Loading...
HomeMy WebLinkAboutCRA-R-25-0019 Preliminary Cost EstimatePROJECT Capital Improvements ANALYSIS FORM & Transportation CIP El Date Prepared: 4-Apr-2025 ORIGINAL NON-CIP ā–  VERSION PROGRAM Omni CRA AREA PROJECT NAME: Fire House Restaurant ADDRESS 1 LOCATION: 1401 N. Miami Ave, Miami PROJECT TEAM: Vertical PROJECT NO: DISTRICT: PROJECT CONTRACTED COST: TBD 2 CATEGORY: Omni CRA CLIENT DEPT: Omni CRA CLIENT CONTACT: Frances Llop-Noy TEL.: 305-679-6862 CURRENT PROJECT EST. COST: $ CURRENT FUNDS: $ FUTURE FUNDS: 320,700.00 - DESIGN MANAGER: TEL.: FUND SHORTFALL: $ (320,700.00) CONSTR. MANAGER: Leigh Heinlein TEL.: 305-416-1049 PROCUREMENT: Conventional DESIGN SCHEDULE BID SCHEDULE CONSTRUCTION SCHEDULE ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED ACTUAL START: END: START: END: ADV: ADV: AWARD: AWARD: START: END: START: END: Conceptual Date: %Plans Date: Bid Open: Paid to On'= %Paid to Date %of Phase: 0% NTP Date: PROJECT ESTIMATED AND ACTUAL COSTS PRODUCTION PHASE (3-DES) Consultant: 0000 To be Assigned 1 2 Design Consultant- under contractor % of Const Pre -Design Est. Design % of Const Current Design Estimate % of Const Post -Bid Design Phase Paid to Date CODE 1.01 $ - PRODUCTION TOTALS $ - $ - $ - CONST. PHASE (4-CON) Contractor: 0000 To be Assigned 1 Const. Cost (Harbour Construction) with contingency Pre- Design Estimated Construction by PM Current Construction Estimate Bid Results & Change Orders Construction Phase Paid to Date % Paid to Date CODE 2.00 $ - $ 231,700 10% $ 25,000 10% $ 25,000 $ 1,000 $ 6,000 $ 282,700 $ - $ - $ - 2 Owner's Contingency/Allowance 2.00 3 Contingency 2.00 Permits JOC Fee CONSTRUCTION TOTALS CONST. ADMIN. (8-CEO) 1 Refer to program management cost for CM CODE Estimated Construction Administration Current Construction Administration Estimate Construction Administration Construction Administration Phase Paid to Date % Paid to Date 3.02 2 3 4 CONSTRUCTION ADMINISTRATION TOTALS $ - $ - $ - $ - ADMIN. EXPENSES (6-ADM) 1 CIP Dept. (Gen. Admin. Fees) CODE Estimated Administrative Expenses Current Administrative Expenses Estimate Administrative Expenses Administrative Phase Paid to Date % Paid to Date 4.00 5.0% $ 5,000 2 ADMINISTRATIVE EXPENSES TOTALS $ 5,000 ADDITIONAL PROJECT TASKS 1 Program Management CODE Estimated Additional Tasks Current Additional Tasks Estimate Additional Project Tasks Additional Tasks Paid to Date % Paid to Date 8.00 $ 33,000 2 ADDITIONAL PROJECT TASKS TOTALS $ 33,000 B-No. TBD PROJECT GRAND TOTAL Pre -Design Estimated Post -Bid Paid to Date $ - $ 320,700 $ - IL 0 0 U 1) Finalize and close the open permit, pending the installation of the grease trap and other outstanding items. 2) Engage a new contractor to take over the project, complete the grease trap installation, and address any remaining tasks. 3) Coordinate with WASD to confirm there are no issues preventing the grease trap connection to the sewer. 4) Serve as the construction manager to oversee the work performed by the newly selected contractor. 5) Estimated time frame for project completion: Approximately six months. PAF FORM Printed on: 4/4/2025 Page 1 of 2 PAF FORM CREATED ON 10/31/06 W O 0 Operating Cost Associated with Project: YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 Client Approval: Islas Jones CRA Director Signature Date: N O FUND SOURCES AWARD NAME AND NUMBER BUDGET 4/1/2025 FUND GRAND TOTAL B-No. TBD $ VALIDATION Initiated by: Approved by: Approved by: Verified by: Verified by: Authorized by : Authorized by : Diego Clavijo Clavijo ° "°",9 Date: PMO Capital Improvements Signature Diego ,,,gā€ž-0 Date: Team Leader Design: Capital Improvements Lai -Wan McGinnis Signature Date: Capital Budget and Financial Administrator Diego Clavijo Signature Clavijo,ā€ž Diego Date: Program Manager: CPM Team Jose Montoya Signature Date: Assistant Director: Capital Improvements Islas Jones Signature Date: CRA Director Jose R. Perez, AIA Signature Date: CIP Director Signature Initials Notes PAF FORM Printed on: 4/4/2025 Page 2 of 2 PAF FORM CREATED ON 10/31/06