HomeMy WebLinkAboutAgenda Item Summary FormAGENDA ITEM SUMMARY FORM
File ID: #18223
Date: 09/24/2025
Commission Meeting Date: 10/09/2025
Requesting Department: Department of
Resilience and Public Works
Sponsored By: Joe Carollo
District Impacted: District 3
Type: Resolution
Subject: Direct CM - Install One (1) Traffic Calming Device - D3
Purpose of Item:
A Resolution of the Miami City Commission, with attachment(s), after a duly noticed
public hearing, authorizing and directing the City Manager to take any and all action(s)
necessary to expeditiously request the Miami -Dade County Department of
Transportation and Public Works ("DTPW') consider the proposed traffic flow
modifications and waive the required resident concurrence and exempt the balloting
process in order to expeditiously proceed with the design and construction of traffic
calming devices at one location in the residential neighborhood of Shenandoah;
directing the City Clerk to send a certified copy of this Resolution to the DTPW Director.
Background of Item:
Several locations in the City of Miami's District 3 residential neighborhoods are
experiencing significant cut -through traffic and speeding during rush hour periods. In
addition to quality -of -life problems such as noise and general congestion, such cut -
through traffic and speeding creates significant life -safety risks as residential streets are
narrower than nearby arterial roadways, increasing the risk of vehicular accidents,
including those involving pedestrians.
Those drivers who cut -through residential neighborhoods during rush hour traffic tend to
disobey posted speed limits and signage to gain an advantage over using arterial
roadways meant for such traffic.
In order to alleviate these issues, the City proposes to install one (1) traffic calming
device on SW 13 Street between SW 12 Court and SW 13 Avenue, a location that
experiences significant cut -through traffic and speeding during morning and afternoon
rush hour periods. Section 1.6 of the Miami -Dade County Traffic Flow
Modification(s)/Street Closure(s) Procedure, as revised by the Miami -Dade County
Public Works Department ("PWD") Traffic Engineering Division in January 2009,
attached and incorporated as Exhibit "A" ("County Procedure"), requires concurrence
from the affected residents and/ or property owners. Section 1.6 of the County
Procedure further states: "Municipal Jurisdictions: In lieu of concurrence from the
affected residents and/or property owners, a municipality may pass a resolution after a
public hearing requesting PW to consider the proposed traffic flow modification(s)/street
closure(s)". In order to expeditiously address the aforementioned quality of life and life -
safety issues, the City desires to install the one (1) traffic calming device on SW 13
Street between SW 12 Court and SW 13 Avenue, in the Shenandoah neighborhood of
District 3 without delay by holding a public hearing in lieu of resident/property owner
concurrence through balloting.
Although the City is adopting this Resolution after a public hearing in lieu of
concurrence, it is the intent of the City, to the best of its ability, to seek concurrence
from the residential properties whose frontage directly abuts the proposed traffic
calming devices. In lieu of concurrence from the affected residents and/or property
owners, the City Commission finds it in the best interest of the City and its residents to
pass a resolution after a public hearing requesting PWD/DTPW to consider the
proposed traffic flow modification(s)/street closure(s).
Budget Impact Analysis
Item is NOT Related to Revenue
Item is an Expenditure
Item is NOT funded by Bonds
Total Fiscal Impact:
Total Fiscal Impact: $75,000
Capital Project No: B-243605
Reviewed B
Department of Resilience and Public Works
Review Completed 09/24/2025 2:15 PM
Office of Management and Budget
Office of Management and Budget
City Manager's Office
City Manager's Office
City Manager's Office
Legislative Division
Office of the City Attorney
Office of the City Attorney
City Commission
Office of the City Clerk
Luis Hernandez -Torres
Marie Gouin
Asael Marrero
Natasha Colebrook -Williams
Arthur Noriega V
Valentin J Alvarez
Patricia Arias
George K. Wysong III
Maricarmen Lopez
City Clerk's Office
Juvenal Santana
Budget Analyst Review
Budget Review
Assistant City Manager Review
Deputy City Manager Review
City Manager Review
Legislative Division Review
ACA Review
Approved Form and Correctness
Meeting
Rendered
Department Head
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
09/29/2025 8:12 AM
09/29/2025 9:57 PM
09/30/2025 5:13 PM
09/30/2025 5:59 PM
09/30/2025 6:05 PM
09/30/2025 6:14 PM
09/30/2025 7:38 PM
09/30/2025 7:58 PM
10/09/2025 9:00 AM
10/17/2025 9:24 AM
City of Miami
Legislation
Resolution
Enactment Number: R-25-0423
City Hall
3500 Pan American Drive
Miami, FL 33133
www.miamigov.com
File Number: 18223 Final Action Date:10/9/2025
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
AFTER A DULY NOTICED PUBLIC HEARING, AUTHORIZING AND DIRECTING THE
CITY MANAGER TO TAKE ANY AND ALL ACTION(S) NECESSARY TO
EXPEDITIOUSLY REQUEST THE MIAMI-DADE COUNTY DEPARTMENT OF
TRANSPORTATION AND PUBLIC WORKS ("DTPW') TO CONSIDER THE
PROPOSED TRAFFIC FLOW MODIFICATIONS AND WAIVE THE REQUIRED
RESIDENT CONCURRENCE AND EXEMPT THE BALLOTING PROCESS IN ORDER
TO EXPEDITIOUSLY PROCEED WITH THE DESIGN AND CONSTRUCTION OF
TRAFFIC CALMING DEVICES AT ONE LOCATION IN THE RESIDENTIAL
NEIGHBORHOOD OF SHENANDOAH; DIRECTING THE CITY CLERK TO SEND A
CERTIFIED COPY OF THIS RESOLUTION TO THE DTPW DIRECTOR.
