HomeMy WebLinkAboutExhibitCAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 5/22/2025 PART I: EXISTING PROJECTS B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40-630688 Marine Stadium Restoration DREAM $68,000,000.00 04- Dry-Run/Permit Citywide 40-B40571 Virrick Park New Pool Facility Parks $13,215,218.00 07- Construction 2 40-6193602 Brickell Key Bridge RPW $8,071,577.00 03-Design 2 40-6173619 SW 15 Road from SW 3 Avenue and SW 11 Street RPW $6,734,239.00 01- Planning 3 40-630874 Brickell Avenue from SE 15 Road to SE 8 Street RPW $2,097,247.00 08- Final Completion 2 40-650906 NE 3 Avenue from NE 54 Street to NE 58 Terrace RPW $3,259,046.00 03- Design 5 40-617357 Antonio Maceo Boat Ramp and Dock Renovations Parks $1,683,326.30 07- Construction 1 40-B183505 West End Park Master Plan, Pool Design, and Enhancements Parks $13,868,410.00 07- Construction 4 40-B193511 and 40-B193511A Curtis Park Community Center Design and Construction Parks $15,365,718.00 05- Bidding 1 40-B193512 and 40-B193512A Armbrister Park Community Center Design and Construction Parks $13,511,477.00 05- Bidding 2 40-6193513 Moore Park Gym Design and Construction Parks $16,630,400.00 05- Bidding 5 40-6193514 Coral Way Park Expansion and Enhancements Parks $2,825,000.00 08- Final Completion 3 40-B193515 Morasan Quesada Park ( FKA Riverside Park) Renovations and Enhancements Parks $3,466,906.00 07- Construction 3 40-6193517 New Woodside Park at 3699/3701 SW 1st AVE Parks $7,565,242.39 06- Pre -Construction 3 40-B40510A Legion Park Building Parks $5,115,633.00 07- Construction 5 40-640566 Spring Garden Point Park Parks $1,954,059.27 01- Planning 1 40-B40581 Douglas Park Community Center Parks $15,572,411.00 04- Dry-Run/Permit 4 40-6193207 Fire Facilities Resiliency Project (FS10) - Design Public Safety $1,465,000.00 02- A/E Selection Citywide 40-6183603 Miami River Greenway Curtis Park East RPW $5,337,166.00 03- Design 1 40-B183611 NW 17th Street from NW 27th AVE to NW 32nd AVE - Road & Drainage Construction RPW $7,884,329.00 02- A/E Selection 1 40-B193622 Very Poor Condition Roads - Outside Priority Drainage Basins RPW $8,067,667.00 07- Construction Citywide 40-B193801 Improve Drainage Outside of Priority Drainage Basins RPW $2,300,000.00 07- Construction Citywide 40-6193802 Brickell Bay Drive Seawall, Drainage and Road Improvements RPW $32,261,008.00 03- Design 2 40-630606 Flagler Street Beautification OCI $33,104,407.00 07- Construction Citywide 40-630637 Mary Brickell Village Drainage Improvements RPW $5,423,619.00 08- Final Completion Citywide 40-630737 South Bayshore Lane/Fairview Street - East and West RPW $12,420,228.00 05- Bidding 2 40-B193522A Dog Run Park Parks $2,444,024.00 04- Dry-Run/Permit 4 40-6233506 Fairlawn Community Park Parks $1,150,000.00 07- Construction 4 40-6233507 Shenandoah Playground Replacement Parks $900,000.00 07- Construction 4 40-6233513 Grapeland Heights Park and Baseball Park Parks $2,582,513.00 07- Construction 1 40-6233523 Bayfront Park Fountain Parks $2,833,760.00 01- Planning 2 40-B223801 East Flagami Flood Mitigation RPW $87,000,000.00 05- Bidding 4 40-6223802 Auburndale Flood Mitigation Project RPW $73,646,027.00 01- Planning 4 40-B233801 SW 49th Ave from SW 8th St. to W Flagler St. RPW $850,000.00 07- Construction 4 40-650413 SW 24th St. from 27th Ave to SW 32nd Ave RPW $8,478,403.00 07- Construction 4 40-650412 SW 23 Terrace from SW 27 Avenue to SW 32 Avenue RPW $6,649,232.00 05- Bidding 4 40-B233821 Mary Brickell Village Drainage Improvements RPW $2,246,000.00 03- Design Citywide 