HomeMy WebLinkAbout8993 Citizens Bank Demo BudgetMASS
1200 Brickell Avenue
Suite 800
Miami, FL 33131
mass-cm.com
Citizens Bank
1361 N Miami Ave I Miami, FL 33136
SCHEDULE OF VALUES
April 27, 2021
MASS
1200 Brickell Ave Suite 800 Miami FL 33131 + www.mass-cm.com + infoemass-cm.com
CONCEPTUAL ESTIMATE
April 27, 2021
CITIZENS BANK - DEMO
1361 N MIAMI AVE
MIAMI, FL 33136
BLDG: 11,000 SF
SITE: 0.09 ACRES
CAPTAIN: ZM
PHASE
WORK PACKAGE
LABOR MATT SUB TOTAL $ / SF
01-300 PROJECT STAFF 52,455 - - 52,455 $ 4.77 5.10%
01-400 GENERAL REQUIREMENTS 3,857 20,668 2,000 2• 6,525 $ 2.41 2.58%
m
02100 DEMOLITION - 266,200 266,200 $ 24.20 25.90%
02-200 SITE PREPARATION
256,610 256,610 $ 23.33 24.97%
02-300 EARTHWORK
8,500 8,500 $ 0.77 0.83%
02-500 UNDERGROUND UTILITIES - - - - $ - 0.00%
02-700 PAVING, CURBS & WALKS
27,940
27,940 $ 2.54 2.72%
03-100 CONCRETE SHELL - - 222,000 222,000 $ 20.18 21.60%
06-100 ROUGH CARPENTRY - - 18,000 1• 8,000 $ 1.64 1.75/
09-900 PAINTING - - 10,000 1• 0,000 $ 0.91 0.97%
10-001 BUILDINGSPECIALTIES - 1,500 1,500 $ 0.14 0.15/
15-400 PLUMBING
5,500 5,500 $ 0.50 0.54%
15-700 HVAC
- $ -
0.00%
16-001 ELECTRICAL
6,038 6,038 $ 0.55 0.59%
18-116 ALTERNATES ALLOWANCE
5,000 5,000 $ 0.45 0.49%
SUB TOTALS #1
56,312 20,668 829,288 $ 906,268 $ 82.39 88.18%
19-100
19-200
OVERHEAD
PROFIT
7.00%
5.00%
63,439 $ 5.77 6.17%
45,313 $ 4.12 4.41%
SUB TOTALS #2
$ 1,015,020 $ 92.27 98.77%
18-250 OWNER CONTINGENCY
18-251 MCC CONTINGENCY
18-253 CONCURRENCY& IMPACT FEES
18-300 PERMITTING & C.O. FEE ALLOWANCE
18-302 THRESHOLD & SPECIAL INSPECTIONS
18-303 MCC PERFORMANCE & PAYMENT BOND
18-305 BUILDERS RISK PREMIUMS & DEDUCTIBLES
18-306 GENERAL LIABILITY INSURANCE
0.00% -
0.00% BY OWNER
BY OWNER
BY OWNER
0.90% EXCLUDED
BY OWNER
1.25% 12,688
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.23%
TOTAL ESTIMATED CONSTRUCTION COST $ 1,027,708 $ 93.43 100.00%
MASS
1200 8rickell Ave Suite 800 Miami FL 33131 + www.mass-cm.com + info@mass-cm.com
GENERAL CONDITIONS
CITIZENS BANK - DEMO
1361 N MIAMI AVE
MIAMI, FL 33136
CONSTRUCTION DURATION: 90 DAYS
13 WKS
3 MON
BUILDING GROSS AREA: 11,000 SF
PHASE/
ITEM
DESCRIPTION
Multi- LABOR MAT'L LABOR MAT'L TOTAL
Factor QTY SUB AMT
U/M UNIT UNIT SUB UNIT AMT AMT AMT
01-300 PROJECT STAFF
01-002 PROJECT EXECUTIVE 0 0 HRS
01-004 SENIOR PROJECT MANAGER 1/2 298 HRS 55.00
16,390
16,390
01-005 PROJECT MANAGER
0
O HRS 30.00
01-007 PROJECT ENGINEER 0 0 HRS
01-008 SENIOR SUPERINTENDENT 0 0 HRS
01-009 SUPERINTENDENT 1 515 HRS 55.00
01-012 FOREMAN 1/2 258 HRS 30.00
28,325
7,740
28,325
7,740
01-017 PROJECT ADMINISTRATION 0 0 HRS 25.00
SUB TOTALS PROJECT STAFF
52,455 -
52,455
01-400 GENERAL REQUIREMENTS
01-309 PLANS REPRODUCTION
3
LS
500.00
1,500
1,500
