HomeMy WebLinkAboutCRA-R-16-0058 Building Paint BIDSLDM Industries, Inc. Proposal
14580 SW 173 St.
Miami, Florida 33177
(305) 216-1545
eMail: LDMlndustrieslnc@aol.com
Proposed To
Chapman Partnership
Thomas Pilla
1550 North Miami Ave
Miami, FL 33136
Tel: 305 329-3091 Fax:
eMail: tpilla@chapmanpartnership.org
Proposal No.
03488
Project
exterior paint work
1550 North Miami Ave
Miami, FL 33136
Tel: 305 329-3091 Fax:
eMail:
Terms Customer PO Branch
Lonie
Type
Date
7/16/2016
Start Date
Commercial
We submit the following specification for Scope of Work listed below.
LDM Industries inc. proposes to furnish all labor,materials,equipment and all supervision to complete scope of work:
Apply one coat of Jomax mold and mildew remover with pump spray prior to pressure cleaning.
Pressure clean complete exterior surface of interior corridor walls and ceilings and complete exterior surface
walls
Apply elastomeric compound patch to all hairline cracks.
Light sand and degloss all (74) metal doors.
Apply (2) coats of DTM enamel to all metal doors.
Apply (1) one coat of tinted 100% acrylic exterior masonry conditioner/sealer to all walls approx 70,662sqft.
Apply (2) two coats of exterior 100% acrylic Super Paint satin paint to all preped ready stucco thruout complete
building.
Note:Al1 work performed will be completed on normal working business hours in phases which includes all
corridors,stair walls and exterior walls. No window frames and railing to be painted.
All areas of work will be blocked off with caution tape and cones daily.
All phases of work will be inspected by a Sherwin Williams Paint representative to insure workmanship
for (6) year manufacture warranty.
All area will be swept and cleaned daily
LDM will provide photos of areas prior to work and after completion
LDM will provide all boom lift and/or scaffles to complete work.
LDM will require a staging area and parking for the boom lift for the duration of the project.
Price:
Complete Paintwork:$59,880.00
Price includes Labor, materials, Boornliftlscaffle
Any additions and/or subtractions to original contract will be applied to a change order.
All labor and material provided by LDM Industries, Inc.
All materials to be Sherwin Williams Paint
Work shall be performed in accordance with manufacturer's specification.
LDM Industries, Inc. is not liable for any delays due to circumstances beyond its control including strikes, casualty, rain, windstorm
or general unavailability of materials.
PROPOSAL 07/19/2016
Mr: Chapman Partnership
1550 N. miari Ave, Miami,FL 33136
28205 SW 124 court, Homestead, FL 33033
WE HEREBY PROPOSE TO FURNISH ALL THE MATERIAL AND PERFORM ALL OF
THE WORK SHOWN ON THE SCOPE O, WORK DESCRIBED.
SCOPE OF WORK:
EXTERIOR BLD PAINT
ALL EXTERIOR BLD PRESURE CLEANING
FIX ALL CRACKS
CAULKING AROUND WINDOWS AND DOORS
PRIMER
PAINT WITH TWO COATS
NOTE
ALL PAINT ,BRAND AND COLORS CHOICE BY OWNER
WARRANTY WELL BE X 10 YEARS
APROX THE BLD ALL AROUND AND INTERIOR ARE 68,650 SQ FT
NOTE(APPROX. 100 DOORS EACH DOOR WILL CHARGE $40 DOLLARS PER
DOOR IF YOU DON'T WANT TO PAINTING WILL BE $4,000, 00 LESS OF THE
ORIGINAL PRICE)
GRANT TOTAL ...................................
$ 58,850.00
AUTHORIZED REPRESENTATIVE DATE
CARLOS ARANGO DATE
I TT ZIT' T/Vd 0'1 IAIG Si O N ...
Alain (Gus) Rosado
July 20, 2016
Chapman Partnership
1550 N Miami Ave
Miami, FL 33136
Attention:
Licensed and Insured
Proposal
iapaintmiami@gmail.com Se Habla Espanol 786-5252854
As per your request, J&A Painting and Waterproofing, Inc. proposes to furnish all labor, tools
and materials to complete all work as described below.
Scope of work:
• Paint Existing Building Exteriors Scope of work exterior:
2 - Story Building. 106,000 SQ FT
• Pressure Clean all Exterior 4000 PSI.
• All existing Minor Stucco cracks shall be filled using Vertical Wall Patch as per
manufacture's specifications.
Apply (1) Coat of Loxon Primer as per manufacture's specifications.
• Apply (2) Coats of Super Paint Latex Paint with 7 Year Warranty as per manufacture's
specifications on Front of the building.
• Include boom lift 40 feet rental
Extra:
• Paint Doors with All Surface Enamel $2,000.00
Exclusions:
• Any Architecture and Engineering Fees if applicable.
• Permitting fees
• Additional work required by for Compliance and/or Building Department
• Trimming/Cutting Back Existing Trees around the perimeter of the Building is if
required Excluded.
PROFESSIONAL FEES:
The total cost of work that would be performed is $74,500.00 (Seventy Four Thousand Five
Hundred Dollars), This includes the scope of work listed above of this document other than
those illustrated that will be provided by the Client listed under Exceptions. Any requirements
that go beyond the scope of work will be adjusted as a change order. Any change orders will be
provided in writing and approved before work commences.
PAYMENT SCHEDULE:
Deposit at Start - $ 15,000.00
After Primer $ 15,000.00
Due at Completion - $ 44,500 00
Total - $ 74,500.00
CLOSING:
Date: Signed:
We appreciate the opportunity to provide our services to you. If you accept this proposal,
Please sign one copy and return it to us with a 30% deposit of total cost. This proposal is valid
for 30 days.
If you have any further questions please do not hesitate to call.
Sincerely,