HomeMy WebLinkAboutExhibit AQii
ARTHUR NORIEGA, V
City Manager
January 2, 2024 EXHIBIT "A"
Alex Schapiro
Prinz Corner, LLC
3841 NE 2 Avenue, Suite 400
Miami, FL 33137
DELSHA.H SUBDIVISION
TENTATIVE PLAT #1948-C (THIRD RESUBMITTAL)
LOCATED AT THE NORTHWEST CORNER OF NE 36 STREET AND NE 1 AVENUE
Ladies and Gentlemen:
The City of Miami Plat and Street Committee, at its meeting of November 2, 2023, approved the above
tentative plat subject to the following revisions being made to the tentative plat, additional information
being provided and/or variances granted. Please be advised that the processing of your tentative plat cannot
proceed until these conditions have been satisfied.
Resilience and Public Works:
1. Submit a resolution for authority, in accordance with the execution in the application, acceptable to the City
Attorney's Office.
2. Surveyor's Notes #3 and #8 need to be revised.
3. A letter from the Florida Department of Transportation (FDOT) is required at the time of final plat
submittal.
4. The discrepancy of the 1 foot right-of-way dedication on NE 1 Avenue needs to be resolved.
Planning/Zoning:
5. The applicant is responsible for paying the Planning Department, Land. Development's Review fee of
$295.00. For more information about this fee, please email Ricardo Lopez-Aldana at
rlopezaldana(cmiamigov.com or 305-416-1601.
6. The density provided in the Development Information exceeds the maximum allowed.
Standard Comments
7. Provide an updated tentative plat at time of final plat submittal.
8. A letter from Comcast is required to determine if any adjustments to their facilities or easements are
required.
9. Verify with Miami -Dade County that the proposed plat name is acceptable.
10. All encroachments across proposed tract and/or lot lines must be removed prior to final plat
submittal.
11. An Opinion of Title, in the City of Miami Opinion of Title form, must be provided at the time of final plat
submittal.
12. Current backup documentation will be required for all who execute the final plat. A resolution for
authority to execute documents and a Certificate of Good Standing from the Secretary of State are
required, if applicable.
DEPARTMENT OF RESILIENCE & PUBLIC WORKS
444 S.W. 2nd Avenue /:Miami, Florida 33130 / (305) 416-1200 / Fax: (305) 416-1278
Mailing Address: P.O. Box 330708 Miami, FL 33233-0708
DELSHAH SUBDIVISION - TENTATIVE PLAT #1948-C (THIRD RESUBMITTAL)
January 2, 2024
Page 2 of 3
13. Tentative plat application must be made with Miami -Dade County after receiving approval from the City
of Miami Plat and Street Committee.
14. Be advised that an incomplete final plat package will not be accepted by the City of Miami. It is the
owner's responsibility to work with his/her surveyor and attorney to assure that everything is in order
before submitting the final plat package.
15. Be advised that if all requirements for scheduling the final plat for City Commission action are not
in order, the final plat will not be scheduled for a City Commission meeting.
16. A letter of concurrency from Miami -Dade County School Board is required prior to the final plat
submittal.
17. A letter from the Miami -Dade Water and Sewer Department is required to determine if any
adjustments to their facilities or easements are required.
18. A letter from Miami -Dade Water and Sewer Department is required to release the final plat in
connection with water and sewer service agreements.
19. Provide two 8 'h" x 11" paper location sketch exhibits, one "Before Replat" and one "After Replat".
In addition to the above requirements, you should be aware of the following:
1. State and local laws require the installation of various physical improvements in the public rights -
of -way when property is platted. These subdivision improvements include paving, drainage,
landscaping, sidewalks, etc. In some cases this could represent a substantial investment on your
part. REQUIRED: The submission of an electronic file of the tentative plat, in an AutoCAD, to the
City of Miami Public Works Department, Development and Roadway Plans Section will
EXPEDITE the preparation and enhance the ACCURACY of the subdivision improvement letter
required for the final plat approval.
2. Execution of Covenant for Postponement of Subdivision Improvements is required in cases where
the required subdivision improvements are not completed.
3. The alteration, relocation or installation of utilities such as storm and sanitary sewers, electric,
telephone, water, etc., caused by this plat will be at the property owner's expense. Also, utility
easements may be required on the property being platted.
4. A building permit will not be issued on the property being platted until the final plat is recorded or
as authorized by the City of Miami Code Section 55-10(j). Also, the Temporary Certificate
Occupancy andlor Certificate of Occupancy for any building construction will be issued only after
all the required subdivision improvements have been completed.
5. Approval for fire flow requirements must be obtained from the Fire -Rescue Department prior to the
issuance of a building permit.
6. In order to mitigate problems associated with access and construction activities throughout the
neighborhood, the contractor/developer is encouraged to notify the affected neighborhood residents,
in writing, of the project starting and completion dates at the time of issuance of permits. The
contractor/developer may coordinate the notification of residents with the local City of Miami NET
Service Center.
7. Additional items must be provided to the City of Miami Department of Public Works before the
final plat is submitted to the City Commission for approval. You will be notified in writing as to
what these items are after the amount of the bond has been determined for the necessary
subdivision improvements. It is required that the applicant contacts the Survey Section of
Resilience and Public Works Department of the City of Miami to verify that all final plat submittal
documents are complete prior to final plat submittal.
8. Tentative plat approval is only valid for one (1) year and six (6) months from the date of the Plat and
Street Committee meeting at which time it was approved.
DELSHAH SUBDIVISION - TENTATIVE PLAT #1948-C (THIRD RESUBMITTAL)
January 2, 2024
Page 3 of 3
If you have any questions concerning these requirements, please refer to the attached sheet for the appropriate
person to contact.
Sincerely,
Juve E antai\a, P.E., CFM
Supe or of Plats - Plat and Street Committee
Director — Public Works
Department of Resilience and Public Works
JS/EP/jv
Enclosure: Contact Sheet
cc: Dan C. Fortin Jr., P.S.M.
Fortin, Leavy, Skiles, Inc.
180 NE 168 Street
North Miami Beach, FL 33162
David Holtzman
3841 NE 2 Avenue, Suite 400
Miami, FL 33137
Damian Thomason
D.E.T. Strategic Consultants, LLC
12385 N. Parkland Bay Trail
Parkland, FL 33076
Plat and Street Committee Members
Nzeribe Ihekwaba, Ph.D., P.E., Deputy City Manager
Development and Roadway Plans
Survey