Loading...
HomeMy WebLinkAboutCRA-R-24-0072 Exhibit BEXHIBIT "B" CONSTRUCTION COSTS - SAWYERS'S WALK - CRA BUILDOUT BLOCK 55 249 NW 6th St, Suite 108 Miami, FL 33136 Description Construction Costs: Fire and Life Safety fire suppression system for retail store Mechanical: 5-ton HVAC system with all structural support, penetrations, thermostats, and ductwork for the store; equipment installed in the garage Electrical: main panel electrical service and conduit and outlets for interior space to include electrical rough -in and wire for permanent connections Electrical: internet connection and photometric design and light fixtures on sales floor, back of house, and bathroom Plumbing: complete ADA accessible bathroom with 1 1/2" water service, sink, toilet, and accessories Epoxy paint and tile flooring in bathroom Drywall: min. 1 hr fire rated demising walls with framing, insulation, sheetrock, and finished for sale floor, back of house, and dressing rooms Painting Flooring - sales floor Low Voltage: connection to main building data distribution room for fiber internet; wireless internet in store Construction Subtotal: Architect and Engineer Professional Design and Permit Plan Services: Permitting and CA Allowance: FF&E Allowance for sales floor and BOH Cost $19,758.60 $87,816.00 $91,604.50 $30,175.60 $30,714.45 $7,974.98 $51,729.60 $11,854.70 $22,092.85 $13,794.56 $367,515.84 $17,500.00 $18,375.79 $25,000.00 Sub Total $428,391.63 Please note that these costs for the CRA space have ben projected without the benefit of construction drawings and could change when the job is fully bid. The work is proposed to be completed at cost, without a fee, and subject to CRA audit. Alternatively, the CRA could complete the work on their own. Construction Costs Block 55 - CRA Buildout October 2024