HomeMy WebLinkAboutExhibitCAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST
ATTACHMENT A - 5/22/2025
PART I: EXISTING PROJECTS
B Number
Project Name
Project Owner
Current Estimated
Total Project Cost
Current Phase
District
40-630688
Marine Stadium Restoration
DREAM
$68,000,000.00
04- Dry-Run/Permit
Citywide
40-B40571
Virrick Park New Pool Facility
Parks
$13,215,218.00
07- Construction
2
40-6193602
Brickell Key Bridge
RPW
$8,071,577.00
03-Design
2
40-6173619
SW 15 Road from SW 3 Avenue and SW 11 Street
RPW
$6,734,239.00
01- Planning
3
40-630874
Brickell Avenue from SE 15 Road to SE 8 Street
RPW
$2,097,247.00
08- Final Completion
2
40-650906
NE 3 Avenue from NE 54 Street to NE 58 Terrace
RPW
$3,259,046.00
03- Design
5
40-617357
Antonio Maceo Boat Ramp and Dock Renovations
Parks
$1,683,326.30
07- Construction
1
40-B183505
West End Park Master Plan, Pool Design, and Enhancements
Parks
$13,868,410.00
07- Construction
4
40-B193511 and
40-B193511A
Curtis Park Community Center Design and Construction
Parks
$15,365,718.00
05- Bidding
1
40-B193512 and
40-B193512A
Armbrister Park Community Center Design and Construction
Parks
$13,511,477.00
05- Bidding
2
40-6193513
Moore Park Gym Design and Construction
Parks
$16,630,400.00
05- Bidding
5
40-6193514
Coral Way Park Expansion and Enhancements
Parks
$2,825,000.00
08- Final Completion
3
40-B193515
Morasan Quesada Park ( FKA Riverside Park) Renovations and
Enhancements
Parks
$3,466,906.00
07- Construction
3
40-6193517
New Woodside Park at 3699/3701 SW 1st AVE
Parks
$7,565,242.39
06- Pre -Construction
3
40-B40510A
Legion Park Building
Parks
$5,115,633.00
07- Construction
5
40-640566
Spring Garden Point Park
Parks
$1,954,059.27
01- Planning
1
40-B40581
Douglas Park Community Center
Parks
$15,572,411.00
04- Dry-Run/Permit
4
40-6193207
Fire Facilities Resiliency Project (FS10) - Design
Public Safety
$1,465,000.00
02- A/E Selection
Citywide
40-6183603
Miami River Greenway Curtis Park East
RPW
$5,337,166.00
03- Design
1
40-B183611
NW 17th Street from NW 27th AVE to NW 32nd AVE - Road &
Drainage Construction
RPW
$7,884,329.00
02- A/E Selection
1
40-B193622
Very Poor Condition Roads - Outside Priority Drainage Basins
RPW
$8,067,667.00
07- Construction
Citywide
40-B193801
Improve Drainage Outside of Priority Drainage Basins
RPW
$2,300,000.00
07- Construction
Citywide
40-6193802
Brickell Bay Drive Seawall, Drainage and Road Improvements
RPW
$32,261,008.00
03- Design
2
40-630606
Flagler Street Beautification
OCI
$33,104,407.00
07- Construction
Citywide
40-630637
Mary Brickell Village Drainage Improvements
RPW
$5,423,619.00
08- Final Completion
Citywide
40-630737
South Bayshore Lane/Fairview Street - East and West
RPW
$12,420,228.00
05- Bidding
2
40-B193522A
Dog Run Park
Parks
$2,444,024.00
04- Dry-Run/Permit
4
40-6233506
Fairlawn Community Park
Parks
$1,150,000.00
07- Construction
4
40-6233507
Shenandoah Playground Replacement
Parks
$900,000.00
07- Construction
4
40-6233513
Grapeland Heights Park and Baseball Park
Parks
$2,582,513.00
07- Construction
1
40-6233523
Bayfront Park Fountain
Parks
$2,833,760.00
01- Planning
2
40-B223801
East Flagami Flood Mitigation
RPW
$87,000,000.00
05- Bidding
4
40-6223802
Auburndale Flood Mitigation Project
RPW
$73,646,027.00
01- Planning
4
40-B233801
SW 49th Ave from SW 8th St. to W Flagler St.