WHEREAS, several locations in the City of Miami's ("City") District 3 residential
neighborhoods are experiencing significant cut -through traffic and speeding during rush hour
periods; and
WHEREAS, such cut -through traffic and speeding on local residential streets are not
designed for such volume diminishes residents' quality of life; and
WHEREAS, in addition to quality -of -life problems such as noise and general congestion,
such cut -through traffic and speeding creates significant life -safety risks as residential streets
are narrower than nearby arterial roadways, increasing the risk of vehicular accidents, including
those involving pedestrians; and
WHEREAS, those drivers who cut -through residential neighborhoods during rush hour
traffic tend to disobey posted speed limits and signage to gain an advantage over using arterial
roadways meant for such traffic; and
WHEREAS, in order to alleviate these issues, the City proposes to install one (1) traffic
calming device on Southwest 13 Street between Southwest 12 Court and Southwest 13
Avenue, a location that experiences significant cut -through traffic and speeding during morning
and afternoon rush hour periods; and
WHEREAS, Section 1.6 of the Miami -Dade County Traffic Flow Modification(s)/Street
Closure(s) Procedure, as revised by the Miami -Dade County Public Works Department ("PWD")
Traffic Engineering Division in January 2009, attached and incorporated as Exhibit "A" ("County
Procedure"), requires concurrence from the affected residents and/or property owners; and
WHEREAS, Section 1.6 of the County Procedure further states: "Municipal Jurisdictions:
In lieu of concurrence from the affected residents and/or property owners, a municipality may
pass a resolution after a public hearing requesting PWD [now known as the Miami -Dade County
Department of Transportation and Public Works ("DTPW )] to consider the proposed traffic flow
modification(s)/street closure(s);" and
WHEREAS, in order to expeditiously address the aforementioned quality of life and life -
safety issues, the City desires to install the one (1) traffic calming device on Southwest 13
Street between Southwest 12 Court and Southwest 13 Avenue, in the Shenandoah
neighborhood of District 3 without delay, by holding a public hearing in lieu of resident/property
owner concurrence through balloting; and
WHEREAS, although the City is adopting this Resolution after a public hearing in lieu of
concurrence, it is the intent of the City, to the best of its ability, to seek concurrence from the
residential properties whose frontage directly abuts the proposed traffic calming devices; and
WHEREAS, in lieu of concurrence from the affected residents and/or property owners,
the City Commission finds it in the best interest of the City and its residents to pass a resolution
after a public hearing requesting PWD/DTPW to consider the proposed traffic flow
modification(s)/street closure(s);
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF
MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are
adopted by reference and incorporated as fully set forth in this Section.
Section 2. The City Commission, after a duly noticed public hearing, authorizes' and
directs the City Manager to take all actions necessary to expeditiously request that DTPW
consider the proposed traffic flow modification at the one (1) location within District 3, more
particularly one (1) traffic calming device on Southwest 13 Street between Southwest 12 Court
and Southwest 13 Avenue, in order to expeditiously proceed with design and construction of the
traffic calming device.
Section 3. The City Clerk is directed to send a certified copy of this Resolution to the
Director of Miami -Dade County's Department of Transportation and Public Works.
Section 4. This Resolution shall become effective immediately upon its adoption.
APPROVED AS TO FORM AND CORRECTNESS:
rge = . Wyy ng Ills, C ty ttor -y 9/30/2025
1 The herein authorization is further subject to compliance with all legal requirements that may be
imposed, including but not limited to those prescribed by applicable City Charter and City Code
provisions.