01-313 AERIAL PHOTOGRAPHS 3 MO 125.00
01-315 VEHICLE EXPENSE - PM 1 0 MO 750.00
01-316 VEHICLE EXPENSE -SUPER 0 1 MO 1,050.00
01-400 CELL PHONE ALLOCATION 2 0 MO 105.00
01-520 OFFICE TRAILER - RENT 0 MO 450.00
01-520 -SETUP
O EA
2,500.00
01-521 STORAGE CONTAINERS 3 MO 150.00
-------------------------------------------------------------------------------------------
01-522 JOBSITEALLOCATIONS 0 MO 827.00
01-523 OFFICE SUPPLIES 0 MO 250.00
01-524 EXPRESS MAIL & COURIER SERVICES 3 MO 250.00
450 -
- 750
01-525 ICE / CUPS / BOTTLED WATER
3 MO 125.00
375
450
750
375
01-526 TEMP POWER -SETUP
1 LS 1,500.00
1,500
1,500
01-526 -MONTHLY 12 MO 300.00
3,600
3,600
01-526 -FINAL 0 MO 3,000.00
01-528 TEMP WATER 12 MO 125.00
1,500
1,500
01-529 TEMP TELEPHONE -SETUP
O LS 1,000.00
01-529 -MONTHLY 0 MO 225.00
01-532 JOBSITETELECOMEQUIPMENTALLOCATION 0 MO 100.00
01-533 ONSITE FAX/COPIER/PRINTER/POSTAGE 0 MO
200.00
01-534 ONSITE OFFICE FURNITURE/MICRO/FRIDGE 0 MO
01-535 SAFETY/SITE INSPECTION 12 MO 375.00
01-546 EXPENDABLES & EQUIPMENT REPAIR 3 MO 250.00
01-580 JOBSIGNAGE 1 LOT 3,000.00
150.00
4,500 - 4,500
750 750
3,000 3,000
01-596 TEMP TOILETS 1 6 MO 100.00
01-597 TRAILER HOLDING TANK 0 3 MO
600
600
01-740 DAILY CLEANUP
1/2 257 HRS 15.00 0.75
3,857 193
4,050
01-741 FINAL CLEANING
1 2 MOB
1,000.00
2,000
2,000
01-742 DUMPSTER-1 PER MONTH 3 MO 650.00
01-742 -EXTRA LOADS, BASED PER WEEK 0 0------LD 450.00
01-810 PUNCH LIST 0 0 HRS 35.00 15.00
1,950
1,950
SUB TOTALS GENERAL REQUIREMENTS
3,857 20,668 2,000
26,525
TOTAL GENERAL CONDITIONS
6,143 PER WEEK - AFTE's
56,312 20,668 2,000
78,980
Citizens Demo Budget 04.27.21.xlsx
Mass Construction Corporation
4/2 7 /21
Page 1 - GENLCOND 4:26 AM
SCOPE OF WORK
QTY UNIT UNIT COST BUDGET
MCC
02-100 DEMOLITION
BASE BID
Removal ofone(1)two-story existing commercial building
foundation, slab on grade, existing walls, roof, flooring,
cabling& conduits, fixtures, mechanical equipment, windows,
doors, and any other components insidethe existing building
Remove existing pour in placeconcretesafeas indicated
Remove existing windows as indicated
Removeexisting plaster/latch from exterior wall to remain
---------------
1 lot 247,000.00 247,000
Asbestos abatement
1 lot
19,200.00 19,200
TOTALS 266,200
02-200 SITE PREPARATION
BASE BID
Furnish & Install heavy-duty temporary wall bracing system
design Wewill install Mabey MASS 25 (or equivalent) wall braces
spaced 40" O.C-that meet specifications offered in design by a
Professional Structural Engineer licensed in thestateof Florida to
temporarily support structural walls remaining in the ground
level and second floor level of existing structure- oftheformer
Citizens Bank building on North Miami Avenue in Miami, Florida.
