Loading...
HomeMy WebLinkAboutItem #19 - Discussion Itemr ig , freld MtMOrt t5WA and :: teftbei' :. :ty do ,Misib se'ph► ;Grassie c ityMahagef"' .... bAft. MAYri Ma: sil i.7 i.c reparation .f �3^a.jct;;rafit NceFisU'�eCi;:; pull' Ltd' Ap.p1.cat�.�i's The City is preparing a project list for Submission Of grant applications to the, Economic beve1optent Administration (EbA), We anticipate within the nett three weeks .we Will be able to estimate the amount of money ` that will be available to ' the City of Miami under this grant .program, EbA in Washington is now developing planning targets (funding levels) for.sitbstate areas such : as bade County.. The City is in constant contact withrepresentatives in Washington.,:` in order to identify the fuhdthatwi11 be available to the City. at the earliest possible. moment, `, This Will ,allow us to prepare: applications : in order to, qualify for grant funds .which May be available in excess of the amount of grant funds for which We havealready applied,. There are four project applications which haV not been funded. under this Public Works Project Program, They aret . Convention; Center. $ 5000,000 ▪ Little Havana Community. Center 2,7360550 • Bayfront Park Auditorium 2,4920400 • Handicap ramps and sidewalks 1,632,100 TOTAL $11 ► 561, 070 n the event the amount offunds available. in the City of. Miami exceed the $11,561,0.70.. amount ,.for '' which' we have already:` applied, the'. Citymay submit -additional .applications. The attached list ofprojects represents applications that could bed. made: if ;additional available to th funds are ��avai e City. beVelot3:tlent of Major nftVefttioft defter With ancillary feeili.tiee to be heated on & 4 acre City -owned downtown► cite on the Miatrd. Rivers Classification: New major facility C Onsultatt: Verendino Local Share: $5,500,000 Nett administration .Btai1dinct Construction of new City Hall in gent Center Complex downtown. Classifications NOW major facility Consultant: to be selected" Local Share: None Orange Bowl Improvements Co ern $ 5 000, 00r Construction of permanent upper deck stand at the east end of the stadium, creation of additional public rest rooms and concession facilities and the replacing of existing structural steel decking anci bleacher type seating in the lower seventeen rows of the north and south stands. Classification: Renovation Consultant: Kunde Local Share: None Little Havana Community Center. Renovation of three buildings - extend to determined - cost estimate being revised. Classification: Renovation Consultant: to be selected( Public Works) Local Share: $900,000 (C. D. Funds). AItGili.tMtNAIC _ttgt ConStruetiort of one thousand dtat1 1�tuiti level parking garage on City owned land adjacent to the Orange noW1. Classification: NeW Minor faoil.ty Consultant: to be _.selected Local Share: None Ea t?font Park Auditoriut Remodeling of Bayfront Park Auditoriut and the redevelopment of the North portion of the park not reauirinc a pewit, (transferred from Sayfront Park Phase IV). Classification: Renovation Consultant: Ed Stone (Park Area) Consultant: to he selected (Auditorium) Local Share: None Community Building Includes the renovation of Grand Ave. Community building and the construction of Community buildings at Moore, Curtis, West End, and Morningside Park Classification: New minor facility Consultant: to be selected (Public Local Share: None Miami Baseball Stadium Remodeling of the stadium, consisting of replacing the press box, 3,500 chair back seats, 2,000 feet of chain link fencing and the public address system. Classification: Renovation Consultant: to be selected. Local Share: None $ 804.0©0'. • tOAX§.13.1.1 .15ftrtilMtNkTralt11,7% jtt Suit..11 Atatit_fte_atikt1 _. ... ._.., , dki,t&riij:biikldiiIT-Altill',.: •:-'*•tOritt:rtiOtiOn Oe, heW btildin/...tonSiStiii4 . . __.... . .. . .. ,. . 4 ,.„ _ . . 4 Too sq. ft. ... _ . . . iassificationt' Htteto, MitVfir'.eatilty, , H:,:,,-,'.,.1,.,..:•_.,:,•:•:Ceinsultatit: ,',.' .' tekit_d_Ltele.O.,t,:ed ' • Local Shard:- :146he' ''' '''''.'-: ,.• J',:-,-„:-H-.-• ..- ' kant_Marifte_Sti,t1M ,' . ,•',.•':'::' This project will include, the Structural repairs to spading concrete, development oe public picnic areas, replacing of existing sound system, improvement of parking lot lighting, the recoating of the entire grand- stand roof, the renovation of existing, dress- ing r001115 and the placement of a permanent cover on the barge Renovation to be selected None Classification: consultant: Local Share: tftilities for Shib Dockage at Bicentennial Park Provide water, dock space. classification: consultant: Local Share: None• , sewer, and electric service New minor facility Public Works Dinner Kev marina Rebuilding Classification: - Renovation Consultant: , • to be selected. Local 'Share: None Ahmtt5lit_Park thatd rv, tt,.:11/1111,t-.90Teta—tfte5.1taT§ xmityllmtvAtit_ttalt CONTtNUtb t°4'1/7 tP.WallantJefttleit Ineludaa improvamentn rocuiring atato permit§ $2onOttell elnlyt (Amphitheater bulkheadiftg @tes) ClAddifidati8nt dew major facility Cont4ultaht g torte Local Share: Nohe Aomacadamitina__Oitv Wide Add a new surface to existing etreets throughout the City. Classification: Renovation Consultant: Public Works Local Share: None Local Storm brain l- City Wide $2 66#066 construct new drains to protect against street ,000010° flooding. Classification: New minor facility Consultant: Public Works Local Share: None Curb and Gutter Replacement - City Wide • Replace broken curb and gutters throughout the City. Classification: Renovation Consultant: Public Works Local Share: None Bandican Remo & Sidewalk Replace broken sidewalk and install ramps for the handicapped throughout the City. Classification: Renovation Consultant: Public Works •Local Share: None Page 4 'free planting in Lubin tight of way throughout thw City, Cla§sifiditttht t Beautifieation Consultant: Publie Work . total Share: None Additional Ottieet ftr ..Cahs_ir oration te1e'Made Island triage Demolition of existing bridge and construction of now bridge and approaches. Classification! New minor facility Consultant: to be selected Local Share: None Solar Water Heater for HeaVy EauipmentService; Facility Construction of a solar water system to provide hot water for the garage, Classification: New minor facility Consultant: David Morton etc. Local Share: None Marina Improvements Bay bottom clean up, bouy and piling replacement,; construction of fishing pier, etc. Classification: Renovation Consultant: to be selected Local Share: None $900, 000