40-B233822 Localized Flooding Improvements Citywide RPW $10,375,000.00 01- Planning Citywide 40-6233823 E & W Glencoe Street, S Bayshore Ct Flood Improvements RPW $1,100,000.00 01- Planning 2 40-B183611A NW 17 Street from NW 32 to NW 37 Avenue RPW $6,717,280.00 03- Design 1 40-B193500 Jose Marti Park Seawall, Shoreline, and Flood Improvements- Construction PARKS $23,736,282.00 05- Bidding 3 40-B193501 Little River Mini Park (Outfall Connection) OCI $3,451,514.00 03- Design 5 40-B233815 Allapattah Flood Improvements - NW 7 Ave to 14 Ave, NW 23 St to RPW $31,376,188.00 03- Design 1 40-B233816 Melrose Flood Improvements - NW 23 Ave to NW 19 Ave, NW 34 St to NW 30 St (Pump Station) RPW $11,029,882.00 02- A/E Selection 1 40-B233805 Edgewater Flood Improvements - NE 4 Ave to Biscayne Bay, NE 22 St to NE 24 St (Pump Station) RPW $34,200,000.00 03- Design 2 40-B233811 Replacement of Seawalls Morningside between NE 55 Terr, NE 65 St and Biscayne Bay RPW $2,781,719.00 03- Design 2 40-B233809 Brickell and Coconut Grove Seawalls between SE 25th Rd to Mathenson Ave. and Biscayne Bay RPW $1,659,265.00 03- Design 2 40-B233810 Replacement of 8 Seawalls in Edgewater between NE 22 St to NE 34 St. along Biscayne Bay RPW $3,541,662.00 03- Design 2 40-B233804 East Little Havana Flood Improvements - W 12 Ave to W 17 Ave, NW 2 St to SW 6 St (Pump Station) RPW $39,269,877.00 01-Planning 3 40-B233606 8 Street Flood Improvements - SW 17 Ave to SW 22 Ave, SW 5 St to SW 12 St RPW $20,000,000.00 03- Design 3 40-B233803 Shorecrest South Flood Improvements - NE 8 Ct to NE Bayshore Ct, NE Little River Dr to NE 79 St (Pump Station) RPW $33,200,000.00 03- Design 5 CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 5/22/2025 PART I: EXISTING PROJECTS B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40-B233814 South-West Wynwood Flood Improvements - NW 3 Ave to NW 5 PI, NW 16 St to NW 28 St (Pump Station) RPW $31,698,773.00 01- Planning 5 40-B233812 Replacement of Seawalls Shorecrest between NE 84 St and Ademar Canal; NE Bayshore Dr. and Davis Canal RPW $3,688,974.00 03- Design 5 40-B233817 Clemente Park Flood Improvements - Miami Ave to NW 2 Ave and NW 30 St to 36 St RPW $14,734,729.00 03- Design 5 40-B233806 Immediate Flood Control: Install Backflow Valves CW RPW $4,084,000.00 01- Planning Citywide 40-B203801 Citywide Pump Stations Telemetry System RPW $1,536,263.00 03- Design Citywide 40-B233819 Localized Flooding Improvements RPW $3,163,093.00 10- Administrative Close -Out 3 40-B233820 Pump Stations RPW $2,500,000.00 01- Planning 3 40-B203515 Badia Center Facility at Flagami Park Parks $11,883,119.00 07- Construction 4 40-B203519 Swannanoa Mini Park - right of way improvements (Design only) RPW $1,836,643.00 03- Design 4 40-B223521 Parks Public WiFi Installation Parks $2,500,000.00 07-Construction Citywide 40-B50414 SW 24 Terrace from SW 27 Avenue to SW 31 Avenue RPW $4,762,302.00 08- Final Completion 4 40-B50421 SW 25 Street from SW 27 Avenue to SW 32 Avenue RPW $4,853,136.00 08- Final Completion 4 40-B223212 Fire Station 12 - Hardening Fire $1,565,300.00 01- Planning Citywide 40-B213210 Fire Station 2 - Hardening Fire $1,093,733.30 01- Planning Citywide 40-B213209 Fire Station 9 - Hardening Fire $1,437,700.00 01- Planning Citywide 40-B213512 Hadley Park - Resiliency Hub Parks $1,315,002.00 05- Bidding 5 40-B50104 NW 13 Street from NW 35 Avenue to NW 37 Avenue RPW $3,165,866.00 05- Bidding 1 40-B30756 NW 30 Street Improvement RPW $6,539,324.00 05-Bidding 1 40-B183610 West Grove Roadway Improvements RPW $3,617,822.00 03- Design 2 