Loading...
HomeMy WebLinkAboutCRA-R-24-0016 Change OrdersPHASE I Change Order Document G701m -2017 PROJECT: Citizens Bank OWNER: Omni CRA CONTRACT INFORMATION: Contract For Date: ARCHITECT: RJ Heisenbottle CHANGE ORDER INFORMATION: Chango Order Number: 1 Date: 2/14/2.2 CONTRACTOR: Mass Construction Corporation The Contract is changed as follows: (Insert a detailed description of the change and, if applicable, attach or reference specie exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) Remove existing delaminating architectural details on facade and furnish and Install new Precast Architectural Mold at Facade to Match Historical. Work to be completed as specified by design team The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Price), including this Change Order, will be The Contract Time will be (increased) (decreased) (unchanged) by The new date of Substantial Completion will be $ $ $ $2,949,724.00 $0.00 $2,949,724.00 $480,124.11 $3,409,848.11 (180 ) days. 1/15/23 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cosi and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALiD UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. RJ Heisenbottle Architects P.A. Slt3NATURE Richard J. Heisenbottle AWED NAME AND TITLE 03/17/2022 DATE Zip PRINTED`i DATE Zion Mass thI OWNER (Firm nail PRINTED NAM DATE CAUTION: You should sign an original AIA Contract Document, on which this text appears In RED. An original assures that changes will not be obscured. AIA Dooument G701 TM — 2017. Copyright 0 1979, 1087, 2000, 2001 and 2017 by The American Institute of Architects. Ail rights reserved. WARNING: This AIA°Documont Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe clvll'and criminal penalties, and will be prosecuted to the maximum oxtont poeslbre under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, email The American Institute of Architects' legal counsel, copyright©ate,org. Document G701 " - 2017 Change Order PROJECT: Citizens Bank OWNER: Omni CRA CONTRACT INFORMATION: Contract For: Date: ARCHITECT: RJ Heisenbottle CHANGE ORDER INFORMATION: Chunk Order Number: 2 Date: 2/14/22 CONTRACTOR: Mass Construction Corporation The Contract is changed as follows: (Insert a detailed description of the change and if applicable, attach or reference specific exhibits. Also include agreed upon adustments attributable to executed Construction Change Directives.) Remove existing footer In conflict with new structural foundation per RFI #8 response. The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Suns) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Price), including this Change Order, will be The Contract Time will be (increased) (decreased) (unchanged) by The new date of Substantial Completion will be $2,949,724.00 $460,124.11 $3,409,848.11 $3,900.82 $3,413,748.93 ( 5 ) days. 1/20/23 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. RJ Heisenbottle Architects P.A. ITECT(Fir(m/f�y�I WM CONTRACT SIGNATURE Richard J. Heisenbottle PRINTED NAME AND TITLE - 03/17/2022 DATE PRINTED DATE Zion Mass AND TITLE 02/14/22 P 1NTED DATE AND TITLE CAUTION: You should sign an original AIA Contract Document, on which this text appears In RED. An original assures that changes will not be obscured. AIA Document G701 2017. Copyright Cr 1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document is protested by U.B. Copyright Law and international Treaties. Unauthorized reproduction or distribution of this AIA0 Document, or any portion of It, may result In severe atvii and criminal penalties, and will be prosecuted to the maximum extent poselbla under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed, To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, eopyright©aia.org. Change Order Document G7OV -2017 PROJECT: Citizens Bank OWNER: Omni CRA CONTRACT INFORMATION: Contract For: Date: ARCHITECT: RJ Heisenbottle WM- CHANGE ORDER INFORMATION: Change Order