HomeMy WebLinkAboutExhibit AApril 9, 2025
Shamary Diaz
1853 SW 7 ST, LLC
8640 SW 4 Street
Miami, FL 33144
ARTHUR NORIEGA, V
City Manager
EXHIBIT "A"
KUKENAN SUBDIVISION
TENTATIVE PLAT #2072 (FORMERLY #1976-A)
LOCATED ALONG THE NORTH SIDE OF SW 7 STREET, BETWEEN SW 18 AVENUE AND
SW 19 AVENUE
Ladies and gentlemen:
The City of Miami Plat and Street Committee at its meeting of February 6, 2025 approved the
above tentative plat subject to the following revisions being made to the tentative plat, additional
information being provided and/or variances being granted. Please be advised that the processing
of your tentative plat cannot proceed until these conditions and/or comments have been satisfied.
Resilience and Public Works
1. Add the area, in square feet, of Tract A on the main sketch.
2. Label the existing building "to remain".
Standard Comments
3. A letter from Corncast is required to determine if any adjustments to their facilities or
easements are required.
4. Verify with Miami -Dade County that the proposed plat name is acceptable.
5. All encroachments across proposed tract and/or lot lines, must be removed prior to final
plat submittal.
6. A letter from the Florida. Department of Transportation (F.D.O.T.) is required at the time of
final plat submittal.
7. An Opinion of Title, in the City of Miami Opinion of Title form, must be provided at the
time of final plat submittal.
8. Current backup documentation will be required for all who execute the final plat. A
resolution for authority to execute documents and a Certificate of Good Standing from the
Secretary of State are required, if applicable.
9. Tentative plat application must be made with Miami -Dade County after receiving approval
from the City of Miami Plat and Street Committee.
10. Be advised that an incomplete final plat package will not be accepted by the City of Miami.
It is the owner's responsibility to work with his/her surveyor and attorney to assure that
everything is in order before submitting the final plat package.
DEPARTMENT OF RESILIENCE & PUBLIC WORKS
444 S.W. 2nd Avenue / Miami, Florida 33130 / (305) 416-1200 / Fax: (305) 416-1278
Mailing Address: P.O. Box 330708 Miami, FL 33233-0708
KUKENAN SUBDIVISION - TENTATIVE PLAT #2072
(FORMERLY #1976-A)
April 9, 2025
Page 2 of 3
11. Be advised that if all requirements for scheduling the final plat for City Commission action
are not in order, the final plat will not be scheduled for a City Commission meeting.
12. A letter of concurrency from Miami -Dade County School Board is required at the time of
final plat submittal.
13. A letter from the Miami -Dade Water and Sewer Department is required to determine if any
adjustments to their facilities or easements are required.
14. A letter from Miami -Dade Water and Sewer Department is required to release the final plat
in connection with water and sewer service agreements.
15. Provide two location sketch exhibits, one `Before Replat" and one "After Replat", in letter
size paper.
In addition to the above requirements, you should be aware of the following:
16. State and local laws require the installation of various physical improvements in the public
rights -of -way when property is platted. These subdivision improvements include paving,
drainage, landscaping, sidewalks, etc. In some cases, this could represent a substantial
investment on your part. REQUIRED: The submission of an electronic file of the tentative
plat, in an AutoCAD, to the City of Miami Resilience and Public Works Department,
Development and Roadway Plans Section will EXPEDITE the preparation and enhance the
ACCURACY of the subdivision improvement letter required for the final plat approval.
17. Execution of Covenant for Postponement of Subdivision Improvements is required in cases
where the required subdivision improvements are not completed
18. The alteration, relocation or installation of utilities such as storm and sanitary sewers,
electric, telephone, water, etc., caused by this plat will be at the property owner's expense.
Also, utility easements may be required on the property being platted.
19. A building permit will not be issued on the property being platted until the final plat is
recorded or as authorized by the City of Miami Code Section 55-10(j). Also, the
Temporary Certificate Occupancy and/or Certificate of Occupancy for any building
construction will be issued only after all the required subdivision improvements have been
completed.
20. Approval for fire flow requirements must be obtained from the Fire -Rescue Department
prior to the issuance of a building permit.
21. In order to mitigate problems associated with access and construction activities throughout
the neighborhood, the contractor/developer is encouraged to notify the affected
neighborhood residents, in writing, of the project starting and completion dates at the time
of issuance of permits.
22. Additional items must be provided to the Development and Roadway Plans Section of
Resilience and Public Works Department of the City of Miami before the final plat is
submitted to the City Commission for approval. You will be notified in writing as to what
these items are after the amount of the bond has been determined for the necessary
subdivision improvements. It is required that the applicant contacts the Survey Section of
the Department of Resilience and Public Works of the City of Miami to verify that all final
plat submittal documents are complete prior to final plat submittal.
23. Tentative plat approval is only valid for one (I) year and six (6) months from the date of the
Plat and Street Committee meeting at which time it was approved.
KUKENAN SUBDIVISION - TENTATIVE PLAT #2072
(FORMERLY #1 976-A)
April 9, 2025
Page 3 of 3
If you have any questions concerning these requirements, please refer to the attached sheet for the
appropriate person to contact.
Sincerely,
Juvenal Santana Jr., CFM
Director, Dep men of esilience and Public Works
Supervisor o lats, Plat and Street Committee
JS/EP/ecb
Enclosure: Contact Sheet
c: Mario Prats Jr.
Mario Prats Jr. & Associates, Inc.
52 SW 8.1 Avenue
Miami, FL 33144
Plat and Street Committee Members
Asael Marrero, RA, RID, AIA, ICC, Assistant City Manager/Chief of Infrastructure
Development and Roadway Plans
Survey