HomeMy WebLinkAboutR-78-0278EEsOLHTTflN NO, 7 8- 2 7 8
A RESOLUTION Co,JETR!IT:11 AND RATTFYINfl THE
ACTTnN OF THE CTTy T.TANAqER TN T10EEASTNq
THE SCOPE OF THE CWATRACT TN THE NET A.,TIOT.INT
op !:,21_1(04,(1f1 FOE THE TRADE FATE (7-1F THE
AIEETC!A::!; ALLOCATTNq THE ADDTTTONAL AviOTINT
"THE LATTN A!'.1ERTI.!AH TRADE ::UTP,ITTRHST
Nr) A:;Nc7 ,.'UND"; A.'2flEPTT711 1
LETIED
"
SUP'ORT
• i* IVE
AT A ToTA!,
DOCUriFft
,
FOLLOW"
there a C,ontract latd ,1an7lary
hetwon The .I1m1. and ,.,.)nructIc.)n, Inc.; and
:annar 127?,
Inth01,12,1 the CI.7 a!r)t and 1?,11LI
the varl, contr]icti.:.)n 9n1
TflF. TH,2, 11-'...Irr7A:7.; and
,'abrHat!fl!:i and IntallatIn all bflf-)th2
In
hai
',)ntrat. In the !..tint o'
tt
4:11,..?
N.O.
"DOCUMENT INDEX
ITEM NO iq
1:7-)n4,rar are arallabTe ro:-1 the ac,T,.nnt "Th.? Latin
F.xhIbition Tru3t and Ancv T''und"; and
the flit7 7Iana.-?r and th,,? Derartment (If'
rocommend the increa2e a" ..::.1.,164.0() in the
C(:)n4Jrat and allocatIn the additional amount
to (:),Jr thc? in- in the ',4,cone at.4 the Contract.
Tm C(7111T:T1T(1 r)1'
FLORTDA:
ion I. The
•
n flr th- *Ity lh
. ••H'• Lntract
•
llereby
.t, .1 t 1 )
arY COMMISSION
MEETING OF
APR 2 (1978
ammo a . 7 8
„or
Section ?), The adVtional amount o' 1164,00
for the a'oresaid increaset hereby allocated "rom the
account entitled "The Latin American Trade 7:xhibition Trust
and Agency Fund”,
ction 4, The nr,T)per o° The Ctt7 Mtami
are hereby authoried
(7o nstruc'. tion, Inc, a balance
00 as "ull 'Inal nalent 'Dr all work ner"ormed
and all materials eurnl:Thed In connectIon with the a?oresaid
Contract,
AT,-) AD;-1PM this 27 ()°
ATTF:
.771 ) /
•
C ( ' (.71eri,
AsPi-rP,fl7!.:7)
/..‘,PYinVED wO!KI
City Al t. or
APRIL
MAURICE A. FERRE
•
1
TO:
Joseph R. rrassie
City ftanar er
r'' i
' �' L L
William E.., Parkes
Director
Department or public ''1or1:s
April 27, 1)78
B-3187
THE TRADE .'AIRR 0r THE A' IERICAS
NETCOn St,Lcti0l, Inc. 1?"comp lc d the tr7„i s , COlslSt i1r of
fabrication and. inst,allt'Lon O`' Panels for exhibitorst booths
and for City offices h:? .'l ?i;i' ... o/C ni. r. This was a
,' pact Ina i n" CI 0,mot i)1but the com-
pleted �a,:, ,��.�1,�� the amount o; . 11 . ,) . ,. , , zw �om-
nleterl contract amount Is T 1w • 2i,1.(•!i. it for oV°'i'run.
It is now in or';er for the Comrli.. - „ to accept the completed
?'fork and uthorize final 7a ment, after all conditions are met.