Number: 3 Date: 2/14/22 CONTRACTOR: Mass Construction Corporation The Contract is changed as follows: (insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) Remove neighboring utilities installed on Citizens Bank Property The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Price), including this. Change Order, will be The Contract Time will be (increased) (decreased) (unchanged) by The new date of Substantial Completion will be $ $2,949,724.00 $464,024.94� $ $3,413,748.94 $ $7,785.40 $ $3,421,534.34 ( 5 ) days. 1/25/23 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cast and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. RJ Heisenbottle Architects P.A. 41CIit�ECT (Firm Hann IGNATU Richard J. Heisenbottle PRINTED NAME AND TITLE 03/17/2022 DATE,,. Zion Mass Zi PRINTED sr' AND TITLE DATE 02/14/22 OWNER (Firm n URE P KITED Nib E A DATE trLE CAUTION: You should sign an original AIA Contract Document, on which thls text appears In RED. An original assures that changes will not be obscured. AIA Document 0701 TM - 2017. Copyright 0 1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA°Document Is protected by U.B. Copyright Law and international Treaties. Unauthorized reproduction or dlstributlon of thls AIA' bacument, or any portion of It, may result In severe civil and criminal penalties, and twill be prosecuted to the maximum extent possible under the levy. Purchasers are permitted to reproduce ten (10) copies of this document when completed, To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright©ata.org. Change Order PROJECT: Citizens Bank OWNER: Omni CRA Document G7013' -.2017 CONTRACT INFORMATION: Phase 1 Contract For: Date: ARCHITECT: RJ Heisenbottle CHANGE ORDER INFORMATION: Change Order Number: 4 Date: 2/14/22 CONTRACTOR: Mass Construction Corporation The Contract is changed as follows: (Insert a detailed description of the change and if applicable, attach or reference speck exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) Per City Inspection NPDES clearance Is required before Final Inspection. All the surrounding storm sewer system must be Jetted/cleaned using a vact©r truck in the presence of an NPDES inspector. The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Price), including this Change Order, will be The Contract Time will be (increased) (decreased) (unchanged) by The new date of Substantial Completion will be $ $ $2,949,724.00 $471,810.34 $3,421,534.34 $1,336.30 t" $3,422,870.64 (3 ) days. '1 /28/23 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract 7Yme, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. RJ Heisenbottle Architects P.A. G1' (Firm nt ON•TURE Richard J. Heisenbottle PRINTED NAME AND TITLE 03/17/2022 DATE Zion Mass CSNTRACT0" r rm ONA" R Zl►u'M ssCEO PRINTED L AND TITLE 02/14/22 d(heA INTED NAMEANDTITLE / DATE DATE CAUTION: You should sign an original AIA Contract Document, on which this text appears In RED. An original assures that changes will not be obscured. AIA Document G701 TM - 2017 Copyright 9197% 1987 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA°Doaument Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of It, may result In aovore civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) coples of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright©ala.org. l Document GM' -2017 Change Order —.— PROJECT: Citizens Bank OWNER: Omni CRA CONTRACT INFORMATION: Phase I Contract For: Date: ARCHITECT: RJ Helsenbottle CHANGE ORDER INFORMATION: Change Order Number: 5 Date: 2/14/22 CONTRACTOR: Mass Construction Corporation The Contract is changed as follows: (Insert a detailed description of the change anaT, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives) Well Depth Extra footage on Well #1 Greater than 100 Feet The WELL was completed as follows: Casing = 136 ft Final Depth= 156 ft CAPACITY= = 750 GPM/FT (260 GPM above design) The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Price), including this Change Order, will be The Contract Time will be (increased) (decreased) (tmchanged) by The new date of Substantial Completion will be $2,949,724.00 $473,146.64 $3,422,870.64 $9,877.00 / $3,432,747.64 ( 3 ) days. 1/28/23 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Mavirnum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and lime have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. RJ Heisenbottle Architects P.A. A HECT (Firm nap A i G NA ..OR 11,1„ ATURE Richard J. Heisenbottle COATRACTO .