HomeMy WebLinkAboutCRA-R-20-0021 Back-upPALM CONSTRUCTION AND DESIGN GROUP, INC.
CONSTRUCTION PROPOSAL/CONTRACT
it TIMM
,,. ,t, . �..,�,,.�� .•� iv nuui41"ninn io
•
7ii111111 111/r0m11" fis!
Between the Owner:
And the Contractor:
ST. AGNES EPISCOPAL CHURCH
P.O. BOX 2943
Miami, FL 33101
Palm Construction and Design Group, Inc.
12491 SW 134 Court, Ste. 20
Miami, FL 33186
786-251-9289
For the Project located: 1750 NW 3rd Avenue
Miami, FL 33136
July 15, 2020
ST. AGNES EPISCOPAL CHURCH
P.O. Box 2943
Miami, FI 33101
RE: Re -roofing, and Bathroom Addition to the Sanctuary Building
Dear Owner:
We are pleased to submit this proposal for construction services on the above referenced project located in
Miami, Florida.
Palm Construction and Design Group, Inc. will perform the work outlined below:
MECHANICAL
- Furnish and install new HVAC system as shown on the Mechanical Plans by Hyde Park Architects
- Furnish and install new refrigerant lines and covers, drain lines, exhaust fans, duct work, and A/C
stands as necessary
- Furnish and install new metal cage for condenser unit on ground floor
- No other mechanical work included in this proposal
ELECTRICAL
Furnish and install new Electrical system as shown on the Mechanical Plans by Hyde Park
Architects (including all new wiring, electric boxes, plugs, breakers, conduits, disconnect boxes, etc.
to service new restroom addition)
No other electrical work is included in this proposal
PLUMBING
Furnish and install new Plumbing system as shown on the Plumbing Plans by Hyde Park
Architects
Furnish and install five (5) new toilets, five (5) new wall hung lavatories, two (2) new urinals, five
(5) new faucets, new water heaters, and ancillary piping
No other plumbing work is included in this proposal
BATHROOM ADDITION
Furnish and install all items needed to construct the new bathroom addition as shown on the
Architectural Plans by Hyde Park Architects
No other work is included in this proposal
ROOF
Remove existing roof covering to expose existing sheathing
Replace existing sheathing as necessary
Install new roof covering (i.e. — asphaltic shingles, etc.)
No other roof work is included in this proposal
METALS
- Install new metal stair railings as shown on the Architectural Plans by Hyde Park Architects
- No other metal work is included in this proposal
A. Exclusions
Environmental services (i.e. — mold, lead, asbestos abatement, or remediation)
Security or police services
Permit fees
No other construction services not specified herein
ST. AGNES EPISCOPAL CHURCH shall pay Palm Construction and Design Group, Inc. for the
performance of completed work, as authorized and outlined by this agreement. The base bid is Four
Hundred Thousand Dollars, ($400,000.00).
Notes:
1. Palm Construction and Design Group, Inc. will furnish all the labor and material necessary to
complete the alterations and improvements described in herein.
2. Match existing textures and colors as close as possible.
3. This proposal is based upon the observation of conditions. Conditions which could not be
known by a reasonable inspection, such as termite damage, hidden water damage, hidden
code violations, or other concealed conditions, may require extra labor or materials.
Date: Signature:
Owner
Date: 7/15/20 Signature:
Palm Construction and Design Group, Inc.
cc: File