HomeMy WebLinkAboutCRA-R-24-0072 Exhibit BEXHIBIT "B"
CONSTRUCTION COSTS - SAWYERS'S WALK - CRA BUILDOUT
BLOCK 55
249 NW 6th St, Suite 108
Miami, FL 33136
Description
Construction Costs:
Fire and Life Safety fire suppression system for retail store
Mechanical: 5-ton HVAC system with all structural support, penetrations,
thermostats, and ductwork for the store; equipment installed in the garage
Electrical: main panel electrical service and conduit and outlets for interior
space to include electrical rough -in and wire for permanent connections
Electrical: internet connection and photometric design and light fixtures on
sales floor, back of house, and bathroom
Plumbing: complete ADA accessible bathroom with 1 1/2" water service,
sink, toilet, and accessories
Epoxy paint and tile flooring in bathroom
Drywall: min. 1 hr fire rated demising walls with framing, insulation,
sheetrock, and finished for sale floor, back of house, and dressing rooms
Painting
Flooring - sales floor
Low Voltage: connection to main building data distribution room for fiber
internet; wireless internet in store
Construction Subtotal:
Architect and Engineer Professional Design and Permit Plan Services:
Permitting and CA Allowance:
FF&E Allowance for sales floor and BOH
Cost
$19,758.60
$87,816.00
$91,604.50
$30,175.60
$30,714.45
$7,974.98
$51,729.60
$11,854.70
$22,092.85
$13,794.56
$367,515.84
$17,500.00
$18,375.79
$25,000.00
Sub Total
$428,391.63
Please note that these costs for the CRA space have ben projected without the benefit of construction drawings and could change when the job
is fully bid. The work is proposed to be completed at cost, without a fee, and subject to CRA audit. Alternatively, the CRA could complete the
work on their own.
Construction Costs
Block 55 - CRA Buildout
October 2024