• Wall bracing and attachments, post shores and required load
capacities (Per OSHA and ANSI Standards) requi re a Professional
Engineer licensed in the state of Florida to providestamped
drawingsthat will note all compliance requirements ofthestate
of Florida and city of Miami Building Codes.
• Install specified wall bracing system as determined by P.E. at
two (2) levels (theground level & the second level)
• All Wall Bracing will meet or exceed minimal standards
associated with P.E. Stamped Drawings
• Duration of rental of equ ipment/materials for this project is
anticipated to be One (1) year.
• No shoring isto be altered, relocated, or removed without the
approval of the P.E. and the direct
supervision of field personnel from ECRS.
• Rental Rates for all equipment are based on a 28-calendar day
cycle and begin once equipment is delivered.
• Rental cycle ends when the equipment is dismantled and
removed.
• Pricing in this proposal is subject to field assessment and as -
built drawings review by a structural engineer
and approved by Engineer of Record.
1 lot 166,580.00 166,580
Citizens Demo Budget 04.27.21.xlsx 4/27/21
Pagel - WORKPKGS
Mass Construction Corporation
4:39 AM
SCOPE OF WORK
QTY UNIT UNIT COST MCC
BUDGET
Pedestrian Overhead protection�1 lot 23,030.00 23,030
Temp Fencing ������� 1 lot 25,000.00 25,000
Temp Construction DOT
1 lot
42,000.00 42,000
TOTALS 256,610
02-300 EARTHWORK
BASE BID
Oncedemolition is completed disturbed areas will be
rough graded 1 lot 8,500.00 8,500
TOTALS 8,500
02-500 UNDERGROUND UTILITIES
BASE BID
N/A
TOTALS 0
LOWEST QUALIFIED BID
02-700 PAVING, CURBS & WALKS
BASE BID
Repair Side Walks and Road from Shoring Concrete Pads 220 LF 127.00 27,940
TOTALS 27,940
LOWEST QUALIFIED BID
03-100 CONCRETE SHELL
BASE BID
Concrete anchoring pads for temporary wall bracing 1 lot 45,000.00 45,000
Facade Concrete Structural Restoration 1 lot 177,000.00 177,000
TOTALS 222,000
06-100 ROUGH CARPENTRY
BASE BID
Plywood and temporary protection at doors and windows 1 lot 18,000.00 18,000
TOTALS 18,000
09-900 PAINTING
BASE BID
Temporary Painting of facade 1 lot 10,000.00 10,000
Citizens Demo Budget 04.27.21.*'
Page 2 - WORKPKGS
Mass Construction Corporation
TOTALS 10,000
SCOPE OF WORK
QTY UNIT UNIT COST MCC
BUDGET
10-001 BUILDING SPECIALTIES
BASE BID
Temporary Fire Extinguisher 10 ea 150.00 1,500
TOTALS 1,500
15-400 PLUMBING
BASE BID
Temp Water Connection 1 ea 5,500.00 5,500
TOTALS 5,500
15-700 HVAC
BASE BID
N/A 0
TOTALS 0
16-001 ELECTRICAL
BASE BID
SafeOffforDemo1 ::::: lot:::::- 1,538.00::::: 1,538
Temp Electrical Panel 1 lot 4,500.00 4,500
TOTALS 6,038
LOWEST QUALIFIED BID
18-116 ALTERNATES ALLOWANCE
Permit Fee Allowance---- = = = = = = = = = = = = = = = = = = = = 1 Lot
5,000.00 5,000
--------------------------------------------------------------------------------------------------
TOTALS 5,000
Citizens Demo Budget 04.27.21.xlsx
Page 3 - WORKPKGS
Mass Construction Corporation