Loading...
HomeMy WebLinkAboutCRA-R-17-0031 BackupCAZO CONSTRUCTION CORP General Contractor - Construction Management 3461 S.W. 8th Street Miami, Florida 33135 LIC#CGC 007041 Town Park Village Assesment Re: Assesment 1680 NW 4th Ave Miami FI Complete Review of 149 Units Preparation of a report/unit including pictures Asbestos Report (Allowance if required) Lead Paint Report (Allowance if required) Cost of a New Survey (Allowance if required) Evaluation of the Site (Allowance) Paving and Drainage Ladscaping (Allowance) No. Of trees, Types of trees, size of trees Etc $ 33,525.00 $ 7,450.00 $ 29,800.00 $ 22,350.00 $ 18,000.00 $ 4,500.00 $ 13,068.00 Roofing Evaluation TBD Termite Tents TBD Selected Demolition (L.S.) $ 5,000.00 Meeting with the Bldg Dept.(Fire Alarm, flood plain, sprinkler) (Allowance) $ 4,500.00 Fire Consultant TBD Architecture and Engineering * Existing Plan * Demo Plan * Architecture * Electrical * Mechanical * Plumbing * Structure (If Required)(Allowance) Civil (Allowance) * Existing Site Plan * Water Distribution * S.S. Distribution * Lighting * Drainage * Paving $ 54,500.00 $ 52,505.00 $ 400,000.00 Relocation - Assesment/Advisory Services $ 30,000.00 Subtotal $ 568,193.00