„Arailotee Zion Mass ZljYjsa CEO PRINTED NAME AND TITLE PR ED AND TITLE 03/1 7/2022 02/14/22 DATE OWNER (Ficm tidine (6(3NATURE eq/ PRINTED NAME AND TITLE 7 DATE — CAUTION: You' should sign an original AIA Contract Document, on which this text appears In RED. An original assures that changes will not be obscured. /2/leckk AIA Document C7011m — 2017. Copyright 0 1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights resolved. WARNING: This AINI'Document la protected by U.S. Copyright Law and International Treaties. Unauthorised reproduction or distribution of thls AIA0 Document, or any portion of it, may result In severe civil and criminal penalties, and will be proseouted to the maximum extant possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyrightigala,org. PHASE II "AIAO "�`1; Document G7OITM - 2017 Change Order PROJECT: Citizens Bank OWNER: Omni CRA CONTRACT INFORMATION: Phase II Contract For: Date: CHANGE ORDER INFORMATION: Change Order Number: 1 Date: 2/14/22 ARCHITECT: RJ Heisenbottle CONTRACTOR: Mass Construction Corporation The Contract is changed as follows: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ $9,000.00 The new (Contract Sum) (Guaranteed Maximum Price), including this Change Order, will be $ $2,859,276.00 $2,850,276.00 $ $0.00 $ $2,850,276.00 The Contract Time will be (increased) (decreased) (unchanged) by The new date of Substantial Completion will be ( 3 ) days. 1/28/23 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. ARCHITECT (Firrn name) SIGNATURE Zion Mass CONTRACTS' (t g any� OWNER (Firrn name) PRINTED NAME AND TITLE DATE GNA _ RESIGNATURE Zi ss CEO PRINTED AND TITLE 02/14/22 DATE PRINTED NAME AND TITLE DATE CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document G701 T" - 2017. Copyright © 1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIM' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA`d Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. 1 O Document G7OITM - 2017 Change Order PROJECT: Citizens Bank OWNER: Omni CRA CONTRACT INFORMATION: Phase II Contract For: Date: CHANGE ORDER INFORMATION: Change Order Number: 2 Date: 2/14/22 ARCHITECT: RJ Heisenbottle CONTRACTOR: Mass Construction Corporation The Contract is changed as follows: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Price), including this Change Order, will be $2, 850, 276.00 $ $9,000.00 $ $2,859,276.00 $ $9,935.10 $ $2,869,211.10 The Contract Time will be (increased) (decreased) (unchanged) by (15 ) days. The new date of Substantial Completion will be 2/12/23 NOTE: This Change Order does' not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. ARCHITECT (Firm name) SIGNATURE PRINTED NAME AND TITLE DATE Zion Mass CONTRACT O' (:t n an OWNER (Firm name) GNA RESIGNATURE Zi ss CEO PRINTED AND TITLE 02/14/22 PRINTED NAME AND TITLE DATE DATE CAUTION: You should sign an original AiA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document G701 TM -2017. Copyright © 1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AlPeDocurnent is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA`"' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. "qtAIADocument G7OITM - 2017 Change Order PROJECT: Citizens Bank OWNER: Omni CRA CONTRACT INFORMATION: Phase II Contract For: Date: CHANGE ORDER INFORMATION: Change Order Number: 3 Date: 2/14/22 ARCHITECT: RJ Heisenbottle CONTRACTOR: Mass Construction Corporation The Contract is changed as follows: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) The original (Contract Sum) (Guaranteed Maximum Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Price), including this Change Order, will be The Contract Time will be (increased) (decreased) (unchanged) by The new date of Substantial Completion will be $2,850,276.00 $ $18,935.10 $ $2,869,211.10 $ $37,939.30 $ $2,907,150.40 ( 15 ) days. 2/12/23 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change .Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. ARCHITECT (Firrn name) Zion Mass CONTRACTOWNER (Firm name) SIGNATURE SIGNATURE PRINTED NAME AND TITLE DATE ZiFss CEO PRINTED AND TITLE 02/14/22 DATE PRINTED NAME AND TITLE DATE CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document G701 T" 2017. Copyright © 1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA`.' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA'" Document, or any portion of it, may result in severe civil and criminal penalties, and will he prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. 14 Change Order Request Project: Citizens Bank Phase II Date: 9/11/2023 From: Mass Construction Corporation 1200 Brickell Ave Suite 800 Miami, FI 33131 Contact: Zion Mass Phone: (305) 849-1216 SCOPE OF WORK DESCRIPTION Historical Signage Ornamental Molding at Signage Citizens Bank West Signage Patch & Painting Lift Sidewalk Repair Demo Existing Sidewalk and Pour new 4" sidewalk Demo and Pour new curb 1" Milling and overlay 1800 sf of asphalt. Final Striping Debris removal RE: COR # 5 To: Omni CRA 1401 N Miami Ave, 2nd Floor Miami FL, 33136 Contact: Bert Gonzalez Phone: 786.316.9838 QTY Cost 1 $ 12,882.59 1 $ 8,500.00 1 $ 1,400.00 1 $ 1,500.00 QTY Cost 1 $ 15,765.00 1 $ 8,750.00 1 $ 6,200.00 1 $ 4,500.00 Total Cost $ 12,882.59 $ 8,500.00 $ 1,400.00 $ 1,500.00 Total Cost $ 15,765.00 $ 8,750.00 $ 6,200.00 $ 4,500.00 COST AND SCHEDULE IMPACTS Cost Impact: Schedule Impact: Yes: X No: Yes: X No: Estimated Cost: OH&P: GC Performance & Payment Bond: General Liability Insurance: $59,497.59 $7,139.71 $1,665.93 $832.97 Total: $69,136.20 Number of Days + 30 •APPROVAL Signature (Owner) Print Name Date Signature (General Contractor) Date Print Name Project: Citizens Bank Phase II Date: 9/11/2023 From: Mass Construction Corporation 1200 Brickell Ave Suite 800 Miami, Fl 33131 Contact: Zion Mass Phone: (305) 849-1216 SCOPEOFAVORKDESCRIPTION Protect Time & Material Extension General Conditions Temp Equipment Rentals Change Order Request COR # 6r1 To: Contact: Phone: QTY 1 $ 1 $ RE: Project Stopped do to ownership change between 6/20/22 to 9/5/22 2 COST AND SCHEDULE IMPACTS Cost Impact: Schedule Impact: Cost 88,278.00 92,004.77 Omni CRA 1401 N Miami Ave, 2nd Floor Miami FL, 33136 Isiaa Jones 786,316:9838 Total Cost $ 88,278.00 $ 92,004.77 Estimated Cost: $180,282.77 Yes: X No: OH&P: $21,633,93 GC Performance & Payment Bond: $5,047.92 General Liability Insurance: $2,523.96 Yes: X No: Total: $209,488,58 Number of Days + 90 3 APPROVAL Signature (Owner) Print Name SIg931,L3re (9e,rieral Contractor)." ".> Print Name Date Date Project: Citizens Bank Phase II Date: 2/1/2024 From: Mass Construction Corporation 1200 Brickell Ave Suite 800 Miami, FL33131 Contact: Zion Mass Phone: (305) 849-1216 SCARE OF WORK DESCRIPTION FPL Delay and Perimeter 6' Wall General Conditions Perimeter CMU Wall Temp Bathrooms RE: 2 COSTAND;SCHEDULE IMPACTS Cost Impact: Yes: X V Change Order Request No: Schedule Impact: Yes: X No: COR # 7 To: Contact: Phone: QTY ` Cost 1 $ 67,400,00 1 $ 48,400.00 Omni CRA 1401 N Miami Ave, 2nd Floor Miami FL, 33136 Isiaa Jones 786.316,9838 Total Cost $ 67,400.00 $ 48,400.00 Estimated Cost: $115,800.00 OH&P: $0.00 GC Performance & Payment Bond: $0.00 General Liability Insurance: $1,447.50 Total: $117,247.50 Number of Days + 90 PPROVAL Signature (Owner) Print Name ntractor Date