RPW
$850,000.00
07- Construction
4
40-650413
SW 24th St. from 27th Ave to SW 32nd Ave
RPW
$8,478,403.00
07- Construction
4
40-650412
SW 23 Terrace from SW 27 Avenue to SW 32 Avenue
RPW
$6,649,232.00
05- Bidding
4
40-B233821
Mary Brickell Village Drainage Improvements
RPW
$2,246,000.00
03- Design
Citywide
40-B233822
Localized Flooding Improvements Citywide
RPW
$10,375,000.00
01- Planning
Citywide
40-6233823
E & W Glencoe Street, S Bayshore Ct Flood Improvements
RPW
$1,100,000.00
01- Planning
2
40-B183611A
NW 17 Street from NW 32 to NW 37 Avenue
RPW
$6,717,280.00
03- Design
1
40-B193500
Jose Marti Park Seawall, Shoreline, and Flood Improvements-
Construction
PARKS
$23,736,282.00
05- Bidding
3
40-B193501
Little River Mini Park (Outfall Connection)
OCI
$3,451,514.00
03- Design
5
40-B233815
Allapattah Flood Improvements - NW 7 Ave to 14 Ave, NW 23 St to
RPW
$31,376,188.00
03- Design
1
40-B233816
Melrose Flood Improvements - NW 23 Ave to NW 19 Ave, NW 34 St
to NW 30 St (Pump Station)
RPW
$11,029,882.00
02- A/E Selection
1
40-B233805
Edgewater Flood Improvements - NE 4 Ave to Biscayne Bay, NE 22 St
to NE 24 St (Pump Station)
RPW
$34,200,000.00
03- Design
2
40-B233811
Replacement of Seawalls Morningside between NE 55 Terr, NE 65 St
and Biscayne Bay
RPW
$2,781,719.00
03- Design
2
40-B233809
Brickell and Coconut Grove Seawalls between SE 25th Rd to
Mathenson Ave. and Biscayne Bay
RPW
$1,659,265.00
03- Design
2
40-B233810
Replacement of 8 Seawalls in Edgewater between NE 22 St to NE 34
St. along Biscayne Bay
RPW
$3,541,662.00
03- Design
2
40-B233804
East Little Havana Flood Improvements - W 12 Ave to W 17 Ave, NW
2 St to SW 6 St (Pump Station)
RPW
$39,269,877.00
01-Planning
3
40-B233606
8 Street Flood Improvements - SW 17 Ave to SW 22 Ave, SW 5 St to
SW 12 St
RPW
$20,000,000.00
03- Design
3
40-B233803
Shorecrest South Flood Improvements - NE 8 Ct to NE Bayshore Ct,
NE Little River Dr to NE 79 St (Pump Station)
RPW
$33,200,000.00
03- Design
5
CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST
ATTACHMENT A - 5/22/2025
PART I: EXISTING PROJECTS
B Number
Project Name
Project Owner
Current Estimated
Total Project Cost
Current Phase
District
40-B233814
South-West Wynwood Flood Improvements - NW 3 Ave to NW 5 PI,
NW 16 St to NW 28 St (Pump Station)
RPW
$31,698,773.00
01- Planning
5
40-B233812
Replacement of Seawalls Shorecrest between NE 84 St and Ademar
Canal; NE Bayshore Dr. and Davis Canal
RPW
$3,688,974.00
03- Design
5
40-B233817
Clemente Park Flood Improvements - Miami Ave to NW 2 Ave and
NW 30 St to 36 St
RPW
$14,734,729.00
03- Design
5
40-B233806
Immediate Flood Control: Install Backflow Valves CW
RPW
$4,084,000.00
01- Planning
Citywide
40-B203801
Citywide Pump Stations Telemetry System
RPW
$1,536,263.00
03- Design
Citywide
40-B233819
Localized Flooding Improvements
RPW
$3,163,093.00
10- Administrative Close -Out
3
40-B233820
Pump Stations
RPW
$2,500,000.00
01- Planning
3
40-B203515
Badia Center Facility at Flagami Park
Parks
$11,883,119.00
07- Construction
4
40-B203519
Swannanoa Mini Park - right of way improvements (Design only)
RPW
$1,836,643.00
03- Design
4
40-B223521
Parks Public WiFi Installation
Parks
$2,500,000.00
07-Construction
Citywide
40-B50414
SW 24 Terrace from SW 27 Avenue to SW 31 Avenue
RPW
$4,762,302.00
08- Final Completion
4
40-B50421
SW 25 Street from SW 27 Avenue to SW 32 Avenue
RPW
$4,853,136.00
08- Final Completion
4
40-B223212
Fire Station 12 - Hardening
Fire
$1,565,300.00
01- Planning
Citywide
40-B213210
Fire Station 2 - Hardening
Fire
$1,093,733.30
01- Planning
Citywide
40-B213209
Fire Station 9 - Hardening
Fire
$1,437,700.00
01- Planning
Citywide
40-B213512
Hadley Park - Resiliency Hub
Parks
$1,315,002.00
05- Bidding
5
40-B50104
NW 13 Street from NW 35 Avenue to NW 37 Avenue
