A RESOLUTION ACCEP 'INO THE COMPLETED PEIA
BY LOWELL MINN COfihrANy AT A TOTAL COST OP,'8
AND AU`I'HORTZING A FINAL PAYMENT OE $17,839+1I0
VTR(ITNTA KEY FILL, PHASE TT 197E
k1HEREA , there eY:i sts a contract dated:May
between the City of Miami and The Lowell Dunn 'Coi aanYl nd
WHEREAS, the work han been . satisf"actarily comp1et
arid, The LoWell` Dunn Company has furnished. the required docuinet s
irif .that all bilk, for lahbP arid materials hare' been
fi111 -in conneet."ion With the aforesaid contract;; and'
W! CRLAC� inc1u ed, i,n the proect, was a $65,OOO Ca
Cash Allowance wapto be : 0,04
available t;o..:
hee.vent'` that extr'"a. f; 11. material
t he .Ci.ty dump After:;. tYie entire Cabh A1.lowalice:was:
iiusted� c� hrad: beefs c� mI A, erg Within: the : contract "ti.m
,. �,,v�l.I,�.l
bau1e'
actor a
8:: Contract--
onmi.sS1: I7 approve d an incrc Se th scope of : contract' iri • th'e. .mount;
$ ,r.
O00 "b: Re'so1utioil No. 76-920; and
WHEREAS, the City Manager and the Department of Public
Works recommend that the completed work be accepted and final
payment made to the Contractor;
pay T1ii:1�':�P. , ! 1 .:)0LVED 9V `r T ' t'r��'I=;1 VI N INDEX
I, DOCbM .NT
THE <ITvr OP ' .IAMI, ;;L,oHIDA: ITEM NO. /
rK
.Section i.. The eonn1.'tr "C 7nst1 uct i on C1=I':'L)I'I'Ied by
rat r3:a1. tO
main .nl t'il l a.t the' o
not,`,,, I3_ca '. 'e_ ;any cost,.r. or re
Ia1
inobilization
n extra. t .me .n
nn , Company Li
Subsequently, the: City,
ateii '.1ta.v 1976 t or
rebN accepted . at
nn CoIImp:ant::
CITY COMMISSION
MEETING OF
JAN l 3 1911
f% '
Rf LUT10M ao...,.; ..;
REMARKS:.... , ,
"SUPP07 JE
DOCU l r'`i ENTS
FOLLOW"
A RESOLUTIO14 ACCEPTING THr COMPLETED) WOHi{ PttIVOAM
HV t,OWrtL DUN1N1 COtIPA 11 AT A TOTAL COST of ,$178) 366
AND AUTHORIZING A FINAL PAYMENT OF $17 y 8391 40 EOR' ' 2
TRCTNIA 1{EY 'ILL) 114ASE TI 1976
WHEREAS) there e fists a contract dated May 8
• between the City. of Miami and The Lowell Dunn Company; and.
,WHEREAS) the work, has been satisfactorily completed
Lowell Dunn Company Yia.s furnished the required documents
ryInr that:all bills
for labor
and materials have' been
4ta full in connection With the aforesaid contract; and,
W1-ttRrAS, inclu ted fl the project was a $65 )000 Cash'
.10,3ariee for .SpectaI
Items.l
ri ,.the event that extra
he City dumt.. >it` ;.
Xhausted; which h `1
cu ipment.
s :contract
he,`..i ash Allowance was to be. `used
as 'available to be ,hauled
Cash Allowance was
:withl,n the contract time:
1'materia1 to be :hauler.'
tnaining fill at the orip;inal
notcharge'a,ny cot for remobiliZatio .
ovidec1 he was given extra time in
to `haul this material. Subsequently;.. the City
tnmission arproved. an' a.nei''e; .se 1.n, scope , of _ contract 'in the amoun`,
000 by Resolution No. 76-920; and
WHEREAS, the City Manager and the Department of Public
rks recommend that the completed work be accepted and final
.payment made to the Contractor;
rr r�jT C,I7i�f� :1: 4-?4, ir :�1'.�zi.�iVEI) tV rp T}'' (�( �iI7 TT )?
;a'•I, �� , 1. , ;`DOC ili iiT,�I INDEX
THE .,ITV O1'' M1AM1, FLORIDA: ITEM NO. � ,►
Section 1. The completed Oonstructlon hV
dr'ontract dated May 9, 1976 for,
leby accepted at
Dunn: Company,
ami
Dunn C ouu ran •:
CITY COMMISSION
MEETING OF
JAN 1 3 1941
RFSOLlITINI
RtMARIG ...•
.atIde of $17,889.40 at fall and final payment for all
rk performed and all materials furnished in connection with
the aforesaid contract.
