Loading...
HomeMy WebLinkAboutCRA-R-17-0012 BackupPoo NEW CONSTRUCTION • REMODELING • ROOFING • ADDITIONS and more .40 September 16, 2016 Mr. Clarence Woods CITY OF MIAMI OVERTOWN PARK WEST CRA 819 N.W. 2ND Avenue Miami, FI 33136 ASTER MIND CONSTRUCTION INC If you can dream it, we can Master Mind it RE: Change Order 210 NW 16th Street Interior Rehab. Project Dear Mr. Woods: We are pleased to submit this proposal for additional construction services on the above referenced project located in Miami, Florida. MASTERMIND CONSTRUCTION, Inc. will perform the work outlined below: A. Structural Steel Erection of new steel columns to support new steel I -beams - Installation of new steel I -beams to support new 2nd floor wood joists, and new roof joists No other structural steel work is included in this proposal B. Concrete Hardening of Bldg. Envelope - Sawcut and remove exist. concrete to insert new reinforcement around new window/door openings - Sawcut and remove exist. concrete to insert new reinforcement into new columns Sawcut and remove exist. concrete to insert new reinforcement into new tie -beams Sawcut and remove exist. concrete to insert new reinforcement into new footings Installation of new 4" slab on grade, in areas where concrete was removed to create new footings No other concrete hardening work is included in this proposal 1854 NW 204'h Street, Miami, FL 33056 Tel: 305.562.0347 Fax. 305.974.4890 smathers305@gmail.com C. Wood Joists Metal Support Fabrication of metal supports for new 2"x8", and 2"x12" floor and roof trusses - Welding of new metal supports for new 2"x8", and 2"x12" floor and roof trusses - No other wood joists improvements are included in this proposal D. Site Concrete - Sidewalk, Ramps, etc. - Removal and disposal of existing damaged concrete sidewalk, etc. - Installation of new base material as necessary - Installation of new concrete slabs as shown on permitted plans - Installation of new concrete ramps as shown on permitted plans - No other site concrete work is included in this proposal E. Exclusions Environmental services (i.e. — abatement, or remediation) Asphalt or concrete driveways or approach Irrigation Security or police services Site plan approval - Septic tank services Permit fees (i.e. — City of Miami Public Works, DERM, WASA, Tree, etc.) No other construction services not specified herein Notes: 1. MASTERMIND CONSTRUCTION, Inc. will furnish the labor and materials to complete the alterations and improvements described in herein. 2. Match existing textures and colors, and tiles as close as possible. 3. This proposal is based upon the observation of conditions. Conditions which could not be known by a reasonable inspection, such as termite damage, hidden water damage, hidden code violations, or other concealed conditions, may require extra labor or materials. Southeast Overtown Park West. CRA shall pay MASTERMIND CONSTRUCTION, Inc. for the performance of completed work, as authorized and outlined by this agreement. The contract sum is Fifty Thousand Dollars, ($50,000.00). Date: Signature: Date: Signature: cc: File Owner ASTERM/ND CONSTRUCTION, Inc.