Subject: CRA1401 N. Miami Ave. (Fire House ) Grease Trap Proposal
PROPOSED STATEMENT OF SERVICES: Provide and install new grease trap where existing exit
plumbing lines are installed. Includes change of contractor process.
Proposal Notes:
• Harbour Construction, Inc does not warrant and has no liability whatsoever for any work
performed by any previous contractors at 1401 N. Miami Avenue Firehouse Restaurant
including the internal sidewalk and pavement ("Subject Property"). Harbour Construction
warrants to be responsible for all work it performs to install the new grease as well as any
exterior restoration efforts it performs at the Subject Property. Harbour will also warranty
any other work that the Omni CRA ("CRA") or the City of Miami ("COM") asks it to
perform at the Subject Property.
• For any issue that would need to be resolved pertaining to permit closure at the Subject
Property, the applicable COM Code provisions would control. The Executive Director of
the CRA will resolve all issues within her authority as provided by the COM' s Building
and Procurement Codes. The Executive Director has the same authority as the City
Manager for all matters pertaining to the CRA, which includes the Subject Property.
• The proposed cost to perform the change of contractor/install grease trap (On site and
where the plumbing exit points are at)/exterior restoration (Excluding any right-of-way
work) is related to the grease trap installation/close inspections and permits. See Table
Below. See also plan attached location of the grease trap.
• All fees referenced in the Table Below are to be used to cover the cost of change of
contractor, permit administration, grease trap installation, and work area restoration.
• Harbour is responsible for obtaining any additional permits needed to complete the grease
trap installation and closing out all existing permits at the Subject Property.
• The fees referenced in the Table Below do not include internal work, right-of-way, or
additional permit fees. If the total cost of grease trap installation exceeds the total cost
referenced in the Table Below, including owner's allowance and contingency fees
(The GC contingecy fee is fixed and to be billed 100% )the additional costs would be
additional fees to the ORA. Any work required to be done outside of the proposed cost
and description would be at an additional cost. Harbour warrants to
restore to equal or better condition all areas affected by work it
performs on the Subject Property.
Harbour warrants that it is responsible to perform Water Service
utility(s) relocation or modification needed on the Subject Property
to install the grease trap.
• Note that some plumbing inconsistencies may have been identified
with the camera work performed. Those repairs or any others are
not part of the proposed cost.
o The CRA confirms that the 40-year certification for the building located at 1401 N
Miami Avenue was completed in 2021. Harbour is proceeding with this proposal
based on that representation.
• The CRA confirms that there are no existing or pending legal actions between the CRA
and: (1) the Subject Property's previous Ownership Group; (2) any prior General
Contractor for the Subject Property; and (3) any business entity or person associated with
the Subject Property
o The CRA confirms that the prior General Contractor for the Subject Property does
not contest the change of contractor and would like this project to be expedited.
Fee: $281,700 (Table below)
2
3
Item #1l
Item Description
Cost
Notes
4
1
General Conditions
$10,000.00
5
2
Mobilization
$7,500.00
6
3
Provide and install new grease trap
S72,000.00
7
8
9
4
Provide and install 4OLF sanitary line'Tie
in Grease trap to neighboring lot existing
sewer lateral
$7,500.00
5
Sfte Restoration from new work
$22,000.00
6
L L. Yrolect Manager rrolect
AssessmentChange of Contractor Close
out discipEes'Includes Administration of
Aquiring DER_M Grease Trap Permit
S2.5,000.00
Excludes any physical
work to close out any
inspections
10
7
Sub -Contractor Fees to Qualify Sub-
Permits
$5,000.00
11
8
GC Superintendent
$15,000.00
12
9
Sub Contractor P'4i Superintendent(s) for
discipline inspection close outs
$12,000.00
13
10
Soft Costs (Bond Insurance Gordian Fee)
11, .50.00
14
11
Contingency- (10 % )
$25,000.00
15
12
Sub -Total
S212.250.00
16
13
P&O
5 7.750.00
17
14
Total
S250,000.00
18
19
15
Owners Allowance (1i]?•a)
$2.5,000.00
20
16
Y ahya Consultant
S6,700.00
21
17
Revised Total
S281,700.00
nn
.... S�YeDP t7lano
Excluded:
• Any work not listed in the proposal description
• Permit Fees
Respectfully submitted:
Guy Lesseur, Project Manager
Harbour Construction
�DocuSigned by:
PI ase si n to accept this proposal.
[Slag ,DIA.t,S
/2Ur 6038YF4F4B3...
Isiaa Jones, Omni CRA Director
Initial
Date 3/5/25
Date March 7, 2025 I 09:25:29 EST