TEE OTT . ..AN G_. . AND THE . ... ....' t
.PJ- 1T ! WC 'EC 1.iJ
iAD()7 .N •11E Ar�_E... ^i'/'!ON .r.,. .._ ? r AND
RAr .. , . _ N n U =I:Ei 37
A TOTAL ^r ,!. 1 l AT7 .. ; T.', ING A 7THALPf. ....rn
OF
"SUPPORTIVE
D0CUMf-N S
FOLLOW"
78- 278
1
Joseph R, Grassie
City Manager
Charles t. Crumpton
Assistant City Manager
CITY Or MI AMI. FLCfflbh
Mt!AbtlANbUM
DAtt APR 14 'n, FILE
Ratification of Additions to
,;,n,EC. MET Construction, Inc. Contract
and Authorization to Make Final
Payment re Trade Fair of the
Americas
PEtI 44CEs:
0.1CLUSURtS.
The original contract with MET Construction, Inc. for fabrication
and installation of all booths at the Trade Fair had to be increased
in order to adjust to changes after work had started; Peru withdrew,
Brazil reduced the amount of space originally reserved, and the VIP
Suite sponsor cancelled its participation.
It was recognized in advance that the time schedule of the work to
be done could not be conveniently adjusted to regularly scheduled
Commission meetings. As a consequence, Resolution No. 78-69 was
adopted by the City Commission which gave the Manager the authority
to award contracts, make changes and do whatever was necessary to
accomplish the work, subject to ratification at a later date by the
Commission. It is now in order that the Commission ratify the action
taken by the City Manager and authorize final payment to MET Construc-
tion, Inc. in the amount of $32,164.
Following is an outline of the work accomplished due to these unfore-
seen circumstances:
1) Peru withdrew its participation in the
fair and thus left unoccupied space.
A fashion area (Fashion Square) was
created to fill that void...
2) Brazil reduced the amount of space
originally reserved, thus creating
1
vacant space which was filled by
$ 9,415
PPORTIVE
the construction of a Seminar Room (\� T
and a series of small conference Q�GU �� L V 1 S
�ti
rooms for the participants and the (� ��f}�
press... FVLLOVv
Seminar Room 4,829
Conference Room 7,658
3) The VIP Suite sponsor cancelled its
participation; therefore, the scope of
the sponsor's construction plans was
reduced and built...
Page 1 of 2
3,970
Total $25,872
Joseph R. dtassie
City Manager
IIIIR 14 1g19
The base bid for the contract was $110,000 with $10,000 of that amount
for "special items" such as repairs, alterations, provision of mote or
less items by units, or unforeseen items which would be utilized as
needed. Only $50292 of the "special items" portion of the contract was
heCessary, thus the balance ($4,708) of the base bid was utilized for
part of these unforeseen items with the remainder authorized as per
Resolution 78-69 which extended the contract with MET Construction by
$21,164 to $131,164. The contractor has beep paid $99,000 to date and
is now due the final payment of $32,164.
1 recommend that these expenditures be ratified as per Resolution 78-69
and the final payment be made to MET Construction. They have fulfilled
their contract on time as well as delivering the materials, once removed
from the fair site, to the City so that most of the wall panels, doors,
etc, can be utilized by the City for other City projects.
Joseph R. drassie
City Manager
APR 14 1979
The base bid for the contract was $110,000 with $10,000 of that amount
for "special items" such as repairs, alterations, provision of more or
less items by units, or unforeseen items which would be utilized as
heeded. Only $5,292 of the "special items" portion of the contract was
necessary, thus the balance ($4,708) of the base bid was utilized for
part of these unforeseen items with the remainder authorized as per
Resolution 78-69 which extended the contract with MET Construction by
$21,164 to $131,164. The contractor has beep paid $99,000 to date and
is now due the final payment of $32,164.
I recommend that these expenditures be ratified as per Resolution 18f-69
and the final payment be made to MET Construction. They have fulfilled
their contract on time as well as delivering the materials, once removed
from the fair site, to the City so that most of the wall panels, doors,
etc. can be utilized by the City for other City projects.
Page 2 of 2