Loading...
HomeMy WebLinkAboutCRA-R-23-0025 Backup -2023-04-27Sir John Guest House - 241 NW 17th ST - Rehabilitation Estimated Project Cost Original 2020 Grant Amount Expendeted Amount for Completed Work Remaining Available Funds $400,000 $32,470 $367,530 Construction Proposal -rehab w/ responsible wages $920,466 Permit fees (master, sub -permits, & 40 year) $0 (Included in proposal) Insurance and Bonds $0 (included in proposal) Total Cost for Remaining & New Work $920,466 Remaining Available Funds $367,530 Additional Funds Required $552,936 Requested Grant Amount $550,000 Changes in current grant request/proposal compared to orginal grant: • 1. Original grant construction proposal was obtained prior to any plans being completed. • 2. Since original grant a 40 year recertification for building was triggered. Engineer's report indicated additional scope items must be included in project including addressing structural issues (sagging floors, corroded steel stairs, and electrical upgrades). • 3. The current/new construction proposal is based on completed and permitted detailed plans. • 4. The current/new construction proposal includes responsible wages per grant agreement (increase of $73,200 over previous proposal which did not have responsible wages). • 5. Permit fees originally estimated were much lower than actual fees (increase of $37,500). • 6. Infllation since original proposal contributed to incresed cost - original proposal was prior to Covid pandemic. 2/17/2023 Mr. McQueen, I am writing to request a grant of $550,000 to complete the affordable housing project located at 241 NW 17 Street Miami, FL 33136 ("Sir John"). Sir John is a two-story residential building consisting of 23 single rooms and 5 shared bathrooms. It is an ideal residence for members of the community to enjoy affordable, secure, safe, clean, and private housing in Historic Overtown. Historically, guest houses, or rooming houses, have been a large part of the fiber of historically African -American communities, first -generation immigrant communities, and many other communities in the City of Miami. As an all-inclusive "flat -rate" housing building, Sir John allows low-income residents to enjoy the housing environment they deserve. Residents of Sir John can save money without the worries of unpredictable utilities thus allowing them to financially prepare for transitioning from a room, with shared bath, to a full housing setting such as an apartment or home. Sir John creates an ideal opportunity for residents transitioning, either out of homelessness or an involuntary downscale, to avoid homelessness by creating a below -market housing option. Since my initial grant request in April of 2020, a required 40-year certification was conducted in August of 2021 that revealed structural issues (which put the building in the jurisdiction of the Unsafe Structures Board) and other issues that were not part of the original scope of work and related grant request. In addition, the pandemic, inflation, the cost of materials, and the cost of labor has materially increased since my initial grant request. Overall, all of the foregoing factors have increased the project cost. Please note that construction will be a very basic retrofit to a 1941 building in order to refresh the interior and exterior, reinforce the structure, and bring the building up to code where required. With respect to the construction status of the project, my plans were submitted in August 2022 with the permits approved on 1/30/23. As this building is currently under an order of the Unsafe Structures Board, all permits must be closed by 8/28/2023. Thank you for your consideration. Sincerely, Amani Kancey 241 NW 17 Street LLC IGWT Construction, Inc. 5931 NW 173rd Drive Suite # 1 Hialeah, FL 33015 License No. CGC062699 2/17/2023 Proposal Te1.786.518.2394 Fax.786.518.2465 info@igwtconstructioninc.us www.igwtconstructioninc.us PROPOSAL SUBMITTED TO: 241 NW 17th Street LLC 241 NW 17th St Miami, FL 33136 WORK TO BE PERFORMED AT: Sir John Guest House 241 NW 17th St Miami, FL 33136 We hereby propose to furnish the materials and perform the labor necessary for the completion of: Scope of Work Unit Price Quant Total Sitework and Complete Interior Retrofit Resp. Wage L Increase (Thous) General Conditions $ 2,500.00 6 $ 15,000.00 Permitting $ 45,000.00 1 $ 45,000.00 Project Manager $ 20,000.00 1 $ 20,000.00 Demolition (Flooring; Walls; Ceilings) $ 4,500.00 $ 22,000.00 1.5 $ 33,000.00 18 Sitework (Water & Sewer; Fill & Grade; Paving & Striping; Sod)) $ 2,000.00 $ 67,500.00 1 $ 67,500.00 8 Reinforce Floor Joists; Wall & Ceiling Framimg $ 2,500.00 $ 18,500.00 1 $ 18,500.00 10 HVAC $ 5,000.00 $ 3,000.00 22 $ 55,000.00 20 Electric $ 6,000.00 $ 42,000.00 1 $ 42,000.00 24 Plumbing $ 5,000.00 $ 38,000.00 1 $ 38,000.00 20 Fire Protection (to Code) $ 1,000.00 $ 7,500.00 1 $ 7,500.00 4 Insulation $ 1,000.00 $ 8,500.00 1 $ 8,500.00 4 Drywall $ 5,000.00 $ 35,500.00 1 $ 35,500.00 20 Painting (Interior and Exterior) $ 5,000.00 $ 29,500.00 1 $ 29,500.00 20 Stair Assembly (Stairs & Metal Railings $ 2,000.00 $ 7,500.00 2 $ 15,000.00 8 Impact Windows & Doors (Exterior) $ 10,000.00 $ 2,000.00 70 $ 140,000.00 40 Interior Doors $ 1,000.00 $ 250.00 50 $ 12,500.00 4 Roofing $ 5,000.00 $ 1,500.00 24 $ 36,000.00 20 Flooring Tile (Labor & Material) $ 4,000.00 $ 2,400.00 10 $ 24,000.00 12 Baseboards $ 2,000.00 $ 500.00 25 $ 12,500.00 8 Security $ 700.00 32 $ 22,400.00 OH&P Fee $ 12,200.00 $ 677,400.00 0.2 $ 135,480.00 Increse Due to Surety Bond Requirement $ 812,880.00 0.03 $ 24,386.40 Increase Due to Builder's Risk Requirement $ 10,000.00 $ 10,000.00 1 $ 10,000.00 Increase Due to Responsible Rate $ 73,200.00 $ 73,200.00 1 $ 73,200.00 Total: $ 920,466.40 All materials are guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted for the above work, and completed in a substantial workmanlike manner for the sum of: Nine Hundred Twenty Thousand Four Hundred Sixty Six Dollars 40/00 Any alteration or deviation from above specifications involving extra costs will be executed only upon written order, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our control. $ 920,466.40 ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do work as specified. Payments will be made as outlined above. Signature Date