HomeMy WebLinkAboutR-78-0392RESOLUTION No, 7 8 3 9 2 A RESOLUTIOIJ ACCEPTING THE COMPLETED WORK PERFORMED BY D.M.P. CORPORATION AT A TOTAL COST OF $148,155.64 FOR CENTRAL DRAINAGE PROJECT E41; AND AUTHORIZING A FINAL PAYMENT OF $12,955.53 WHEREAS, there exists a contract dated November 16, 1977 between the City of Miami and D.M.P. Corporation; and WHEREAS, the work has been satisfactorily completed, and D.M.P. CORPORATION has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF IMIAi'4I, FLORIDA: Section 1. The completed work performed by D.M.P. Corporation for CENTRAL DRAINAGE PROJECT E-41 at a total cost of $148,155.44 is hereby approved. Section 2. The propr officials of the City of G e Miami are hereby authorized to pay $12,995.53 to D.M.P. Corporation as full and final payment for all work performed and all materials furnished DRAINAGE PROJECT E-41. PASSED AND ADOPTED this ATTEST: E S T : in._connection with CENTR(3OCUMENT INDEX ITEM NO. 13th day of June , 1978. Maurice A. Ferre ,, c_-_,;../ (7, Q 1AURICE A, FERRE, MAYOR 4 LPIH C), ONGIE, CITY CLER . PREPARED ANJI) APPROVED BY: JA(if ROBhRT F. CLARh�,EORG ASSISTANT CITY ATTORNEY CITY APPROVED AS TO FORM AND CORRECTNESS: F, KNOX, TORNPV a R. OMMtSSION I STING OF UN 11 31978� RESOLUTION , 8 ` e3 REMARKS: 'O: cry OF MIAMF. F•LDRFDA i •NTER•C F(C ;.' .;.1OV ANDDUtv1 Joseph R. Grassie City Manager Williafn E. Parkes Director Department of Public Works June 13, 1978 B-5434 CENTRAL DRAINAGE PROJECT E= 41 D.M.P. CORPORATION has completed the project consisting of construction of nine (9) drainage structures in an area bounded by N. 36 Street, W. 27 Avenue, S. 8 Street, and Biscayne Bay with 13 drainage structures outside this area. The original contract amount was for $155,178.00, but the completed contract amount is $148,155.64, and it was completed on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTIO:d OF RESOLUTION) ACCEPTING THE COMPLETED WORT: AND AUTHORIZING A FINAL PAYMENT OF $12,955.53 TO D.M.P. CORPORATION) FOR CENTRAL DRAINAGE PROJECT E-41. EAE : cmt.1 M Er - r *. mwm ERE FtNAL CONSThtICI'ION., FACT , SHEET FOR_.,.PHE CITY MAttAc w J01tAt'lt Central Drainage Project E 41 B-5434 COr1'I',P,aCTQP. D.M.P. Corporation JC$__S,CO°E _ Construct nine (9) dra.inage structures in an area bounded by N. 36 Street, W. 27 Avenue, Si 8 Street, and Biscayne Bay with 13 drainage structures outside this area. REASON FOR.WORK Provide storm drainage to locations of greatest need. SOURCE OF FUNDS Storm Sewer Bond Fund PROJECT Bids Received: 10/25/77 HISTORY Contract Awarded: 11/10/77 ?reconstruction Meeting: 11/22/77 CONTRACT TI ME STARTED 1/20/78 CONTRACT TIME SCHEDULED COMPLETION DATE ACTUAL COMPLETION DATE 60 working days plus 9 days delay from rain.. 4/27/78 4/27/78 BID AMOUNT $ 155,178.00 CONTRACT FINAL CCST $ 148,155.64 CURRENT ITEIM FOR CONSIDERATION Resolution to accept completed work and authorize final payment to the contractor. 7 8 . 3 9 s, MAt, CO 1ST uc'IIoN ,FACT SliE8T Von ..THS CITY_ MAMAGEt J0 _MAMt Central Drainage Project E-41 5 5434 COt TnACTCR D.M.P. Corporation JOB_SCO?E Construct nine (9) drainage, structures in an area bounded by N. 36 Street, W. 27 Avenue, S, 8 Street, and Biscayne Bay with 13 drainage structures outride this area. REASON FOR wORK Provide storm drainage to locations of greatest need. SOURCE OF FUNDS Storm Sewer Bond Fund PROJECT Bids Received: 10/25/77 HISTORY Contract Awarded: 11/10/77 Preconstruction Meeting: 11/22/77 CONTRACT TIME STARTED 1/20/78 CONTRACT TINE E SCHEDULED COMPLETION DATE ACTUAL COMPLETION DATE 60 working days plus 9 days delay from rain. 4/27/78 4/27/78 BID AMOUNT $ 155,178.00 CONTRACT FINAL CCST $ 148,155.64 CURRENT ITEM FOR CONSIDERATION c7754.." Resolution to accept completed work and authorize final payment to the contractor. 78-392