PASSED At1D ADOPTED this day of JANUARY_
.//co -&9## (32
TY CLERK
PREPARED AND APPROVED BY:
ROBERT F. CLARK
Assistant City Atttorney
M&UR t CE A. F RRE
MAYOR
"SUPPORTIVE
E. N TS
FCLi O
APPROVED AS TO FORM AND CORRECTNESS:
F. . OX, JR.
City Attoriey
ITV OF MI Amt. st..f)nirD.A
1t MEMORANDUM
TO,
hteph A. Grassi
City Manager
01:71, er, • e
FROM E. ParkeS
Acting Director
Department of Public Worka
t E 2Gi 3: le
wliber 2 1976 ,, 8-4W
VIRGINIA KtY PILL -PHASE 11-1976
Report Prior to Pinal Acceptance
utzt:1-4
The VIRGINIA KEY FILL -PHASE 11-1976 project has.been completed
by Lowell Dunn Company. The project consisted of excavating
approximately 150,000 cubic yards of fill material at the
northerly end of Virginia Key, hauling and stock piling this
material at City dump site approximately one mile to the south.
Also included in the project was a $65,000 Cash Allowance for
Special Iterrs. The Cash Allowance was to be used in the event
that extra fill material was available to be hauled to the City
dump site.
After the entire Cash Allowance was exhausted, which had been
completed within the contract time limits, there still remained
some fill material to te hauled. The Sanitation Department
requested that this remaining fill be hauled. The contractor
agreed to haul this remaining fill at the original price per
cubic yard bid and not charge any cost for remobilization of
equipment and manpower, provided he was given extra titre in his
contract to haul this material. Subsequently, the City Commission
approved an increase in scope of contract in the amount of
$33,000 by Resolution No. 76-920.
We will request preparation of a Resolution accepting the work
and authorizing final payment to the contractor for the Commission
meeting of January 13, 1977.
This was a unit item contract in the amount of $178,700.00,
including a $65,000.00 Cash Allowance for Special Items and an
increase in scope of contract in the amount of $33,000.00. The
actual construction cost is less than the contract amount because
only $32,666.37 of the increase in scope was used.
The actual construction cost, therefore, is $178,366.37. The
work was completed on time.
WEP:RAR:ps
cc: Construction
Assessments
Contract
To•
J°th b A • ' r
•At4' urassae
City Manor.
r
_ • '
L.1
Department
•
Olortherly end o
ti
maeral a
(
Parkes) Acting
of Public Workt-''
7 •
i
In 4
4
Centact
1:06 0402
Vitt ?!AS It
J .•-
.111:On.Auth-Oriting Pita'
. „
•
Dunn ComPanha8 Completee:;tcaNatingapr
t elv 150)000 cubiC 'ards of fill Material at the
AMa"
f Virnia hauling and stock piling
t City dump site approxately one mile tO
.the south. .._,.,..,,. „.
. .,
The original contract a7,ount wan ':.4,1L5)7:0. Included in the
:-Contract wan a $6517.0: :ash AlloWance f:r Special Items. The.
Cash Allowance was t be used in the e'-:ent that extra fill
paterial was availa1:le to be hauled t,.: he City dump site.
- : After the entire Cash Allowance was exausted) which ha:1 been
.completed within the contra:.t tIr.e 1!:•%Its) thned
ere still remai
some fill matr!al '..7) be hs:oled. 2h- C:ntractor aEl-eed to haul
this remainIng fll' a- The oiia.1:.:'t-2e per cubic yari bid and
hot char70 an:i cost f:r cf equipm..,nt and ma -
power, provld,-Jd he -.as Etven extra la his contract to haul
this mater;a1. Subcentl:..) the Cit.' 7ommission app:-.:7ed nn
increase in scone o contract in tha a-1:unt of $3i)000 by
Resolution :!(:), 76-92D, :,aking the total contract amount .1.78)700.
• The contract was cbT.bleted fbr $37)3'S6.37) and it was completed
on time.
It is now in order for the Commies!on t: accept the completed
Work and authorize final payment, after all conditions are met.