40-B183612 Charles Avenue from Main Highway to South Douglas Road RPW $4,630,148.00 03-Design 2 40-B213602 Little Havana Pedestrian Priority Zone RPW $5,504,338.00 03- Design 3 40-B203610 SW 5 Street from SW 29 Avenue to SW 32 Avenue - Reconstruction RPW $3,062,752.00 07- Construction 3 40-B213606 Kinloch Roadway Neighborhood Improvements RPW $3,443,884.00 03- Design 4 40-B173613 South Golden Pines No Outlet Streets Improvements RPW $9,557,063.00 03- Design 4 40-B243800 Wagner Creek Embankment Stabilization RPW $9,662,959.00 01- Planning 1 40-B173511A Morningside Park - Baywalk, Kayak Launch, and Boat Ramp Parks $19,268,735.00 07- Construction 2 40-B193521 Fairlawn Community Park Parks $3,809,461.00 07- Construction 4 40-B203509 Athalie Range Park - New Recreation Building Parks $14,087,813.00 04- Dry-Run/Permit 5 40-B70100 Gusman Hall Improvements / Repairs DREAM $31,533,964.00 03- Design 5 40-B70121 Police Drains and Parking Police $3,023,550.00 05- Bidding Citywide 40-B243208 Police HQ -Garage Demolition and Sitework Police $8,843,030.00 04- Dry-Run/Permit Citywide 40-B233601 Miami River Greenway - NW N River Dr from NW 22 Ave to NW 19 RPW $5,192,815.00 03- Design 1 40-B233602 Buena Vista Local Drainage and Road Improvements RPW $5,665,040.00 03- Design 5 40-B173642 Belle Meade Circle Cul-De-Sac Improvements RPW $760,564.00 03- Design 5 40-B213605 NW 11 Street from NW 1 Avenue To NW 3 Avenue RPW $2,412,839.00 03- Design 5 40-B70046 Virginia Key Boat Launch & Trailer Parking DREAM $2,942,118.00 06- Pre -Construction 2 40-B70042 Miami Marine Stadium Marina - Mooring Field DREAM $4,133,205.49 06- Pre -Construction 2 40-B233500 Margaret Pace Park Parks $2,248,059.36 03-Design 2 CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST ATTACHMENT A - 5/22/2025 PART II: ADDED PROJECTS B Number Project Name Project Owner Current Estimated Total Project Cost Current Phase District 40-B233505 Ruben Dario Park Development Parks $16,188,200.00 03-Design 3 40-B243400 New Administration Building and Parking/Other Improvements DREAM $241,483,400.72 01- Planning Citywide 40-B193803 Construction Engineering & Inspection Services for Seawall, Baywalk, and Landscape Improvements at Jose Marti Park Parks $20,000,000.00 OS -Bidding 3 40-6223504 and 40-6253503 Robert King High Park Infrastructure Improvements Parks $10,852,403.00 02- A/E Selection 4 40-B30541D Baywood Seawall Repair Parks $8,000,000.00 01- Planning 4 40-B243603 Fuller Street RPW $2,000,000 01- Planning 2 40-B243602 Little Havana Pedestrian Priority Zone - Phase II RPW $9,538,660 01- Planning 3 40-B243604 Silver Bluff Traffic Flow Modification RPW $7,776,837 01- Planning 3 40-B233813 North Grapeland Heights Seawall (NGHS) at NW 13 Street and NW RPW $356,406 03- Design 1 40-B203614 Traffic Circle at North Bayshore RPW $2,256,708 03- Design 2 40-B213606A Kinloch Flooding Mitigation and Road Reconstruction FDEP Grant RPW $5,982,546 03- Design 4 40-B243600 Tamiami Blvd Roadway Drainage Imrprovements RPW $7,215,420 03- Design 4 40-B253600 Brickell Key Bridge replacement RPW $30,031,616 01- Planning 2 N/A Construction and Permanent Financing: MLK Residences Housing $2,000,000.00 N/A 5 N/A Construction and Permanent Financing: Liberty Renaissance Housing $1,000,000.00 N/A 5 N/A Affording Housing and Economic Development Housing $8,000,000.00 N/A Citywide N/A Home Ownership Preservation / Single Family Home Rehabilitation Housing $4,000,000.00 N/A Citywide N/A Citywide Parks Playground Renovations (13 Sites - D1, D2, D3, and Parks $4,059,580.00 01- Planning Citywide