedwork and -authorize
final payment=to contractor.