DEPAT•Iri4PNT OF 1-1EOC'S THE ADOPTION OF A
ESOLUTION ACCEPT -I -Ng CO:1PliETED AUEFOR131Nn A FINAL
nv101NT OF $17,839.1.) 7J TliF, LOWELL ?OYIPA::Y FOR
hhi' FILL, PHASE .T
EP:EAE:hh
-.44 .4..43.43 4 •
A
ta:
iioseDh 0t611t;
City ' Manager'.
F oy GJ ll�i tii E P ,Y'ke
"� 3
Departtflent of Pub1
Ll
•Otntract
�..�: 4402
Pitt)`:ty I 1976 -1
,IOn Ailthorit ng Pi 1
Lowell Dunn COm:a.: y. has cohple ed e::c .vati.nr, approx '
-. of fill material at the
:�►��t�i�� l,o,000 c�_ib'.c yards �. a� �
Orther1y end of Virginia -';eyy hauling and stook piling
r City � � ,r.,::3--a e
material at C�.dump site ��,_ y one mile 1
'' 'the south,
The original contract _.-`:punt ''ra _ `.5 `' : CI . Included In the
contract wa: a $65 C ): :ash Allowance f:r Special ltem8, the
the - .::. that extra fill
Cash Allowance was t'�� be used in event
material was avai 1 to to be hauled ;' the City dump Sie.
.`'ter the entire Cash Allowance was ex =;.:stedyrst'rhich h^:l been
4 a :!e i r .L r i i there still remained.
v omp1et�''� within o:cl.♦ C3.` � t: t..'� 1 . "�- y
:tom
e fi11 mat' ' _a be 1.=�d. ' '.^r.tracter aE:reed to haul
this remaining fill at the o:'1gizla.: :. per cubic yard bid an
not char:char7e any Cos r er-,c h i 1 . ... t i eh : _f equipment and m`ui-
po'sier, orov.. c cd he � i _ 1vc';-! extra t : 3 in his contract ',.C1 haul.
y + S co e .r the Cjt: _:jnmission approved :in
-this T::GC L � • t' .i ..-�...i.. �. a til � `-: 4w''. a i t• � • • � L. � .i �
'Increase in scone o" contract r-e in t a: '. nt of :'33,OOO by
' iesolut on 11o,. 70-923 ::=-: 2tf; the total contract amount 178,7OO,
'The contract was co:n `.3i e.ed for $178, 36' 6 , 37, and it was completed,
on time.
It 'is now in order Th '..r ' Comml= _.'-%n to accept the completed
a•:ork and authorize a1 pi m nt , ,after all conditions are
DFPARTM•, rr� OF D' R.... .t e..., i:..
= A `CI�;;,rr ' ,, �. C ',>-,r }-T., , � � ,. t �� AU "F'O1 1 1Jtt 11 FINA
:RESOLUTION �. x :st�. 't t�:` ;'�tcity�.a{i��.� .�. .." � ti �
'PAME
�It F $i .v 8 9a .::' '� .. �,t''i "_. 1,i : ..'�;'" n �p J ti1a
i>t. 1: I.
i
JOB.NAMr.
CONTRACTOR
JOB SCOPE
REASON
FOR .WORM;
SOURCE
OF FUNDS
PROJECT
HISTORY
CONTRACT
TIME
STARTED
CONTRACT
TIME
SCHEDULED
COMPLETION
DATE
ACTUAL
COMPLETION
DATE
BID AMOUNT
CONTRACT
FINAL COST
CURRENT
ITEM FOR
CONSIDERATION
COMMISSION
TIME
REPORTED
E Mtn.
the City Mahag
Virginia Key Fill Phase II .. 1 6
Dowell Dunn Company
excavate approximately 150)000 cubic yards of fill
t;.aterial at northerly end of Virginia Key, hauling
and stockpiling this material at City Dump Site
approximately one mile to the south.
Pollution Control has required City to take steps to
prevent fires at City Dump. Sanitation Department
will use this fill to prevent fires.
Pollution Control & Incinerator Facilities Bond Fund
Bids Received: 5/21/76
Contract Awarded: 5/27/76
PreconstructionMeeting: 6/22/76
7/12/76
75 working days plus 17 days_
of contract
11/19/76
11/19/76
$178,700.O0lIncludo_s $33,000.00 increase in scope
of::contract authorized by Commission
,Resolution 76-920)
0 increase in
$178,366.37
Resolution to accept completed work and : authorize
payment to the Contractor,
Two minutes,