A + S Architects, Planners P. A. (The Architects) submits this proposal for architectural
& engineering services for the tenant buildout of 4 spaces in the existing new commercial
building located at 101 Northwest 8th Street, Miami, Florida 33136.
Description of Project
The project is to do architectural and engineering design and construction documents for
the tenant build -out of the approx. 7,100 sq. ft. space listed above. The new renovated
area will be divided into 4 new tenant spaces, 1.A restaurant with full kitchen, 2,570 sq.ft.
2. A Business Resource Center office space, 2,166 sq.ft. 3.A Media Design Group office
space, 1,044 sq. ft. 4. A Retail T-Shirt Shop at 978 sq,ft. and 336 sq.ft service area.
This proposal is based on the project design sketch layout supplied by the client and the
discussions at a preliminary meeting and initial site visit to the project site. The architects
will conduct an initial programming phase to verify the required square footages and
establish actual required rooms and space relationships and adjacencies.
This is a major full buildout and will require electrical, mechanical/HVAC, plumbing,
fire protection as well as specialty restaurant equipment needs, (grease trap, exhaust
systems etc.) This proposal does not include the actual exhaust hood design drawings.
Scope of Basic Services
The architects will conduct on site visits to the future tenants existing offsite facilities
to help ascertain a better understanding of their current working methods and space
requirements. The architects will retain MEP engineers as part of the design team. The
design team will prepare design and construction documents for the complete project
described above. The architects will use the existing condition drawings supplied by the
client to make new background drawings -floor plans, elevations and sections. The project
will be developed with the clients using a standard phased review and approval process.
This will include programming, preliminary/schematic design, design development and
construction documents. The design team will also coordinate with specialty restaurant
equipment consultants and providers. All drawings will meet the requirements of the
latest edition of the Florida Building Code. Once the project drawings are complete and
are submitted for permitting the design team will address all plan processing comments
from the local building and permitting authorities until complete plan approval has been
achieved. However the initial plan submittal and day to day processing is by the client,
contractor or plan expeditor. The scope of design services will be completed in a time
frame to be approved by the client. Deliverable drawings shall include:
3045 N.W. 49th Street, Miami, Florida 33142, PH 305-635-1557, AplusSARC@msn.com
A+S
ARCHITECTS, PLANNERS P.A.
Architectural: existing site -plan, existing floorplan, sections and elevations, new
site -plan, area plans, new floor plans, reflected ceiling plans, life safety
plan, new building sections, enlarged detailed interior restroom plans and
elevations, enlarged kitchen plans and elevations, schematic furniture
layouts, detail interior wall sections, room finish schedules, new door
schedules, restaurant bar & interior walls elevations, hardware schedules,
plumbing fixture, appliance and equipment schedules, toilet accessories
schedules, concrete floor details, misc. details, general notes, minor specs.
MEP: Mechanical — HVAC plans 4 separate spaces, energy calculations, unit
schedules, details, notes
Electrical — electrical power & lighting plans, load calculations, panel
schedules, riser diagram, details, notes.
Plumbing — water & sanitary plans, grease trap plumbing, gas piping,
fixture counts, details, notes.
Fire protection — complete system drawings, details, notes.
Compensation
For the performance of the scope of service listed above our fee will be a stipulated
sum of FORTY SEVEN THOUSAND DOLLARS, $47,000.00.
The schedule of payments will be as follows:
Initial Payment Deposit/Retainer- $ 4,000.00
Project programing (room size -verification & adjacency) $ 4,000.00
Schematic Design (architectural codes & space planning) $ 8,000.00
Design Development (engineering coordination) 50% $ 9,000.00
Construction Documents 100% $ 17,000.00
Permitting $ 2,500.00
Construction Supervision (Architectural) .$ 2,500.00
TOTAL $ 47,000.00
Fee Breakdown
Architectural - retail & office $11,600.00, Restaurant $14,000.00 ..$ 25,600.00
MEP Engineering - restaurant $9.000.00, large office $6,000,00
small office $3,200.00, retail space $3,200.00 $ 21,400.00
The above stipulated fee does not include the following reimbursable expenses:
reproduction cost (printing), mailing, 3D renderings, models, long distance telephone,
express couriers, detail interior/cabinet design, travel, consultant construction site visits.
Payments are due at the end of each phase, before the start of the next or billed monthly
based on work completed. Construction Documents phase due upon receipt of plans.
3045 N.W. 49th Street, Miami, Florida 33142, PH 305-635-1557, AplusSARC@msn.com
A+S
ARCHITECTS, PLANNERS P.A.
Additional services beyond the described Scope of Basic Services and design
changes made after previous client approval shall be billed at a rate of
$180.00 per hour or at a flat rate to be approved by the Client and Architect.
This agreement may be terminated by either party upon not less than seven (7)
days written notice should the other party fail substantially to perform in accordance
with the terms of this agreement through no fault of the party initiating the termination.
The Architects shall be compensated for all services performed up to that date.
Owner Responsibilities
The Owner shall provide full information regarding the status of the property including:
existing as built building plans, a current topographic/boundary survey, location of any
underground utilities, geotechnical/percolation and soil bearing reports, The
Owner/Contractor shall make the initial plan processing submittals to the local permitting
agencies and day to day submittals.
Conclusion
A + S Architects, Planners P.A. looks forward to working with you on the plans for
the build -out of the new Tenant Spaces at Lyric Point Complex and will do our very
best to make it a complete success.
Sincerely,
Derrick W. Smith
Principal A + S Architects, Planners P.A.
All parties are in agreement with the terms as set forth above:
This Agreement entered into as of DUNE EIGHT (8) in the year
TWO TI- OU AND TWENTYONE (2021).
Mr. Brian Zeltsman
Director of Architecture
Date 6/16/2021
Derrick W. Smith
Principal, A+S Architects, Planners P.A.
Date
2 D/
3045 N.W. 49th Street, Miami, Florida 33142, PH 305-635-1557, AplusSARC@msn.com
(C(
2,143
SO.FT.
iP41—
rei
STORAGE
245 SQ.FT.
1,043
SQ. FT.
KITCHEN
SPACE
560 SQ.FT.
RESTAURANT
SPACE
2,566 SQ.FT.
RETAIL
SPACE
980 SQ.FT.