RPW
$3,165,866.00
05- Bidding
1
40-B30756
NW 30 Street Improvement
RPW
$6,539,324.00
05-Bidding
1
40-B183610
West Grove Roadway Improvements
RPW
$3,617,822.00
03- Design
2
40-B183612
Charles Avenue from Main Highway to South Douglas Road
RPW
$4,630,148.00
03-Design
2
40-B213602
Little Havana Pedestrian Priority Zone
RPW
$5,504,338.00
03- Design
3
40-B203610
SW 5 Street from SW 29 Avenue to SW 32 Avenue - Reconstruction
RPW
$3,062,752.00
07- Construction
3
40-B213606
Kinloch Roadway Neighborhood Improvements
RPW
$3,443,884.00
03- Design
4
40-B173613
South Golden Pines No Outlet Streets Improvements
RPW
$9,557,063.00
03- Design
4
40-B243800
Wagner Creek Embankment Stabilization
RPW
$9,662,959.00
01- Planning
1
40-B173511A
Morningside Park - Baywalk, Kayak Launch, and Boat Ramp
Parks
$19,268,735.00
07- Construction
2
40-B193521
Fairlawn Community Park
Parks
$3,809,461.00
07- Construction
4
40-B203509
Athalie Range Park - New Recreation Building
Parks
$14,087,813.00
04- Dry-Run/Permit
5
40-B70100
Gusman Hall Improvements / Repairs
DREAM
$31,533,964.00
03- Design
5
40-B70121
Police Drains and Parking
Police
$3,023,550.00
05- Bidding
Citywide
40-B243208
Police HQ -Garage Demolition and Sitework
Police
$8,843,030.00
04- Dry-Run/Permit
Citywide
40-B233601
Miami River Greenway - NW N River Dr from NW 22 Ave to NW 19
RPW
$5,192,815.00
03- Design
1
40-B233602
Buena Vista Local Drainage and Road Improvements
RPW
$5,665,040.00
03- Design
5
40-B173642
Belle Meade Circle Cul-De-Sac Improvements
RPW
$760,564.00
03- Design
5
40-B213605
NW 11 Street from NW 1 Avenue To NW 3 Avenue
RPW
$2,412,839.00
03- Design
5
40-B70046
Virginia Key Boat Launch & Trailer Parking
DREAM
$2,942,118.00
06- Pre -Construction
2
40-B70042
Miami Marine Stadium Marina - Mooring Field
DREAM
$4,133,205.49
06- Pre -Construction
2
40-B233500
Margaret Pace Park
Parks
$2,248,059.36
03-Design
2
CAPITAL IMPROVEMENTS PROJECTS REVISED EXPEDITED LIST
ATTACHMENT A - 5/22/2025
PART II: ADDED PROJECTS
B Number
Project Name
Project Owner
Current Estimated
Total Project Cost
Current Phase
District
40-B233505
Ruben Dario Park Development
Parks
$16,188,200.00
03-Design
3
40-B243400
New Administration Building and Parking/Other Improvements
DREAM
$241,483,400.72
01- Planning
Citywide
40-B193803
Construction Engineering & Inspection Services for Seawall, Baywalk,
and Landscape Improvements at Jose Marti Park
Parks
$20,000,000.00
OS -Bidding
3
40-6223504 and
40-6253503
Robert King High Park Infrastructure Improvements
Parks
$10,852,403.00
02- A/E Selection
4
40-B30541D
Baywood Seawall Repair
Parks
$8,000,000.00
01- Planning
4
40-B243603
Fuller Street
RPW
$2,000,000
01- Planning
2
40-B243602
Little Havana Pedestrian Priority Zone - Phase II
RPW
$9,538,660
01- Planning
3
40-B243604
Silver Bluff Traffic Flow Modification
RPW
$7,776,837
01- Planning
3
40-B233813
North Grapeland Heights Seawall (NGHS) at NW 13 Street and NW
RPW
$356,406
03- Design
1
40-B203614
Traffic Circle at North Bayshore
RPW
$2,256,708
03- Design
2
40-B213606A
Kinloch Flooding Mitigation and Road Reconstruction FDEP Grant
RPW
$5,982,546
03- Design
4
40-B243600
Tamiami Blvd Roadway Drainage Imrprovements
RPW
$7,215,420
03- Design
4
40-B253600
Brickell Key Bridge replacement
RPW
$30,031,616
01- Planning
2
N/A
Construction and Permanent Financing: MLK Residences
Housing
$2,000,000.00
N/A
5
N/A
Construction and Permanent Financing: Liberty Renaissance
Housing
$1,000,000.00
N/A
5
N/A
Affording Housing and Economic Development
Housing
$8,000,000.00
N/A
Citywide
N/A
Home Ownership Preservation / Single Family Home Rehabilitation
Housing
$4,000,000.00
N/A
Citywide
N/A
Citywide Parks Playground Renovations (13 Sites - D1, D2, D3, and
Parks
$4,059,580.00
01- Planning
Citywide